SUITE 7-3, 7TH FLOOR, WISMA UOA II WEEKLY TIMESHEET
NO.21, JALAN PINANG 50450 KUALA LUMPUR PROJECT NAME 9-Sep 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 1 3 N C 0 1 0 5 P R 8 8 8 8 8 40.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ANNUAL LEAVE 0.00 MEDICAL LEAVE 0.00 PUBLIC HOLIDAY 0.00 TOTAL HOURS 0.00 0.00 8.00 8.00 8.00 8.00 8.00 40.00 0.00 0.00 0.00 8.00 8.00 8.00 8.00 8.00 40.00 IMPORTANT : PLEASE ENSURE YOU PUT PROJECT CODE AND CTR NUMBER BEFORE SUMBIT YOUR TIMESHEET Approved net OT Hours : Supervisor/PM Signature Overtime Hours Basic Hours (must be 8 hours per day) SUN SAT CTR D I S C I P L I N E MODULE / SYSTEM (Optional) DESCRIPTION OF ACTIVITIES P R O J E C T
C O D E WEEK NO 6 4 PROJECT MANAGER INITIAL DESIGNATION 1 1 TOTAL HOURS WORKED THU CFD Modelling of the Pilot Plant FRI CHECK SIGNATURES PERSON Kuala Lumpur CFD Mohamed Sanad SUPERVISOR/ PROJECT MANAGER LOCATION NAME (as per Employment Contract) DICIPLINE NGLTECH LEAD ENGINEER SIGNATURE NAME MM DD WEEK ENDING YY STAFF NO 5 1 1 3 Intern WED TUE MON Page No 1 of 1 Pilot Plant STANDARD CTR Item CTR No Brief Description Major Items Covered Type 1 EM01 Engineering Management Available only to EM, GM, Advisor, Resident Engineer, Consultant EM, PM Multidiscipline 2 EM02 Doc Control & Secretarial Available to doc control and secretarial related to engineering only Multidiscipline 3 EM03 Graduate Engineer Available to only graduates working with the engineering team Multidiscipline 4 EM04 Travel & Accommodation All related work (except identify last discipline CTR in lieu of Module No) Multidiscipline 5 EM05 Planning, Cost Control & Proj Engg Available to EM, GM, Advisor, Resident Engr & Project Engrs + Consultant EM, PM Multidiscipline 6 EM06 Hazops, SIL & Design Reviews All related work (except identify last discipline CTR in lieu of Module No) Multidiscipline 7 EM07 3rd Party Reviews/Audits All related work (except identify last discipline CTR in lieu of Module No) Multidiscipline 8 EM08 Safety & Special Studies RAM, Safety Case, Blast, Ergonomics, other Special Studies Multidiscipline 9 EM09 Inspection, test, FAT All related work (except identify last discipline CTR in lieu of Module No) Multidiscipline 10 EM10 Vendor Data Review & Incorporation All related work (except identify last discipline CTR in lieu of Module No) Multidiscipline 11 EM11 Follow-on Engg & Const Support All related work (except identify last discipline CTR in lieu of Module No) Multidiscipline 12 EM12 As Built and Close Out All related work (except identify last discipline CTR in lieu of Module No) Multidiscipline 13 PR01 PFD & H&M UFDs Sizing Calcs Simulation, all related work Process 14 PR02 P&IDs, C&E & Haz Area Drgs All related work Process 15 PR03 Design Philosophies All reports and related documentation Process 16 PR04 Data Sheets & Specs Process Datasheets equip, inst etc. Process 17 PR05 All other process work All other process work including IDCs, TBEs, Meetings, input to others Process 18 PR06 Follow-on Engg & Const Support All related work regarding follow-on engineering for Process Process 19 PI01 Pipe Stress Analysis & Supports Design All stress analysis work (including support design/drgs), design basis, reports Piping 20 PI02 PDMS & Piping Design/Drawings All studies, 2D/3D modeling, drawings, isos etc Piping 21 PI03 Piping Material, Valves, Fittings etc All material specs, piping specialty specs, data sheets Piping 22 PI04 Piping Engg & Related Tasks All other piping work incl reports, studies, noise, vibration, IDC, TBE, Mtgs Piping 23 PI05 Follow-on Engg & Const Support All related work regarding follow-on engineering for Piping Piping 24 ME01 Rotating Equipment/Packages All related work including drawings, all specs and datasheets Mechanical 25 ME02 Static Equipment/Packages All related work including drawings, all specs and datasheets Mechanical 26 ME03 Mechanical Handling, Studies, Reports All other mechanical work including design basis, reports, IDCs, TBEs, Mtgs Mechanical 27 ME04 Fire & Safety (Mechanical & Marine) Firewater, safety equipment, foam, related mechanical safety equip incl datasheets Mechanical 28 ME05 Follow-on Engg & Const Support All related work regarding follow-on engineering for Mechanical / Package Mechanical 29 EL01 Load list, SLDs, calcs, system analysis Related fault, short circuit, relay setting, motor starting studies, design basis, reports Electrical 30 EL02 Specification & Datasheets All electrical specifications, datasheets Electrical 31 EL03 Layout and Drawings Layouts, loops, hook-ups, cable schedule, wiring/termination diagrams, all drawings Electrical 32 EL04 All other electrical work All including IDC, TBE, Mtgs, inputs to other disciplines etc Electrical 33 EL05 Marine Systems interface All related reports, calculations, drawings and interface work to integrate marine/topsides Electrical 34 EL06 Follow-on Engg & Const Support All related work regarding follow-on engineering for Electrical Electrical 35 IN01 Block Diagrams & Design Philosophies Design basis, reports, philosophies Instrument 36 IN02 Instrument Specs & Datasheets All instrument specs, datasheets and related work, instrument index, I/O list Instrument 37 IN03 Instrumentation drawings Layouts, cable schedule, hook ups, loops, wiring & termination diagrams, all drgs, C&E Instrument 38 IN04 Telecommunication System Design All related design, drawings, specifications and datasheets Instrument 39 IN05 Fire & Safety (instrumentation) fire and safety including fire and gas detection, all related work Instrument 40 IN06 Marine Systems interface All related reports, calculations, drawings and interface work to integrate marine/topsides Instrument 41 IN07 All other Instrumentation work All including IDC, TBE, Mtgs, inputs to other disciplines etc Instrument 42 IN08 Follow-on Engg & Const Support All related work regarding follow-on engineering for Instrument Instrument 42 ST01 Design Basis & Specs Struct Design Basis, Specs, Dropped Object Study, Reports Structural 43 ST02 Topsides Design & Analysis In place, lift, transportation, fatigue analysis for Topsides Structural 44 ST03 Topside/Hull Integration Analysis Hull related (e.g.: stools, integration) analysis and calculations Structural 45 ST04 Topsides GAs, Drawings and MTOs All topside related drawings, MTOs Structural 46 ST05 Topside/Hull integration drawings All hull integration related drawings (e.g. stool drawings) Structural 47 ST06 All other structural work IDCs, TBEs, Mtgs, other structural work specifically not covered elsewhere Structural 48 EM11 Follow-on Engg & Const Support All related work regarding follow-on engineering for Structural Structural 49 MA01 Marine System Design Marine facilities review, upgrade, reports and design basis Marine 50 MA02 Marine System Drawings Marine system drawings (instrument and electrical marine system work part of I/E) Marine 51 EM11 Follow-on Engg & Const Support All related work regarding follow-on engineering for Marine Marine 52 HT01 Turret System Turret EPCC management, design definition reports and drawings Hull & Turret 53 HT02 Riser systems Riser EPCC mngmt design definition, reports and drgs incl cpled riser/mooring analysis Hull & Turret 54 HT03 Hull Structure Strength & Fatigue Anlys, Stern, Turret Support Structure (incl interfacing with ST03/05) Hull & Turret 55 HT04 LQ & Outfitting LQ, lifeboat interface, fire control and life saving plan (interface with IN05/ME04) Hull & Turret 56 HT05 Hydrodynamics Mooring system, pipe laying analysis. Hull & Turret 57 HT06 Naval Architecture Linesplan, Stability, Lightship Survey, Weight Control, Capacity Plan, Docking Plan Hull & Turret 58 HT07 Fire Control & Life Savings Hull & Turret 59 EM11 Follow-on Engg & Const Support All related work regarding follow-on engineering for Hull & Turret Hull & Turret PROJECT CODE DESCRIPTION 13NC0101 Administration 13NC0102 Engineering -General 13NC0103 Training 13NC0104 ISO 13NC0105 CFD PROJECT CODE REGISTER ATTENTION ALL, below are the new codes for the respective items, please include in your Timesheets where applicable. ATTENTION ALL, below are the new codes for the respective items, please include in your Timesheets where applicable. Current Project Number: 1 2 3 4 LOCATION CODE ACCOUNT CODE CTR PLEASE REFER CTR LIST **Cut Off date every week - Every Friday