Brief Summary with Project details:
Organization
Position
till date)

Al-OSAIS INABENSA
Project Manager (2011-

Worked with this organization on the following projects


1- 380 KV BSP Jeddah North West BSP
2- 380 KV BSP Jeddah North Remote End
3- Six 110kV Line feeders including Remote Ends
Complete responsibility of making the project scheduling &
planning in order to
achieve on time delivery, design and engineering coordination,
cost control with
allocated budget, logistic sources, material management, spare
parts
management, training courses arrangements, installation work
and testing &
commissioning activities. providing complete Interface
facilities among project,
client and company board members.
1- Electrical works
2- Civil works
3- Mechanical works
Organization

Services & Solution Company

Position

Project Manager (2007- 2011)

12345-

380 KV BSP Namerah North(ABB contracting)


380 KV Remote END(Shuqaiq Power plant)
380 KV Remote END(Shoaiba power plant)
110KV Substation Nawariah (Makah Almukarma)
18*3 MW power plant for Arabian cement company (ABB Switz )
Complete responsibility of making the project scheduling &
planning, costing,
logistic sources, material management ,installation work and
testing &
commissioning

Organization
company

Al-Nassmah al-sharqiah

Position
(2004- 2007)

Site Manager

Worked with this organization on the following projects


1234-

Kiln up gradation Yanboo cement Industries (ABB switz)


New cement Mill Yanboo cement Industries (ABB switz)
33KV substation for SWCC AL-Birk ( Siemens Ltd)
New production line installation work for QCC(ABB Switz)

Organization Omer Salim Al-smaida Est.(Sub contractor for MASCO)


Position
(2001- 2004)
1234-

Installation Eng.

Civil defense & police station Riyadh


Civil defense & police station AlKharj
Multi storey buildings(10 floor Hotel Albukaria Alqassim)
Medical college building( Albukaria Alqassim)

Work Experience:
i- 380 KV GIS & Out door Gantry(Electrical & Mechanical work)
aDesign review and approvals from SEC.
bCoordination with venders for manufacturing of equipment after
design approvals
cCoordination for shipment including custom clearance matter
dComplete installation of 380 KV indoor GIS containing
Installation of Circuit breakers,
installation of GIBs, installation of CT,s, Installation of
VT,s, installation of Disconnector switches, Fast earthing switches
eInstallation of Cable Mesh tray, Laying of cable for GIS system
and termination work
fInstallation of indoor LCC for each bay, Cable laying and
termination as per schematic
diagrams
gInstallation of density monitors, drive shafts, their cable
laying and terminations
hInstallation of indoor GIS structure and catwalk installation
iOut door structure assembly and erection as per GIBs
requirement
jOut door GIB,s and End bushings installation with complete
electrical cable laying and
termination
k- Installation of Earthing/Grounding copper strip as per
diagram(indoor & outdoor)
l- Assembly of Gantry towers, beams and their erection work, assembly
of surge arrestor
structure and their erection
m- Assembly and Installation of 380 KV surge arrestors

n- Installation of droppers for transmission line and their connection


with GIS bushing and
surge arrestors
o- Installation of 550 KV hybrid switch gear and their electrical and
mechanical work
p- Installation of lightening towers
iii- 502 MVA Power transformers (380 KV/132 KV/13.8KV)
abcdefghi-

Complete design coordination including manufacturing and shipment


Erection of transformers main body on Civil foundation
Installation of radiator banks for these trafoes
Installation of conservative tank for oil
Installation of HV , MV bushings
Complete earthing and grounding work as per requirement
Complete connection of 380 KV GIS with transformers
Installation of Cable sealing ends for 132 KV System
Complete work for vacuum, oil circulation and oil filling

iv- 110/132 KV GIS Installation


a- Design coordination , manufacturing coordination including shipment
b- Complete installation of 132/110 KV GIS containing Installation of
Circuit breakers,
installation of GIBs, installation of CT,s, Installation of VT,s,
installation of Disconnector switches, Fast earthing switches
c- Installation of Cable Mesh tray, Laying of cable for GIS system and
termination work
d- Installation of indoor LCC for each bay, Cable laying and
termination as per schematic
diagrams
e- Installation of density monitors, drive shafts, their cable laying
and terminations
f- Installation of indoor GIS structure and catwalk installation
g- Complete earthing grid for 132 KV GIS system
h- SF6 gas filling activities and leakage test
v- Installation of AC/DC System
a- Design, manufacturing including shipment management
b- Complete installation of AC/DC system including AC Panels , DC
panels with bus bar
arrangement
c- Complete installation, testing and commissioning of battery bank for
DC system
d- Installation of battery chargers cubicles and UPS system
e- Installation of two auxiliary transformers 13.8 KV/380v
f- Installation of Dry type transformers
g- Interface of AC/DC system with GIS both for 380 KV & 132 KV
h- Complete testing and commissioning activities
v- Control and protection system
a- Complete design coordination for approval
b- Complete all coordination for shipment at work site
c- Installation of line protection panels, bus-bar protection, mosaic
panels for both 380 KV

and 132 KV system


dInstallation of SOE, Fault recorder and SCADA system
eInstallation of energy metering panels and Transformer control
panels
fInstallation of tele-protection panels for communication system
gComplete cable laying and their termination activities
vi- 550 KV Hybrid switch gear installation
aInstallation of hybrid circuit breakers
bInstallation of GIBs, CTs, and bushings for transmission
line connections
cInstallation of Marshalling cabinets, LCCs, all protection and
control panels
dInstallation of cable ladders, Mesh tray, all cable work for
Hybrid GIS and their
termination
eSF6 gas filling activities and leakage test
fInstallation of Surge arrestors, post insulators and Dis-connector
switches
gComplete installation of Aluminum tabular bus
hInstallation of NGR and their connections
iComplete assembly and installation of two set of Gantry
jComplete installation of droppers from transmission line
kComplete connection for HV bushings, surge arrestors, Disconnector switches with Tlines
vii- 380 KV Shunt reactors
abcdefviii-

Installation of shunt reactors main body


Erection of radiators with main body, installation of CT,s
Erection of phase and neutral bushings and erection of oil tank
Installation of complete pipe work for shunt reactors
Complete electrical cable laying and termination as per scheme
Earthing grid as per diagram
Cement Industries work

a. Erection work for EP fan Motor and Pre-heater motors


b. Installation work for Transformers
c. Installation of MV switchgear to feed MV motors
d. Installation of MCC,s( Motor control cabinets)
e. Marshaling cabinets erection work and making the all the system to
control from
CCR (central control room)
f. Erection work for motors in Kiln cooler area their relevant control
cabinets
erection in substation
g. Installation of Sensors (pressure, temperatures) in Kiln cooler area
h. Installation of stainless steel pipes to supply fresh water to
switchgears for their
cooling system( it includes Argon welding)
i. Cable ladders installation work in cable seller and plant for access
of cables
j. Power and control cable laying and their terminations

k. Involved in Testing and commissioning activities with ABB


supervisors
l. 13.8 KV substation erection work including 13.8 KV switchgear
m. Installation of LV cabinets, MCC,s, Marshalling cabinets, AC & DC
cabinets
n. Battery banks installation to feed DC cabinets
o. Installation of main mill motor, laying and termination for MV
cables
p. Installation of cable ladders in cable seller and all the cement
mill area
q. Installation of cable ladders to high rise bag filters
r. Laying of power and control cables for the complete cement mill
s. Installation of lighting system in cement mill and substation
building
t. Installation of fire alarm system in substation building
u. Feeding work to this substation from existing power plant includes
cable ladder
erection work on cable bridge, laying of MV cables, testing and
connection with
newly erected switchgear in power plant E-Room
v. Jointing for power cables where it is required
w. Make all testing procedures for power, control cables and issue the
testing sheets
x. Fabrication of frames to make ready the basement for all panels in
E-Room
y. Fabrication of metallic covers for the cable ladder where required
z. Supervision of Air-conditioning and duct work for the substation
aa. Installation of control cabinet for Air conditioning system
ab. Galvanized conduits installation where required to protect the
cables
ac. Internal wiring supervision for all control cabinets in substation
according to ABB
drawings
ad. Making arrangements for pulling cards to make schedules for cables
ae. Installation of intercom system within the cement mill and
connection with central
exchange of cement factory
af. Installation of lighting protection and grounding system for the
substation
building, connection of all equipments with grounding system
ag. Involved in load and no load tests for equipments with ABB
supervisors
ah. Laying of fiber optic cables through metallic conduits to make
interface of
substation and field process with CCR
ai. Connections & OTDR test of single mode and multimode fiber cables
Work experience at SWCC Project:
Civil works:
a- Supervision of Civil building construction for substation
including E-Room,
cable seller, Transformer foundations, transformer walls,
installation of fire rated
doors, battery room and openings for all electrical panels
bSupervision of trench work for rooting the power & control
cables

cMaking ramps for transformer rooms


dMake ready the floor for substation and epoxy coating to meet
the requirements
eSupervision for making the roof of substation building water
proof and finally
tiles erection
fMake supervision of Air-conditioning system for substation
gInstallation of monkey ladder for access to roof
hFabrication and installation of hand rails
Electrical works:
i- Installation of lightening protection & grounding system for
substation
j- Make connection for all equipments with grounding system through
P.E.Bs
k- Make testing for all the earth resistance value from earthing
pits of earthing grid
l- Making conduit work for lighting work in concrete slab of roof
m- Wiring and installation of lighting inside and outside of
substation building
n- Installation of galvanized conduits for fire alarm system
o- Make wiring and installation of fire alarm panel
p- Installation of smoke detectors, break glasses and sounders
q- Installation of cable trays in cable sellers and through trenches
for cable routing
r- Making frames for installation of Electrical panels in E-Room
s- Installation of 33 KV switchgear and arrangement of bus bars
t- Plug in terminations for 36KV power cables, far end connected to
SEC panel
u- Installation of Generator control panels and LV panels
v- Installation of capacitor banks
w- Installation of sacada panels
x- Installation of two 1 MVA transformers
y- Connection of LV side of transformers with LV compartment through
Bus duct
z- Laying of power and control cables on cable trays and through
tranches
aa- Installation of Aux-transformers, laying of cables and
connections
ab- Bus bar installation for LV distribution
Testing & commissioning activities
aTesting for all power cables (insulation resistance test & high
potential test)
bContinuity test for all the cores of control cables
cPrimary injection & secondary injection test for ACBs
dContact resistance test for all the contacts
eAll wiring scheme check for switchgears
fMechanical testing for bus bar installation(nut bolting and
torque check)
Transformer tests performed on site
abc-

Insulation Resistance Test.


Winding Resistance Test.
Oil Di-Electric Strength (by oil testing set of 2.5mm gap)

defg-

Primary and secondary ratio test


Earthing connection for traffo.
Vector group Test.
Contacts resistance test

ix- Work Experience for Govt & Multi story buildings


Electromechanical works:
a- Review of design drawings for site execution work
b- Design of electrical load calculation for complete project
c- Design calculation for lighting and sockets panels
d- Complete installation of pvc conduits and boxes
e- Wiring for complete lighting and socket system as per design
f- Installation of lights, sockets, emergency lights, pole lights and
exit sign lights
g- Installation of telephone and data systems, wiring, sockets etc
h- Installation of CCTV cameras and central control system
i- Installation of security system for the doors
j- Installation of panel boards and wiring as per schedule
k- Installation of MDP, EDP and UPS system
l- Installation of transformer and 33 kv switch gear
m- Installation of fire alarm system, EMT conduits and wiring
n- Installation of smoke detectors, break glasses and horns for fire
alarm system
o- Installation of fire fighting sprinkler system(MS piping and
welding etc)
p- Installation of Earthing grid for the buildings and lightening
protection system
q- Installation of speaker system in the building
r- Installation of one way, two way switches, their wiring and
conduits work
s- Installation of floor mounted elect-sockets, tele sockts and data
sockets
t- Installation of HVAC system, ducts and package units
P E R S O NAL I N FO R MAT I O N
Name
:
Muhammed ijaz safarash
Date of Birth
:
16-06-1976
Marital Status

Married

Nationality

Pakistani

Iqama

Transferable

Driving License
Present Address
2.

Valid(Saudi Arabia)
:

AZIZIA Dist Jeddah Saudi Arabia

Academic Qualifications

1995 - 2000
(Pakistan)

University of Engineering and Technology

BSc. Eng (Hons) Electrical


Modules Included:

power distribution
power transmission line
Digital Communications
Advance Electronics
Control Systems
Power Electronics
Quality Engineering and Management
Final year Project
Instrumentation & Control Systems
Project
Analytical methods for Engineers
Digital and Analogue Circuits and Devices
Electronics
Programming Concepts

Professional Affiliations:
Pakistan.
Skills:

Member of Pakistan Engineering Council,

Computing:

MS-Word, Excel, Power Point, MS project

Hardware:

Spartan 3A FPGA Development Board

OS Tools:

Windows 98, 2000, XP, Vista ,Window7

Communication:

Presentations, Customer dealing