1. Purpose
The purpose of this document is to define the responsibilities and actions to be taken
to protect the hearing of personnel working at PV Drilling (PVD) facilities and to
meet legislative requirements.
2. Scope
This procedure applies to all PV Drillings facilities. The procedure covers the
responsibilities and actions required ensuring compliance with the Noise at Work
regulations of Vietnam and the host country if working outside Vietnam.
3. Procedures
Assess the risks of noise
Protect employees
Consultation and training.
Maintain and use equipments
Health surveillance.
3.1 .Assess the risks from noise.
-
Every job shall be analyzed the risks which included risk from noise.
P1.04.48
31 Jan 07
02
01 Aug 10
2/4
Hearing protection devices shall be always available for employees to use when
working at high noise areas.
In some high risk areas, hearing protection is mandatory with instruction and
supervision.
The worker shall be consulted the noise risk associated their work and let
participation in noise control. The safety representative of each department in
HSE Committee will play his role with consultation in hearing protection.
The worker shall be given information, instruction and training about the risks,
control measures, hearing protection and safe work practices.
Any noise control equipments and hearing protection shall be properly used and
maintained.
Employees shall use the controls provided and report any defects.
All employees who are likely to be regularly exposed above the upper exposure
action values, or are at risk for any reason shall be provided health surveillance
(hearing check) with 06 month interval.
P1.04.48
31 Jan 07
02
01 Aug 10
3/4
4. Responsibility
Rig Operation Manager:
-
- Auditing compliance with the legislation and this procedure on an annual basis
Drilling Division Administration Manager:
-
In coordination with HSE manager and rig personnel to arrange medical checking
for employees working onboard to make sure compliance with the legislation and
this procedure.
Offshore Installation Manager (OIM):
-
P1.04.48
31 Jan 07
02
01 Aug 10
4/4
Type of workplace
Maximum limit
(dbl)
85
80
70
Administrative office
65
55
Remarks
Maximum limit
(dbl)
Peak level
08 hours
85
115
04 hours
90
115
02 hours
95
115
01 hour
100
115
30 minutes
105
115
15 minutes
110
115
Note: The above limits designed for 08 hour shift, in case of more than 08 hour
shift, the allowable exposure shall not exceed 80 dbl for all remaining time at
work.