CHEVRON INDONESIA COMPANY

PROJECT GENDALO - GEHEM


Sump Pit
Pump
Foundation
Excavation M3 2,611.76 209.33 66.57 10.00 232.13 3,278.76 98,140.66 10,346.70 9,603.45 1,246.11 523.43 1,481.37 1,297.82 597.27 3,471.66 2,861.35 570.00 928.54 137,476.91 M3
Back fill M3 870.59 69.78 22.19 3.33 77.38 1,092.92 70,794.94 7,444.98 29,486.10 432.61 199.09 1,157.22 953.78 190.00 309.51 113,104.42 M3
Soil Removal M3 1,741.17 139.56 44.38 6.66 154.75 2,185.84 27,345.72 2,901.73 - 19,882.65 1,246.11 523.43 1,481.37 865.21 398.18 2,314.44 1,907.57 380.00 619.03 24,372.49 M3
Sand Bedding M2 20,653.87 2,901.73 23,555.60 M2
Subgrade M2 29,427.20 5,798.23 2,485.81 7,406.85 45,118.09 M2
Gravel Ls 1,481.37 1,481.37 Ls
Levelling Concrete (10 Mpa) M3 59.76 22.74 7.81 1.06 9.30 50.67 21.48 4.24 26.14 94.20 11.77 8.45 317.62 M3
Structural Concrete (28 Mpa) M3 384.64 204.86 45.23 6.49 53.57 238.24 274.52 1,246.11 523.43 121.20 186.79 2,003.47 239.59 131.04 49.08 5,708.26 M3
Finishing Surface Concrete M2 - M2
Paving M' 7,744.00 864.62 8,608.62 M'
Formwork installation/disassembling M2 1,297.03 449.24 227.61 37.14 305.89 3,300.68 218.72 26.27 582.65 289.78 1,651.35 402.84 778.10 654.42 10,221.72 M2
Staging M3 - M3
Bar-Reinforced, SD40, D10~32 Ton 61.54 32.78 7.24 10.63 8.57 35.74 41.18 0.74 0.33 18.18 29.89 300.52 35.94 19.66 0.25 603.18 Ton
Wire mesh M2 12,461.08 4,157.62 16,618.70 Ton
Water stop M' 91.08 91.08 M'
Grouting Steel Part M3 2.68 0.52 0.73 0.05 0.29 0.92 0.14 5.32 M3
Water Profing M2 - M2
Steel Structure Ton 112.22 14.26 10.63 1.73 138.84 Ton
Embedded plate Ton 6.14 3.63 9.78 Ton
Plate Conection Ton 16.83 1.76 1.59 20.19 Ton
Bolt Conection Ton 1.94 0.20 0.18 2.32 Ton
Steel Ladders Ton 0.17 0.39 0.55 1.11 Ton
Pipe steel 114 mm SCH-40 Ton 92.31 387.82 480.13 Ton
Pipe steel 40 mm SCH-40 Ton 2.83 2.83 Ton
Hand Rails Ton 0.74 3.90 4.64 Ton
Grating 25 thk M2 83.16 146.07 132.51 86.94 448.68 M2
Stair tread grating Ton 2.00 2.00 Ton
Anchor bolts Ton 0.64 0.43 0.11 0.10 0.73 2.01 Ton
Wall Sheet Cladding M2 - M2
Roof sheet Cladding M2 201.05 201.05 M2
Tension wire M' 4,008.29 4,008.29 M'
Brace rod Ton 6.91 6.91 Ton
Turn Buckles Ea 682.00 682.00 Ea
Barbed wire M' 6,012.44 6,012.44 M'
Chain link Fabrick M2 4,151.17 4,151.17 M2
Hinge 25 mm Ea 16.00 16.00 Ea
Main gate Unit - Unit
Subbase Course M3 5,420.80 5,420.80 M3
Base Course M3 4,956.16 4,956.16 M3
Wearing Course M3 2,323.20 2,323.20 M3
Polyethylene sheet M2 5,798.23 2,485.81 8,284.04 M2
Expansion Joint, contraction joint M' 190.00 16.28 206.28 M'
Lot Lot
TOTAL FINAL UNIT Pipe Culvert
Unpaved
Road
Fence & gate
Concrete
Paving
Gravel Paving Pipe rack REPRESENTATIVE WORKS ITEM
PCR Building
Foundation
Concrete
work
Shelter
Workshop
Building
Foundation
Platform
GRAND TOTAL
Earth
work
Rebarwork
Pipe Suport
Foundation
Metal
work
Others
UNIT
Form
work
Sleeper
Sewer and
Drainage (open
ditch)
Pipe Line
Concrete
Road
Foundation : KO
Drums, Closed Drain
Drums, Pig
Receivers, Pig
Launchers, Gas
Metering,
Condensate
Metering, EDG
Blast Wall