WBS Code

WBS Name

AMJ

Total Activities

Atlantis Management and staff accomodation at Jumeirah Villag

General Wide Area

General Area Wide

Project Wide Dependancies

AMJ.1.1.1.1

Dependancies on local Authorities

AMJ.1.1.1.2

Dependancies on client/Engineer

AMJ.1
AMJ.1.1
AMJ.1.1.1

AMJ.1.1.1.2.1Appoinment of Local subcontractors

AMJ.1.1.1.2.2General Area Wide

AMJ.1.1.3

Contractual Milestones

AMJ.1.1.2

General Area Wide

AMJ.1.1.2.1

Project

AMJ.1.1.2.2

General Requirement Cost

AMJ.1.1.2.2.1Phase 1-MB 1 2 & Staff 4

AMJ.1.1.2.2.2Phase 2-Staff 123 and Staff 5

AMJ.1.1.2.3

Mobilization and Demobilization

AMJ.1.1.2.4

Management Accomodaiton 1 and 2

AMJ.1.1.2.5

Staff accomodation 12 and 3

AMJ.1.1.2.6

Staff accomodation 4

AMJ.1.1.2.7

Staff accomodation 5

Nominated Subcontractors

AMJ.1.1.8.1

Alucobond Cladding

AMJ.1.1.8.2

Lifts

AMJ.1.1.8.3

Sanitary Ware

AMJ.1.1.8.4

Windows cleaning

AMJ.1.1.8.5

Bulkheads

AMJ.1.1.8.6

MEP

AMJ.1.1.8.7

Ironmongery

AMJ.1.1.8.8

Swimming Pool and Finishes

AMJ.1.1.8.9

Landscaping

AMJ.1.1.8.10

Grabage Chute

AMJ.1.1.8.11

Traffic Barriers

AMJ.1.1.8.12

Curtain and Blinds

AMJ.1.1.8.13

Kitchen and Canteen

AMJ.1.1.8.14

Bathroom and Cabinates

AMJ.1.1.8.15

Light Fittings

Management Building 1&2

Engineering

Management Accomodaiton 1&2

Domestic Subcontractors

AMJ.16.1.1.1.1Aluminium doors and Windows louvers

AMJ.16.1.1.1.2Aluminium Balustrades

AMJ.16.1.1.1.3Gypsum Board and Tiles

AMJ.16.1.1.1.4Substructure Waterproofing

AMJ.16.1.1.1.5Post Tentioning Work

AMJ.16.1.1.1.6Road Marking

AMJ.16.1.1.1.7Floor coating

AMJ.16.1.1.1.8Roof waterproofing

AMJ.16.1.1.1.9Painting works

AMJ.16.1.1.1.10
signage works

AMJ.16.1.1.1.11
speed check system

AMJ.16.1.1.1.12
steel door

AMJ.16.1.1.1.13
wooden door

AMJ.1.1.8

AMJ.16
AMJ.16.1
AMJ.16.1.1
AMJ.16.1.1.1

AMJ.16.1.1.14

Materials

AMJ.16.1.1.14.1
Concrete suppliers

AMJ.16.1.1.14.2
ceramic tiles

AMJ.16.1.1.14.3
granite floor tiles

AMJ.16.1.1.14.4
granito tiles

AMJ.16.1.1.14.5
steel

AMJ.16.1.1.14.6
Limestone tiles

AMJ.16.1.1.14.7
Vinyle skirting

AMJ.16.1.1.14.8
Precast concrete pavers

AMJ.16.1.1.14.9
sports flooring

AMJ.16.1.1.10

General Area Wide

Page 1 of 7

Oracle Corporation

29-Dec-13 21:00
WBS Code

WBS Name

Total Activities

AMJ.16.1.1.2

Basement Level

AMJ.16.1.1.3

Ground floor level

AMJ.16.1.1.4

First Floor level

AMJ.16.1.1.5

second floor level

AMJ.16.1.1.6

third floor level

AMJ.16.1.1.7

Forth floor level

AMJ.16.1.1.8

5 to 8 typical floor level

AMJ.16.1.1.9

9 and 10 typicla floor level

AMJ.16.1.1.11

elevan floor level

AMJ.16.1.1.12

twelve floor level

AMJ.16.1.1.13

Thirteen and Forteenth floor level

AMJ.16.1.1.15

Fifteen and Sixteenth floor level

AMJ.16.1.1.16

Roof floor level

Procurements

Management Accomodation 1&2

General Area Wide

Transformer by DEWS

Domestic subcontractors material procurements

AMJ.17.1.2.1

Aluminium door,window, louvers

AMJ.17.1.2.2

aluminium balustrade

AMJ.17.1.2.3

gypsum board tiles

AMJ.17.1.2.4

subcontractor waterproofing

AMJ.17.1.2.5

post tentioning works

AMJ.17.1.2.6

road markings

AMJ.17.1.2.7

floor coatings

AMJ.17.1.2.8

roof waterproofing

AMJ.17.1.2.9

painting works

AMJ.17.1.2.10

signage works

AMJ.17.1.2.11

speed check system

AMJ.17.1.2.12

steel door

AMJ.17.1.2.13

wooden door

general material procurements

AMJ.17.1.14.1

ceramic tiles

AMJ.17.1.14.2

granite floor tiles

AMJ.17.1.14.3

granito tiles

AMJ.17.1.14.4

steel

AMJ.17.1.14.5

limestone tiles

AMJ.17.1.14.6

sports flooring

AMJ.17.1.14.7

vinyle skirting

AMJ.17.1.14.8

prcast concrete pavers

Nominated subcontactors material procurements

AMJ.17.1.9.1

alucobond cladding

AMJ.17.1.9.2

vertical transportation

AMJ.17.1.9.3

sanitary ware

AMJ.17.1.9.4

window cleaning system

AMJ.17.1.9.5

bulkhead

AMJ.17.1.9.6

MEP

AMJ.17.1.9.7

Ironmongery

AMJ.17.1.9.8

swimming pool

AMJ.17.1.9.9

landscaping

AMJ.17.1.9.10

garbage chutes

AMJ.17.1.9.11

traffic barriers

AMJ.17.1.9.12

curtain blinds

AMJ.17.1.9.13

bathroom cabinates

AMJ.17.1.9.14

light liftings

Construction installations

Management accomodation 1&2

Management 1-structural works

Basement 1

AMJ.17
AMJ.17.1
AMJ.17.1.1
AMJ.17.1.1.1
AMJ.17.1.2

AMJ.17.1.14

AMJ.17.1.9

AMJ.15
AMJ.15.1
AMJ.15.1.1
AMJ.15.1.1.1

AMJ.15.1.1.1.1Civil works

AMJ.15.1.1.1.1.1
Preparaiton works

AMJ.15.1.1.1.1.2
grade slab

AMJ.15.1.1.1.1.3
core walls

Page 2 of 7

Oracle Corporation

29-Dec-13 21:00
WBS Code

WBS Name

Total Activities

AMJ.15.1.1.1.1.4
retaining walls

AMJ.15.1.1.1.1.5
water tank/retaining tank/ramp wall

AMJ.15.1.1.1.1.6
column

AMJ.15.1.1.1.1.7
slab

AMJ.15.1.1.1.1.8
staircase flight slab

AMJ.15.1.1.9

Ground floor

AMJ.15.1.1.9.1Civil Works

AMJ.15.1.1.9.1.1
core wall

AMJ.15.1.1.9.1.2
column

AMJ.15.1.1.9.1.3
slab

AMJ.15.1.1.9.1.4
staircase flight slab

AMJ.15.1.1.5

First Floor

AMJ.15.1.1.5.1Civil Works

AMJ.15.1.1.5.1.1
core wall

AMJ.15.1.1.5.1.2
column

AMJ.15.1.1.5.1.3
slab

AMJ.15.1.1.5.1.4
staircase flight slab

AMJ.15.1.1.2

Second floor

AMJ.15.1.1.2.1Civil Works

AMJ.15.1.1.2.1.1
core wall

AMJ.15.1.1.2.1.2
column

AMJ.15.1.1.2.1.3
slab

AMJ.15.1.1.2.1.4
staircase flight slab

AMJ.15.1.1.3

Third floor

AMJ.15.1.1.3.1Civil Works

AMJ.15.1.1.3.1.1
core wall

AMJ.15.1.1.3.1.2
column

AMJ.15.1.1.3.1.3
slab

AMJ.15.1.1.3.1.4
staircase flight slab

AMJ.15.1.1.4

Forth floor

AMJ.15.1.1.4.1Civil Works

AMJ.15.1.1.4.1.1
core wall

AMJ.15.1.1.4.1.2
column

AMJ.15.1.1.4.1.3
slab

AMJ.15.1.1.4.1.4
staircase flight slab

AMJ.15.1.1.6

Fifth floor

AMJ.15.1.1.6.1Civil Works

AMJ.15.1.1.6.1.1
core wall

AMJ.15.1.1.6.1.2
column

AMJ.15.1.1.6.1.3
slab

AMJ.15.1.1.6.1.4
staircase flight slab

AMJ.15.1.1.7

sixth floor

AMJ.15.1.1.7.1Civil Works

AMJ.15.1.1.7.1.1
core wall

AMJ.15.1.1.7.1.2
column

AMJ.15.1.1.7.1.3
slab

AMJ.15.1.1.7.1.4
staircase flight slab

AMJ.15.1.1.8

seventh floor

AMJ.15.1.1.8.1Civil Works

AMJ.15.1.1.8.1.1
core wall

AMJ.15.1.1.8.1.2
column

AMJ.15.1.1.8.1.3
slab

AMJ.15.1.1.8.1.4
staircase flight slab

AMJ.15.1.1.10

eighth floor

AMJ.15.1.1.10.1
Civil Works

AMJ.15.1.1.10.1.1
core wall

AMJ.15.1.1.10.1.2
column

AMJ.15.1.1.10.1.3
slab

AMJ.15.1.1.10.1.4
staircase flight slab

AMJ.15.1.1.11

Nineth floor

AMJ.15.1.1.11.1
Civil Works

AMJ.15.1.1.11.1.1
core wall

AMJ.15.1.1.11.1.2
column

Page 3 of 7

Oracle Corporation

29-Dec-13 21:00
WBS Code

WBS Name

Total Activities

AMJ.15.1.1.11.1.3
slab

AMJ.15.1.1.11.1.4
staircase flight slab

AMJ.15.1.1.12

Tenth floor

AMJ.15.1.1.12.1
Civil Works

AMJ.15.1.1.12.1.1
core wall

AMJ.15.1.1.12.1.2
column

AMJ.15.1.1.12.1.3
slab

AMJ.15.1.1.12.1.4
staircase flight slab

AMJ.15.1.1.13

roof floor level

AMJ.15.1.1.13.1
Civil Works

AMJ.15.1.1.13.1.1
core wall

AMJ.15.1.1.13.1.2
column

AMJ.15.1.1.13.1.3
slab

AMJ.15.1.1.13.1.4
staircase flight slab

AMJ.15.1.1.14

top roof floor

AMJ.15.1.1.14.1
Civil Works

AMJ.15.1.1.14.1.1
core wall

AMJ.15.1.1.14.1.2
column

AMJ.15.1.1.14.1.3
slab

AMJ.15.1.1.14.1.4
staircase flight slab

AMJ.15.1.15
AMJ.15.1.15.1

Management 2-structural works

Basement 1

AMJ.15.1.15.1.1
Civil works

AMJ.15.1.15.1.1.1
Preparaiton works

AMJ.15.1.15.1.1.2
grade slab

AMJ.15.1.15.1.1.3
core walls

AMJ.15.1.15.1.1.4
retaining walls

AMJ.15.1.15.1.1.5
water tank/retaining tank/ramp wall

AMJ.15.1.15.1.1.6
column

AMJ.15.1.15.1.1.7
slab

AMJ.15.1.15.1.1.8
staircase flight slab

AMJ.15.1.15.9

Ground floor

AMJ.15.1.15.9.1
Civil Works

AMJ.15.1.15.9.1.1
core wall

AMJ.15.1.15.9.1.2
column

AMJ.15.1.15.9.1.3
slab

AMJ.15.1.15.9.1.4
staircase flight slab

AMJ.15.1.15.5

First Floor

AMJ.15.1.15.5.1
Civil Works

AMJ.15.1.15.5.1.1
core wall

AMJ.15.1.15.5.1.2
column

AMJ.15.1.15.5.1.3
slab

AMJ.15.1.15.5.1.4
staircase flight slab

AMJ.15.1.15.2

Second floor

AMJ.15.1.15.2.1
Civil Works

AMJ.15.1.15.2.1.1
core wall

AMJ.15.1.15.2.1.2
column

AMJ.15.1.15.2.1.3
slab

AMJ.15.1.15.2.1.4
staircase flight slab

AMJ.15.1.15.3

Third floor

AMJ.15.1.15.3.1
Civil Works

AMJ.15.1.15.3.1.1
core wall

AMJ.15.1.15.3.1.2
column

AMJ.15.1.15.3.1.3
slab

AMJ.15.1.15.3.1.4
staircase flight slab

AMJ.15.1.15.4

Forth floor

AMJ.15.1.15.4.1
Civil Works

AMJ.15.1.15.4.1.1
core wall

AMJ.15.1.15.4.1.2
column

AMJ.15.1.15.4.1.3
slab

AMJ.15.1.15.4.1.4
staircase flight slab

AMJ.15.1.15.6

Fifth floor

AMJ.15.1.15.6.1
Civil Works

Page 4 of 7

Oracle Corporation

29-Dec-13 21:00
WBS Code

WBS Name

Total Activities

AMJ.15.1.15.6.1.1
core wall

AMJ.15.1.15.6.1.2
column

AMJ.15.1.15.6.1.3
slab

AMJ.15.1.15.6.1.4
staircase flight slab

AMJ.15.1.15.7

sixth floor

AMJ.15.1.15.7.1
Civil Works

AMJ.15.1.15.7.1.1
core wall

AMJ.15.1.15.7.1.2
column

AMJ.15.1.15.7.1.3
slab

AMJ.15.1.15.7.1.4
staircase flight slab

AMJ.15.1.15.8

seventh floor

AMJ.15.1.15.8.1
Civil Works

AMJ.15.1.15.8.1.1
core wall

AMJ.15.1.15.8.1.2
column

AMJ.15.1.15.8.1.3
slab

AMJ.15.1.15.8.1.4
staircase flight slab

AMJ.15.1.15.10 eighth floor

AMJ.15.1.15.10.1
Civil Works

AMJ.15.1.15.10.1.1
core wall

AMJ.15.1.15.10.1.2
column

AMJ.15.1.15.10.1.3
slab

AMJ.15.1.15.10.1.4
staircase flight slab

AMJ.15.1.15.11 Nineth floor

AMJ.15.1.15.11.1
Civil Works

AMJ.15.1.15.11.1.1
core wall

AMJ.15.1.15.11.1.2
column

AMJ.15.1.15.11.1.3
slab

AMJ.15.1.15.11.1.4
staircase flight slab

AMJ.15.1.15.12 Tenth floor

AMJ.15.1.15.12.1
Civil Works

AMJ.15.1.15.12.1.1
core wall

AMJ.15.1.15.12.1.2
column

AMJ.15.1.15.12.1.3
slab

AMJ.15.1.15.12.1.4
staircase flight slab

AMJ.15.1.15.13 roof floor level

AMJ.15.1.15.13.1
Civil Works

AMJ.15.1.15.13.1.1
core wall

AMJ.15.1.15.13.1.2
column

AMJ.15.1.15.13.1.3
slab

AMJ.15.1.15.13.1.4
staircase flight slab

AMJ.15.1.15.14 top roof floor

AMJ.15.1.15.14.1
Civil Works

AMJ.15.1.15.14.1.1
core wall

AMJ.15.1.15.14.1.2
column

AMJ.15.1.15.14.1.3
slab

AMJ.15.1.15.14.1.4
staircase flight slab

AMJ.15.1.2
AMJ.15.1.2.1

Managemetn accomodation 1&2 Finishing works

General Area Wide

AMJ.15.1.2.1.1general area wide

AMJ.15.1.2.1.1.1
alucobond cladding

AMJ.15.1.2.1.1.2
vertical transportation

AMJ.15.1.2.1.1.3
windows cleaning system in management 1

AMJ.15.1.2.1.1.4
windows cleaing system in management 2

AMJ.15.1.2.1.1.5
swimming pool

AMJ.15.1.2.1.1.6
garbage chute

AMJ.15.1.2.1.1.7
traffic barrier

AMJ.15.1.2.1.1.8
grabage room

AMJ.15.1.2.1.1.9
staircase finishes

AMJ.15.1.2.1.10
elevation 1

AMJ.15.1.2.1.2elevation 2

AMJ.15.1.2.1.3elevation 3

AMJ.15.1.2.1.4elevation 4

AMJ.15.1.2.4

basement floor level

Page 5 of 7

Oracle Corporation

29-Dec-13 21:00
WBS Code

WBS Name

Total Activities

AMJ.15.1.2.4.1finishes

AMJ.15.1.2.4.1.1
service room and driveway/parking area

AMJ.15.1.2.4.2MEP
AMJ.15.1.2.3

Ground floor level

AMJ.15.1.2.3.1Finishes

AMJ.15.1.2.3.1.1
cooridor/lift lobby

AMJ.15.1.2.3.1.2
service room and drive way

AMJ.15.1.2.3.1.3
transformer room

AMJ.15.1.2.3.1.4
MEP

AMJ.15.1.2.2

first floor level

AMJ.15.1.2.2.1finishes

AMJ.15.1.2.2.1.1
apartments

AMJ.15.1.2.2.1.2
cooridor lift lobby

AMJ.15.1.2.2.1.3
service room parking area

AMJ.15.1.2.2.1.4
MEP

AMJ.15.1.2.5

second floor

AMJ.15.1.2.5.1finishes

AMJ.15.1.2.5.1.1
apartments

AMJ.15.1.2.5.1.2
cooridor lift lobby

AMJ.15.1.2.5.1.3
service room parking area

AMJ.15.1.2.5.1.4
MEP

AMJ.15.1.2.6

third fllor

AMJ.15.1.2.6.1finishes

AMJ.15.1.2.6.1.1
apartments

AMJ.15.1.2.6.1.2
cooridor lift lobby

AMJ.15.1.2.6.1.3
service room parking area

AMJ.15.1.2.6.1.4
MEP

AMJ.15.1.2.7

forth floor

AMJ.15.1.2.7.1finishes

AMJ.15.1.2.7.1.1
apartments

AMJ.15.1.2.7.1.2
cooridor lift lobby

AMJ.15.1.2.7.1.3
service room parking area

AMJ.15.1.2.7.1.4
MEP

AMJ.15.1.2.8

fifth fllor

AMJ.15.1.2.8.1finishes

AMJ.15.1.2.8.1.1
apartments

AMJ.15.1.2.8.1.2
cooridor lift lobby

AMJ.15.1.2.8.1.3
service room parking area

AMJ.15.1.2.8.1.4
MEP

AMJ.15.1.2.9

sixth floor

AMJ.15.1.2.9.1finishes

AMJ.15.1.2.9.1.1
apartments

AMJ.15.1.2.9.1.2
cooridor lift lobby

AMJ.15.1.2.9.1.3
service room parking area

AMJ.15.1.2.9.1.4
MEP

AMJ.15.1.2.10

seventh fllor

AMJ.15.1.2.10.1
finishes

AMJ.15.1.2.10.1.1
apartments

AMJ.15.1.2.10.1.2
cooridor lift lobby

AMJ.15.1.2.10.1.3
service room parking area

AMJ.15.1.2.10.1.4
MEP

AMJ.15.1.2.11

eighth fllor

AMJ.15.1.2.11.1
finishes

AMJ.15.1.2.11.1.1
apartments

AMJ.15.1.2.11.1.2
cooridor lift lobby

AMJ.15.1.2.11.1.3
service room parking area

AMJ.15.1.2.11.1.4
MEP

AMJ.15.1.2.12

ninth fllor

AMJ.15.1.2.12.1
finishes

AMJ.15.1.2.12.1.1
apartments

AMJ.15.1.2.12.1.2
cooridor lift lobby

AMJ.15.1.2.12.1.3
service room parking area

AMJ.15.1.2.12.1.4
MEP

Page 6 of 7

Oracle Corporation

29-Dec-13 21:00
WBS Code

WBS Name
AMJ.15.1.2.13

Total Activities

tenth fllor

AMJ.15.1.2.13.1
finishes

AMJ.15.1.2.13.1.1
apartments

AMJ.15.1.2.13.1.2
cooridor lift lobby

AMJ.15.1.2.13.1.3
service room parking area

AMJ.15.1.2.13.1.4
MEP

AMJ.15.1.2.14

eleventh fllor

AMJ.15.1.2.14.1
finishes

AMJ.15.1.2.14.1.1
apartments

AMJ.15.1.2.14.1.2
cooridor lift lobby

AMJ.15.1.2.14.1.3
service room parking area

AMJ.15.1.2.14.1.4
MEP

AMJ.15.1.2.15

twelth fllor

AMJ.15.1.2.15.1
finishes

AMJ.15.1.2.15.1.1
apartments

AMJ.15.1.2.15.1.2
cooridor lift lobby

AMJ.15.1.2.15.1.3
service room parking area

AMJ.15.1.2.15.1.4
MEP

AMJ.15.1.2.16

thirteen floor

AMJ.15.1.2.16.1
finishes

AMJ.15.1.2.16.1.1
apartments

AMJ.15.1.2.16.1.2
cooridor lift lobby

AMJ.15.1.2.16.1.3
service room parking area

AMJ.15.1.2.16.1.4
MEP

AMJ.15.1.2.17

forteenth

AMJ.15.1.2.17.1
finishes

AMJ.15.1.2.17.1.1
apartments

AMJ.15.1.2.17.1.2
cooridor lift lobby

AMJ.15.1.2.17.1.3
service room parking area

AMJ.15.1.2.17.1.4
MEP

AMJ.15.1.2.18

fifteenth

AMJ.15.1.2.18.1
finishes

AMJ.15.1.2.18.1.1
apartments

AMJ.15.1.2.18.1.2
cooridor lift lobby

AMJ.15.1.2.18.1.3
service room parking area

AMJ.15.1.2.18.1.4
MEP

AMJ.15.1.2.19

sixteenth fllor

AMJ.15.1.2.19.1
finishes

AMJ.15.1.2.19.1.1
apartments

AMJ.15.1.2.19.1.2
cooridor lift lobby

AMJ.15.1.2.19.1.3
service room parking area

AMJ.15.1.2.19.1.4
MEP

AMJ.15.1.2.20

roof floor

AMJ.15.1.2.20.1
finishes

AMJ.15.1.2.20.1.1
apartments

AMJ.15.1.2.20.1.2
cooridor lift lobby

AMJ.15.1.2.20.1.3
service room parking area

AMJ.15.1.2.20.1.4
MEP

AMJ.15.1.21

Testing and commisioning

Page 7 of 7