Earth Work in excavation in foundations, trenches, columns pits, basements, under ground tanks, etc. In all kind of soils including backfilling and dressing of sides and ramming of bottoms, bailing out, pumping out or otherwise removing all water which may accumulate in the excavation from any or all casues whatsoever, providing and fixing open or close timpering, strutting, shoring and packing of cavities and use of and waste of raking shores complete (wherever
Earth Work in excavation in foundations, trenches, columns pits, basements, under ground tanks, etc. In all kind of soils including backfilling and dressing of sides and ramming of bottoms, bailing out, pumping out or otherwise removing all water which may accumulate in the excavation from any or all casues whatsoever, providing and fixing open or close timpering, strutting, shoring and packing of cavities and use of and waste of raking shores complete (wherever
Earth Work in excavation in foundations, trenches, columns pits, basements, under ground tanks, etc. In all kind of soils including backfilling and dressing of sides and ramming of bottoms, bailing out, pumping out or otherwise removing all water which may accumulate in the excavation from any or all casues whatsoever, providing and fixing open or close timpering, strutting, shoring and packing of cavities and use of and waste of raking shores complete (wherever
1.00 EXCAVATION WORK 1.01 Earth Work in excavation in foundations, trenches, columns pits, basements, under ground tanks, etc. in all kind of soils including backfilling and dressing of sides and ramming of bottoms, bailing out, pumping out or otherwise removing all water which may accumulate in the excavation from any or all casues whatsoever, providing & fixing open or close timpering, strutting, shoring and packing of cavities and use of and waste of raking shores complete (wherever required) including getting out of the excavated materials and disposal of surplus excavated materials .( Rate inclusive of all machanical & manual Excavation and Disposal/ carring away surplus excavated material from site ) a. Ordinary and hard soils :- I. Depth upto 2.00m from ground level cft 552 7 1.02 Providing and injecting chemical emulsion for pre- constructional anti-termite treatment and creating continuous chemical barrier under and alround the column pits, wall trenches, excavation top surface of plinth filling, junction, external perimeter of buildings, expansion joints surrounding of pipes and conduit etc. Complete as per specification (Plinth area of the building at ground level shall only be measured) a. Using 5% Heptachlor sft b. Using chloropyrophos Emulsifiable Concentrate 1% (FLOOR & WALL) sft 543 8 Total of Sub-Head carried to summary 2 DISMANTLING & CLEANING 2.01 Dismantling work for following :- a). Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Site - in- charge. cuft 290.00 #### b) Old plaster CHIPPING sqft ###### 20.00 c) Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Site-in-charge. In cement mortar cuft ###### 80.00 d) Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Site-in-charge. In cement mortar sqft 980.00 80.00 e) Dismantling work in floors laid in cement mortar including stacking material within 50 metres lead sqft ###### 25.00 f) Dismantling tile work in floors and walls laid in cement mortar including stacking material within 50 metres lead sqft ###### 25.00 2.02 Cleaning & removing of all waste materials from site to safe place by transport. cuft ###### 50.00 2.03 Removal of old Door, window etc., and stacking safe place. sqft 550.00 90.00 2.04 TEMPORARY PARTITION WORK FOR SAFETY SFT 450.00 #### 2.05 REBARING WORK 25MM DIA NOS 10 2500 20MM DIA NOS 25 2200 16MM DIA NOS 30 2000 12MM DIA NOS 95 1800 2.06 STEEL CUTTING WORK ( UPTO 12MM DIA ) NOS 150 100 Total of Sub-Head carried to summary 3 Concrete Work 3.01 Providing and Laying Cementat concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm & down size) under floors & Foundation including side forms, curing complete Cuft 479.30 #### 3.01 Providing & laying plain cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate . Lintels,, plat form, counter & etc. Cuft 52.00 #### 3.02 Providing and laying in position specified grade M-20 (1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate ) of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto 4th floor level Cuft 950.00 #### 3.04 Centring and shuttering including strutting, propping etc. and removal of shuttering complete. Sqft ###### 55.00 3.05 High yield strength deformed bar reinforcement TO IS : 1786 or approved equivalent) in all reinforced concrete work including straightening cutting, binding, laying in position, binding with 18 gauge annealed steel wire and cost of binding wire complete. Kg ###### 85.00 3.06 Screeding work 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate . 45mm thk. Sqft #### a) With neat cement punning flooring . Sqft #### 3.07 Providing/Laying the sunken protion of slabs, raft, toilets etc. with Ballarpur waste aerated blocks in 1:12 ration (1 sand : 12 broken aerated blocks) including watering and ramming complete. cft 581.00 #### Total of Sub-Head carried to summary 4 Masonry Work 4.01 Masonry work using selected quality bricks in cement Mortar 1:6 (1cement : 6 washed coarse sand) in super structure in any shape and profile including curvilinear, joint finished flush / raked to 12mm depth as directed as work proceeds cured etc. complete. Allow for concrete blocks at doors and windows jambs as required. Cuft ###### #### 4.02 Masonry work selected quality brick half brick thick walls in cement mortar 1:4 (1cement : 4washed coarse sand), joints finished flush/racked to 12mm depth as proceeds as directed, cured etc. with hoop iron reinforcement. ( 6mm dia 2nos of bar in every 4th layer in brick work) Sqft ###### 80.00 Total of Sub-Head carried to summary 5 Waterproofing Work 5.01 Three coats of "Tapecrete" applied to surfaces where called for in a proportion of 2:1 (2parts of cement & 1 part Tape Crete) for each layer tro a total thickness of not less than 3mm after preparation of surface etc. including a protective layer of 12mm thick cement plaster in 1:4 cement mortar (1 cement : 4 coarse sand). Tapecrete shall be polymer modified cementious Emulsion. The work shall be carried out by specialist firms approved by the P.M. Consultant to their own specifications broadly outlined above and shall carry guarantee against leakage, seepage, sweating and other defects for 10 (Ten) years. Treated surface area shall only be measured. a. Floors, Horizontal surfaces and slopping roofs. Sqft 895.00 80.00 b. Vertical surface including Base Plaster Sqft 474.00 80.00 5.02 Providing & laying six layar water proofing treatment comprising of bituman primer, a coat of blown type bitumen @1.8 kg per sqm, a layer of hessian based bituminous felt type three, grade one with a further coat of blown type bitumen @1.8 kg per sqm, a layer of aluminium foil of 0.05mm thickness & a further coat of blown type bitumen @1.8 kg per sqm. Allow for cutting of chases in wall, plaster on corners & vertical sides to recive above treatment in 1:4 cememt mortar, filling of chase with 1:2:4 cement concrete and repair of surface with plaster complete in all respect. a. Horizontal surface SFT ###### #### b. Vertical surface SFT ###### #### 5.03 Providing & carrying thermal insulation on terrace using VERMUCLITE aid to slope with and average thickness of 75mm on RCC slabs. SFT ###### #### 5.04 Providing Gola 75x75mm in cement concrete 1:2:4 (1cement : 2coarse sand : 4stone aggregate 10mm & down) including finishing with cement mortar 1:3 including cutting chase in wall 7 its repair RFT 550.00 50.00 Total of Sub-Head carried to summary 6 Wall Finishing ( PLASTER WORK ) 6.01 12 to 15mm thick plaster to walls, columns, piers etc, in cement mortar 1:6 (1acement : 6 fine and coarse sand mix in equal proportions) applied, finished smooth and cured complete. Sqft ###### 25.00 6.02 8mm thick plaster to soffits and sides of slabs, walls beams and other concrete surfaces in cement mortar 1:4(1cement : 4fine and coarse sand mix in equal proportions) applied, finished smooth and cured complete. Sqft ###### 28.00 6.03 32mm thick cement plaster in two coats under layer 20mm thick cement plaster 1:5 (1cement : 5coarse sand) and top layer 12mm thick cement plaster 1:4 (1cement : 4coarse sand) finished rough with sponge or as directed and cured complete including providing grooves or off sets on external surfaces. (RATE 45/- FOR PART WORK) Sqft ###### 55.00 6.04 Providing approved galvanized chicken wire mesh (24 gauge 12mm sq size) to junction of concrete and masonry work and other locations where called for including cutting to required sizes side laps of minimum 75mm and fixing in position with galvanized wire nails as approved complete sft 1850 70 Total of Sub-Head carried to summary 7 Wall Finishing. 7.01 Providing three or more finishing coats of dry distemper/plastic emulsion paint of approved manufacture and shade to walls and ceilings applied evenly to give uniform finish as approved complete as per specifications. Allow for preparation of surface and a coat of primer as specified. a. Oil bond distemper sqft 20.00 b. Plastic Emulsion paint. ( ALL ROOM AREA) sqft ###### 35.00 c.Valvet touch sqft 7.02 Providing three or more finishing coats of enamel paint of approved manufacture and shade applied evenly, complete as per specifications. Allow for a coat of Zinc chromate primer / wood primer and preparation of surface. a. Steel doors, windows and other steel surfaces. sqft 160.00 28.00 7.03 Finishing walls with three or more coats of weather coat paint manufactured by M/ Killick Nixon / Asian of required shade to give an even shade including curing the painted surface for a minimum period of 7 days: a. Plain plastered, rough plastered, or concrete surfaces. sqft ###### 30.00 7.05 Providing & carrying coats of Melamine polish to get approved shade & finish on wood surfaces including preparation of surface complete. SFT ###### #### 7.06 6 mm to 8 mm thick plaster of paris punning to walls and ceiling to lines and level using first quality Gypsum Androus. Complete in all respects. Including repair. Work of electrical boxes. sft ###### 28.00 7.07 Providing and Laying 25mm thick plaster of paris. Suspended ceiling with galvanised expended metel Mesh 10x30x1.6mm reinforcement fixed to GI Frame work. Including cutting opening for Fixtures. Acgrills etc. Providing Additional hard wood or metel frame around. Opening & making good the same. sft a. Horizontal Surface sft ###### 30.00 b. Vertical Surface ( up to 11" ) rft 150.00 30.00 Total of Sub-Head carried to summary 8.0 Flooring and Paving 8.01 Fixing 20m thick Italian Marble In cement mortar 1:4 approx. 25mm thick & pigmented cement slurry for grouting joints Including Tin Oxide mirror Polish . a. In floors,wall & window sills sft ###### #### b. In skirting rft 175.00 #### c. nosing rft 125.00 #### d. Dedo work sft ###### #### 8.02 /Fixing 20m thick Granite slab on Counter using cement mortar 1:4 approx. 25mm thick & pigmented cement slurry for grouting joints a)For counter. sft 85.00 #### 8.03 Rounded Nosing (INCLUDING POLISH) RFT 65.00 #### 2" PATTI RFT 65.00 #### 8.03 Only Laying in position colour glazed /Vitrified standard quality tiles over a base of cement mortar 1:3 (1cement : 3 coarse sand) including laying tiles to approved pattern in cement paste, joints filled eighth white cement pigmented slurry and finished neat as per specifications complete. Allow for rubbing down of edges of tiles to match the size of flooring tile. a. Walls and similar location over a base/backup mortar 15mm thick . (Basic cost Rs.70/-sft) sft 650.00 #### b. Floor and similar location over a base/backup mortar 15mm thick . (Basic cost Rs.50/-sft) sft 250.00 #### c. COMM. TILE (UNDER WARDRODE & CABINET) (Basic cost Rs.30/-sft) sft 559.00 #### d. Terrace tile work. (Basic cost Rs.40/-sft) sft ###### #### Total of Sub-Head carried to summary 9 Wood Work 9.01 Providing, fabrication and fixing selected quality first class kiln seasoned and chemically treated wrought wood frames and subfirames for doors windows and ventilators to shape and profile shown on the drawings with mitred joints complete as per specification. Allow for fixing to supports with threaded expansion bolts and other fixing accessories, and for providing and fixing beading, trim at grooves etc. as shown. a. Burma Teak RFT 475.00 #### 9.02 Providing and fixing in position door & window shutters of sizes as shown, including Brass Hindges, a. 50mm thick Panneled shutters, SFT 340.00 b. 50 mm thick Glazed Shutters SFT 165.00 c. 50mm thick jalli shutters SFT 190.00 d. 50mm thick fixed glazed shutters SFT 272.00 e. Sliding door SFT 65.00 9.03 P/F Modi float glass (net area of glass to be measured) a.6mm thick SFT b.8mm thick SFT c 10mm thick SFT 9.04 Providing & fixing 1st class chemeically treated burma teak wood moulded beading to doors and windows, ventilator frames with wooden plugs and steel screw complete with priming of the unexposed surfaces. a. 45mm x 25mm RFT 700.00 b. 75mm x 50mm RFT 9.05 Supplying hardware for door windows as per schedule of hardware 9.05 providing and fixing 1st class chemically treated burmateak wood moulded hand rail to staircase CFT 9.07 Providing and fixing kitchen cabinet a. Over head cabinet with veneare SFT b. Under counter cabinet with venear SFT c. Dry goods cabinet shutter SFT 9.08 Providing and fixing wardrobes of block board having 25mm BST shutters SFT 569.00 Providing and fixing LIBRARY wardrobes of block board having 25mm BST shutters SFT 323.00 9.09 Providing and fixing sliding drawer SFT 9.10 12mm plate glass door including hinges and necessary hardware LS 9.11 Hardware L S 9.12 WOODEN FLOORING SFT ###### Total of Sub-Head carried to summary 10.00 Metal Works 10.01 Providing & fixing M.S. work for railing, gates, grills, grating etc as per design to staircases, balconies, partitions etc square or round bars / flats/ pipes/ tees angles etc including providing and fixing holdfasts as necessary to the sides of RCC/Brick members as per drawing, welding the joints and grinding smooth the welded joints to give one piece appearance. Rate shall include the cost of drilling holes in the top flat iron members for securing handrail if required painting the exposed surfaces of steel members with a coat of primer and two or more coats of synthetic enamel paint of approved shade and quality to give a uniform apprarance. Measurement shall be taken by weight of the total steel work involved in the fabrication of the railing. a. Using Angle, flat,tube, sq. bar etc For Stair Only Kg 280 100 b. Using pipe square or round Kg/RO c. Using channel, ISMB etc. Kg/RO d. Using ribbed or Drawn steel as per design Sqm d. 50mm thick fixed glazed shutters STRUCTURE WORK 1 EXCAVATON WORK 2 Dismantling & cleaning work 3 Concrete Work 4 Masonry Work 5 Waterproofing 6 Wall Finishing ( PLASTER WORK ) TOTAL OF STRUCTURE WORK ( A ) FINISHING WORK 7 Wall Finishing 8 Flooring 9 Wood Work (Door frame & shutter ) 10 Metal Works TOTAL OF FINISHING WORK ( B ) TOTAL OF (A+ B ) 11 Marble, Granite, tile cost L.S 12 Electrical work L.S 13 ELECTRICAL FITTING & FIXTURE L.S 14 PLUMBING LAYING L.S 15 TOILET FITTING & FIXTURE L.S 16 MISS. WORK L.S 17 A/C WORK ( AS PER QUOTE ) 18 LIFT (KONE) L.S 19 lift earthing & cabling L.S 20 FIRE PLACE WORK L.S 21 EXPOSE TROLLY ( AS PER QUOTE) 22 MODULAR KITCHEN Amount 3864 0 0 0 0 4344 0 4344 0 0 0 0 40600 71200 0 156000 0 78400 105000 37800 210000 49500 0 180000 0 0 0 25000 55000 60000 171000 0 15000 0 1254500 0 0 0 91067 0 10400 0 209000 0 109175 0 272000 0 0 0 0 58100 0 749742 0 0 0 470000 0 92000 0 562000 0 0 0 71600 37920 0 0 360000 125000 0 540000 0 27500 0 0 1162020 0 0 87150 0 35280 0 63250 0 129500 0 0 315180 0 0 0 0 0 0 323750 0 0 0 4480 0 0 44850 0 196000 0 181300 0 0 53700 4500 0 0 0 808580 0 0 0 1192800 122500 100000 1305000 0 0 0 38250 0 19500 9750 0 0 0 130000 45000 72670 504000 0 0 0 3539470 0 0 0 142500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 142500 0 0 0 28000 0 0 0 0 0 0 285,000.00 4,344.00 1,254,500.00 749,742.00 562,000.00 1,162,020.00 315,180.00 4,047,786.00 808,580.00 3,539,470.00 142,500.00 285,000.00 4,775,550.00 8,823,336.00