Vous êtes sur la page 1sur 27

1

coregas for TSO



Product description

CX4U - Januar 2012
2

Content
Inhalt
The company group CX4U ...................................................................................................... 3
1 Network points Illustration of the grid topology ........................................................... 4
1.1 Hierarchy representation of the grid technology ............................................................ 4
1.2 Detailed information for grid interconnection points ..................................................... 5
1.3 Storage management ....................................................................................................... 9
1.3.1 Storage entry point .................................................................................................. 10
1.3.2 Storage exit point ..................................................................................................... 11
1.3.3 Operating Balancing Agreement .............................................................................. 11
2 Capacity management ................................................................................................... 14
2.1 Presentation of capacity-relevant time-series ............................................................... 16
2.2 Allocation preparation ................................................................................................... 17
2.3 Seamless integration in SAP IS-U ................................................................................... 17
2.4 Event Logging ................................................................................................................. 17
3 Nomination- and allocation management ...................................................................... 18
3.1 Allocation effective nomination management .............................................................. 18
3.2 Inbound processing of nomination ................................................................................ 18
3.2.1 Processing of incoming IDocs ................................................................................... 19
4 Market communication ................................................................................................. 20



3
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
The company group CX4U
The management consulting company, CX4U Consulting GmbH & Co.KG (formerly corporate
practice for utilities GmbH & CO. KG) of the CX4U AG - is dedicated since 2004 to SAP IS-
U/EDM based extension solutions for the gas market
CX4U is since 2006 Special Expertise Partner Gas of the SAP Germany AG & CO. KG.
Since 2007 is the IT-subsidiary of the CX4U-group, CX4U Solutions GmbH & Co. KG (formerly
corporate service for utilities GmbH & CO.KG), certified Development Cooperation Partner of
the SAP AG about gas. The development cooperation agreement concerns SAP IS-U/EDM -
based and - supplementing software products for the worldwide energy markets.
We take this task seriously and are pleased about this extremely successful partnership,
which is already well represented in many common installations.
All software products of the coregas product family are developed and documented accord-
ing to the development guidelines of the SAP AG. Furthermore in the context of develop-
ment co-operation was agreed a standardized maintenance upon: the coregas products have
their own name space and are serviced over the SAP Solution manager.
The technical routing of the OSS messages does not change from there for our customers.
Downloads and the completion of release changes and patches, etc. for our products is
available on our website www.cx4u.com.


4
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
1 Network points Illustration of the grid topology
1.1 Hierarchy representation of the grid technology
As substantial increase in value coregas for TSO offers an aggregated summary of all objects
within the grid topology. This aggregated view on the grid topology is realized by the display
of gas stations.
Menu path: Utilities Industry -> Energy Data Management -> coregas -> coregas for TSO ->
Grid points Station Display station (/CS4UGAS/STAT03)

Picture 1: Hierarchy representation of the grid topology


5
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
1.2 Detailed information for grid interconnection points
Grid interconnection points are shown in coregas for TSO as a station. In order to give a
complete illustration of the different objects within the grid topology, the following kinds of
stations are currently supported:

Short Summary Usage
AUSPZ Output Region
BEMST Gas composition measurement station
BEQST Gas acquisition source station
BWBZK Calorific value area
DIMST Compression measurement station
EKFST Purchase station
GDR Gas pressure regulating station
MENANM Quantity declaration
MGEB Market area
MSBZK Measurement district
NETPUF Network-Buffer
NKPKT Grid point
NOMNG Nomination
SPCHR Storage
TRANS Transfer-Point
UEMST Transfer measurement station
Table 1: Kinds of station in coregas for TSO

6
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
Menu path: Utilities Industry -> Energy Data Management -> coregas -> coregas for TSO ->
Grid points Station Display station (/CS4UGAS/STAT03)

Picture 2: Detailed information for grid interconnection points General information
After opening the view to a certain gas station, detailed information on the different tabs of
the Time-dependent data area are provided.
Within the General tab information like the gas station owner or the flow direction are
displayed.

7
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
Menu path: Utilities Industry -> Energy Data Management -> coregas -> coregas for TSO ->
Grid points Station Display station (/CS4UGAS/STAT03)

Picture 3: Detailed information for grid interconnection points Information to the Instal-
lation
Within the Installation tab detailed information, like the location of the installation are
provided.

8
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
Menu path: Utilities Industry -> Energy Data Management -> coregas -> coregas for TSO ->
Grid points Station Display station (/CS4UGAS/STAT03)

Picture 4: Detailed information for grid interconnection points Functional parameters
Within this view detailed information about this grid point e.g. the technical maximum ca-
pacity or the name of the grid is given.

9
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
Menu path: Utilities Industry -> Energy Data Management -> coregas -> coregas for TSO ->
Grid points Station Display station (/CS4UGAS/STAT03)

Picture 5: Detailed information for grid interconnection points Gas specification
On the last tab there are information about the gas specifications provided e.g. the minimal
and maximal calorific value.

1.3 Storage management
coregas for TSO provides the full functionality of the storage management. The schedule
management can be realized based on receipt nomination. The complete data can be ex-
ported from the system in different formats to process them later.


10
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
1.3.1 Storage entry point
In the capacity view of the entry point the following information is for every storage dis-
played:
- Hourly profile: Entry nomination
- Hourly profile: Capacities from package reservations (identical view for entry and exit
point)
- Daily profile: Level of the working gas account (identical view for entry and exit point)
- Daily profile: Maximal stand for the working gas account (package reservations, iden-
tical view for entry and exit point)

Picture 6: Storage entry point (Capacity View)

11
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
1.3.2 Storage exit point
The button in the top of the screen switches between 2 different views the Capacity-View
(CAP) and the Energy-Data-Management-View (EDM).
In the EDM-View the details for the equipment information with counter mechanism are set
for the installation. This is used to manage the following data:
- Formula profile (hourly values): Sum for the exit nomination of exit settlement
- Profiles for metering (preliminary and finally) of entry nomination for entry settle-
ment
- Profile for calorific values for entry storage into the network


In the view of the capacity of the exit point, for every transport customer the following in-
formation will be shown:

- Hourly profile: Exit nomination
- Hourly profile: Capacities from package reservations
- Daily profile: Stand of the working gas account (identical for entry and exit point)
- Daily profile: Maximal stand for working gas account (from package reservations,
identical for entry and exit point)

1.3.3 Operating Balancing Agreement
The Operating Balancing Agreement (OBA) is an agreement between an operator at an entry
and the nominator of non-assignable residual amounts on the distribution.
During the nomination process, the divergences between the target and the physical memo-
ry on the operating mode of the operator control account (OBA) are posted. For this purpose

12
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
an "Operating Balancing Agreement" has to be signed between the storage facility operator
and the network operator. The goal is a balanced account.
A negative balance of the network operators control account means a shortage of the net
against the storage, while a positive account balance an exceed of the networks against the
storage represents. Thereby saving on the nomination will be deducted from the measured
value, while deducted from the measured value of the nomination.


Saving of Storage
Nomination 100.000 kWh
Measurement 90.000 kWh
Shortage of storage OBA -10.000 kWh

Nomination 100.000 kWh
Measurement 110.000 kWh
Exceed of storage OBA +10.000 kWh

Removal of storage
Nomination 100.000 kWh
Measurement 90.000 kWh
Shortage of removal OBA +10.000 kWh

Nomination 100.000 kWh
Measurement 110.000 kWh
Exceed of removal OBA -10.000 kWh
Table 2: Example for the determination of the OBA balance
In the OBA agreement, the limit values for the network operators control account are de-
fined and how to respond to higher limits is described, too.

The parties agree that a balance account (network operators control account), if technically
possible, is the major goal and the differences between target nomination and physi-
cal behaviour of the storage are supervised by hourly measured values.

The presentation of the OBA account is in the coregas Gasstation Display.

13
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275

Picture 7: OBA Account within Gasstation Display
By a click on the profile number the OBA account is displayed for a predefined period of
time.


Picture 8: Process of the OBA Account


14
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
2 Capacity management
coregas for TSO has the possibility to check for free capacities and therefore it crosschecks
the numbers of connected pipelines. The capacity check is based on available and market
capable transport capacities of the segments of the transport system.
coregas for TSO has the ability to control the network-capacity for different transport sce-
narios (grid points, workload, flow direction, etc.).
coregas for TSO supports the control of the requested transport capacities versus the availa-
ble capacities regarding to the different workload scenarios short, middle and long range
intervals.
coregas for TSO has functionalities for all transport routes, transport section routes, trans-
port sub section routes and capacity workload scenarios to collect and maintain at least data
for:
Unique identifier of the transport segments
Technical attributes of the transport segments
Unique identifier of the transport sub-segments based on a transport segment in
an n: 1 relationship
Technical attributes of the transport sub-segments (e.g. basic capacity)
Unique identifier for load scenarios
Technical attributes for load scenarios

coregas for TSO maps the various network topologies and network levels with the appropri-
ate network points relationship. Each of the net available capacity is shown.
The network points are connected with all necessary segments for showing all relations be-
tween the partially overlapping transport relations and all network points (which are listed in
the transport contract and the internet).

The path from an interconnection point to another (entry/exit) will be shown in coregas for
TSO through the entry to exit point matrix.

15
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
coregas for TSO identifies all possible transport paths and sub paths to a particular transport,
the results from a point-to-point service provided for clients booking.
To check the possible requested transport capacities, coregas for TSO calculates based on
booked capacities and reserved capacities possible free capacities for single sub path and
network points.
For further processing, the following data of coregas for TSO is considered:
Take-over or entry point
Interconnection or entry point
Load-scenario
Fixed / interruptible
Start date of the transport service
End date of transport service
Requested capacity profile (m3/h)
Gas pressure (entry and exit)
Gas quality

coregas for TSO shows the results of previously executed controlled capacities in a tabular
structure:
Entry-/exit point (characteristically classification)
Transport path (characteristically classification)
Transport segment (characteristically classification)
Minimal capacity
Current maximum capacity
Nominated fixed capacity
Available capacity
Nominated interruptible capacity
A list of all transport segments and sub segments (all assigned, provisionally assigned and
available capacities) will be processed.
coregas for TSO correlates transport segments and network points with their summed allo-
cated capacity. If a capacity within a transport path has a state reserved / available or

16
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
booked assigned, coregas for TSO will regard this in further processes as not changeable.
Additionally the state effectively reserved can be given for further capacity planning.
The booking process or the reservation of transport capacities can be revoked. Therefore the
state of the capacity must be released from reserved/offered, booked or requested to free
and the quantities of the available capacities must be checked.
If enough capacities are available for a specific request, the state will be changed to YES.
In the event that one or more entry-exit capacities and transport segments can be used for
this interrupt, the availability state will be set to interruptible.
In all other cases coregas for TSO will set the available state on NO. In order to hold the
resulting rejection of the requested capacity for a later revision, coregas for TSO can save
capacity situations (e.g. transport quantity, etc.).
coregas for TSO calculates future transport requests based on the net structure. Therefore
coregas for TSO creates offer/ request scenarios for nodes and transport segments based on
net segments.
The load scenario monitor displays the flow situations or a virtual flow situation within the
pipelines and identifies the points where a capacity may be interrupted because of the fact
that it runs short.
Each capacity contract is assigned to a corresponding capacity load scenario. Capacity checks
are performed against corresponding load scenarios. A capacity overload from the load sce-
nario to the contract has to be avoided.
coregas for TSO is able to analyse the capacity request based on offer/ request scenarios and
current overload in the net.

2.1 Presentation of capacity-relevant time-series
The Presentation of the corresponding time series can be pictured by
tabular presentation and
Graphical presentation.

17
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
2.2 Allocation preparation
coregas for TSO provides the following possibilities in preparation of an allocation which is
processed later:
Determination of capacity settlement for a certain time series
Check and Reservation of capacity requests
Calculation of free and booked capacities
Validation of capacity by nomination limits
Cyclic update of time series
2.3 Seamless integration in SAP IS-U
Integration in the SAP IS-U/EDM data model is given about the use of the SAP IS-U installa-
tions and point of delivery.
2.4 Event Logging
Separate log documents are written for all the events that result in the calculation and
processing of capacity relevant objects in coregas for TSO.

18
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
3 Nomination- and allocation management
3.1 Allocation effective nomination management
The nomination management includes all nominations compared to the corresponding op-
erators. The nomination must be made by all market partners e.g. in kWh indicating alloca-
tion number on an hourly basis.
Generally it could be nominated:
All inputs into the market area as border crossing, crossing the market area, storage
exit, national production, feeding biogas, LPG mixing station exit.
All the offtake from the market area as border crossing, crossing the market area,
storage entry,
Transfer of gas quantities at trading or balancing points.

3.2 Inbound processing of nomination
The following functionalities based on the Edig@s-Market-Communication-Formats are sup-
ported (a detailed overview of all supported formats is given within chapter 4):
The following activities for example are supported:
Receive a NOMINT message
Acknowledgement of receipts
Processing a NOMRES message
Matching request as s DELROD message
Matching answer as a DELRES message
Archiving of the acknowledgement
Logging
Profile storage with corresponding allocation

19
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
Configuration of the nomination time limits on the interconnection point and suppli-
er level
Flexible configuration and implementation of correction procedures for each inter-
connection point and supplier
Automated replacement values for missing nominations

3.2.1 Processing of incoming IDocs
The reception of messages of the format NOMINT is done automatically through a specially
defined IDoc format. The used IDoc type will be configured in the customizing. Apart from
the acknowledgement of receipts per NOMRES is the confirmation or correction of nomi-
nation possible. The following figure illustrates a nomination and a capacity for a grid con-
nection point within the graphical display:

Picture 1 - Nomination


20
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
4 Market communication
coregas for TSO gives the user the possibility to automatically take part to the market com-
munication with other market members. Therefore coregas for TSO has the special Edig@s -
formats integrated, as they are used in a lot of european countries.

NOMINT / NOMRES
The message types NOMINT and NOMRES can be used for the exchange of nominations
within the gas market. If e.g. a transport customer processes a nomination at a virtual trad-
ing point a message of the type NOMINT is used and answered by a message of the type
NOMRES. Within this answer will the asked amount of energy be accepted or an adjustment
to the original nomination will be send.
The product coregas for TSO offers the possibility to receive to process and to send messag-
es of the formats NOMINT and NOMRES.






Message type Process to be transmitted
NOMINT Transmission of nomination Messages
NOMRES Reception of acknowledges of nomination messages
TSIMSG Transmission of declaration lists and change of case groups
SSQNOT Transmission of exceed and shortages of quantities
SCHEDL Transmission of nomination
DELORD Nomination message
DELRES Acknowledge of nomination
CAPNOT Capacity notification
CAPRES Reception of messages for capacity notifications

21
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
DELORD / DELRES
A message of the type DELORD is used to exchange nomination quantities between two
network operators. The message type DELRES is used to provide a response of the DELORD
message. This includes the quantities which are present after the matching process.
The product coregas for TSO offers the possibility to receive to process and to send messag-
es of the format DELORD and DELRES.

SCHEDL
A message of the type SCHEDL is used to send quantity declarations on an hourly basis. In
general case SCHEDL message will not be answered. The product coregas for TSO offers the
possibility to receive to process and send to messages of the format SCHEDL.

CAPNOT / CAPRES
The format CAPNOT is used for the exchange of information about the notifications of capac-
ities. The format CAPRES is used for the acknowledgment (acceptance or rejection) of a re-
ceived CAPNOT message.
The product coregas for TSO offers the possibility to receive to process and to send messag-
es of the formats CAPNOT and CAPRES.

TSIMSG
A message of the type TSIMSG is used to exchange information about the change of case
groups. Besides the message type TSIMSG can be used to send the declaration list for the
next time period.
The product coregas for TSO offers the possibility to receive to process and to send messag-
es of the format TSIMSG.



22
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
SSQNOT
A message of the type SSQNOT is used to send exceed and shortages of quantities as result
of the settlement. Additionally the message type SSQNOT can be used to send late registra-
tion of exceed and shortage quantities.
The product coregas for TSO offers the possibility to receive to process and to send messag-
es of the format SSQNOT.

23
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
Appendix A:
Example for the determination of a technical quantity
In the context of the condition quantity revaluation, coregas for TSO provides the opportuni-
ty of the revaluation of the operating volume of a mass of gas into a standardized volume.
The operating pressure of the gas, the gas temperature and the compressibility factor serve
as possible input parameters. The compressibility factor can be calculated according to the
standard procedure of the American Gas Association, which has been described in the report
8 (AGA 8), where the 21 gas components are evaluated.

Replacement Value
In the standard delivery of the SAP IS-U are replacement value procedure already contained.
coregas for TSO contains additional replacement value procedures, which offer optimized
procedures for the replacement value formation particularly for the characteristics of gas
sector. One of these replacement value procedures are the alternative calculation of stan-
dard volume based on the operation volume. This procedure replaces missing profile values
for the AMR (automatic meter reading) if they are not correctly transferred. These values are
calculated in coregas for TSO with help of the operation volume V
o
and the S-factor.
The other replacement value procedure which is implemented in coregas for TSO is the re-
taining value procedure. This procedure holds with its assistance replacement values for
missing values in the transmission.

Calculation Workbench
The calculation Workbench provides the user the ability to create user-defined formulas
without programming any code for the calculation. For the definition and calculation are no
special privileges in the system necessary.

24
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275

List of abbreviations
AGA American Gas Association
AUSPZ Gasstation type - Output Region
BEMST Gasstation type - Gas composition measurement station
BEQST Gasstation type - Gas acquisition source station
BWBZK Gasstation type - Calorific value area
CAPNOT Edig@s format - Capacity
CAPRES Edig@s format - Capacity
DELORD Edig@s format - Nomination message
DELRES Edig@s format - Acknowledge of nomination
DIMST Gasstation type - Compression measurement station
DSO Distribution System Operator
EDM Energy-Data-Management
EKFST Gasstation type - Purchase station
GDR Gasstation type - Gas pressure regulating station
ID Identifier
IS-U (SAP) Industry Solution Utilities
kWh Kilowatt per hour
MENANM Gasstation type - Quantity declaration
MGEB Gasstation type - Market area
MSBZK Gasstation type - Measurement district
NETPUF Gasstation type - Network-Buffer
NKPKT Gasstation type - Grid point
NOMINT Edig@s format Transmission of nomination message

25
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275
NOMNG Gasstation type - Nomination
NOMRES Edig@s format Reception of acknowledges of nomination messages
OSS Online Support Service
SCHEDL Edig@s format Nomination
SLP Standard load profile
SPCHR Gasstation type Storage
SSO Storage System Operator
SSQNOT Edig@s format - Transmission of exceed and shortages of quantities
TQD Technical quantity determination
TRANS Gasstation type - Transfer-Point
TSIMSG Edig@s format Transmission of declaration lists
TSO Transmission System Operator
UEMST Gasstation type - Transfer measurement station
XML Extensible Markup Language
XXVI

List of figures
Picture 1: Hierarchy representation of the grid topology .......................................................... 4
Picture 2: Detailed information for grid interconnection points General information .......... 6
Picture 3: Detailed information for grid interconnection points Information to the
Installation .................................................................................................................................. 7
Picture 4: Detailed information for grid interconnection points Functional parameters ...... 8
Picture 5: Detailed information for grid interconnection points Gas specification ................ 9
Picture 6: Storage entry point (Capacity View) ........................................................................ 10
Picture 7: OBA Account within Gasstation Display .................................................................. 13
Picture 8: Process of the OBA Account .................................................................................... 13

List of tables
Table 1: Kinds of station in coregas for TSO ............................................................................... 5
Table 2: Example for the determination of the OBA balance .................................................. 12



















27
CX4U Solutions GmbH & Co. KG, Theaterwall 10, D-26122 Oldenburg, Geschftsfhrer Dr. Peter Rgge,
Tel.: +49 (441) 779359-0, Fax: +49 (441) 779359-20, Internet: www.cx4u.com, info@cx4u.com, HRA 200275










by CX4U Solutions GmbH & Co.KG, Oldenburg, Germany www.cx4u.com
All rights reserved. No part of this publication may be reproduced or transmitted in any form
(print, photocopy, microfilm or any other way) without written permission of the publisher.
This document was created with the utmost care. Nevertheless, errors can not be complete-
ly excluded. Editor and author neither can take legal responsibility nor accept any liability for
incorrect information or consequences.

Vous aimerez peut-être aussi