Vous êtes sur la page 1sur 4

Reg. No.

:
Question
Paper Code: 11200
B.E./B.Tech. DEGREE EXAMINATION, NOVEMBER/DECEMBER 2012.
Seventh Semester
Civil Engineering
CE 24O2ICE 72ICE 1401
_
ESTIMATION AND
QUANTITY
SIJR\DYING
(Regulation 2008)
Time : Thlee hours Maxinum : 100 marks
Answer Al-L questions.
PARTA-(10x2=20marks)
1. Give the importance of Estimation.
2. Wtat is prime cost?
3. List the various sanilary 6ttings.
4. Draw different
parts of culvert.
5. IIow will you analyse the rate ofa particular item?
6. Wllat are the uncertainties in material an<l labour in road work?
7. What is ecrap value?
8. What do you understand by standard rent?
9. What is book value ofthe property?
10. What are the priociples ofreport preparation?
www.vidyarthiplus.com
www.vidyarthiplus.com
PARTB-(5:16=B0marks)
11. (a) The plan and sectional elevation of a building are given in
Estimate the quantities of the following ofitems of work of the
(i) Doors and windows
(ii) R.C.C work in roofslabs, lintels and sunshades
(iii) Plasteringinternal
wr^rnrlrxc coulsct ScB rI
r.. eoF sg, rtc|. tl(
E
aar cct!o(
frg. 11(a).
Building.
(5)
(6)
(5)
:d
SECTNN ON ABC
,ii;
ti
i
w
tB
l---:---:----r
,r!L,rt foux0ltlox to(//rra
sECfiOt
grBlLlr
ro
rodr leal.r.
PLAN
lrr o!.llirox3 /rl
Fig. 11
(a)
Or
2
mf
Flg-.r
m
11200
www.vidyarthiplus.com
www.vidyarthiplus.com
o)
Estimate the
quantities
of following items shown in fig. 11
(a).
(i)
First class brick work in C.M. 1:6 in super structure.
(ii)
P.C.C. in fou4dation
(iii)
Ceilirlgplastering.
Estimate the
quantity
of followirg items of Septic taDk fig. 12(a).
(i)
Earth work excavation
(ii)
P.C.C. 1:5:10
(iii)
Bdck Bats in soak pit.
(6)
(5)
(5)
1.2.
(a)
(6)
(5)
(s)
Bii<k_ {rt in ltptGtrnk
will
wirh
12 d.!n. ccs<-t p\"skr
cnJ upto
fitst
t{cp outsiJc
t.
t\asl(Y.J
oDh
jointr
ih c.M. 1:3 lnri.lc
(
t,2,a)
sEcf lo
lr
-
A E
tet
tr
(5)
(6)
(5)
1&+
PLAN
CAll
JinGrrsio^e
cr. in Certih.t.rJ
-"EPTlC
1Al.lt<
wlTH Soa.r< PIT
Or
Estimate the quantity
of following items of Septic tanl frg. l2(a)-
(i)
InternalPlastering
(ii)
Brick work in C.M. 1:6 in septic tanl
(iii)
R.C.C cover slab for septic tank and soah
pit.
dffl. well with
(b.)
11200
www.vidyarthiplus.com
www.vidyarthiplus.com
13.
(a)
Using current schedule of rates for materials and labours, prepare
data
for the following items of rvork:
(i)
Half brick with CM 1:'1,for 1m,
(ii)
Plain cement concrete 1:5:10 for 1m3-
Or
Briefly explain the following iteds.
(i)
Tender
(ii)
Contract document
(iii)
Termination of contract
(iv)
Overhead cost in anaiysis ofrates.
Calculate the Standard rent of a building with followinE data:
(8)
(8)
(b)
(4)
(4)
(4)
(4)
14.
(a)
15.
(a)
(b)
Cost ofland: Rs. 7, 00,000.00, cost of building 16, 00,000, Expected life of
building
=
65
years-
Returns expected 5% on land and 8% on building.
Annual repair 1% on the cost of building. Sinling fund on 4% interest
basis on 90% of the cost of building. Other outgoing 30% of the return
from the building.
(16)
Or
Explain the following :
(i)
Tlpes oflease (4)
(it
Mortsase (4)
(iii)
Methods of depreciation (4)
(iv)
Escalation.
(4)
Prepare a report on estimate for construction of a Culvelt and Road
construction. (16)
Or
(b)
Prepare a repo* ot estimate for the construction
of residential building
and water supply and sanitary installation. (16)
www.vidyarthiplus.com