Vous êtes sur la page 1sur 7

Date Recvd: GA Order No.

:
Rev. 0
Customer Order No.: Rev.
Lab Program Experimental Category Shipment Due Date - only one per form:
1 Target / Experiment ID
Best Efforts Facility:
PI name & phone #:
PI e-mail address:
Quantity
Target or Component
Descriptor
Shipment Due
Date
QC GA review
1st Shipment date
2nd Shipment date
3rd Shipment date
Questions that must be answered (Y/N), please provide more information if necessary: TARGET REQUEST ACCEPTANCE DATE BY GA:
1. Are alignment fibers or fiducials needed and specified ?
2. Are dimensions, tolerances, and units specified for all critical dimensions ?
3. Is surface finish and/or material composition critical, has it been specified ?
4. Is the target sensitive to environmental conditions during fabrication or delivery ?
5. Are critical or non-standard characterization data needed and identified ? Customer Approval
6. Does target have special assembly needs ? Customer Name:
7. Does target need to be mounted ? Customer Approval Date:
Ship this order to:
Lab Coord:
*Enter other contact info if desired (people, cell #)
*Enter N/A when "not applicable"
*Indicate number of days if multiple days in a shot
series
No Best Effort specifications required
Special
needs
Detailed description or comments (assembly, characterization, etc.)
General Atomics Target Request Form
Total number of pages in this request form:
Please fill in this worksheet to submit a target request to General Atomics. Attach extra sheets if necessary. (Shaded boxes for GA use only) v.5.4d
Shot Date - if multiple, enter first day:
C1 Rev. 0
Capsule Specifications
GA Order No. Customer Order No.
W/O No.
Comments
Item
Quantity
ID (m)
Inner layer (m)
2nd layer (m)
3rd layer (m)
4th layer (m)
Total wall (m)
OD(m)
Fill(atm)
D1 Rev. 0
D2 Rev. 0
D3 Rev. 0
Required Measurements
M1 Rev. 0
GA Order No.: Rev. 0
Customer Order No. Rev.
Delivered Parts
No.
DWG
Grid
Location
Specification
Name
Value Tol 1 2 3 4 5 6 7
1 0
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0
B1 Rev. 0
Best Effort Explanation
x
No Best Effort specifications required
The product can be fabricated to within the tolerances of the
quantitative specifications.
"R&D" Developmental best efforts order
Best effort on all dimensions and other properties (e.g., a new dopant).
When nearly everything about the order is best effort, the order is a
developmental best efforts order. It's so developmental that we are not
sure we can make it.
Best effort on a named specification
Best effort on some of the dimensions and other properties. In this
case, only one specification or a small number of specifications are
best effort. An example is to keep the glue volume below a certain
level. Be sure to identify the specifications that are best effort in the
box below.
The particular best effort specifications for this order are:
Remove this text and enter the particular best effort specifications here
Best effort for a delivery date
There is no specific delivery date because the order is developmental
or because there is not enough lead time to commit to the desired date.

Vous aimerez peut-être aussi