Académique Documents
Professionnel Documents
Culture Documents
I.
1/169
1. Process description
2. Simulation PFD
3. Start up procedure on dynamic simulator
4. Shutdown procedure on dynamic simulator
5. Malfunction exercises
2/169
1. Process description
Slug catcher
GPP Deethanizer
GPP Dehydration
Gas Stripper
Regeneration
Stabilizer
3/169
1. Process description
Slug catcher (SC-01)
Separate condensate and Free-water from the gas at 109 BarA, 25oC
Piping type
The volume should be sufficient to receive liquid slug coming from
the battery limit
4/169
1. Process description
GPP Dehydration (V-06A/B)
Feed stock: The natural gas stream at 29oC and 109 BarA
5/169
1. Process description
Regeneration
The absorbents will become saturated with water for 8 hours with
condition of water saturated at inlet (29oC and 109 BarA) and
need to be regenerated.
Suppose V-06A is on standby for dehydration and V-06B need to
be regenerated.
6/169
Regeneration (Desorption)
6 steps:
1. Adsorber Switch-over
2. Depressurization
3. Heating
4. Cooling
5. Pressurization
6. Standby
7/169
a. Adsorber Switch-over
For a short time both adsorbers are operated in parallel to:
8/169
b. Depressurization
The adsorber is depressurized, after isolated at both gas in
& out, from the gas pressure (109 BarA) to the regeneration
gas pressure (35 BarA).
9/169
c. Heating
Heating with dry regeneration gas which originates from suction
10/169
d. Cooling
The adsorbent bed is cooled with the same regeneration
11/169
e. Pressurization
The adsorber is pressurized in a down flow direction
12/169
f. Standby
The adsorber will be maintained at the natural gas
pressure (109BarA) using the pressurization line.
During this period some of the liquid hydrocarbons in the
inlet pipe work will evaporate due to the ambient
temperature.
13/169
1. Process description
GPP Condensate Process
The liquid and gas from the Slug Catcher Liquid Flash Drum (V-03)
are sent to the Gas Stripper (C-04) and 2nd Stage overhead Gas
Compressor (K-03).
Pressure of the Slug Catcher Liquid Flash Drum (V-03) is controlled
at 75 BarA
A purpose of sending the gas to K-03 suction: water included in the
gas stream can be removed by Dehydration Adsorber the gas
can be compressed by the K-03 and mixed with the feed gas before
the dehydration Regeneration gas for Dehydration will not
include water any more.
14/169
1. Process description
Gas chill down & Rectifier
Around 1/3 of the dried gas (60 NM3/HR) is sent to Cold Gas/Gas
Exchanger (E-14) to be chilled down from 26oC -35oC by the cold
gas from top of Rectifier (C-05) of -42.5oC
The Toutlet (-36oC) is rather important factor in the gas processing:
If it is higher than specific value a recovery of liquids cannot
be obtained
If it lower hydrate could form at downstream
15/169
1. Process description
Gas chill down & Rectifier
Another 2/3 (134NM3/HR) is sent to the Turbo Expander (CE-01), in
which the gas is expanded from 109 Bar to 33.5 Bar to result in
lower temperature as -18oC.
In the Rectifier:
Top product: Sale gas (methane, ethane), T = -43oC
Bottom product: heavier component such as C3, C4; T = -20oC
16/169
1. Process description
GPP Deethanizer (C-01)
Has 2 feeds:
17/169
1. Process description
Gas Stripper (C-04)
18/169
1. Process description
Stabilizer (C-02)
LPG component (C3 and C4) is separated from the feed condensate.
The top LPG vapor from the column is totally condensed at 43 oC
One Kettle type reboiler is installed at its bottom to provide reboiling
heat by hot oil at 154 oC
Condensate is stored in a float-roof tank TK-21
19/169
1. Process description
C3/C4 Splitter (C-03)
Operating pressure is controlled at 16 BarA
20/169
1. Process description
Metering for pipeline
21/169
1. Process description
Storage tank and pumps
Three LPG Bullets and a condensate Day Tank in the Plant will
22/169
1. Process description
Storage tank and pumps
30 m3/H capacity
133 m head
Driven by 30kw motor
One standby
Deliver the condensate product in the tank to the condensate
pipeline
23/169
1. Process description
Storage tank and pumps
Three LPG Bullets (V-21A/B/C):
3,35 m diameter
54,61 m long horizontal vessel
Provided for liquid products storage of 540 m3 capacity
A for propane, B for butane, and C for off specification product basically
A and B can store of specification also
Mechanically these three bullets are identical
The design pressure of 17.5 Barg is equivalent of propane vapor
pressure at 50oC any one of them can be used as propane storage.
24/169
2. Simulation PFD
25/169
2. Simulation PFD
26/169
2. Simulation PFD
27/169
Regeneration
2. Simulation PFD
GPP
Dehydration
Adsorber Switch-over
Depressurization
28/169
2. Simulation PFD
Regeneration
Heating
Cooling
29/169
2.Regeneration
Simulation PFD
Pressurization
Stanby
30/169
2. Simulation PFD
31/169
2. Simulation PFD
32/169
2. Simulation PFD
33/169
2. Simulation PFD
GPP Deethanizer
34/169
2. Simulation PFD
GPP Compression
35/169
2. Simulation PFD
Stabilizer C-02
Splitter C-03
36/169
37/169
38/169
39/169
5. Malfunction exercises
Blockage slug catcher downstream
Compressor K-02 trip
V03 Level transmitter LT0302 drift high
FV1201 fails close
SDV1101 fails close CC01 trip
C04 gas stripper pressure transmitter PT1801B drift high
C01 transmitter LT1302 drift low
E01A Deethanizer reboiler fouling
Loss of hot oil
Electrcal power failure
40/169
5. Malfunction exercises
Blockage slug catcher downstream
Compressor K-02 trip
41/169
1. Process description
2. Simulation PFD
42/169
1. Process description
The Gas Dehydration consists of the following major equipment:
a. Glycol Contactor Inlet Cooler 24HH001
b. Glycol Contactor Inlet Scrubber 24VG101
c. Glycol Contactor 24VB001
43/169
44/169
45/169
46/169
47/169
closed
if
the
bypass
valve
is
closed.
Safeguarding
48/169
49/169
50/169
51/169
52/169
Cooler 24HH001
Scrubber 24VG101
53/169
Glycol Contactor
24VB001
54/169
Glycol Regeneration
Reboiler & Surge Drum
55/169
Glycol Regeneration
Filter & Glycol/Glycol HX
56/169
57/169
58/169
59/169
60/169
If the solids present in the rich glycol are not removed, they
could damage the glycol pump.
More solids in the lean glycol steam indicates there are more
solids in The reboiler
The first step of the glycol dehydration plant shutdown
61/169
62/169
63/169
64/169
65/169
66/169
THANK YOU
www.pvmtc.com.vn
67/169