SCOPE OF WORKS for ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION / TIE-IN and COMMISSIONING for NEW CHEMICAL INJECTION SKIDS ON PQP-HT.
Description originale:
Titre original
Scope of work for new chemical skid on PQP-HT Draft copy for information.doc
SCOPE OF WORKS for ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION / TIE-IN and COMMISSIONING for NEW CHEMICAL INJECTION SKIDS ON PQP-HT.
SCOPE OF WORKS for ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION / TIE-IN and COMMISSIONING for NEW CHEMICAL INJECTION SKIDS ON PQP-HT.
INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT Revso n Date Remarks Prepared by Checked By Approved by B1 12-Sep- 14 Prepared for revew V.Pho/P.D.Don g D.D.Long T.H.Nam B2 17-Sep- 14 Revsed as comments V.Pho/P.D.Don g D.D.Long T.H.Nam SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 1 SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 2 SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT TABLE OF CONTENTS: 1.0 OBJECTIES:..................................................................................................... !.0 GENERAL REQUIREMENTS:................................................................................ 2.1 CODES AND STANDARDS:...................................................................................................... 3 2.2 NATIONAL LAWS AND REGULATIONS:....................................................................................... 3 2.3 SPECIFICATION, PROCEDURES:............................................................................................... 4 ".0 BASIS OF DESIGN:............................................................................................. #.0 SCOPE OF WORKS:............................................................................................ 4.1 ENGINEERING SCOPES:............................................................................................... 8 4.2 PROCUREMENT: Optional/TBA???..............................................................................10 4. ONS!ORE CONSTRUCTION T!E C!EMICA" IN#ECTION S$I%: Un&'( )ont(a)to( *)op' o+ ,o(-*............................................................................................................................. 10 4.4 PRE./ABRICATION /OR O//S!ORE UPGRA%ES/INSTA""ATION: Optional/TBA...........10 4.0 O//S!ORE INSTA""ATION/!OO$ UP/TIE.IN: Optional/TBA........................................10 4.1 O//S!ORE INSTA""ATION:........................................................................................ 10 SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 3 SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT 1.0OBJECTIES: BDPOC $%& % '()'%'*+( ,-%) '. /,01%2( '$( ,1.2/3(2 4%'(1 &5&'(6 .) PQP-HT ,-%'7.16 85 %22*)0 3$(6*3%- &9*2& '. *):(3' 3$(6*3%- *)'. '$( ,1.2/3(2 4%'(1 &5&'(6. !.0GENERAL REQUIREMENTS: The purpose of ths document s to outne BDPOCs requrements for engneerng, procurement, onshore constructon, ohshore nstaaton/te-n and commssonng for new chemca n|ecton skd. 1.1 C.2(& %)2 S'%)2%12&: ISO 10418:2003 Petroeum and natura gas ndustres-Ohshore producton nstaatons - Anayss, desgn, nstaaton and testng of basc surface process safety systems API RP 14C Anayss, Desgn, Instaaton, and Testng of Basc Surface Safety Systems for Ohshore Producton Patforms API RP 14E Desgn and nstaaton of Ohshore Producton Patform Ppng system API RP 14| Desgn and Hazard Anayss for Ohshore Producton Factes API 500B Recommended Practce for Carcaton of Eectrca Areas API RP 2X Utrasonc and Magnetc Examnaton of Ohshore Structura Fabrcaton and Gudene for Ouacaton of Techncans API RP 2Z Pre-producton Ouacaton for Stee Pates for Ohshore Structures API RP 521 Gude for Pressure Reevng and Depressurzng System API Spec 2D Fabrcaton Structura Stee Ppe 1.! N%'*.)%- L%4& %)2 R(0/-%'*.)&: TCVN 6171- 2005 Fxed Ohshore Patform TCVN 6767-3- 2000 Patform Machnery and Process System TCVN 6767-4- 2000 Patform Eectrca Instaatons TCVN 6968- 2001 Ohshore Lftng Appances SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 4 SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT 1." S,(3*;3%'*.), P1.3(2/1(&: BD-00-M-S- 0331 Speccaton for Protectve Coatngs BD-00-M-S- 0332 Speccaton for Fabrcaton & Wedng for Equpment BD-00-M-S- 0335 Speccaton for Vendor Drawngs & Documentaton BD-00-M-S- 0337 Speccaton for Skd Mounted Package Equpment BD-00-M-S- 0345 Speccaton for Chemca In|ecton Package BD-00-P-S-0002 Speccaton For Ppng Fabrcaton, Instaaton, Inspecton And Testng BD1-00-I-S- 0020 Speccaton For Instrument Instaaton BD1-00-R-T- 0005 Process Emergency Shutdown Phosophy ".0BASIS OF DESIGN: The O In Water (OIW) outet de-gassng vesse coud not brng down ower than 40 ppm before over board. Based on chemca tra report for produced water treatment system, 2 nos. of chemca n|ecton shoud be provded for produced water system as beow: SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 5 SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT F*0/1( 1: C$(6*3%- *):(3'*.) 7.1 P1.2/3(2 4%'(1 &5&'(6 The chemca RBW517 and RBW 82379 w be n|ected to net of 2nd stage separator and outet of 2nd stage separator wth cacuated concentraton and ow rate by vendor. The tra of addtona chemca shown that the resut of OIW have been mproved and met the speccaton requrement before over board. Based on desgnaton capacty of produced water treatment s 36 m3/hr (5500 bbd), n|ecton rate of RW 517 and RW 82379 s 5 to 10 ppm. The cacuaton norma workng capacty of n|ecton pump for RW 517 s 72 L/Hr and RW 82379 s 18 L/Hr. SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 6 SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT F*0/1( !: C$(6*3%- *):(3'*.) ,/6, 7.1 RW <1= F*0/1( ": C$(6*3%- *):(3'*.) ,/6, 7.1 RW >!"=? These pumps are drven by nstrument ar & equpped wth fu safety devces and automatc shutdown ogc n accordance wth Process Emergency Shutdown Phosophy BD1-00-R-T-0005. Instrument ar shoud be provded for these chemca pumps as beow: SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 7 SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT F*0/1( #: I)&'1/6()' %*1 &/,,-5 7.1 I):(3'*.) ,/6,&. Ths chemca skd shoud be ocated nearby the exstng Oxygen Scavenger skd on Mezz deck POP as pcture: F*0/1( <: C$(6*3%- &9*2 &$./-2 8( -.3%'(2 )(%185 '$( O@50() S3%+()0(1 &9*2 .) M(AA 2(39 PQP SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 8 SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT Chemca n|ecton to produced water treatment system s avaabe for connecton as shown on pcture: F*0/1( B: C$(6*3%- I):(3'*.)& %1( -.3%'(2 %' !)2 &'%0( &(,%1%'.1, C(--%1 2(39 PQP Materas and speccaton are sted as beow (to be further deveoped/re-conrmed n detaed desgn phase) 1. 01 each HOOVER Tote tank, SS 316 tote tank type 1 m3 2. 01 each HOOVER Tote tank, SS 316 tote tank type 2 m3 3. 02 eachs CRP1000W400B316TG, Pneumatc meterng punger pump, W seres, max 30.7 L/hr @ 145 barg 4. 02 eachs CRP1500W600B316TG, Pneumatc meterng punger pump, W seres, max 86.4 L/hr @ 131 barg 5. 04 eachs Y straner, 0075 YT6SS 032, 3/4" Y straner, 316 SS, ASME, cass 600 1/32" Perf screen. SUREFLOW equpment straner 6. 02 eachs 15846-SS-B-LPH, KENCO cabraton Pot, 3/4 FNPT Maxmum pump rate 37,85 L/Hr 7. 02 eachs 15848-SS-B-LPH, KENCO cabraton Pot, 1" FNPT Maxmum pump rate 75,71 L/Hr, 8. 04 eachs SS-R4M8S8 SS Hgh pressure proportona reef vave, 1/2"MNPTx1/2n swageok ttng 9. 04 eachs SS-CHS8-10 SSPopet 6000 psg(413 barg) check vave, 1/2 n Swageok tube ttng, 10 psg(0.69 barg) 10.04 eachs SS-CHS12-10 SSPopet 6000 psg(413 barg) check vave, 3/4 n Swageok tube ttng, 10 psg(0.69 barg) 11.12 eachs SS-83KS8, SS 3-Pece Hgh-Pressure Ba Vave, PCTFE Seats, 1/2" Swageok Tube Fttng 6000 PSIG @ 100F /413 @ BAR 37C SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 9 Chemca tubng shoub be routed from Mezz deck to Inet and Outet of 2 nd stage separator on POP cear deck SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT 12.120 meters SS-T8-S-049-6ME Tubng 316/316L Seamess 1/2" OD x .049" wa x 6 meters, aowabe workng pressure=3700 ps(Usued for chemca n|ecton skd RW-82379) 13.120 meters SS-T12-S-049-6ME Tubng 316/316L Seamess 3/4" OD x .049" wa x 6 meters, aowabe workng pressure=2400 ps(Used for chemca n|ecton skd RW-517) 14.30 eachs SS-810-9 Unon ebow 1/2" OD, ebow 90 degree, 316/316L Seamess 1/2" OD ttng, aowabe workng pressure=5600 ps 15.30 eachs SS-1210-9 Unon ebow 3/4" OD , ebow 90 degree, 316/316L Seamess 1/2" OD ttng, aowabe workng pressure=5600 ps 16.40 eachs SS-810-6 Tube Fttng Unon 1/2"OD, aowabe workng pressure=5600 ps 17.40 eachs SS-1210-6 Tube Fttng Unon 3/4"OD, aowabe workng pressure=5600 ps 18.30 eachs SS-810-3, SS Swageok Tube Fttng, Unon Tee, 1/2 n. Tube OD, aowabe workng pressure=5600 ps 19.30 eachs SS-1210-3, Unon Tee, 3/4 n. Tube OD, Swageok, aowabe workng pressure=2400 ps 20.10 eachs SS-810-1-8, SS Swageok Tube Fttng, Mae Connector, 1/2 n. Tube OD x 1/2 n. Mae NPT, aowabe workng pressure=5600 ps 21.10 eachs SS-1210-1-8, SS Swageok Tube Fttng, Mae Connector, 3/4 n. Tube OD x 1/2 n. Mae NPT, aowabe workng pressure=2400 ps. 22.04 Bfod Soenod vave n NPT port, 3 ways, 2 poston SPR12-E1-32-NU-00- 78A-370. 23.04 Pressure gauge workng range 40barg 24.02 Pressure gauge workng range 10 barg 25.Matera for pumps and day tanks base frame 26.Cabe, cabe gands & accessores #.0SCOPE OF WORKS: *. ENGINEERING SCOPES: Contractor s requested to perform a fu detaed desgn for chemca n|ecton skd(s), to perform browned topsdes modcaton engneerng for addton of chemca n|ecton package to exstng produced water system whch s to consst of 2x100% n|ecton pumps skds for each of two chemcas - RBW 517 and RBW 82379 respectvey to be ocated on Cear Deck and Tote Tanks to be ocated on Mezzanne Deck wth the ob|ectve of brngng the OIW to ower than 40ppm. The CI package w be a vendor bought-out tem (optona) or fabrcated tem. P1.3(&& Provde detaed desgn for a chemca n|ecton skd. Update exstng P&ID for Produced Water System Update exstng P&ID for Instrument Ar Suppy Provde Process support to procurement engneerng .e. technca bd evauaton, vendor data revew of CI package M(3$%)*3%- Provde chemca skd detaed desgn/cacuaton/anayss. Revew exstng Equpment Speccatons and Equpment Layouts Update exstng patform Mechanca Equpment Lst SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 10 SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT Prepare new Datasheets and Technca Requstons for CI Package Perform procurement engneerng support .e. prepare TBE report and perform VDR for new CI Package Update exstng patform Equpment Layouts for addton of new CI Package E-(3'1*3%- Update exstng patform ghtng ayouts for addton of CI equpment Prepare Earthng deta drawng for CI pump skds I)&'1/6()' Update exstng patform tubng GA drawngs for new CI tubng between Tote Tanks and CI pump skds Prepare tubng support ocaton pans and deta drawngs for new CI tubng between Tote Tanks and CI pump skds. Provde Instrument nput to CI package Prepare Instrument Hook-up drawng Update exstng patform Tubng & Instrument MTO Update exstng patform Instrument Index Update exstng patform I/O Lst Update exstng patform Cabe Schedue Update exstng patform Loop Dagrams Update exstng patform Cause and Ehect Dagram Update exstng patform Instrument Locaton Pans Provde Instrument support to procurement engneerng .e. technca bd evauaton, vendor data revew of CI package Deveop overa ICSS phosophy Deveop the ICSS Desgn Bass Prepare a speccatons, and data sheets to sutabe desgn condtons. Incorporate a nstrument and contro as detaed on the P&IDs Deveop PLC and ICSS bock dagrams Deveop software for ICSS system Prepare contro schematcs and nterconnecton dagram Prepare update I/O st Prepare nstrumentaton ayouts Prepare deta cabe routng ncudng any supports ayouts. Prepare tubng ncudng any supports ayout Prepare deta support for nstruments Prepare wrng termnaton deta Prepare ogc dagrams for ICSS, Contro Logcs. Deveop the desgn for re and gas detecton systems f requred Deveop cause and ehect (SAFE) charts, as part of the desgn to cover ESD ogc and F&G ogc Instrument Speccatons Cause and ehect matrx Preparaton of Data sheets for new equpment and nstruments based on exstng pro|ect speccatons Genera speccatons for nstruments Ma|or nstrument ,vave szng cacuatons Instrument ndex /data base SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 11 SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT Instrument & contro purchase speccatons Issue summarze MTO ncude msceaneous matera for ECR Instrument(s) as mentoned here means process (pressure, temperature, ow, eve , vave contros.) S'1/3'/1%- Provde Structura nput to Equpment Layouts Prepare oca Equpment Support deta drawngs for pump skds and day tanks Perform ocased Equpment Support checks Provde Structura nput to procurement engneerng .e. technca bd evauaton, vendor data revew of CI package **. PROCUREMENT: Materas for the new skds: Contractor s requested to oher a ump sum prces to cover a the permanent materas to bud a new chemca n|ecton skd and necessary materas to upgrade the patform to accommodate the new scopes. Materas to upgrade ohshore: Contractor s requested to oher a ump sum prce to cover a the permanent materas to upgrade ohshore factes to accommodate the new scopes. The materas w be handed over to the fabrcaton ste n Vung tau (fabrcaton ste ocaton w be deveoped) ***. ONSHORE CONSTRUCTION THE CHEMICAL INJECTION SKID: U)2(1 3.)'1%3'.1 &3.,( .7 4.19& Contractor s requested to provde necessary engneerng as noted n secton 4.1 (engneerng scope), to provde necessary consumabes and permanent materas for new chemca n|ecton skds and the necessary materas to upgrade the patform to accommodate the new scopes. Contractor s requested to provde necessary manpower for fabrcaton, testng, pre- commssonng/commssonng, documentatons, and oad out & sea fastenng onto BDPOC dedcated transportaton barge/suppy boat. Contractor w be responsbe for transportaton of the skds from contractor yard to the port for oad out Contractor s requested to engage 3 rd Party to nvove on engneerng, constructon, testng, commssonng to make sure the chemca n|ecton skds to be certed after competon. *+. PRE-FABRICATION FOR OFFSHORE UPGRADES/INSTALLATION: Contractor s requested to provde necessary consumabes, constructon equpment and manpower for ste survey, to pre-fabrcate the necessary structures (ncudng msceaneous structura tems, ppng and E&I). A the pre-fabrcated tems sha be panted before oadng out nto BDPOC transportaton barge/suppy boat for ohshore nstaaton. Contractor s requested to onshore prepare, pack up and oad out a the pre-fabrcated tems nto BDPOC dedcated transportaton barge/suppy boat for ohshore transportaton. +. OFFSHORE INSTALLATION/HOOK UP/TIE-IN: Contractor s requested to provde a the necessary consumabes, constructon and nstaaton equpment, to provde necessary manpower for onshore preparaton, ohshore preparaton, hook up/te-n and commssonng the new skds. SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 12 SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION, OFFSHORE INSTALLATION/TIE-IN & COMMISSIONING FOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT BDPOC w be responsbe for ohshore transportaton to/from POP-HT. Ohshore beds + meas w be provded by BDPOC. +*. OFFSHORE INSTALLATION: Fnaze concept/Fnaze the requrements: Sept-Oct 2014 Contract naze: Dec 2014. Engneerng : Nov 2014 - Dec 2014 (under contractor scope of works) Procurement ong ead tems: |an 2015 to Apr 2015 (Pumps/fabrcaton of skds) Ohshore modcaton/nstaaton: |une 2015. SCOPE OF WORK - NEW CHEMICAL IN|ECTION SKID - Rev B2 Page 13