Vous êtes sur la page 1sur 90

Sr.

No DATE
Equipment Tag No with
Description
START
TIME
TOTAL
TIME
STOP TIME kw
258 1-Aug SCH Crane 10:00am 12:30pm 2.5hrs
259 2-Aug 10RAL-01b 3:00Pm 3:15PM 15 mins 1.5
260 6-Aug 3BF-01C 3:00Am 3:15Am 15Mins 22
261 6-Aug 7P-02 10:10Pm 10:20Pm 10Mins 1.1
262 6-Aug LDB-6 11:20Pm 11:35Pm 15Mins
263 7-Aug 5AG-05F 11:30PM 1:00AM 1hr 30 mins 22
264 8-Aug Pb Area EOT 2:45Pm 3:00Pm 15Mins
265 8-Aug LDB-12 6:30Pm 6:35Pm 05Mins
266 9-Aug 7AG-11 10:30AM 10:32AM 2 Mis 1.5
267 11-Aug 7AG-11 10:00Am 10:05AM 5mins 1.5
268 11-Aug 7AG-11 2:30Pm 7:30Pm 5Hrs 1.5
269 12-Aug 7AG-11 7:15Am 9:00Am 1.5Hrs 2.2
270 12-Aug 3AF-01 6PM 7PM 1 hr 75
271 12-Aug 10AG-02 11:30PM 11:55PM 25 mins 45
272 13-Aug 7AG-11 1:50pm 1:55pm 5mins 2.2
273 14-Aug 8P-08D 09:00am 10:00am 1 hr 75
274 18-Aug 5P-04E 7:15PM 7:20PM 5 mins 22
275 19-Aug 8FDS-03 9:00Am 9:15Am 15Mins
276 20-Aug 10P-01A 1:40pm 1:50pm 10 MINS 132
DAILY UPDTION FILE OF LT DRIVE
277 20-Aug 10P-01A 2:30Pm 4:30Pm 2Hrs 132
278 21-Aug
Tailing Thickner day
tank agitator
9:15am 9:45am 30MIns 1.5
279 22-Aug 6P-09A 10:15am 10:30am 15 mins 75
280 22-Aug 6P-09A 7PM 7:30PM 30 Mins 75
281 23-Aug 7AG-11 9:05am 9:10am 5mins 2.2
282 23-Aug 6P-09A 7PM 7:30PM 30 Mins 75
283 24-Aug 8P-03A 7Am 7:05am 5Mins 7.5
284 24-Aug 9P-09B 11PM 11:05PM 5Mins 18.5
285 25-Aug 3RF-01B 3AM 3:05AM 5Mins 9.3
286 25-Aug PB Area Crane - Siren 11:45AM 12:30PM 45 Mins
287 25-Aug BM-1 heat exchanger 4pm 4:20PM 20mins 0.75
288 25-Aug 8P-03A 2PM 2:10PM 10 mins 7.5
289 27-Aug 6P-17 9:00am 9:10am 10Mins 11
290 27-Aug ZN Area Crane 11:40am 12:10pm 30MIns
291 27-Aug ZN Area Crane 2:20am 2:50m 30MIns
292 28-Aug 6P-11A 22kw
293 28-Aug
6.6KV Buscoupler -2
Panel-39
294 29-Aug 9P-09A/B 18.5
295 30-Aug Reagent EOT 1:30PM 1:40PM 10 MIns
296 30-Aug 10P-02B 1:35 PM 1:55PM 20mins 55
297 30-Aug 6AG-05A 8:00AM 8:023AM 3 Mins 75
298 31-Aug 10P-02B 10:00AM 10:45AM 45 Mins 75
299 31-Aug 6P-04B 3:30AM 3:35AM 5 mins 30
300 1-Sep 3RF-01 7:50am 8:00am 10Mins
301 1-Sep ZN Area Crane 4:30Pm 4:45Pm 15Mins
302 1-Sep BC-1 Magnet 6:15Pm 6:45Pm 30Mins
303 3-Sep 3BF-02B 7:00Pm 8:00Pm 1Hrs 22
304 3-Sep MLDB-2 6:30Pm 6:40Pm 10Mins
305 4-Sep 8P-07 8:00Am 8:10Am 10Mins 18.5
306 4-Sep 8P-07 5PM 5:10PM 10Mins 18.5
307 4-Sep 3F-03B 11:00PM 11:10PM 10Mins 90
308 5-Sep Hydrofill EOT 10:30Am 11:00Am 30Mins
309 5-Sep 7P-34 10:50PM 11:20PM 30 MIns 18.5
310 6-Sep Hydrofill EOT 10:00Am 10:15Am 15Mins
311 8-Sep MLDB-2 8:00Pm 8:05Pm 05Mins
312 9-Sep 3bf-02b 01:00pm 01:05pm 05MINS 22
313 9-Sep 10RAL-01A/B 6:00PM 6:30PM 30 Mins 1.5
314 10-Aug tailing Dam 5PM na na
315 13-Aug 3RF-01a 12:05Am 15:20Am 15Mins 9.3
316 15-Sep 10RAL-01B 12:15Pm 12:30Pm 15 mins 0.75
317 15-Sep 6P-10F 10:45Pm 11:00Pm 15Mins 33
318 17-Sep BC-13 tripper 11:00am 11:15am 15 mins
319 17-Sep MLDB-3 5:00Pm 6:00Pm 1Hrs
320 17-Sep 8P-02B 11PM 11:05PM 5 mins 7.5
321 19-Sep 6P-09A 2:00PM 2:05PM 5 mins 75
322 19-Sep BC-13 tripper 10:00Am 10:15Am 15Mins
323 20-Sep 6P-09A
5:20AM
5:35AM
5:25AM
5:40AM
5 mins 75
324 22-Sep Reagent EOT 4:00Pm 4:15Pm 15Mins
325 22-Sep BC-13 tripper 9:30Pm 9:45Pm 15Mins
326 23-Sep 9p-09b 8:30am 8:40am 10Mins 18.5
327 23-Sep 6ag-06f 11:20am 11:30am 10Mins 37
328 23-Sep 3BC-03 7:00PM 8:20PM 80Mins 90
328 24-Sep 3BF-01A 10:00PM 10:30PM 30 Mins
329 25-Sep 5AG-03E 7:00PM 7:05PM 5 mins 22
329 26-Sep 2F-01 2:00PM 3:00PM 1 Hr 2.2
330 26-Sep 10P-01B 9:15Am 9:30Am 15Mins 132
330 26-Sep BC-04 Magnet 2:30PM 2:45PM 15mins
331 27-Sep 5AG-03E 3:30Am 6:30Am 3Hrs 22
331 29-Sep 7P-12A 10:30am 11:00 30mins 0.75
332 29-Sep Zn Thickner 5:00Pm 5:15Pm 15Mins
332 1-Oct EOT- Reagent 2:25PM 2:35PM 10 Mins
333 2-Oct MLDB - 2 6:00PM 6:05PM 05 Mins
333 2-Oct
Main gate Tailing dam (
From HFP cable cellar)
8:45PM 8:55PM 10 Mins
334 3-Oct reagent crane 8:30am 8:45am 15 min
334 5-Oct MLDB-4 11:15Pm 11:30Pm 15Min
335 7-Oct 8P-01B 1:00Am 1:10Am 10Mins 5.5
335 7-Oct 3BC-01 2:55PM 3:20PM 25 Mins 110
336 7-Oct LDB-22 6:30PM 6:3PM 5 Mins
336 8-Oct reagent crane 9:30am 9:45am 15 min
337 8-Oct BC-13 tripper 11:00am 11:15am 15min
337
338
338
339
339
340
340
341
341
342
342
343
343
344
344
345
345
346
346
347
347
348
348
349
349
350
350
351
351
352
352
353
353
354
354
355
355
356
356
357
357
358
358
359
359
360
360
361
361
362
362
363
363
364
364
365
365
366
366
367
367
368
368
369
369
370
tripping
current
2.8
38
2.5
40
3
3
3
5.2
185
76
5.2
40
DAILY UPDTION FILE OF LT DRIVE
225
2.5
128
151
5.2
151
12.5
37
16
1.6
13
22
40
34
92
151
120
60
38
32
32
147
34
2.8
15
2.8
51
13.7
128
128
37
75
148
40
4.8
220
40
1.6
10.4
180
Type of Tripping with reason and rectification
Effect of
Productio
n or Not
from
Electrical
side
It was not working.While checking its LT reverse dir contactor Y phase was found burnt.Replaced it
with spare on.Now working fine
No
Motor tripped on Motor Stall fault. Process dept was informed to clear the jamming before starting
the motor.
no
Motor was tripped due to thermal O/L. It was reset and started again. Now running fine and taking
37A,
No
Motor was showing unhealthy in DCS. While check EPB was found in healthy condition from fedder
side. It was released from our side. Now it is fine
No
It was tripped due to earth fault. It was reset and started no tripping occur further. Now running fine No
It was tripped due to earth fault. Trip value 3A, set value 500mA. Motor windings found burnt.
Motor was replaced with new motor kept in MPP maintenance bay. Motor running fine drawing 28-
30A. Feeder was also replaced as MPCB relay contact was not proper.
EOT was not working, while check its CT limit switch was found in operating condition. After relesing
of limit switch, EoT was working fine.
No
It was tripped due to fault in MCB-4 ckt. Its need to be check No
Motor was tripped due to thermal O/L. It was reset and started again. Now running fine and taking
2.8A,
No
Motor was tripped due to thermal O/L. It was reset and started again. taking 4.8A, P/D is checking it. No
Motor was replaced with new gear assembly of 2.2Kw, also feeder side MPCB was changed from 4A
to 6.3A. Set valuse was 4.5A.
No
Motor was tripped while check its R-Phase insulation was found puncherd and sort with star point.
After relugging of R & B phase its trial was taken. Now running fine and taking 3.7A, Set Value was
4.5A
No
Motor tripped on AI< min fault (8110). From instrumentation side 4mA signal was not properly
supplied into VFD. Problem was rectified by instru dept. now its running ok. Later it was informed
that motor speed in not increasing above 25%. VFD parameters were checked and found ok. Instru
dept is looking after the issue.
No
Motor was tripped due to thermal O/L. It was reset and started again. Process Dept is working on
that motor, Running curretn was not taken.
No
Motor was trippeddue to O/L. Now running fine and taking 3.7A, Set Value was 4.5A
Motor was not running but was showing on indication in DCS. Found its R and Y phase fuses were
blown.Replaced with new fuse. Now working fine
No
Motor tripped on overload. After resetting motor was started again. It is running fine now taking 33-
35A.
Tailing thickenr agitator motor was not running. While check its neutral cable was found open from
fedder side. After connecting it properly it was working fine
No
Its R phase lead from VFD to C3 contactor was found burnt.It needs to be replaced. No
MONTH: February - 2014
Motor trial was taken after relugging of R phase. Motor is running fine and taking 63A. No
It was getting tripped due to O/L. Its setting was at 1.7A and normal running current 1.72A.Its setting
increased to 1.8A.Now running fine
No
Tripped once due to O/L.Its pump was jammed.Not started yet by P/D No
tripped due to thermal overload. Jam clearing work was going on. Later it was found that R-phase
fuse was blown away. It was replaced with new one. Motor trial was takin on No-load. It was taking
51-55A.
no
Motor was trippeddue to O/L. Now running fine and taking 3.7A, Set Value was 4.5A no
tripped due to thermal overload. Jam clearing work was going on. Later it was found that Y-phase
fuse was blown away. It was replaced with new one. Motor trial was takin on No-load. It was taking
55A.
no
Tripped due to "F009" motor over temp fault. It was jammed.After clearing of jam; running fine
taking 10.1A
no
Motor found tripped. It was reset and informed to p/d. it was started again but got tripped after
few minutes. Problem informed to p/d.
no
motor tripped on thermal overload. It was reset and turned on again. Running fine now taking 7.5A no
Siren was not working, While checking it was found Repaired. Kept in SCADA Room. No
tripped on overload. It was reset and started, now taking 1.3A, set at 1.6A No
Tripped due to "F009" motor over temp fault. It was reset and started. Now running on full load 13A
with 990 rpm.
No
Tripped once due to O/L.Its pump was jammed.Not started yet by P/D No
Crane got stuck in between. Its B phase current collector was out. Aligned it properly.Now working
fine
No
Crane got stuck in between. Its Y phase current collector was out (2 Times ). Aligned it properly.Now
working fine
No
Motor side abnormal sound was coming.So motor replacement work is going on No
It is in charged position for charging the bus bar for panel No-43 and Panel No-44
Both the motors tripped on thrmal overload. (took 180A)Motor was found ok, there was jamming in
the pump. After clearing jam 9P-09A was started, it was taking 20A on load. For 9P-09B emg p/b is
pressed from feeder side. Clear the shutdown if jamming issue is sorted out.
Main Hoist VFD tripped on DC Under Voltage. It was reset and started. Now working Fine. No
Tripped on Thermal Overload. Reset and not yet started. No
Trip indication was showing in DCS, While checking no problem from our side. Once reset from DCS
it was ok. Now running fine.
No
Trip indication was coming in DCS, while checking feeders moving TB contact was not making proper
contact with fixed one. It was rectified, Now working fine now.
No
Tripped on thermal overload. Feeder was reset and motor started again. Current was fluctuating-40-
55A. Now motor 6P-04A is running. Taking 35A on load.
no
Tripped due to "F009" motor over temp fault. It was reset and started. Now running fine. no
Crane got stuck in between. Its Y phase current collector was out. Aligned it properly.Now working
fine
No
BC- 1 Magnet was checked and found ok. Its O/P DC volt is 206V. Resistance-9.5Ohm, Oil level in
conservator tank is <1/4.
O/P volt- RY- 156V, (Trafo taping set on 160V)
YB- 149V,
BR- 155V
O/P current of trafo- R-16.7A,
Y-17.2A,
B-17.7A
Trafo Temp- R Phase Limb-56.6C,
Y Phase Limb-58.8C,
B Phase Limb- 55.6C
Magnet Temp- Down side-44C & Upside-57C
No
Motor was not running while check its BSS was found damage. It was replaced with new one. Now
working fine.
No
It was tripped due earth fault in LDB-22 MCB-4. Its Ckt need to be check No
It was tripped due to thermal O/L. It was taking 48A. Problem was from mech side. On no load it was
taking 9.1A. After solving of problem from mech side, it was started again and taking 32A
No
It was tripped due to thermal O/L. It was taking 50+ A. it was stopped by pressing panel emg button.
Problen informed to process dept.
no
Tripped on q>qt ( Thermal unit trip), Reset and started. Now running fine. no
Its I/C Y and B Phase from TB to Power contactor was found burnt. It was rectified. Now EOT
working fine
No
Tripped by ELR (TV - 833mA, Set Value - 100mA, Set Time - 0.10Sec). While checking motor was
found burnt, Its Terrmination Has been removed. Motor replacement wotrk is pending from Mech
side.
No
EOT crane was tripped due to thermal O/L. It was reset, also one wire was found loose from
pandent. After tightness its trial was taken now running fine
No
Tripped due to earth fault in LDB-12. Its LDB-12, MCB-4 Ckt need to be check in G-Shift. No
tripped due to fault no. 009,reset it No
tripped on 'Motor Stall' fault. Problem was informed to mech dept as motor was not moving
manually. After clearing the jam 10RAL-01A trial was taken it was running fine taking 1.4A on
31.5rpm. For 10RAL-01B VFD switch is turned off as mech work was in progress. clear the isolation
after getting conformation from mech dept.
yes
11kv supply from RDM tripped on low set overcurrent fault while taking a trial of 55kw motor after
assembling discharge valve. RDM was informed to turn on the power supply for tailing dam panel.
From their end it was reported that DO fuses got blown away twicw while charging the panel. 11kv
line inspection will be done tomorrow.
no
It was tripped due to motor over temp fault, F0009. Problem was from Mech side. It was reset but
not started yet
No
It was tripped due to motor stall, reset once but tripped again asked mech to remove jam. yes
Motor was tripped. While check its MPCB O/G cables to Power contactor was found burnt. Fedder
was replaced with spare feeder in MCC-2 3F3. Motor trial was taken running fine and taking 45A.
Also Burnt feeder cable was replaced by 35 Sq mm Cu cable.
No
Tripped on overload. It MPCB was reset and started, now working fine No
Energy Meter was changed with new one. No
motor tripped on overtemp fault (F0009). It was reset and started again but because of jamming it
couldnt move. Problem informed to process dept.
nno
motor tripped on thermal overload. Jam clearing work was going on under process dept supervision.
It was reset but not started till now.
no
Tripped on overload. It MPCB was reset and started, now working fine no
motor tripped twice on thermal overload. Jam clearing work was going on under process dept
supervision. It was reset but not taken in ckt till now.
No
EOT was not working while check its current collector switch was found ouside from DSL. After
inserting it proper, it was started now running fine
No
Tripped on overload. It MPCB was reset and started, now working fine
Allready tripped, reset it now healthy no
Tripped on overload twice reset it , now working fine, taking 40A. no
Problem found in panel due to loose conncetion in TB in DC outgoing supply wire to BSS. One more
problem found n NC contact of BSS No:9 ( terminal 3-4). Then it was changed with ( terminal 7-8)
NC. All problems are solved at 8:20PM
Yes
Motor was not starting. Pull cord contactor was not in picked up condition. Also at DCS pull cord
operated indication was not showing. Later both the pull cords were checked and tightened. Now
working fine.
yes
Motor tripped on overload during trial because of some jamming. Motor was reset ans started
again. Running ok, drawing 33A. Motor turned off after the trial. (MPCB aux contact is loose, replace
it if it comes out again)
no
Motor was tripped due to overload, While checking motor was taking unbalance current. So
checked on field side and found Motor power cable armor was damaged and Live wire was visible
and which is in contact with the metal frame in Cooling Tower Tank. This puncture was repaired for
temporarily.
no
Motor was not showing VFD Healthy on DCS, while check it was showing healthy on VFD panel, and
healthy signal was not given to DCS. Motor trial was taken running fine
No
one of the auxiliary contact was found loose. It was fixed properly. Also Motor-Gear box coupling
lock key found broken. It was informed to mech + process dept.
no
Motor ws taking 250A & tripped on O/L. While checking motor terminal box all the phase of power
cables are found burnt. Terminal box motor winding insulation plates are burnt. So it was replaced
with new motor. After terminal connection motor trial was taken and on no load it was taking 12.2A
and on load it is taking 35.5A. Running fine
no
Motor was tripped, checked and found resistance unbalanced, drawing 0.6, 0.6 and 1.1 amp on no
load, motor was not started yet by P/D on load
no
Zn focculant transfer pump was not running in local and auto mode. While check no problem was
found from our side. Problem was in Inst. Level sensor. After solving by P/D, its trial was taken and
running fine
no
LT MPCB was found tripped, Reset and started. Now working fine. no
Trpped due to earth fault( Trip value:3A), reset and started. Set values: 3A, 0.05Sec and now leakage
current:746mA
no
Tripped due to earth fault( Trip value:508mA), reset and started. Set values: 500mA, 0.25Sec and
now leakage current:399mA
no
crane mpcb was trriped reset it know working fine no
MLDB-4 was tripped due to Earth fault in LDB-5A. Trip Value- 3.33A, Set Value-2A. It was reset and
started, Running Fine.
No
Motor was tripped due to F0009 Fault(Motor Over Temp). Its Pump was jam. Information was given
P/D and they are working on it
No
PCS was not ok. While checking PCS-5 3-4 NC was not working fine. So 7-8 NC contact is used as of
now. Working fine now. PCS needs to be change tomorrow.
no
It was tripped due to earth fault. It was reset and started no tripping occur further. Now running fine no
crane mpcb was trriped reset it now working fine no
LT MPCB was found tripped, Reset and started. Now working fine. no
Name of
Shift
Engineer
Deepna
avinash
Pitamber
Pitamber
Pitamber
Pitamber
Pitamber
Linges
Deepna
Pitamber
Pitamber
avinash
Linges
Deepna
Pitamber
Deepna
MONTH: February - 2014
Pitamber
Deepna
Deepna
avinash
Deepna
avinash
Deepna
avinash
avinash
Linges
avinash
avinash
Deepna
Deepna
Linges
Deepna
Linges
Linges
Linges
Linges
avinash
Deepna
Pitamber
Pitamber
Pitamber
Pitamber
Pitamber
avinash
Linges
Pitamber
Linges
Rahman
Pitamber
Rahman
avinash
avinash
Pitamber
H.rahman
Pitamber
H.rahman
Pitamber
avinash
avinash
Pitamber
avinash
Pitamber
H.rahman
H.rahman
Avinash
Avinash
Avinash
Linges
Pitamber
Avinash
Linges
Praful
Pitamber
Linges
Linges
Linges
H.rahman
Pitamber
Pitamber
Linges
Linges
Deepna
Deepna
Sr. No DATE
STOP
TIME
START
TIME
TOTAL
TIME
Equipment Tag
No with
Description
1 5-Feb - - - BM-1
2 8-Feb-14 9:15 PM 9:30PM 15 mins BM-2
3 8-Feb-14 9:15 PM 9:30PM 15 mins RM-2
4 12-Feb-14 07:30Pm 8:00Am 30Mins RM-2
5 16-Feb 9:19AM 9:02AM 2 mins
Rod Mill-2,
Blower-3
Ventillation fan
6 16-Feb 9:20AM 9:02AM 2 mins transformer-3
7 17-Feb 12:50PM 12:55PM 5 mins RM-1
8 18-Feb 9:30AM 9:40AM 10 mins Blower-3
9 27-Feb 9:30am 9:50am 20 min RM-2
10 16-Mar 4 10 pm 4 20 pm 10 mins BM - 2
11 19-Mar 4 10 pm 4;15 pm 5 mins 3c-02
12 23-Mar 3 40 pm 3;45 pm 5 mins 3c-02
13 24-Mar 10:00Am 10:10Am 10Mins Transformer-4
14 29-Mar 04:30Am 05:30Am 01Hrs 3C-02
15 3-Apr-14 3:30PM 3:40PM 10Mins Rod Mill - 2
DAILY UPDTION FILE OF HT DRIVE MONTH: February - 2014
16 4-Apr-14 2:00Pm 5:00Pm 3Hrs
33Kv Incomer-1
VCB
17 21-Apr-14 8 55 am 9 10 am 15 mins
Blower-2 TRAFO
3
18 28-Apr-14 9:58AM 10:15AM 17 Mins
Blower-C TRAFO
3
19 30-Apr-14 12:48PM 12:52pM 4 Mins
Blower-C TRAFO
3
20 30-Apr-14 2:30Pm 2:40Pm 10Mins BM-2
21 7-May-14 2:30Pm 2:35Pm 5 mins Tr-3,4
22 7-May-14 2:40Pm 2:45Pm 6 mins ball mill-1
23 10-May-14 10:15Pm 10:20Pm 05Mins RM-01A
24 17-May-14 12:30PM 1:00PM 30Mins
33KV Incoming
Line
25 29-May-14 9:30am 1:30am 4hrs Rod mill-1
26 12-Jun-14 11:30am 12:30pm 1hr ball mill-1
27 12-Jun-14 2:20PM 2:40PM 20 mins Trafo-4
28 12-Jun-14 3:00PM 3:05PM 5 mins 6ag-06a
29 22-Jun-14 5:00Am 5:15Am 15Mins 3C-01
30 24-Jun-14 4:15Pm 4:20Pm 05Mins 3C-02
31 1-Jul-14 7:11AM 7:14AM 3MIns Trafo 4
32 2-Jul-14 3:15Pm 3:45Pm 30Mins Trafo 3
33 6-Jul 11PM 11:10PM 10 mins Rod Mill-2
34 11-Jul 10:15Am 10:30Am 15Mins 4 MVA Trafo
35 13-Jul 8:15AM 8:30AM 15Mins Trafo 4
36 15-Jul 10:30Pm 05:00Am 6.30Hrs 3C-01
37 16-Jul 4:00Am 4:05Am 05Mins Trafo-3
38 26-Jul 4:40Pm 4:45Pm 05Mins BM-1
39 12-Aug-14 5PM 6PM 1HR 6.6kV Incomer-2
40 27-Aug 5:00 PM 5:20 PM 20 Mins 3C-01
41 29-Aug 6PM 6PM 33kV trafo-2 O/G
42 30-Aug 9AM 11AM 2 Hrs 33kV trafo-2 O/G
43 6-Sep 10am 10:30am 30mins BM-02
44 21-Sep 9:30Pm OLTC-1
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
Type of Tripping with reason and rectification
Carbon brush size of Ball Mill-1 was very low. Its need to be change as early as possible
Trip indication was coming in RM-2. Its LRS was not healthy. Problem was in its water level
sensor. After cleaning of sensor, LRS trial was taken in local & it is fine. Since stream-2 was not
running so production loss was not occur.
Rod mill-2 tripped bacause of overload fault in micom 220 relay. Rod mill was stopped for rod charging
and after few minutes it was started again. At first rod mill got tripped and subsequently blower 3(
miniler ELR fault) and Ventillation fan(micom 220 overload fault).
tripped due to phase overcurrent fault. All the agitators in PMCC-1 started drawing more current
bacause of blower-3 tripping issue.
Tripped from temp. scaner. Temp Scaner was checked and no problem was found. Its due to
malfunction of temp. scaner. It was reset and started again. Now running fine and its temp is-
DE side- 47C, NDE SIDE-22.6C
Process dept was planning to shift the load from blower 2 to blower 3. blower 3 was started and after
12 secs motor got tripped. Micom 220 was showing excess long start fault. Blower suction was
controlled and motor started again. Now running fine taking 43A.
Tripped due to LRS fault coz of problem in water sensor. Needs to be replaced with new one as soon as
possible
Tripped on Trip circuit 110 V DC wires loose connction on 6.6kv Feeder side. It was tightened and
started again
Tripped due to thermal overload due to improper shaft position due to which it took around 24A for
some period and tripped . Shaft position was adjusted and it started again.It took around 14-16 A and
running fine now.
Tripped due to thermal overload due to improper shaft position due to which it took around 24A for
some period and tripped . Shaft position was adjusted and it started again.It took around 18 A and
running fine now.
Tripped due to phase overcurrent fault. All the agitators in I/C-4 started drawing more current bacause
of Blower-A Emg stop by Mech. Its trip value was Ip> 0.17kA and set value is 0.7A, CT Ratio is-250/1A
V-Belts of 3C-02 were blowen so its motor connection was removed from motor TB. While opening of
motor connection it was found that its Y-Phase lug was broken. Its Re-Lug work is going on.
Motor tripped on LRS Fault. No problem found from electrical side. Possible Reason: Some person may
pressed the LRS Emg stop Button.
DAILY UPDTION FILE OF HT DRIVE MONTH: February - 2014
2P-08A (Hot water pump) feedback to DCS gone missing and in response BM-1 got tripped. Fixed and
Moving contacts of TB were checked and made clear. The same problem found in 2P-08B.
Trip circuit healthy was not coming. Its trip ckt SFU of 4A was foun blowen. It was replaced with new
one. Also it service position limit switch was not working. It is Bypassed due to unavailability of spare.
It was charged after I/C-1 line was charged by MRS. It is fine now
Blower 2 tripped on over load while making changeover from blower 3 to 2. And because of blower
trip trafo - 3 also got tripped.
Blower tripped without any indication, Due to this trafo 3 tripped on Phase over current(175A, 60 Sec).
Reset and started.
Blower B stopped Due to this trafo 3 tripped on Phase over current(175A, 60 Sec) ( Stream 1
floatation motors). Reset and started.
BM-2 VCB panel side Master relay (86) observed in trip condition. Then checked at LRS side and found
that LRS panel Emg. Stop pressed. So release it and clearnace given to Process to start the grinding
circuit.
Tripped on Ip> fault,problem was tripping of instrument air compressor,process engineers are working
to find the problem,as of now it is working fine.
Tripped due to LRS fault but no problem was found in LRS,it was reset and started .Now running fine.
Its temp scaner was showing under temp in channel no-1. It was skiped and its terminal box tightness
need to be done when RM will not running
Voltage spike arose due to RSEB power grid trip. Because of this Stream 1 & 2 HT Motors , MCC-2,4 & 5
(I>> Fault) Tripped . Reset and started. Now plant is running on Islanding Mode.
Rod Mill-1 trip coil was not getting picked. In previous shift, because of the malfunctioning of
temperature scanner, master relay was operated but motor was running continuously. All modes of
tripping checked and later spare motor feeder breaker(P-02) was replaced with Rod Mill-1 breaker.
Again there was some problem in the control ckt of that breaker so Ventilation fan motor breaker(P-
03) was used. Breakdown Time (9:30AM- 11:30AM mech b/d & 11:30AM-1:30PM elect b/d).
It was getting tripped without any indication. One cooling fan for BM was not working. Now running
fine
tripped due to Ip> fault (phase overcurrent). Blower-A was turned off by proces dept and blower-B was
started, but it was not providing sufficient amount of air. This causes overloading of agitators and as a
result Trafo-4 got tripped.
tripped due to overload twice. It was reset and turned on. Now taking 38-40A.
Motor was tripped due to thermal O/L due jam in crusher. Motor was checked and found ok. Also
motor temp is normal.
Motor was tripped due to tI Start fault. Motor was checked and found ok. But crusher was found jam.
Motor was started again after removal of jam. Now running fine
Tripped on Ip> Fault, Problem is due to over load of stream 2 cell motors, Motors are overloaded
Becoz Blower A was stopped at that time while stopping Stream - 2 . Now reset and started and OK.
Tripped two times on Ip> Fault, Problem is due to over load of stream 1 cell motors, Motors are
overloaded Becoz Blower B was stopped. Now reset and started and OK.
tripped due to false reading of temperature scanner. Channel 2 was showing 126 deg celcius.
Terminations were checked and tightened, still it was showing 102 degree celcius. It is bypassed now.
It was tripped from Aux-A type relay(Buchholz relay). Trafo temp was checked and found ok. It was
reset after removing of gas from Buchholz relay. Now running fine
Trafo tripped due to Ip> fault. Process dept turned off the Blower (Blower-A) before reducing rotors
load. Later it was reset and turned on.
Trafo 4 tripping causes 4P-01C/D + MCC-8 supply Off as well. This makes primary sump overflow and
entire reagent area motors inactive.
Motor was not getting start from DCS/Local. It was checked and found that its CC was not working.
VCB was change with spare VCB from Panel-2. Now working fine
It was tripped due to Ip> Fault. Process dept turned off the Blower (Blower-C) before reducing rotors
load. Later it was reset and turned on. Now running fine
It was tripped due to tripping of MCC-1. MCC-1 was tripped from ELR. It was reset and started again.
Now running fine
6.6kV incomer-2 feeder got tripped because of "U/V fail" under voltage fault. Its 'R' phase fuse in Line
PT was found blown away. Now 6.6kV Incomer-1 is in line.
Running Motor was stopped without any indication from feeder side and DCS Side. No problem found
while checking. Started later. Running fine now.
humming sound was noticed. problem not checked yet.
Termination tightness checked, Insulators were cleaned. Now the sound was reduced. Blowering done
for the panel.
Some body has pressed emergency just after start of motor it was reset and started after 30minutes of
as per start inhibit time
OLTC-1 was not working its ckt need to be check
Effect of
productio
n or Not
Name of
Shift
Engineer
No Pitamber
No Pitamber
yes avinash
yes avinash
yes Pitamber
No avinash
yes deepna
yes vinoth
yes kapil
yes kapil
yes Pitamber
yes Pitamber
yes Linges
DAILY UPDTION FILE OF HT DRIVE MONTH: February - 2014
yes avinash
No Pitamber
yes vinoth
yes Linges
yes Linges
No Pitamber
yes kapil
yes kapil
No Pitamber
yes Linges
yes avinash
yes deepna
yes avinash
No avinash
yes Pitamber
yes Pitamber
yes Linges
yes Pitamber
yes avinash
No Pitamber
yes avinash
yes Pitamber
yes Pitamber
yes Pitamber
yes avinash
yes Linges
No Pitamber
No Linges
No
H.Rahman/D
eepna
No Pitamber
A H.rahman 48 50
B Linges 46 48
C Pitamber 48 48
A H.rahman 48 50
B Linges 46 48
C Pitamber 48 48
A H.rahman 46 48
B Linges 42 46
C Pitamber 46 48
A H.rahman 46 46
B Linges 46 46
C Pitamber 44 44
A H.rahman 44 44
B Linges 44 46
C Pitamber 44 44
A Deepna 44 46
B Linges 44 46
C Pitamber 44 44
A Deepna 52 52
B Linges 48 50
C Avinash 44 42
A Deepna 50 50
B
C
A
10-Oct
11-Oct
3-Oct
4-Oct
5-Oct
6-Oct
7-Oct
8-Oct
2-Oct
9-Oct
1-Oct
Oil Temp(alarm-
90,trip-90)
NAME SHIFT
Winding Temp(alarm-
100,trip-120)
Sr. No. DATE
Power Transformer - 1
42 42 40 40 42
42 44 38 40 40
40 42 38 38 40
40 40 48 44 48
40 42 44 46 46
40 42 34 38 40
42 44 44 46 46
40 42 42 44 44
40 40 40 40 44
42 40 46 48 48
42 42 42 44 46
40 40 38 40 42
42 40 46 46 50
40 42 40 42 46
40 40 40 40 42
42 40 48 52 50
42 42 42 44 46
40 40 40 42 42
48 52 52 50 50
42 42 44 48 48
42 40 40 38 42
48 50 48 48 48
Oil Temp(alarm-
80,trip-100)
Winding
Temp(alarm-
80,trip-90)
Power Transformer - 2
Winding Temp(alarm-
80,trip-90)
Dist. Transformer - 2 Dist. Transformer - 1
Oil Temp(alarm-
80,trip-90)
Oil Temp(alarm-
80,trip-90)
46 54 60 52 52
40 48 52 50 56
42 52 54 50 52
45 62 55 35 42
50 56 62 42 44
44 48 57 38 30
48 58 62 40 32
50 54 60 42 46
46 52 56 44 48
50 58 62 42 34
52 54 62 32 34
44 56 58 38 36
46 62 54 34 40
50 54 62 34 42
42 56 58 36 38
52 58 64 43 36
48 56 60 36 42
44 50 58 38 30
46 64 56 34 42
52 56 64 39 42
40 58 52 38 38
50 64 56 38 40
Dist. Transformer - 4 Dist. Transformer - 2
Winding
Temp(alarm-80,trip-
90)
Oil Temp(alarm-
80,trip-90)
Dist.Transformer - 3
Winding
Temp(alarm-
80,trip-90)
Winding
Temp(alarm-
80,trip-90)
Oil Temp(alarm-
80,trip-90)
42 44 42 44 42 42
40 42 42 44 42 42
40 42 42 42 36 36
40 42 42 45 38 38
40 40 38 40 38 38
38 38 38 38 38 38
42 40 42 42 36 38
40 40 42 44 40 42
40 42 42 42 38 40
42 40 42 42 38 38
42 42 34 34 36 38
38 38 38 40 40 42
40 42 42 42 38 40
42 42 42 42 40 42
38 40 40 40 38 40
41 42 44 42 43 44
42 42 42 42 40 42
36 38 38 38 40 40
40 40 42 44 42 42
42 42 42 42 40 42
38 36 40 38 40 40
42 42 42 42 40 42
Dist. Transformer - 6
Winding
Temp(alarm-
80,trip-90)
Dist. Transformer - 7 Dist.Transformer - 5
Winding
Temp(alarm-
80,trip-90)
Oil Temp(alarm-
80,trip-90)
Winding
Temp(alarm-
80,trip-90)
Oil
Temp(alarm-
80,trip-90)
Oil Temp(alarm-
80,trip-90)
42 42 42 42
44 46 42 42
34 34 40 40
40 38 42 42
40 40 40 42
36 36 40 42
40 40 38 40
42 44 42 46
38 38 40 40
40 40 42 44
38 38 42 42
40 40 42 40
38 40 40 42
40 42 40 42
38 38 40 40
44 45 49 48
40 42 40 42
40 42 40 40
40 42 48 46
40 42 44 44
44 42 42 42
40 42 44 46
Dist. Transformer - 8 4 MVA Transformer
Winding
Temp(alarm-
85,trip-90)
Winding
Temp(alarm-
80,trip-90)
Oil Temp(alarm-
80,trip-90)
Oil Temp(alarm-
85,trip-90)
WINDING
DE NDE
CH9(SET-90) CH10(SET-90)
A H.Rahman 84 62 56
B Linges 81 57 58
C Pitamber 79 52 51
A H.Rahman 88 59 57
B Linges 81 57 54
C Pitamber 78 51 50
A H.Rahman 81 57 54
B Linges 80 52 55
C Pitamber 74 51 48
A H.Rahman 83 59 54
B Linges 81 57 54
C Pitamber 78 51 38
A H.Rahman 86 58 55
B Linges 83 56 54
C Pitamber 77 51 37
A Deepna 88 59 56
B Linges 85 58 53
C Pitamber 77 51 41
A Deepna 85 59.6 58.4
B Linges 86 57 58
C Avinash 80 53 54
A Deepna 87 59 58
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
BEARING TEMPERATURE(SET-
Sr. No. DATE SHIFT NAME
BALL MILL 1
MAX.(CH1-
6)(SET-110)
5-Oct
4-0CT
1-Oct
2-Oct
3-Oct
7-Oct
6-Oct
8-Oct
9-Oct
10-Oct
11-Oct
12-Oct
13-Oct
14-Oct
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
4-0CT
15-Oct
16-Oct
15-Oct
4-0CT
13-Oct
14-Oct
WINDING
DE NDE
CH9(SET-90) CH10(SET-90)
149 1410 80 63 41 42 406
146 1404 79 62 39 45 425
138 1400 75 56 34 40 432
140 1411 82 66 41 50 480
143 1405 78 65 39 43 416
142 1397 73 52 34 49 360
145 1389 79 58 40 43 423
145 1369 80 56 40 42 442
141 1349 74 80 34 47 417
138 1407 81 58 42 42 437
143 1405 78 65 39 43 416
145 1385 72 55 33 51 414
142 1391 79 64 41 44 411
139 1370 80 62 38 48 379
140 1392 74 54 34 46 412
141 1400 81 64 42 50 432
139 1388 80 63 40 45 386
138 1378 74 56 33 49 405
148 1404 80 57 42 49 355
146 1399 80 56 40 43 380
152 1395 76 57 35 44 381
139 1389 81 58 42 54 396
CURRENT
(RATED-178A)
KW (RATED-
1600KW)
CURRENT
(RATED-
59A)
KW
(RATED-
500KW)
RUNNING BEARING TEMPERATURE
ROD MILL 1 BALL MILL 1
MAX.(CH1-
6)(SET-110)
RUNNING
WINDING WINDING
DE NDE DE NDE
CH9(SET-
90)
CH10(SET-
90)
CH9(SET-
90)
CH10(SET-
90)
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF
KW (RATED-
1600KW)
BEARING RUNNING
CURRENT
(RATED-
178A)
ROD MILL 2
MAX.(CH1-
6)(SET-120)
BALL MILL 2
MAX.(CH1-
6)(SET-110)
BEARING
WINDING WINDING
DE NDE DE
CH9(SET-
90)
CH10(SET-
90)
CH9(SET-
90)
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
BLOWER 1 ROD MILL 2 BLOWER 2
BEARING RUNNING BEARING TEMPERATURE
CURRENT
(RATED-
51.5A)
KW
(RATED-
450KW)
MAX.(CH1-
6)(SET-100)
MAX.(CH1-
6)(SET-100)
RUNNING
CURRENT
(RATED-
59A)
KW
(RATED-
500KW)
WINDING
NDE DE NDE
CH10(SET-90)
CH9(SET-
90)
CH10(SET-
90)
OFF OFF OFF 67 50 41 42 437
OFF OFF OFF 66 49 40 42 441
OFF OFF OFF 63 46 37 42 444
OFF OFF OFF 68 51 42 41 435
OFF OFF OFF 66 49 40 42 440
OFF OFF OFF 62 44 35 43 444
OFF OFF OFF 67 51 41 42 434
OFF OFF OFF 67 50 40 44 436
OFF OFF OFF 62 45 36 43 442
OFF OFF OFF 67 51 42 42 437
OFF OFF OFF 67 51 41 42 434
OFF OFF OFF 62 45 36 44 444
OFF OFF OFF 68 51 42 42 429
OFF OFF OFF 66 49 40 42 439
OFF OFF OFF 62 46 36 44 443
OFF OFF OFF 69 52 43 42 433
OFF OFF OFF 68 50 41 42 436
OFF OFF OFF 69 46 33 42 441
OFF OFF OFF 69 53 43 41 426
OFF OFF OFF 67 50 44 42 435
OFF OFF OFF 64 46 33 44 442
OFF OFF OFF 69 53 43 42 431
BLOWER 3
BEARING RUNNING
BLOWER 2
BEARING TEMPERATURE RUNNING
CURRENT
(RATED-
51.5A)
KW
(RATED-
450KW)
CURRENT
(RATED-
51.5A)
KW (RATED-
450KW)
MAX.(CH1-
6)(SET-100)
WINDING WINDING
DE NDE DE NDE
CH9(SET-
90)
CH10(SET-
90)
CH9(SET-
90)
CH10(SET-
90)
OFF OFF OFF OFF OFF OFF OFF OFF OFF
57 43 37 9 75 OFF OFF OFF OFF
49 38 32 13 61 50 42 40 19
OFF OFF OFF OFF OFF OFF OFF OFF OFF
56 43 36 10 95 54 56 48 20
46 36 32 10 84 52 55 48 OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
57 44 37 11 73 57 58 46 19
51 39 32 10 62 56 57 48 OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
48 38 31 9 43 54 56 46 OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
53 43 36 11 57 56 54 48 20
64 39 32 9 29 54 58 48 OFF
OFF OFF OFF OFF OFF OFF OFF OFF OFF
54 4 37 12 58 OFF OFF OFF OFF
50 39 32 9 39 64 55 45 19
OFF OFF OFF OFF OFF OFF OFF OFF OFF
54 44 37 10 78 OFF OFF OFF OFF
55 42 35 13 81 55 54 44 19
OFF OFF OFF OFF OFF OFF OFF OFF OFF
BEARING
KW (RATED-
220KW)
MAX.(CH1-
6)(SET-100)
SCH MOTOR PCH MOTOR
RUNNING BEARING
CURRENT
(RATED-
24A)
RUNNING
MAX.(CH1-
6)(SET-110)
CURRENT
(RATED-
51.5A)
WINDING
DE NDE
CH9(SET-90)
CH10(SET-
90)
OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
51 OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
49 OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
50 OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
47 OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
47 OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
49 OFF OFF OFF OFF OFF
OFF OFF OFF OFF OFF OFF
REGRIND MILL PCH MOTOR
KW
(RATED-
450KW)
RUNNING
CURRENT
(RATED-
42A)
KW (RATED-
375KW)
RUNNING BEARING TEMPERATURE
MAX.(CH1-
6)(SET-100)
18-8-12
19-8-12
22-8-12
29-8-12
6/9/2012
13-9-2012
2/10/2012
12/10/2012
3/11/2012
6/11/2012
13/11/12
23/11/2012
28-11-12
29-11-12
30-11-12
4/11/2012
26-12-12
27-12-12
Important Breakdown list
4/1/2013
5/1/2013
12/1/2013
13-1-13
20-1-13
21-1-13
24-1-13
31-1-2013
31-1-13, 1-2-
13
1 & 2-2-
2013
3/2/2013
4/2/2013
7,8,9,10-2-
13,
11/2/2013
15-2-2013
21-2-2013
23-2-13
24-2-2013
25-2-2013
6/3/2013
15-3-2013
31-3-2013
2,3-4-2013
4/4/2013
6/4/2013
9/4/2013
10/4/2013
16-4-2013
17-4-2013
17-4-2013
17-4-2013
17-4-2013
3/5/2013
10/5/2013
11/5/2013
12/5/2013
13-5-13
14-May-13
17-5-13
18-5-13
19-5-13
20-5-13
27-5-2013
28-5-2013
29-May-13
30-May-13
8-Jun-13
8-Jun-13
9-Jun-13
11-Jun-13
6/16/2013
18-Jun-13
24-Jun-13
27-Jun-13
3-Jul-13
4-Jul-13
13-Jul-13
18-Jul-13
20-Jul-13
21-Jul-13
24-Jul-13
4-Aug-13
28-Aug-13
18-Sep-13
23-Sep-13
25-Sep-13
26-Sep-13
27-Sep-13
4/11/2013
5/11/2013
5/11/2013
9/11/2013
9/11/2013
7/12/2013
26-Feb
29-May-14
28-Jun
12-Aug-14
22-Aug
28-Aug
10-Aug
12-Sep

Ball mill 1 LRS insulator support damaged. Flash over. Total 9 nos were defective and replaced by new insulators.
Ball mill 2 LRS insulator support damaged. Flash over. Total 9 nos were defective and replaced by new insulators.
Rod mill 1 LRS checked. Insulation value was less. All the six insulators were replaced with good one.
Ball mill 1, 2 water level in LRS was lowered by 30mm to increase the gap between the insulators and water
level. For this one no 10mm hole was drilled in LRS tank.
Ball mill 1 NDE side bearing NU 230 M was replaced as the old bearing was giving scratching sound. Grease
SCH motor NDE bearing replaced. 6320 C3. Motor fan replaced with the fabricated fan brought through Adarsh
5AG-01, 5AG-02 lead agitator motor non drive end bearings were replaced with 6209-2RS bearing.
Ohline shifting work completed near SKM gate through M/s Navdurga electrical jaipur
11KV/440V 1500KVA trafo 440V side cables were removed and connected to 11KV/6.6KV/440V transformer .
Raise borer M/c power supply given .
Main V.fan greasing done. With Temp Gun. Motor DE Cover= 68 deg C , Motor body= 77degC, NDE cover=
Masibus Scanner: Channel 1=36degC, 7= 110degC, 8=78degC.
Raise borer m/c connections removed from the back of the techno office room.
Power given to raise borer m/c at south ramp.
The 33KV no 1 feeder tripped at early morning 1AM. One no 33KV PT fuse blown out at the SKM incomer feeder.
The tripping was cause due to one cable bursting and eathing at the DSC side cable tray near yard. 33KV No 2 ckt
Raise borer m/c pump connections removed in the evening as the pilot hole drilling is over.
33KV no 2 feeder cable jointing done
33KV no 2 feeder line charged after cable jointing work.
Raise borer M/c is taking 490A @ the boring of 3.5 mtr dia .
Hydro fill plant 6.6KV trafo power supply energized on 6.0PM.
SCH was giving problem. 3 core cable was laid out from oil cooling panel to float switch so that relay R1 can be
energized directly. R2 elay is kept charged through permanent short ckt.
Important Breakdown list
The mill was switched off in 4PM due to the union after the accident in lead plant.
33kv no1, no 2 circuits were taken in to ckt and 6.6KV no1, 2 feeders switched on and the bus coupler is kept off.
Ball mill 1 DE side grease cover opened. The cup was not in exact position. Grease is coming out. Ball mill 1
motor needs to be opened to rectify this fault. Fixed back as it is greasing done.
11KV/6.6KV/440V 1500KVA transformer was energized from 6.6kv mill side power. Power given from 6.6KV
Greasing done on Main V.fan 630KW
Ball mill no 1 drive end side grease which was lying inside motor approximately 7KG was removed.
Greasing done on V.fan
Capacitor reforming done in the spare inverter module
KTSelvan & Ravi went to Udaipur on official tour.
CVR ventilation fan started. It is taking 150A load.
Sh Sukhmayan was deputed for 33KV yard work at DSC
Ball mill 1 : NDE side bearing NU230E ( Fag) changed, DE side bearing NU236E( NSK japan make ) & 6320
changed.( Grease ring(oil ring in NDE side is AJ180 & this is damaged. ).
All the three new bearings are SKF make.
Ravikant Baipai sent to Udaipur for grease seal.
U/G 11KV cable joint near hoist room opened, cable re-routed through cable trench and straight through jointing
made. 8AM to 4PM. Cable charged back.
Ball mill-1: Motor DE side oil seal 200*180*15 mm fixed with juggad fittings and trial taken.
Total Mill power was taken through 33KV ckt2 @ 10AM. 33kv CKT 1is in no load.
SCH crusher complete set replaced with new crusher, new oil cooling system, new overpressure fan.
Sukmayan was deputed to DSC 33KV yard work
DGMS electrical inspector visited SKM for inspection
KTselvan Went to (DGMS ) Udaipur for submitting HT file. File was rejected as it was not in stipulated New
format.
VVIP visit took place at SKM.
Compressor house power shutdown taken from 3.0PM to 6.30 PM for jointing the VCB panels.
High mast light work completed
Went to DGMS Udaipur office on personal taxi to submit the compr house substation application.
By train on 6-7-13 went to delhi. Came back on 8-3-13 by flight. V.fan motor inspection work.
Power to south ramp given from mill side through cable. 11KV/440V transformer switched off and 440V cable
connection removed from PCC side.
BC-3 magnet coil insulation failure at bottom. Removed , repaird and brought back on 6-4-2013 for fixing. It was
tested at Udaipur and found ok.
M/s Zitron visited the SKM for additional fan requirement study.
Went to Udaipur for magnet inspection @ Sakthi elect
Mine shaft supply given from mill via feeder ie no 14 & 38
Ball mill no 2 shaft sheared off near motor coupling.
The BC-3 Magnet was put in to operation. Working OK.
SCH motor (removed from use) DE side NU320 (SKF) bearing was changed with new bearing ( SKF). The bearing
was damaged due to low grease.
ABB engr Raj kumar was attending the problem of UMC 22 for the past 4 days. MOM signed today. There is a
small problem in the UMC 22 which needs to be resolved.
Setting for trafo 3, 4 HT feeders changed from 0.7, 1.0 to 0.7, 0.4( I>0.7, t>0.4). Setting for trafo 440V incomer in
all 1 to 8 no trafo changed to ( t> 0.65 from t>4.0)
V.fan setting for 1 no channel changed from 70 to 75 deg for tripping. No1 channel temp reading jumped from
48 to 64 deg C.
V.fan AC indoor card damaged & sent to Udaipur. Now the AC is not working.
Hydro fill plant 30VDC battery charger batteries failed in B shift end. Battery ircuit opened and the system
started with 30VDC rectifier ckt without battery.
Trafo-5 was tripped due to high set over current while the CT changing work is going on. MCC 5 Both front and
Both Mill stopped at 5 pm due to water shortage.
Both mill kept shut. PMCC2 complete blowering done on backside, front side . MCC5,6,7 complete blowering
done. PMCC2 side all Breakers removed and cleaned. MCC5,6,7,8 ACB cleaned and checked.
Both mill kept shut. MCC4 complete blowerng done. PMCC1 side front , back side complete blowering done.
PMCC1 side all ACB opened and cleaned and checked. MCC4 checked. MCC1,2,3 opened and cleaned and
Both Mill started at 5 PM. Trafo 1,2,3,4,5,6 VCB Cleaned and checked.
DSC power tripped at 5PM. 33KV 1,2 power not available. 11KV power not available. CPP is down. Power is
through RSEB. Total load on mill 33KV feeder 2 is 2.3 MW.
33KV no 1 feeder PT fuse blown at SKM side.
Mill is off from 5PM.
Both mills started at 12:30 AM.
Shutdown taken from MRS for Incomer 1 (33KV) inorder to change the Line PT fuses ( R phase and Y phase).
Incomer - 1 and Trafo 1 back panel cleaning done. Incomer 1 GO switch in 33KV Switch yard maintenance
New reservoir pump started with VFD panel after cable laying work from hydro fill plant.( job went for a week).
850 mtr cable 95 sqmm laid out. 45kw motor taking 33A at full speed.
15kw submersible pump and starter fixed in the main reservoir sump and started.
PB& ZN floculant drawing traced and changed as in the panel.
MLDB 4 at PCH fixed with digital ELR.
On trafo 4, oil leakage was found. And in there LT side bushings of Y and B phases were found loose. So it was
630kw vfan motor received with duct assembly at SKM site.
Plant - Both the streams are stopped due to the fatal accident in Mines at 4:00AM
Plant didn't run for the whole day .
Power Readings:
33KV I/C 2 : 1.36MV
Mines Shaft 2 : 362 W
Surface VF : 320.2KW
Mines 300MRI : 172KW
Mines Fdr-4 : 51.5KW

TR-7 : 24.5KW
TR-6 : 132KW
TR-5 : 115.5KW
TR-4 : 2KW
TR-3 : 93KW
TR-2 : 165KW
TR-1 : 2.4KW
Shaft Fdr-1 : 67KW
Hydrofill Plant : 60KW
Plant was Restarted at 10:30am after that incident.
4P-01C, motor windings burnt and DE side bearing was damaged. e/f was shown in vfd. New 180kw(287A) motor
was installed and ID run test was successful. Old motor details: Serial No: NAD2X 10507 TOP, Frame size:
ND3152X New motor Details: Serial No: NAD2X 11876 TOP, Frame size: ND3152X. Old motor bearing -SKF
NU319C3, This bearing was completely dry, inner race cracked, oil seal burned, motor rotor rubbed at drive end
33kv black-out at 3pm from CPP. Entire plant was taken in load at 6:30 pm
BM-1 energy meter was replaced with spare motor feeder (panel no 2)
5AG-03G motor was replaced with newer one. Abnormal sound was noticed in motor.
Regrind Mill motor was tripped due to False alarm in Temperature scanner. Problem due to loose connection in
On rod mill-1 new 500kw motor was fixed. And no load trial was taken.
Report of no load trial KW = 24, CURRENT = 22A, WINDING TEMP = 33, DE SIDE = 33, NDE SIDE = 31 , KVA =
BC-2 tripper cable dressing done properly.Its clips got out from wire.It was fixed properly
Ball Mill-1 ( channel 5 in Scanner was showing "undr' .While checking from motor side it was found that 1 cable
On mines shaft feeder-1 (feeder no 14) CT was changed by 400/1 A. Earlier it was 250/1 A.
Hydro fill plant Transformer (6.6KV/440V) - NGR to Earthis not proper. It was rectified and started. Transformer
Feeder No 31 Charged by Mines Electrical for 212 mrl substation(mines). Micom 220 was found faulty and
replaced from spare feeder.Shutdown given.
11KV Overhead Line was tripped due to earth fault. It was checked from Mines side by Mr. Bhanu. No problem
was found. After that it was started again.
7P-02 (1.1KW/2.35A) motor was replaced. Old motor was having bearing problem.
33kV Incomer-1 shutdown was taken from MRS end. Incomer-1 & Transformer-1 breaker were turned OFF from
Since new ventilation fan motor connection was to be done in Raise Borer M/C panel, P-22 in PMCC-2 so
Shutdown was taken for trafo-5. This ventilation fan motor was installed in Mines area. Also ELR+CBCT was
change in P-22, PMCC-2. After termination of Motor connection from feeder side its shutdown was cleared.
3BC-03 ventilation fan trial taken. Taking 8.6A. ( Rating:5.5KW/9.9A, MPCB Setting:9A). Motor is runnig fine.
Tripped from temp. scaner. While check it was found that its channel no-4 showing false reading. It was skiped
and started again. Channel no 4 need to be check in ROD mill shutdown.
5AG-03G (22KW/40A) has been changed with the spare one due to some abnormal sound in the motor. Load
Trafo-3 was tripped without any indication in SPAJ-140C Relay. It was started again and no further tripping occur
mcc 4 Tripped on Io>> fault. Fault has come from from ball mill 2 inching drive winding termination weak
insulation. Also loose bolts were also found inside that terminal box. Trial was taken for that motor after
3c-02 tripped on temp scanner tripped on temp scanner channel 3. it was skipped and started. Also all HT
motor's winding temp signals were skipped in temp scanner.
3C-02 TRIPPED DUE TO THERMAL OVERLOAD.IT WAS JAMMED , SO INFORMED TO PROCESS DEPT. TO RECTIFY
Rod mill-1 Motor starting get delayed because of LRS problem. On LRS the limit switch LSR was not released
properly. Motor started after rectifying this.
SCH ASB main I/C got tripped due to ELR. Leakage current was 2.6A. Reset & started it. Faulty welding m/c
SCH ASB main I/C got tripped due to ELR. Leakage current was 2.13A. Reset & started it. Faulty welding m/c near
BC-7 head pulley connection removed.
Hydrofill MCC control supply got tripped while checking feeder 7P-34, Reset & started it.
Ball Mill-1 tripped due to fault in cooling fan. Fans supply was checked from feeder end and visually from field
side and both found ok. Ball mill started later on.
3C-02 motor V belts got broken. Motor end connections removed.
CAPACITOR BANK-2 TRIPPED DUE TO ALL FAULT, PROBLEM WAS IN ITS EARTH GO WHICH WAS FOUND
Pb area crane was not working. While checking control ckt neutral wire is somewhre shorted with ground. Work
is postponded to tomo General shift Due to unavailability of time and manpower.
Rod Mill-1 trip coil was not getting picked. In previous shift, because of the malfunctioning of temperature
scanner, master relay was operated but motor was running continuously. All modes of tripping checked and later
spare motor feeder breaker(P-02) was replaced with Rod Mill-1 breaker. Again there was some problem in the
control ckt of that breaker so Ventilation fan motor breaker(P-03) was used. Breakdown Time (9:30AM-
Paste fill Plant feeder was charged on 28-june-14.
6.6kV incomer-2 feeder got tripped because of "U/V fail" under voltage fault. Its 'R' phase fuse in Line PT was
found blown away. Now 6.6kV Incomer-1 is in line.
SCADA system was checked and started by vollkraft engineer
6.6KV Bus coupler-2 (panel-39) charged for charging the bus bar for panel no 43 and 44
11kv supply from RDM tripped on low set overcurrent fault while taking a trial of 55kw motor after assembling
discharge valve. RDM was informed to turn on the power supply for tailing dam panel. From their end it was
3BC-07 control supply is tripping frequently due to problem in PCS. It was rectified and working fine now.