Addendum-1 to PTS-12EN1102

(Substation project)

The addendum is issued to
1.01 GEN ERAL
A. This Addendum-1 to PTS-12EN1102 shall be read in conjunction
with the Original PTS-12EN1102 and shall be considered as an
integral part of it. This addendum is issued due to the followings:
1. Changing the COMPANY/MANUFACTURER supplied Power
Transformer HV Bushings/Terminations from HV Cable Box to
Outdoor HV Bushings.
2. Changes in the equipment layout to incorporate manufacturer's
outline drawing for the 115kV GIS and 115/13.8kV Power
transformer.
3. Replaced Data Schedule for MV Cable Termination.
B. The General requirements, Design criteria, Detailed Technical
Specifications and Testing and Commissioning requirements for the
equipmentIWORK covered under this Addendum shall be
considered as identical to those applicable to original scope of work
(PTS-12EN1102). Unless otherwise specifically indicated, all the
requirements applicable to the original scope of work shall also be
applicable to this Addendum.





** The purpose of Bushing**
1- Provide insulation for high field to pass safely through the ground
(allows a current carrying conductor to grounded)
2- providing a large distance for the surface path to avoid flashover

**115kV GIS(Gas-insulated switchgear)**
Switchgear act as a huge switch to operate and protect substations.
Hitachi provides compact, reliable Gas Insulated Switchgear (GIS) with technology that
can isolate 500 kV at a single point.
Hitachi is working to organize and build a new global supply chain and is expanding its
engineering system that is in line with the market.





General
The main idea about the project is to remove a transformer HV
cable box and replaced it with outdoor HV Bushings. The equipment
need to change for 115KV GIS and 115/13.8KV Power transformer
and replaced Data Schedule for MV termination.

Scope of Work
1- New HV and MV cable in the Power transform



2- HV bushings
3- MV cable box
4- 9 nos
5- 108 KV outdoor
6- Station class
7- Metal oxide surge arresters
A) Power cables and termination
(1)MV cable connecting to P T, (2) Station Service Transformer, (3) MV capacitor Bank
(4) MV switchgear)
i- 1core, copper XLPE cable ----115Kv P T to (4) with cable termination
(the size of cable 1C*630mm^2----6 cables/phase)
ii- 1core, copper XLPE cable----(3) to (4) with cable termination
( the size of cable 1C*630mm^2---1 cables/phase)
iii- 3core, copper XLPE------- (2) to (4) with cable termination
( the size of cable 3C*240mm^2---1 cables/phase)
iv- M terminal lug with 4 holes 630mm^2, 1core, XLPE. Min 2 holes for lower size
B) HV cable ------HV GIS to Power Transformer
i- HV, 40KA for 1 sec, 400mm^2, 1core, copper XLPE cable between HV GIS circuit
Breaker and outdoor cable sealing ends.
ii. Nine (9) Nos. HV indoor XLPE cable to SF6 terminations (cable sealing end) at GIS
circuit breakers along with all accessories required to terminate the HV cables.
iii. Nine (9) Nos. HV outdoor cable sealing end for 1C x 400mm2, copper, XLPE cable near
the 115/13.8kV Power Transformers. Please refer to drawing no. ET-922631.
iv. One (1) Lot: 1-795 kcmil "DRAKE", ACSR/AW overhead conductor per phase between
HV outdoor cable sealing end and transformer HV bushing.


4. Clause no. 4.09 A. 9. of Original PTS-12EN1102 shall be modified as :

9. Design and construction of the reinforced concrete foundations for power
transformers. Design and construction of oil retention pit around the power
transformers. Installation of removable steel pipe crash barriers with chain link in front
and sides of power transformers. Refer COMPANY Standard drawing TA-800133. Design
and construction of steel supporting structure and its foundation for Cable Sealing Ends
near the power transformers.
5. Replace 12-SDMS01 Rev.01 (Cable Joint, Terminations and Accessories up to 36kV)
throughout the SOW/TS & Appendices by 12-TMSS-04 Rev.O (Splice & Termination Kits
for MV Power Cables) given in Appendix 2.
6. Replace 40-TMSS-03 Rev.O (Automatic Meter Reading (AMR) System) throughout the
SOW/TS, Drawings & Appendices by 40-TMSS-03 Rev.01 (Advanced Metering
Infrastructure (AMI)); attached in Appendix-2. Also, all affected drawings shall be
rectified to match with the new standard (40-TMSS-03 Rev.01) requirements.
7. Appendix-I, Drawing Control Sheet no. ET-911621 (sheet 1 of 1, Rev. 0) of Original
PTS-12EN1102 shall be replaced by ET-911621 (sheet 1 of 1, Rev. 1). Accordingly, replace
drawings ET-911623 sheet (1 of 1, Rev.O), ET-911630 sheet (1 of 1, Rev. 0) ET-922631
sheet (1 and 2 of 2, Rev.O) and ET-911633 (Sheet 10f 1, Rev.O) by the new Rev.01 given
in Appendix-1.
8. Appendix-XI, Geotechnical Soil Investigation shall be included as given in Appendix 3.
9. Appendix-XIV, 115KV Gas Insulated Switchgear detailed design shall be included as
given in Appendix-4.
10. Appendix-XV, 50/67MVA, 115/13.8KV Power Transformer detail design shall be included
as given in Appendix-5.
Material data schedules
1. 12-TMSS-04 : Splice & Termination Kits for MV Power Cables
2. 35-TMSS-01 : Surge Arresters (For 115kV Nominal System Voltage)
3. 40-TMSS-03 Advanced Metering Infrastructure (AMI)
Geotechnical investigation /// civil engineering////// geologic////drilling(Standard Penetration
Test)
115/13.8kv substation 60m*85m
1- Battery room
2- Power transformer
3- 115kv GIS
4- Control & 13.8kv switchgear room..etc.
Field Tests and Result
1- Wenner array (5 location) measuring the resistivity of soil
Also
Wenner array is needed to intensive survey of the cable length and movement of the
Electrodes during the survey.
The Wenner method consists of
1- four electrodes,
2- two are for current injection (introduced into ground)
3- two for potential measurement









The purpose of Bushing
3- Provide insulation for high field(allows a current carrying conductor to grounded)
4- providing a large distance for the surface path to avoid flashover




















HV Bushings















HV cable box


























Gas-Insulated Switchgear(GIS)




1.Busbar
2.Diconnector
3.Maintenance Earthing Switch
4.Current Transformer
5.Circuit Breaker
6.Current Transformer
7.Maintenance Earthing Switch
8.Diconnector
9.Earthing Switch
10.Voltage Transformer
11.Bushing

Vous aimerez peut-être aussi