Vous êtes sur la page 1sur 2

DVD Document Index

Mandatory Referral Montgomery County


Uniform Standard Submission Requirement Documents on DVD File Name
1
1.a. Hours of Operation 1.a. - Hours of Operation from FEIS
1.b. Consistency with County Plans 1.b. - Master Sector Plans from Tech Report
4
1.c. Pedestrian/Bicycle Impact Statement
1.c. - Ped-Bike Impact Statement FEIS
1.c. - Ped-Bike Impacts Tech Report
1.d. Roadway/Pathway Sections meet Standards
1.d. - 2013-11-13 MCDOT Design Exceptions
Meeting Notes
1.d. - 2013-11-20 MCDOT Design Exceptions
Meeting Notes
1.d. - MCDOT Memo Des Except
1.d. - Roadway Typ Section BODR
3
1.d. -MTA Des Except Request
1.e. Status of Historic Work Area Permit
1.e. - Historic - Draft Prog Agreement FEIS App H
1.e. - Historic - Section 106 Effects Tech Report
4
1.f. Phasing Schedule 1.f. - Phasing-Schedule Construction from FEIS
1.g. Land Use 1.g. - Land Use Planning from Tech Report
4
1.h. Funding Source(s) 1.h. - PL Presolicitation Report 080513
1.i. Impacts to Public/M-NCPPC Land 1.i. - Parkland-MNCPPC Impacts from FEIS
1.j. LEED Building Certification 1.j. - LEED Lyttonsville from BODR
3

2. General Location Map 02 - General Location Maps
3. Site Plan Plan sheets
2
4. Utilities and ROW Plan sheets
2
5. Pedestrian/Vehicular Circulation
05 - Ch 3 Transportation from FEIS
05 - Roadway and Traffic Signals from BODR
3
05 - Trackwork and Alignment from BODR
3
6. Natural Resources Inventory 06 - Natural Resource Mapping
7. Water Quality Plan 07 - Water Quality Maps
8. Preliminary Forest Conservation Plan Not available.
9. Topographic Mapping
06 - Natural Resource Mapping
07 - Water Quality Maps
10. Preliminary SWM Concept Plan
10 - Concept SWM Report
10 - Water Resources from Tech Report4




DVD Document Index
Mandatory Referral Montgomery County
Uniform Standard Submission Requirement Documents on DVD File Name
1
11. Landscape and Lighting Plans
Plan sheets
2
for Landscaping plans.
Lighting plans not available.
12. Overall Concepts Development Plan Not required
13. Statement of Compliance . . . Noise
13 - Noise Ordinance Compliance from Tech
Report
4
14. Architectural Schematics Plan sheets
2
15. Traffic Impact Statement
16 - Traffic Impacts from Analysis Tech Report
4
16 - Traffic Impacts from FEIS
16 - Traffic Impacts from Forecast Tech Report
4

1
All files are provided in PDF format.
2
Volumes 1 thru 9 have been included on the DVD

Volume 1 - Track, Highway, Trail Alignment and Survey
Volume 2 - Track, Highway, Trail Cross Sections
Volume 3 - Maintenance of Traffic & Traffic Signals
Volume 4 - Right Of Way, Drainage and SWM
Volume 5 - Utility Relocations
Volume 6 Structures
Volume 7 - Stations and Civil Plans
Volume 8 - Yards and Shops
Volume 9 Systems

3
BODR = Basis of Design Report
4
Tech Report = Technical Reports that accompanied the FEIS

Vous aimerez peut-être aussi