S.No.

Description Unit Qty Rate


1.00 EXCAVATION WORK
1.01 Earth Work in excavation in foundations, trenches, columns
pits, basements, under ground tanks, etc. in all kind of soils
including backfilling and dressing of sides and ramming of
bottoms, bailing out, pumping out or otherwise removing all
water which may accumulate in the excavation from any or
all casues whatsoever, providing & fixing open or close
timpering, strutting, shoring and packing of cavities and use
of and waste of raking shores complete (wherever required)
including getting out of the excavated materials and disposal
of surplus excavated materials .( Rate inclusive of all
machanical & manual Excavation and Disposal/ carring away
surplus excavated material from site )
a. Ordinary and hard soils :-
I. Depth upto 2.00m from ground level cft 552 7
1.02 Providing and injecting chemical emulsion for pre-
constructional anti-termite treatment and creating
continuous chemical barrier under and alround the column
pits, wall trenches, excavation top surface of plinth filling,
junction, external perimeter of buildings, expansion joints
surrounding of pipes and conduit etc. Complete as per
specification (Plinth area of the building at ground level shall
only be measured)
a. Using 5% Heptachlor sft
b. Using chloropyrophos Emulsifiable Concentrate 1%
(FLOOR & WALL) sft 543 8
Total of Sub-Head carried to summary
2 DISMANTLING & CLEANING
2.01 Dismantling work for following :-
a). Demolishing R.C.C. work manually/ by mechanical means
including stacking of steel bars and disposal of unserviceable
material within 50 metres lead as per direction of Site - in-
charge. cuft 290.00 ####
b) Old plaster CHIPPING sqft ###### 20.00
c) Demolishing brick work manually/ by mechanical means
including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per
direction of Site-in-charge.
In cement mortar cuft ###### 80.00
d) Demolishing brick work manually/ by mechanical means
including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per
direction of Site-in-charge.
In cement mortar sqft 980.00 80.00
e) Dismantling work in floors laid in cement mortar including
stacking material within 50 metres lead sqft ###### 25.00
f) Dismantling tile work in floors and walls laid in cement
mortar including stacking material within 50 metres lead
sqft ###### 25.00
2.02 Cleaning & removing of all waste materials from site to safe
place by transport. cuft ###### 50.00
2.03 Removal of old Door, window etc., and stacking safe place.
sqft 550.00 90.00
2.04 TEMPORARY PARTITION WORK FOR SAFETY SFT 450.00 ####
2.05 REBARING WORK
25MM DIA NOS 10 2500
20MM DIA NOS 25 2200
16MM DIA NOS 30 2000
12MM DIA NOS 95 1800
2.06
STEEL CUTTING WORK ( UPTO 12MM DIA )
NOS 150 100
Total of Sub-Head carried to summary
3 Concrete Work
3.01 Providing and Laying Cementat concrete 1:4:8 (1 cement : 4
coarse sand : 8 graded stone aggregate 40mm & down size)
under floors & Foundation including side forms, curing
complete
Cuft 479.30 ####
3.01 Providing & laying plain cement concrete 1:2:4 (1 cement : 2
coarse sand : 4 graded stone aggregate . Lintels,, plat form,
counter & etc. Cuft 52.00 ####
3.02 Providing and laying in position specified grade M-20
(1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone
aggregate ) of reinforced cement concrete excluding the cost
of centring, shuttering, finishing and reinforcement - All work
upto 4th floor level
Cuft 950.00 ####
3.04 Centring and shuttering including strutting, propping etc. and
removal of shuttering complete.
Sqft ###### 55.00
3.05 High yield strength deformed bar reinforcement TO IS : 1786
or approved equivalent) in all reinforced concrete work
including straightening cutting, binding, laying in position,
binding with 18 gauge annealed steel wire and cost of binding
wire complete.
Kg ###### 85.00
3.06 Screeding work 1:2:4 (1 cement : 2 coarse sand : 4 graded
stone aggregate . 45mm thk. Sqft ####
a) With neat cement punning flooring . Sqft ####
3.07 Providing/Laying the sunken protion of slabs, raft, toilets etc.
with Ballarpur waste aerated blocks in 1:12 ration (1 sand : 12
broken aerated blocks) including watering and ramming
complete.
cft 581.00 ####
Total of Sub-Head carried to summary
4 Masonry Work
4.01 Masonry work using selected quality bricks in cement
Mortar 1:6 (1cement : 6 washed coarse sand) in super
structure in any shape and profile including curvilinear, joint
finished flush / raked to 12mm depth as directed as work
proceeds cured etc. complete. Allow for concrete blocks at
doors and windows jambs as required.
Cuft ###### ####
4.02 Masonry work selected quality brick half brick thick walls in
cement mortar 1:4 (1cement : 4washed coarse sand), joints
finished flush/racked to 12mm depth as proceeds as
directed, cured etc. with hoop iron reinforcement. ( 6mm dia
2nos of bar in every 4th layer in brick work)
Sqft ###### 80.00
Total of Sub-Head carried to summary
5 Waterproofing Work
5.01 Three coats of "Tapecrete" applied to surfaces where called
for in a proportion of 2:1 (2parts of cement & 1 part Tape
Crete) for each layer tro a total thickness of not less than
3mm after preparation of surface etc. including a protective
layer of 12mm thick cement plaster in 1:4 cement mortar (1
cement : 4 coarse sand). Tapecrete shall be polymer modified
cementious Emulsion. The work shall be carried out by
specialist firms approved by the P.M. Consultant to their own
specifications broadly outlined above and shall carry
guarantee against leakage, seepage, sweating and other
defects for 10 (Ten) years. Treated surface area shall only be
measured.
a. Floors, Horizontal surfaces and slopping roofs. Sqft 895.00 80.00
b. Vertical surface including Base Plaster Sqft 474.00 80.00
5.02 Providing & laying six layar water proofing treatment
comprising of bituman primer, a coat of blown type bitumen
@1.8 kg per sqm, a layer of hessian based bituminous felt
type three, grade one with a further coat of blown type
bitumen @1.8 kg per sqm, a layer of aluminium foil of
0.05mm thickness & a further coat of blown type bitumen
@1.8 kg per sqm. Allow for cutting of chases in wall, plaster
on corners & vertical sides to recive above treatment in 1:4
cememt mortar, filling of chase with 1:2:4 cement concrete
and repair of surface with plaster complete in all respect.
a. Horizontal surface SFT ###### ####
b. Vertical surface SFT ###### ####
5.03 Providing & carrying thermal insulation on terrace using
VERMUCLITE aid to slope with and average thickness of
75mm on RCC slabs. SFT ###### ####
5.04 Providing Gola 75x75mm in cement concrete 1:2:4
(1cement : 2coarse sand : 4stone aggregate 10mm & down)
including finishing with cement mortar 1:3 including cutting
chase in wall 7 its repair RFT 550.00 50.00
Total of Sub-Head carried to summary
6 Wall Finishing ( PLASTER WORK )
6.01 12 to 15mm thick plaster to walls, columns, piers etc, in
cement mortar 1:6 (1acement : 6 fine and coarse sand mix in
equal proportions) applied, finished smooth and cured
complete. Sqft ###### 25.00
6.02 8mm thick plaster to soffits and sides of slabs, walls beams
and other concrete surfaces in cement mortar 1:4(1cement :
4fine and coarse sand mix in equal proportions) applied,
finished smooth and cured complete.
Sqft ###### 28.00
6.03 32mm thick cement plaster in two coats under layer 20mm
thick cement plaster 1:5 (1cement : 5coarse sand) and top
layer 12mm thick cement plaster 1:4 (1cement : 4coarse
sand) finished rough with sponge or as directed and cured
complete including providing grooves or off sets on external
surfaces. (RATE 45/- FOR PART WORK)
Sqft ###### 55.00
6.04 Providing approved galvanized chicken wire mesh (24 gauge
12mm sq size) to junction of concrete and masonry work
and other locations where called for including cutting to
required sizes side laps of minimum 75mm and fixing in
position with galvanized wire nails as approved complete
sft 1850 70
Total of Sub-Head carried to summary
7 Wall Finishing.
7.01 Providing three or more finishing coats of dry
distemper/plastic emulsion paint of approved manufacture
and shade to walls and ceilings applied evenly to give
uniform finish as approved complete as per specifications.
Allow for preparation of surface and a coat of primer as
specified.
a. Oil bond distemper sqft 20.00
b. Plastic Emulsion paint. ( ALL ROOM AREA) sqft ###### 35.00
c.Valvet touch sqft
7.02 Providing three or more finishing coats of enamel paint of
approved manufacture and shade applied evenly, complete
as per specifications. Allow for a coat of Zinc chromate
primer / wood primer and preparation of surface.
a. Steel doors, windows and other steel surfaces. sqft 160.00 28.00
7.03
Finishing walls with three or more coats of weather coat paint
manufactured by M/ Killick Nixon / Asian of required shade to
give an even shade including curing the painted surface for a
minimum period of 7 days:
a. Plain plastered, rough plastered, or concrete surfaces.
sqft ###### 30.00
7.05 Providing & carrying coats of Melamine polish to get
approved shade & finish on wood surfaces including
preparation of surface complete. SFT ###### ####
7.06 6 mm to 8 mm thick plaster of paris punning to walls and
ceiling to lines and level using first quality Gypsum Androus.
Complete in all respects. Including repair. Work of electrical
boxes. sft ###### 28.00
7.07 Providing and Laying 25mm thick plaster of paris. Suspended
ceiling with galvanised expended metel Mesh 10x30x1.6mm
reinforcement fixed to GI Frame work. Including cutting
opening for Fixtures. Acgrills etc. Providing Additional hard
wood or metel frame around. Opening & making good the
same. sft
a. Horizontal Surface sft ###### 30.00
b. Vertical Surface ( up to 11" ) rft 150.00 30.00
Total of Sub-Head carried to summary
8.0 Flooring and Paving
8.01 Fixing 20m thick Italian Marble In cement mortar 1:4 approx.
25mm thick & pigmented cement slurry for grouting joints
Including Tin Oxide mirror Polish .
a. In floors,wall & window sills sft ###### ####
b. In skirting rft 175.00 ####
c. nosing rft 125.00 ####
d. Dedo work sft ###### ####
8.02 /Fixing 20m thick Granite slab on Counter using cement
mortar 1:4 approx. 25mm thick & pigmented cement slurry
for grouting joints
a)For counter. sft 85.00 ####
8.03 Rounded Nosing (INCLUDING POLISH) RFT 65.00 ####
2" PATTI RFT 65.00 ####
8.03 Only Laying in position colour glazed /Vitrified standard
quality tiles over a base of cement mortar 1:3 (1cement : 3
coarse sand) including laying tiles to approved pattern in
cement paste, joints filled eighth white cement pigmented
slurry and finished neat as per specifications complete. Allow
for rubbing down of edges of tiles to match the size of
flooring tile.
a. Walls and similar location over a base/backup
mortar 15mm thick . (Basic cost Rs.70/-sft) sft 650.00 ####
b. Floor and similar location over a base/backup
mortar 15mm thick . (Basic cost Rs.50/-sft) sft 250.00 ####
c. COMM. TILE (UNDER WARDRODE & CABINET) (Basic cost
Rs.30/-sft) sft 559.00 ####
d. Terrace tile work. (Basic cost Rs.40/-sft) sft ###### ####
Total of Sub-Head carried to summary
9
Wood Work
9.01 Providing, fabrication and fixing selected quality first class kiln
seasoned and chemically treated wrought wood frames and
subfirames for doors windows and ventilators to shape and
profile shown on the drawings with mitred joints complete as
per specification. Allow for fixing to supports with threaded
expansion bolts and other fixing accessories, and for providing
and fixing beading, trim at grooves etc. as shown.
a. Burma Teak
RFT 475.00 ####
9.02 Providing and fixing in position door & window shutters of sizes
as shown, including Brass Hindges,
a. 50mm thick Panneled shutters,
SFT 340.00
b. 50 mm thick Glazed Shutters
SFT 165.00
c. 50mm thick jalli shutters
SFT 190.00
d. 50mm thick fixed glazed shutters
SFT 272.00
e. Sliding door
SFT 65.00
9.03 P/F Modi float glass (net area of glass to be measured)
a.6mm thick
SFT
b.8mm thick
SFT
c 10mm thick
SFT
9.04 Providing & fixing 1st class chemeically treated burma teak
wood moulded beading to doors and windows, ventilator
frames with wooden plugs and steel screw complete with
priming of the unexposed surfaces.
a. 45mm x 25mm
RFT 700.00
b. 75mm x 50mm
RFT
9.05 Supplying hardware for door windows as per schedule of
hardware
9.05 providing and fixing 1st class chemically treated burmateak
wood moulded hand rail to staircase
CFT
9.07 Providing and fixing kitchen cabinet
a. Over head cabinet with veneare
SFT
b. Under counter cabinet with venear
SFT
c. Dry goods cabinet shutter
SFT
9.08 Providing and fixing wardrobes of block board having 25mm
BST shutters
SFT 569.00
Providing and fixing LIBRARY wardrobes of block board
having 25mm BST shutters
SFT 323.00
9.09 Providing and fixing sliding drawer
SFT
9.10 12mm plate glass door including hinges and necessary
hardware
LS
9.11 Hardware
L S
9.12 WOODEN FLOORING
SFT ######
Total of Sub-Head carried to summary
10.00 Metal Works
10.01 Providing & fixing M.S. work for railing, gates, grills, grating
etc as per design to staircases, balconies, partitions etc
square or round bars / flats/ pipes/ tees angles etc including
providing and fixing holdfasts as necessary to the sides of
RCC/Brick members as per drawing, welding the joints and
grinding smooth the welded joints to give one piece
appearance. Rate shall include the cost of drilling holes in the
top flat iron members for securing handrail if required
painting the exposed surfaces of steel members with a coat
of primer and two or more coats of synthetic enamel paint of
approved shade and quality to give a uniform apprarance.
Measurement shall be taken by weight of the total steel work
involved in the fabrication of the railing.
a. Using Angle, flat,tube, sq. bar etc For Stair Only Kg 280 100
b. Using pipe square or round Kg/RO
c. Using channel, ISMB etc. Kg/RO
d. Using ribbed or Drawn steel as per design Sqm
d. 50mm thick fixed glazed shutters
STRUCTURE WORK
1 EXCAVATON WORK
2 Dismantling & cleaning work
3 Concrete Work
4 Masonry Work
5 Waterproofing
6 Wall Finishing ( PLASTER WORK )
TOTAL OF STRUCTURE WORK ( A )
FINISHING WORK
7 Wall Finishing
8 Flooring
9 Wood Work (Door frame & shutter )
10 Metal Works
TOTAL OF FINISHING WORK ( B )
TOTAL OF (A+ B )
11 Marble, Granite, tile cost L.S
12 Electrical work L.S
13 ELECTRICAL FITTING & FIXTURE L.S
14 PLUMBING LAYING L.S
15 TOILET FITTING & FIXTURE L.S
16 MISS. WORK L.S
17 A/C WORK ( AS PER QUOTE )
18 LIFT (KONE) L.S
19 lift earthing & cabling L.S
20 FIRE PLACE WORK L.S
21 EXPOSE TROLLY ( AS PER QUOTE)
22 MODULAR KITCHEN
Amount
3864
0
0
0
0
4344
0
4344
0
0
0
0
40600
71200
0
156000
0
78400
105000
37800
210000
49500
0
180000
0
0
0
25000
55000
60000
171000
0
15000
0
1254500
0
0
0
91067
0
10400
0
209000
0
109175
0
272000
0
0
0
0
58100
0
749742
0
0
0
470000
0
92000
0
562000
0
0
0
71600
37920
0
0
360000
125000
0
540000
0
27500
0
0
1162020
0
0
87150
0
35280
0
63250
0
129500
0
0
315180
0
0
0
0
0
0
323750
0
0
0
4480
0
0
44850
0
196000
0
181300
0
0
53700
4500
0
0
0
808580
0
0
0
1192800
122500
100000
1305000
0
0
0
38250
0
19500
9750
0
0
0
130000
45000
72670
504000
0
0
0
3539470
0
0
0
142500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
142500
0
0
0
28000
0
0
0
0
0
0
285,000.00
4,344.00
1,254,500.00
749,742.00
562,000.00
1,162,020.00
315,180.00
4,047,786.00
808,580.00
3,539,470.00
142,500.00
285,000.00
4,775,550.00
8,823,336.00