Gonnection Gost Estimate
Township of Georgian Bluffs & Chatsworth
Township of Georgian Bluffs
0.1 MW Bio Gas Generation
Proiect lD #
gOG
January 4, 2008
Generation Connections Department
System lnvestment Division
COPYRIGHT@ HYDRO ONE NETWORKS INC. ALL RIGHTS RESERVED
This_report may not be reProduced or copied, in whole or in part,
in any printed,
mechanical, electronic
film, or other distribution and storage without written permission
trm nvOro One Networks lnc.
Coinection Cost Estirnate Report
DISCLAIMER
Hydro Oire 'letr'orks lnc-.'s-lia!'iliiy to any party
other than the persoil
to whom this Reporl s addresseci
with respect to the use of this Connection Cost Estimate is limited to damages that arise'directty out iin
negligence or the willfulmisconducl of Hydro One. Under no circumstances whatsoever will ilydro One
Networks lilc. be fiable for airy ndirect or consequential damages, loss of profit or revenues, business
intenuption losses, loss of contract or loss of goodwill,
special dmages, punitive
or exemplary damages,
r.rhether any of the said lablty, loss or damages arises n contract, iort or-othe-r^se.
Page 2 of6
Corrr'reciio: Cost Esiiaie Repor'i
l. Background
Tiie followirig is a Coitirectioir Cost Estilate for tlie cotnection of iire proposei.l geireraiioii projer,t, as
i.re
the scope of work (the "Work")
outlined in the Connection Cost Estimate Agreement mad-e between
Township of Georgian Bluffs (the "Generator''),
and Hydro One NetworkJ lnc. ("Networks"). This
Cotltiectio-r Cosi Estinlate is baseci oit tfle iiiciings stateci ii-r ilie Coriilection iiiipact Assessiiieit ("CiA)
report issued by Networks on July 6, 2007. Any future modifications to the CIA report could affect the
Cori r rectiort Cosi f siinrate pr'o vicied belor.,.
The Generator is responsible for any resulting requirements that come from a review of the IESO-
controlled grid (as that term is defined in lhe Electricity Act, 1998 (Ontario)) including, but not limited to
atiy ciraiiges lequteci to be iriacje t ihe'f:,bik s co-rssquenc o suir revieiry.
2. Key Project and Gonnection Data:
^
n,-^:- -^
^!-.--
-,
f^....--r-:.-
-a
^-
-.--.:_--
^t
rr
f.. rl ujeLr r!it! I le. I uvvf lsr il., ot \reOi gtall criuIIS
B. Project Type: Anaerobic Biodigesters
C. EG Single Line Drawing No.:2
n
^-,-,--
-t:-.- t.--.-.--
-ti.-.-
lt- I r..-r,.-
^,-_ ^.,_^-.--\. Lr. uur ilreLuor r riluliltaUUlt
\ru
nyuiLr uile i,Sigii):
1. Name of Hydro One supply station ("Station"): Squire DS ( 44 / 8.32 kV)
2. Nominalvoltage, kV: 8.32 KV
g.
Feeder No.: F13
4. Breaker position at Station normally supplying the F3 feeder:
5. Distance from the Station to the EG connection point (tap point) on the feeder, km: Approx. 4.8
km
6. Distance from the feeder tap point to the EG disconnecting switch (at demarcation point):
0 km
7. EG to be connected over dedicated feeders? (yes / No): No
O
^..*-^^.^
(). \/\.,r ilE tt5.
a. The 8.32 distribution system is 3-phase, 4-wire, solidly grounded
at the TS. The
conductors of the distribution feeder are not transposed.
i:. iol'siuciy and cosi esiinraie
rulpuses,
oillv tire ilo'li suppiy, ihiougi-- l-3 'lreai:er po-<itoir
at Squire DS, will be considered.
c. Normal operating conditions will be considered for Squire DS for this Connection lmpact
ir.'.'..^^*^^+
nvt rg t.
E. Generator Data:
'1.
Generator Type: Biogas Engine/ Generator Set( Synchronous)
'f 4.\h^^^,
^-^'
1f\ii.\i,i
. vvr vr qtut
9. t uu^v v
3. Numberofphases:1
4. Rated frequency, Hz: 60
r I t. ..-- r-
-,. -
a _. _._
' urr) r lplririq i
6. Total output of EG facility: l00kW
7. Manufacturer of generator: \A/EG Electric Motor Corp.
n-r__r. .t1-_-- _t^l_
.
-..-v--'
oi tile geleltoi, r"r.
240
F. EG Step-up (lnterface) Transformer Data: Single Phase
1. Ratng, kVA: 100
^
t ,-r--- -1 -t----
./_. rr,!iiluet ut
Jtta5es.
I
3. Winding connection (HV/ LV): 4.Bt(/ t0.24 t<\t
4. HV neutral impedance (if applicable), ohms:
q
linl,1^ ,.u..
X
=0.035 R -0.0035 ( ASSUirted)
v...,rvvelvv
/
G. EG lntermediate Transformer Data, (if applicable): N/A
, _-:._
-.
t-i ,^
i . I \lril 9, v/ \.
--,_ ,a^
rilge J ut o
Connection Cost Estimate Report
2. Numberofphases:
3. Wnding connection (HV / LV):
4. lmpedance, p.u.:
3. Scope of Work
The subject generation project is proposed
for connection to the Squire DS F3 feeder at
g.32kV.
The
generating
facility is located within the Township of Georgian Bluffs would include a 100 kW synchronous
generators. As connection is proposed
to the Hydro One distribution system, the project
is referred to as
an embedded generator ('EG).
Main deliverables include:
o
Design review of the proposed EG facility as part
of the COVER process.
Review EG design
drawings and details including detailed singleJine diagram, desciiption of EG protection ph-ilosophy,
protection
diagrams and settings, and EG relay logic diagram and tripping mairix.
o
Commissioning and COVER work as required, including, but not limited to, verification of testing,
review of commissioning report, and other commissioning and COVER activities.
.
Non-contestable customer revenue metering work including selection & supply of required meter and
commissioning dial-up functionality.
o
Distribution Lines Work: the work required to connect generator facility to Squire DS F3. (.e. line tap)
o
Coordination of customer protections
with existing feeder protective
devices.
The estimate includes Line Connection cost in addition to the engneering and metering cost as requested
by Georgian Bluffs Biodigester project.
The cost mostly includes ihe wor[ at Hydro On site. Customer is
fully responsible for all work at their site, except the supply of customer's revenue meter.
The total cost of the connecton work, HoNl scope, is
g23,000.00
cAD, excludng GST.
Line Connection Scope
Complete the work required for the connection of Georgian Bluffs generation
facility to Squre DS F3
feeder at 8.32kV.
. lt is assumed that the connection work is straightfonrvard (umpering only) and does not require
any substantial material besides basic hardware.
Protection Scope
Hydro One wili 'eview the design of the proposed
EG facility as part of the COVER process.

lt is assumed that no transfer trip is needed for this project,
but hydro one to check customer's
protections
for their own facilities to make sure it is all in compliace with Hydro One standards.

Note: The following cost estimate does not include the transfer trip cost as required by CIA from line
recloser OCR 281. However and as per
the CIA Hydro one will work with proponent
fr alternative to
transfer trip option and after reviewing detailed protection
scheme of Generaiion facility, the
alternative protection
scheme may be considered if deemed adequate. The detaited review is
required to be done before actual connectior of generatirrg
facility witir Hyciio oie distri!ution
system.
Proponent is required to pay for all cost associated with the Transfer trip, if the detailed review of the
pioteciioii
scleiiie ptorrueci by iiie proponei'it
as alteriaiiie solutiorr io iaiisfer irip cloes noi nieet
Hydro One's aiiii-siaiiciillg requiiererrts.
--.- a
-t
^ rage
+ (Jt
o
Connection Cost Estimate Report
Metering
The metering scope of work will cover the procurement of customer revenue meter and non-
contestable portion of the work to be done at customer's site.
Customer is responsible to meet the Hydro One requirements
CHANGE CONTROLWORK
. Hydro One to update databases (i.e. Line protections, SCADA, Communication equipment failure,
line and station drawings etc).
4. Connection Cost Estimate
The prelminary connection cost to be performed
by Hydro One as in section 3 above is estimated at $
23,000.00 excluding of any work for which Generator is responsible.
5. Cost Breakdown
Unshared Work
Engineering Design $ 7,000
Materials and Equipment
$ 3,000
Line connection & Labour $ 11,000
Administrative Activities
$ 2,000
Subtotal: Unshaed Work
$ 23,000
Note: GST is extra
6. lmplementaton Schedule and Validity Period
The planned in-service date for this work is September 1, 2009.
ln order to meet the proposed schedule and budget commitments, the Connection Cost Recovery
Agreement ("CCRA') must be executed no later than May 7, 2008 (the "Expiry Date"). lf the CCRA is
signed after the Expiry Date, the Connection Cost Estimate may need to be redone at the Generator's
expense.
7. Assumptions
. This cost is prepared under the assumption that the work will be completed in 2009.
. No interest component is added to the estimate on the assumption that all payments will be
received in advance from Georgian Bluffs Biodigester project per the CCRA.
This Cost Estimate Report was compiled by Amish Bhatt
Page 5 of 6
Connection Cost Estimate Report
Appendix A
EG Contact lnformation
This Connection lmpact Assessment was issued to the following individual(s):
Name Howard Greig, Mayor
Title
Organization Municipalities of Twp. Of Chatsworth
& Twp. of Georgian Bluffs
Mailing Address R.R #1, chatsworth, ON
NOH lGO
Email Addrees office@chatsworth.ca
Name AlBarfoot, Mayor
Title
Organization Township of Georgian Bluffs
Mailing Address 177964 Grey Road 18,
R.R#3, Owen Sound, ON
N4K 5N5
Email Address office@qeorqianbluffs.ca
Name Ross Slaughter
Title Consultant
Organization Henderson Paddon & Associates
Limited.
Mailing Address 945, 3'u Ave.E, Ste 212
Owen Sound, ON N4K 2KB
EmailAddress hpa@hpa.on.ca
Page 6 of6
hvdroQ
'
one
Connection Cost Recovery Agreement Application Form
Distrihrtion System
This Application Form is for Generators that have completed a Connection Cost Estimate
ane! woi:ld !!ke to e'eqr;est a Cannecticn Cast Qsssr.rselr.Agreement.
It is important that the Generator provide ail of the information requested below. Failure
to do so could result in the non-acceptance of this application form by Hydro One
t^L-",^-!.- l-
^
!.tLt.,-t=,^ a*^rr
- -""
,'
.e.l! trcl:::ie a! i!e'::.ime:-.te
=:'*:t
!::. eig::sd e:::t::-:!c-* b;: e !iee-r::.-.d C::t:ric- Frsfceglc:al *gi:-rcsr.
Date:
_
(dd / mm lyWy) Contact Person Name:
n--:*
-
l-t- .*. ._
rr\rjltt,t Nrrttt.
E!..r!a lF fl.
. ,vrvvr -r-'
Project Dates:
A
t.
3.
4. Project Size:
Proposed Start of Construction:
n.^5^^/.1 1,. ^..,;^^
lvl-V'Wl r,_Vv YrwV.
Number of Units
Nameplate Rating of Each Unit
F)".:nl'T..r
^t
t^
-
^
^
it, I
r r vyvovu t vaqt vuYavtay
o. rrojecr Locauon: utty / town / ownsntp:
Lot Number:
^^^^,--..,:-.^
t..-L ---.
\/Ul UUlUt i -iuir iiiL .
^ ^--4^-4
t-!--4-4:--.
v. vvrtgvt avr rgravr.
_kw
t,t4t
I
i l.rrnnnvlParcrrn.
Generator Owner
? a
^^-.t-a^ -- ^-..!
^:r..
Ft^-
I . LVVqtVl r qr
tt gtt I tqt I
Provide Site Plan with approximate line routings for connection to nearby Hydro One's facilities. The Site
flan should incluclc i'oads, corlccssion c:d lot nurnbcrc and nccrby po'uvcr lincc
.,.,i-^ , t-.!.^k l r..
rV / v\V(Ui rUV.
_
Hydro One Networks lnc. Distribution System Connection Cost Recovery Agreement Application Form
Revised November 16, 2006
D.^^ 1 .,t 4
it)gwtVtL
hvdr&
'
one
8. Gonnection to Hydro OnE's Distribution System
Proposed connection voltage to Hydro One's distribution system:
_
kV
Station:
Feeder:
9. Single Line Diagram ("SLD"):
Provide a SLD of the Generating Facility including the lnterface PoinUPoint of Common Coupling (,pCC)
to Hydro One's distribution system.
SLD Drawing Number:_, Rev
10. lnformation Modified Since Last Submission
lf any information that has changed Jrom the original applications submitted for the Connection lmpact
Assessment ('ClA') or Connection Cost Estimate, please
re-submit the CIA application .ror.m with the
changes highlighted in yellow.
Elease ,!ote=that
gnY chang,e.q,coqld triggr the need for another Connection lmoact Assessment anct
Connection Cost Estimate. lf the Gonnection lmpact Assessme
need to be redone or revised, it will be at the Generato/s expense and could delay the connection
process.
A new or revised Connection lmpact Assessment and/or Connection Cost Estimate could be required in
various circumstances, including:
-
Changes to the Generation Facility
- The connection of other generators
to the Distribution or Transmission system
- Distribution System upgrades and modifications
- Transmisson $5re1sm upgrades and modfcatons
Hydro One Networks lnc. Distribution System Connection Cost Recovery Agreement Application Form
Revised November 16, 2006
Page 2 of 2
Connection of Generation Facilities to the Hydro One Distribution System
: TlT
^5
r9T^TiT!]!:n ^,'r!.Far.:
Lrrr r \rt r\L\t, rrtLp tari.a,riir\
NUT the review musl be received AT LEAST 3 months Drior lo Connection
Descriotion
Document / Inforrnation Reouired For:
Remarks
Connection
Assessment
Design
Review
\ilovER-
Witness/Test
As-Built
Record
I
Detailed Single Line Diagram
(SLD) of the DG Facility
X X x x
Show ratings of electrical
components, generator &
transformer neutral
grounding, protection,
metering synchronizing
schemes. etc.
2.
Site Plan Showing General
Anangement of the EG Facility
X X X X
Include location - street
address, lot nos. etc. (inclucle
the location of lockable,
visible-break isolatins device)
3.
Interface Electrical Equipment
Technical Information / Data
Sheets / Manufacturer's Nameplate
Information
X x x
transformers, CTs, VTs,
isolating / disconnect device,
HV circuit breaker, fuses,
surge arresters and other
interface ecuipment
4. Description of Protection Scheme x X X X
Philosophy of Tripping for
Internal & External Faults,
Islanding and Other Abnormal
Conditions
5.
Description of Synchronizing
Scheme (Synchronous & Inverter
Units) & Connection Scheme for
Induction Units
X x X X
6.
Description of Powel Factor
Control for Induction Generators
(& Inverter Units, if applicable)
X X X x
Include details of capacitor
switching and control, if
applicable. Highlight: method,
steps, safety features,
interlocks with generator
breaker etc.
7. Protection AC and DC EWD X X X
8. Protection Three Line Diasrams X X X
9.
Breaker (HV & Generator) and
Isolating Device / Disconnect
Control Schematics
x x X
r0. Tele-orotection AC and DC EWD X x X
ll
Breaker Failure Protection AC and
DC EWD
x X X
t2.
Interface Protection Relay / Fuse
Co-ordination Stud Curves &
Settings
X X x
EG interface protection relay /
fuse must co-ordinate with
upstream Hydro One
protection
relay / device
13.
Relay Logic Diagrams / Tripping
Matrix
X x X
14.
Ground Potential Rise (GPR)
Studv
X x X Ifrequestcd by Hydro One
15.
Metering Single & Three Line
Diagrams
X X x
Show ownership boundaries,
transformers, CTs, VTs,
isolating device / disconnect,
breakers, operating
desisnations. etc.
16. o_
Meter Forln, MV 90 X x 3 months before WOVER
a
I
Site Specific Loss Adjustment
(ssLA):
fi,ne and Trons.former. as rter
Mnrkpt Mnnunl ?-1 l.
stanped by an Electrical
Engneer Registered in
Totalization Table,
Connection Agreement
Schecltrle lr{.
.
Verification of End to End
Testing.
3 weeks before WOVER
^-^r:^ - I
17.
Commissioning & Verification
Procedure & Schedule
X X X
C<linmissioning Rcport cliv Hydro
One Acccptcd Interl'acc Protection
3 weeks befbre W0VLI.
Nctcs:
l. The above list includes drawings that would generally be required for EG projects.
-
Additional drawings / information may be required for certain projects. In such cases, Hydro One will duly inform the EG.
l.}rrfl crirrtr h.eke
fbilure. etc.
3. Hydro One teview of EC 9rawing / data / protection settings & witnessing of cornrnissioning tests etc. shall be lirnited only
to those portions of the EG facility that interests Hydro One and which interfaces with its distribution system.
tt.
Tllc llG Crsfoi,rci shall bc lcsponsblc to cooid',atc tlic dcsigrr, irstallaton, tcsling, opcr;on ancl nraiiilcrancc
of its tcilities in confbrmance with applicable codes, standards, Hydro One and IESO connection requirements,
service performance requirements and all relevant laws and regulations. The EG customer shall obtain, at its
c)ipcnst, any and al! autho'iz:atioils, pct'nrits and liccnscs lcquilcd loi tllc consiiuctior, aird opci-atio of its EC
aciiitics

Vous aimerez peut-être aussi