Vous êtes sur la page 1sur 3

Factor de decalaje

PDF download from SAP Help Portal:


http://help.sap.com/saphelp_470/helpdata/es/3c/abb384413911d1893d0000e8323c4f/frameset.htm
Created on November 04, 2014

The documentation may have changed since you downloaded the PDF. You can always find the latest information on SAP Help Portal.

Note
This PDF document contains the selected topic and its subtopics (max. 150) in the selected structure. Subtopics from other structures are not included.

2014 SAP SE or an SAP affiliate company. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose
without the express permission of SAP SE. The information contained herein may be changed without prior notice. Some software products marketed by SAP SE
and its distributors contain proprietary software components of other software vendors. National product specifications may vary. These materials are provided by
SAP SE and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be
liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express
warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty. SAP and other
SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE in Germany and other
countries. Please see www.sap.com/corporate-en/legal/copyright/index.epx#trademark for additional trademark information and notices.

Table of content

PUBLIC
2014 SAP SE or an SAP affiliate company. All rights reserved.

Page 1 of 3

Table of content
1 Factor de decalaje

PUBLIC
2014 SAP SE or an SAP affiliate company. All rights reserved.

Page 2 of 3

!--a11y-->

Factor de decalaje
Hay dos factores de decalaje en el componente de Planificacin de mantenimiento . Existen factores de decalaje en el caso de:
Cierre prematuro
Cierre retrasado
Se puede definir un factor de decalaje especfico para el plan de mantenimiento indicando el porcentaje de decalaje que se tendr en cuenta al calcular el
siguiente vencimiento.
El factor de decalaje se aplica slo cuando ya se ha programado el plan de mantenimiento y la diferencia entre la fecha prevista y la real est fuera del margen
de tolerancia.

La fecha prevista para la orden de mantenimiento era el 01.08.05, pero se notific 15 das ms tarde, el 16.08.05. La siguiente fecha prevista
podra variar de fecha ya que depende de los factores de decalaje especificados. En la siguiente tabla se muestran tres factores de decalaje
posibles.
Factores de decalaje
Fecha prevista

Notificado el

Siguiente fecha prevista

Factor de decalaje

01.08.2005

16.08.2005

01.09.2005

0%

16.09.2005

100%

08.09.2005

50%

PUBLIC