Vous êtes sur la page 1sur 3

NISHTAR HOSPITAL

1. Donation fund for Nishtar


a. Collection of more than 5 cores
b. Ongoing donation from philanthropist still continues
2. Development & Extension of ICU
a. Bed Strength increased from 12 beds to 28 beds
b. Comprehensive monitoring & state of art equipment for each bed.
c. 30 dedicated nurses for ICU from hospitals own income.
3. Development & opening of Paediatric ICU (PICU) and Neonatal ICU (NICU).
4. Development & new equipment for labour room
5. Development of state of art laboratory (Nishtar Lab.)
a. Fully automatic
b. No human error
c. Reliable results
d. 800 tests per hour
e. Increased revenue for the hospital & patient welfare.
6. Hospital Welfare Fund
a. To cater for urgent needs of hospital
b. Supplied ultrasound, ECG, CTG, Gastroscope & other equipment for each ward.
7. Collection points for Nishtar Lab.
8. Computerization introduced.
a. Main offices.
b. Student Section.
c. Laboratory.
d. Radiology
e. Pharmacy Store.
f. Out patients
g. Accident & Emergency.
9. Development & Renovation of Radiology.
a. Division in Out-patient & Inpatient Section.
b. Computerization.
c. New 500 MA X-Ray Machine.
d. New Ultrasound machines including two Doppler.
e. Digital Automatic X-Ray Film Processor.
f. Purchase of Digital Radiography Unit in process.
10. Extension of Urology Ward.
11. Shifting of ICU in newly built ICU Unit.
12. Establishment of Neurology Unit with recognition by CPSP.
13. Independent Gastroenterology unit with CPSP recognition.
14. Purchase of new Gastroscope.
15. Plasmaphoresis unit in Ward No. 10.
16. Improvement of Dialysis Unit.
17. Connecting bridge between family ward & medical block
18. Functioning of six new lifts in Nishtar Hospital.
19. Purchase of good quality medicines.
20. Purchase of new pleuroscope, bronchoscope
21. Construction and renovation of new OPD which has computerized registration desk for
all OPD patients.
22. Accident & Emergency.
a. Renovation
b. Resuscitation room
c. New equipment
d. Two lifts
e. Computerized registration
f. Duties of PGRs & consultants on call
23. Increase in Paid House Job posts.
24. Paid house job for each Nishtarian.
25. Improvement & renovation of Hospital Canteen.
26. Construction of Car Park for 400 cars.
27. Renovation / Development of Green flowery belt in front of Nishtar hospital giving a
new awesome to Nishtar.
28. Two new enterance gates.
29. Green Nisthar Projects.
30. New lighting with LED lights.
31. Construction and renovation of new Blood Bank near A & E Department.
32. Construction and renovation of new canteen near A & E Department.
33. Installation of ATM machine near A & E and OPD.
34. Construction and renovation of Labour room car park for 150 cars.
35. New Out-patient for oncology
36. Establishment of Diabetic /eye care centre
37. Accommodation for attendants (Saraiy)
38. Two intensive beds allocation in each ward for close monitoring of serious patients.
39. Purchase of equipment for burn unit.
40. Independent electicity connection for burn unit.
41. Purchase of Linear Accelerator for cancer unit.
42. Renovation Hospital Auditorium.
43. SNE Approval for Burn Unit.
44. SNE Approval for Thoracic Surgery Unit
45. ADP Scheme approved for upgradation of theaters & Anaesthesia worth Rs. 34 crore.
46. Renovation of Nurses hostels.
47. New Ambulances for Burn Unit.
48. New Physiotherapy department.
49. Purchase of surgical instruments for general surgery & orthopedic.
50. Development of Nishtar Formulary.
51. BLS courses for all the staff.
52. International conference.
a. Plastic Surgery.
b. Oncology
c. Cardiac Surgery
d. Gastroenteerology
e. Many more

NISHTAR MEDICAL COLLEGE

1. Introduction of some elements of Problem Based Learning & Integrated teaching.
2. Biometric attendance of students
3. Strict criteria of attendance for university examination.
4. Upgradation of student section office.
5. Renovation of College Campus.
6. Renovation of Assembly Hall
7. Nishtar Point.
8. Lawn tennis courts
9. Students sitting area.
10. Renovation & development of mortuary.
11. Development of skill Lab.
12. Upgradation of Histology Lab.
13. Establishment of Animal Lab.
14. Recognition by UHS for M. Phil course in Anatomy & Microbiology.
15. Establishment of Nishtar Paramedical School.
16. Establishment of a dedicated Examination Hall.
a. Mobile Phone Jammers.
b. Video recording of examination.
c. Air conditioning.
17. Purchase of new books for Library.
18. Development of Department of Medical Education (DME).
19. CME Workshops for teachers.
20. Construction and renovation of Girls Common Room
21. Power Lab for Physiology.
22. Upgradation of computer section for students.
23. Upgradation of College Garden.
24. Repair of Hayat Zafar Auditorium.
25. International Workshops & conferences.
26. Student week functions.
27. Sports week
28. Student excursions.
29. Improvement of mess facilities for students
30. Ongoing renovation of student hostels.
31. Repair of mosque in student hostels.
32. Repair & renovation of swimming pool for students
33. Hassle free organization of entry test.
34. Repair of Tower Clock
35. Repair & renovation of Staff Club.
36. Abolishing of marriage ceremonies in NMC.
37. Strict discipline for students.
38. Construction of Back Boundary wall & security barriers in hostels
39. Improved academic results.

Vous aimerez peut-être aussi