Vous êtes sur la page 1sur 10

Managing safely v3.

1 project
Introduction
As part of the Managing safely course, you have to complete a project and have it
assessed. You will e e!pected to carry out a ris" assessment ased on your own wor"
environment. You need to record the results on the attached sheets and sumit them for
mar"ing. #o not sumit any additional material in support of your project wor" as only the
si! parts of the A$ project will e assessed. %he project can e word processed or hand
written.
&hen you have completed your wor" you should return it to
%here is a two wee" time limit for the return of the project. Your project must e completed
and returned within
Instructions
'lease read all of the instructions efore starting wor" on your project.
%he project is ro"en down into a numer of parts. 'lease complete each section as
detailed elow.
Part 1 description of the work tasks that are your responsibility
(ecord a rief description of all the wor" tas"s within your wor" environment including)
description*laelled s"etch of the location+s,
people who wor" in or visit the area on a regular asis or from time to time. +%hin"
aout the different groups of people who may e in the area and how often they
may e there.,
permanent and temporary items of e-uipment and sustances
activities carried out within your wor" environment
M. 'roject
'ac" version 3.1
The http://www.shields-elearning.co.uk eLearning website using our project
upload facility from the resource entitled:
IOSH MS Project Assessment
(This resource is located below the available examination in the on-line IOSH MS course)
14 days from receiing confirmation from your tutor that you hae passed the
e!amination.
Part 2 a hazard checklist of the location(s)
(ecord a rief description of three location ha/ards that may arise in your wor"
environment. 0or e!ample, car par", stairs, uneven floor. 0or each of these ha/ards please
include)
a description of the location
a description of the ha/ard in relation to the location
the numer and occupation of people who could e affected y the ha/ard in
relation to the location
whether a ris" assessment is recommended
Part 3 a hazard checklist of permanent and/or temporary items of euipment and
substances used in your work en!ironment
(ecord a rief description of three ha/ards that may arise from e-uipment or sustances
used. 0or each of these ha/ards please include)
a description of permanent and*or temporary items of e-uipment and sustances
used
a description of the ha/ard in relation to the e-uipment*sustance
the numer and occupation of people who could e affected y the ha/ard 1 in
relation to the e-uipment*sustance
whether a ris" assessment is recommended
Part " a hazard checklist of the acti!ities carried out within your work en!ironment
(ecord a rief description of three ha/ards that may arise from within your wor"
environment. 0or each of these ha/ards please include)
a description of the wor" activity
a description of the ha/ard in relation to the wor" activity
the numer and occupation of people who could e affected y the ha/ard in
relation to the wor" activity
#ote$ for the purpose of this e%ercise all three acti!ity hazards that you are
assessin& on part " must reuire a risk assessment'
Part ( carryin& out a risk assessment
'lease carry out a ris" assessment on all three of the activity ha/ards you have listed on
part $. 'lease ma"e sure you include)
a description of the wor" activity
a description of the ha/ard, ha/ardous event and e!pected conse-uence in
relation to the wor" activity
the numer and occupation of people affected in relation to the wor" activity
an assessment of ris" +please use the 2 ! 2 matri!, in relation to the wor" activity
#ote$ for the purpose of this e%ercise all three acti!ity hazards that you are
assessin& on part ( must reuire risk controls'
M. 'roject
'ac" version 3.1
Part ) risk control recommendations
'lease complete the ris" control form for all three activity ha/ards you have listed on part
2. 'lease ma"e sure you include)
a description of the wor" activity and ris" level from the ris" assessment
e!isting ris" controls
any further ris" controls re-uired 1 in relation to the wor" activity
the residual ris" +please use the 2 ! 2 matri!, 1 in relation to the wor" activity
a description of the type of monitoring re-uired and how often 1 in relation to the
residual ris"
3ote) where you have large numers of ha/ards in your wor" environment you will not
have space to record them all. In these circumstances, select a representative sample of
ha/ards for the purposes of this project and record only these. (ememer that only three
ha/ards are re-uired for parts 4, 3, and $.
5ach part has a ma!imum numer of mar"s which can e awarded and details are given
in the tale elow.
Part *a%imum marks
1 16
4 17
3 17
$ 13
2 38
7 38
+otal 123
*inimum mark )2
0inally, efore returning your project chec" that your name, the end of course date, the
name of your company, the site name and the name of your training provider are recorded
on the first sheet.
'lease also ensure that you sign each sheet to confirm that the wor" you sumit is your
own.
Please note: the small square boxes in the bottom right hand corner of each section
on parts 2 to 6 are for the markers use only.
M. 'roject
'ac" version 3.1
Part 1 description of the work tasks that are your
responsibility (continued on the ne%t pa&e)
#elegate 3ame )
9ompany) .ite name)
%raining provider) .:5ilds ;td.
, description/labelled sketch of the location(s)
, description of the people who work in or !isit the area on a re&ular basis or
from time to time and how often they-re there
*ana&erial .taff
'roject #irector
'roject Manager
9onstructions Manger
'roject 5ngineer
'lanning 5ngineer
Assistant 5ngineer
#raftsmen
Admin <fficers
:.5 Managers
.r. .afety <fficer
.afety <fficer
.tore"eeper
.ecurity <fficers
.ecurity =uards
=ate >eeper
+otal
/ork 0orce
.upervisor
0oreman
9harge :and
9ivil ;a %ech
.teel 0i!er
9arpenter
Masson
5lectrician
'lumers
:elpers*;aour
0aricator
0itters
&elders
(iggers
.caffolders
.caffolding Inspectors
+otal
Part 1 description of the work tasks that are your
responsibility
, description of permanent and temporary pieces of euipment and
substances used in your work en!ironment
M. 'roject
'ac" version 3.1
Mar"s
allocated
Mar"s
allocated
'lease sign to confirm that this is your own wor")??????????????????
'lease sign to confirm that this is your own wor")
5!cavators
.hawl
@oom ;oad
0or"lift
(oller
9rane
%ower 9rane
=enerators
Air 9ompressors
:eavy Aehicle 18 %on
Ber" 9ompactor
Airator
&elding Machine
9utting .et
=as 9ylinders <
4

=as 9ylinders #.A.
0ire 5!tinguishers
=enerators
<il %an"ers
#rin"ing &ater %an"er
&ater 9oolers 5lectric
0resh &ater for sprin"ling
.ewage &ater %an"ers
Aehicle for material shifting
.ustance )

9ement
9oncrete
.and
'etrol * #iesel
(einforcement ar
.caffolding material
'aint
, description of the acti!ities carried out within your work en!ironment
M. 'roject
'ac" version 3.1
'lease sign to confirm that this is your own wor")
M. 'roject
'ac" version 3.1
Part 2
1azard 2hecklist$ locations(s)
2ompany$ 3epartment$ .ite name$
3escription of the
4ocation
3escription of the hazard
(in relation to the location)
#umber and occupation of
people affected
(in relation to the location)
5isk assessment
recommended6
(7f no8 please e%plain)
Yes 3o

Yes
Yes 3o
Yes
Yes 3o
+he location(s) you mana&e

Yes
'lease sign to confirm that this is your own wor")
M. 'roject
'ac" version 3.1
Part 3
1azard 2hecklist$ euipment and substances
2ompany$ 3epartment$ .ite name$
3escription of the
9uipment/substances
3escription of the hazard
(in relation to the euipment/substance)
#umber and occupation of
people affected
(in relation to the euipment/substance)
5isk assessment
recommended6
(7f no8 please e%plain)
Yes
3o
Yes
Yes 3o

Yes
Yes 3o
Permanent and temporary pieces of euipment and substances used in the work en!ironment
'lease sign to confirm that this is your own wor") .tron&ly confirm
M. 'roject
'ac" version 3.1
Part "
1azard 2hecklist$ acti!ities
2ompany$ 3epartment$ .ite name$
3escription of the
/ork acti!ity
3escription of the hazard
(in relation to the work acti!ity)
#umber and occupation of
people affected
(in relation to the work acti!ity)
5isk assessment
recommended6
Yes
Yes 3o
Yes
Yes 3o
Yes
Yes 3o
Activities carried out within your wor" environment
#ote$ 0or the purpose of this e!ercise, all three activity ha/ards must re-uire a ris" assessment.
'lease sign to confirm that this is your own wor")

M. 'roject
'ac" version 3.1
Part (
5isk assessment form
2ompany$ 3epartment$ .ite name$
/ork
acti!ity
1azard8 hazardous e!ent and
e%pected conseuence
(in relation to the work acti!ity)
4ikelihood
le!el
2onseuence
le!el
5isk
4e!el









3ate$ +ime. 5e!iew Period$ 3ate of ne%t re!iew$
,ssessor-s name$ Position$
.i&nature$
Yes 3o
Yes 3o
Yes 3o
: ;
<ccupation$
#umber$
<ccupation$
#umber$
<ccupation$
#umber$
'lease sign to confirm that this is your own wor") .tron&ly confirm

#ote$ 0or the purpose of this e!ercise, all three activity ha/ards must re-uire ris" controls.
,ssessment of risk
(in relation to the work acti!ity) People
affected
(in relation to the work
acti!ity)
,re risk controls
reuired6
M. 'roject
'ac" version 3.1
Part )
5isk control form
2ompany$ 3epartment$ .ite name$
/ork acti!ity
and risk le!el
(from risk
assessment form)
9%istin&
risk controls
(in relation to the work
acti!ity)
Probable
4ikelihood
Potential
2onseuence
#ew risk
le!el
:
-










0reuency$
3ate$ 5e!iew period$ 3ate of ne%t re!iew$
,ssessor-s name) Position$
.i&nature$
0reuency$
0reuency$
;
'lease sign to confirm that this is your own wor")??????????????????
5esidual risk
(in relation to the work acti!ity) 0urther risk
controls reuired
(in relation to the work acti!ity)
3escription of
monitorin& reuired
(in relation to the residual risk)
5isk le!el$
5isk le!el$
5isk le!el$

Vous aimerez peut-être aussi