Set-up effect of cohesive soils in pile capacity


M.R. Svinkin VibraConsult, Cleveland, Ohio, USA

Page 1 of 7

R. Skov CP Test a/s, Vejle, Denmark

ABSTRACT: Knowledge of pile capacity over a long period of time after the end of initial driving is important for
proper design, construction and estimation of the cost of pile foundations. In this paper, assessment of pile capacity
as a function of time has been performed for cohesive soils. On the basis of an existing formula, a new relationship
between pile capacity and time after pile installation has been derived. This relationship takes into account pile
capacity at the end of driving and an actual time after pile installation. Derived results can be used as a guide for
evaluation of long term capacity of piles in cohesive soils.

1 INTRODUCTION
Piles have to withstand design loads for a long period of time. Therefore the consequences of soil modification
around the pile are essential with respect to changes of pile capacity. During pile installation, the soil around the pile
experiences plastic deformations, remolding, and pore pressure changes. Excess pore water pressure developed
during driving reduces the effective soil shear strength and ultimate pile capacity. After the completion of pile
driving, soil reconsolidation in cohesive soils, manifested by the dissipation of excess pore pressure at the soil-pile
interface zone, is usually accompanied by an increase in pile capacity (soil set-up). The amount of increase in pile
capacity and the time required for return of equilibrium conditions depend on soil properties and pile characteristics.
For example, the disturbed zone around a pile is more or less proportional to the soil volume displaced during driving
and dissipation of excess pore water pressure occurs faster in friction soils.
The phenomenon of time-dependent strength gain in cohesive soils related to pile driving has been studied and
published, for example, Fellenius et al. (1989), Randolph et al. (1979), Skov & Denver (1988), Seed & Reese (1955),
Svinkin et al. (1994), Thorburn & Rigden (1980), Tomlinson (1971), Wardle et al. (1992), and others.
Assessment of pile capacity as a function of time is, of course, important in the design and construction of pile
foundations. Having knowledge of general tendencies of pile capacity with time after driving would certainly be
beneficial in economical standpoint. Such information may be used during construction to reduce the design
penetration and pile capacity at the end of initial driving and also to choose relevant time for dynamic testing at
restrikes or static loading test. In this paper, an attempt is made to present the relationships between pile capacity and
elapsed time after the end of initial driving (EOID) for cohesive soils and to show some benefits for estimation of
pile capacity from this approach.

2 EXISTING FORMULA
Skov and Denver (1988) found the following formula for ultimate pile capacity, Ru(t), as a function of relative time
between different tests
(1)

Some designations in this formula are different from those given in the original expression. The pile capacity at the
first restrike, RRSTR-1, is the lower limit for appreciable increasing in pile capacity when some time elapsed after
initial driving results in developing soil set-up. Quantity, t, is a time elapsed from the end of initial driving and
capacity RRSTR-1 is determined for t=t1. A factor, A, is dependent on soil conditions.
Consolidation of cohesive soils around the pile after pile installation requires much more time in comparison with
other soil types like sand and gravel to regain in soil strength and pile-soil adhesion after EOID. For this reason the
existing formula is pertinent for clay and cohesive soils.

Set-up effect of cohesive soils in pile capacity

Page 2 of 7

Case histories presented by Svinkin et al. (1994) confirmed that formula (1) is a good indicator of the pile capacity
versus relative time relationship after pile installation. Besides, it was shown that the factor, A, depends not only on
the soil but also on the pile type and size.
The application of formula (1) usually requires to make the first restrike in 1-2 days after pile driving. It might be
especially convenient for dynamic testing at construction sites where many piles should be tested by restrike in a
short period of time.
Nevertheless, the existing formula yields relative set-up versus relative time for assessment of the pile capacity after
the first restrike. This is a contradiction to the set-up approach commonly used in geotechnical practice and
inconvenient for certain construction sites to restrike piles on 1-2 days after pile installation.

3 PROPOSED FORMULA
The main goal to derive a new formula for evaluation of the set-up effect of cohesive soils in pile capacity is to take
into consideration the pile capacity at EOID and the actual time elapsed after pile installation.
For a soil set-up straight line passing through two points corresponding pile capacity at EOID, REOID, and pile
capacity at any time after pile installation, Ru(t), a formula with a logarithmic time scale can be written
(2)

Time is calculated in days after pile installation. The time for EOID is taken 0.1 (2.4 hours) that negligibly affects
increasing in the pile capacity at EOID but gives an opportunity to use the logarithmic time scale.
After simplification formula (2) becomes
(3)

Formula (3) is similar to formula (1). However, proposed formula (3) has certain advantages. This formula (a) uses
the traditional set-up formulation, (b) takes into account the actual time in days passed after pile installation, (c)
provides determination of the soil set-up independently of the time of the first restrike.

4 CASE HISTORIES
For verification of formula (3), in the following case histories the existing and proposed expressions were used to
calculate the pile capacity as a function of time after EOID.
4.1 Case 1
Three piles were considered in this study from total number of seven prestressed concrete piles tested for a bridge
approach (GRL Report 1987, Svinkin et al. 1994). A pile description is presented in Table 1. The depth of
penetration of each pile was approximately 24.4 m. The soil consisted of about 25.6 m of mainly gray clays followed
by a bearing layer of silty sand. Water table was at the ground surface. A Delmag D 46-13 hammer was employed for
initial driving and restrikes. For each pile, 3 to 4 dynamic testings were performed after pile installation. For piles

Set-up effect of cohesive soils in pile capacity

Page 3 of 7

TP3 and TP4 static loading tests (SLT) were made as well. The elapsed time after EOID, the penetration resistance
and the time dependent ultimate capacity of piles tested are shown in Table 1. Pile capacities from dynamic testings
were determined by CAPWAP analysis and the Davisson criterion of failure load was used for static loading tests
(GRL Manual 1993).
Pile capacity calculation according to formula (1) was made by Svinkin et al. (1994). Quantity, t1, was equal to 2
days for piles TP1 and 1 day for piles TP3 and TP4. Measured data and results calculated in accordance with the
existing formula have been plotted in ordinates Ru(t)/RRSTR-1 and log10(t/t1) as broken and straight lines,
respectively, in Figure 1. Note that the set-up coefficients from the field tests generally match well to those obtained
from the existing formula.
Table 1. Static and Dynamic Data for Prestressed Concrete and Steel Piles in Clayey Soils
Pile

Test

Time
after
EOID
(days)

Penetration
Resistance
(blows/0.3 m)

Ru (kN)

Factor
B

Set-up
Measd

Set-up
Calcd

1.60

No.

Description

TP1

1372 x 127 mm

EOID

38

752

Cylinder

RSTR-1

>240

2451

3.26

3.08

Prestressed

RSTR-2

>240

2927

3.89

4.13

Concrete

RSTR-3

22

>240

3545

4.71

4.75

610 x 610 mm

EOID

10

267

(305 mm D.
void)

RSTR-1

21

912

3.42

3.37

RSTR-2

10

72

1530

5.73

5.74

RSTR-3

18

144

1672

6.26

6.35

SLT

31

1841

6.90

6.91

762 x 762 mm

EOID

14

200

(475 mm D.
void)

RSTR-1

23

890

4.45

4.45

RSTR-2

60

1299

6.50

6.61

RSTR-3

>240

1517

7.60

7.84

RSTR-4

18

168

1601

8.00

8.90

SLT

32

2273

11.37

9.77

TP3

2.37

Prestressed
Concrete

TP4

3.50

Prestressed
Concrete

Set-up effect of cohesive soils in pile capacity

B-2





HP 310x94

Page 4 of 7

EOID

12

489

RSTR-1

36

RSTR-2

RSTR-3

1.14

1201

2.46

2.48

60

72

1512

3.09

3.10

SLT

15

13972002

2.86

3.48

RSTR-4

16

48

2291

4.09

3.50

RSTR-5

132

>120

4.69

4.55

EOID - end of initial driving


RSTR - restrike
SLT - static loading test

For piles under consideration, the factor, B, has been found on the basis of back calculations using formula (3). This
factor ranges from 1.6 to 3.5 (Table 1). Scattering of the factor, B, is the same for the existing and proposed
formulae. The set-up coefficients derived from both the field tests and from formula (3) are given in Table 1 and
depicted in ordinates Ru(t)/REOID and Time after EOID in days (logarithmic scale) as broken and straight lines,
respectively, in Figure 1. Good agreement is found between calculated and measured values of pile capacity as a
function of time after EOID.

Set-up effect of cohesive soils in pile capacity

Figure 1. Pile capacity-time relationship for prestressed concrete and steel piles in clayey soils

Page 5 of 7

Set-up effect of cohesive soils in pile capacity

Page 6 of 7

4.2 Case 2
Initial data for this case were taken after Fellenius et al. (1989). An H-pile 310x94 (mm, kg/m) with length of 47.2 m
was driven and restruck by a Vulcan 010 hammer with a nominal energy of 44 kJ. Restrike No. 4 of this pile was
performed by drop hammer with nominal energy of 65 kJ. The soil at the site consisted of about 6.1 m of
miscellaneous earth fill followed by about 19.8 m of soft to medium stiff compressible post-glacial silty clay and
clayey silt underlain by about 27.4 m of glacial material deposited on dolomite bedrock. The water table was about
2.5 m below grade. The H-pile was founded in the glacial material.
Five restrikes were made for pile tested. Pile capacities from dynamic testings were determined by CAPWAP
analysis (GRL Manual 1993). The static loading test for this pile did not show a plunging behavior. Failure load
from the static loading test was 1397 kN (Davisson 1972), 1957 kN (Butler & Hoy 1977), and 2535 kN (Fuller &
Hoy 1970). The capacity from the static loading test was evaluated from the Davisson criterion. The results of
dynamic and static tests are shown in Table 1.
Pile capacity calculation according to formula (1) was made by Svinkin et al. (1994) and shown in Figure 1. It can
be seen the calculated set-up line averages measured values of pile capacity.
Measured soil set-up and calculated set-up in accordance with formula (3) are presented in Table 1 and displayed in
Figure 1 as well. For the H-pile, the proposed formula provides better fit to results tested than the existing formula.

5 SUMMARY
The application of the proposed formula shows that the magnitude of gain in pile capacity in cohesive soils depends
on soil conditions, pile material and dimensions. However, the same equation with a different factor, B, can be
applied for assessment of soil set-up in cohesive soils during relatively long elapsed time after pile installation.
The existing and proposed formulae demonstrate similar tendency of the set-up effect of cohesive soil in pile
capacity. However, there are substantial differences between two approaches.
The existing formula yields relative set-up versus relative time for assessment of the pile capacity after the first
restrike. This is a contradiction to the set-up approach commonly used in geotechnical practice. Also, it is
inconvenient for certain construction sites to restrike piles on 1-2 days after pile installation. Moreover there is no
standard time for the first restrike. If this time is different for various piles, the existing formula yields different
assessment of soil set-up at the same site and obtained results of increasing in pile capacity cannot be compared.
The proposed formula uses the traditional set-up formulation, calculates the pile capacity at the actual time after
EOID, and provides determination of the soil set-up independently of the time of the first restrike.
The proposed formula provides determination of pile capacity as a function of time after pile installation using pile
capacity values obtained through dynamic testing at EOID and one restrike or one static loading test. This approach
is identical for any construction site. Obtained information would be beneficial to choose sensible pile penetration
depth at EOID and search the proper times in days after EOID to verify set-up in cohesive soils with an additional
dynamic testing or the static loading test.

6 CONCLUSIONS
Determination of long term pile capacity is important for proper design and construction of pile foundations in
cohesive soils.
A new relationship like a linear equation in a logarithmic time scale has been derived to predict an increase in pile

Set-up effect of cohesive soils in pile capacity

Page 7 of 7

capacity with time after pile installation. Soil set-up for several piles in cohesive soils was verified on the basis of the
existing and proposed formulae. The latter has certain advantages. Obtained results showed that changes of pile
capacity with time in cohesive soil may be predicted well.
Results presented in this paper certainly do not mean that pile capacity will change with time exactly like shown
above. However, the demonstrated pile capacity versus time relationships can be used as guide for assessment of pile
capacity with respect to time. Presented results give a chance to safe significant amount of time, energy and
materials taking into account the gain of pile capacity from soil set-up. Derived relationship can also be useful in
choosing representative times for both static loading test and dynamic restrike testing.

REFERENCES








Butler, H.D. & H.E. Hoy 1977. Users manual for the Texas quick-load method for foundation load testing.
FHWA, Office of Development, Washington.
Davisson, M.T. 1972. High capacity piles. Proc., Lecture Series, Innovations in Foundation Construction,
ASCE, Illinois Section.
Fellenius, B.H., R.E. Riker, A.J. O'Brien, & G.R. Tracy 1989. Dynamic and static testing in soil exhibiting setup. Journal of Geotechnical Engineering, 115(7): 984-1001.
Fuller, R.M. & H.E. Hoy 1970. Pile load tests including quick -load test method, conventional methods and
interpretations. HRB 333: 76-86.
GRL and Associates, Inc. 1993. CAPWAP - Case Pile Wave Analysis Program, Manual, Cleveland, Ohio.
GRL and Associates, Inc. 1987. Dynamic pile tests performed during June and July, 1987, Advance Pile Test
Program, Louisiana DOT, Project No. 450-36-06, Cleveland, Ohio.
Randolph, M.F., J.P. Carter & C.P. Wroth 1979. Driven piles in clay - the effect of installation and subsequent
consolidation. Geotechnique, 29(4): 361-393.
Skov, R. & H. Denver 1988. Time-dependence of bearing capacity of piles. In B. Fellenius (ed), Proc. Third
Inter. Conf. on the Application of Stress-Wave Theory to Piles, Ottawa, 25-27 May: 879-888, Vancouver:
BiTech Publisher.
Seed, H.B. & L.C. Reese 1955. The action of soft clay along friction piles. Transactions, ASCE, 122: 731-754.
Svinkin, M.R., C.M. Morgano & M. Morvant 1994. Pile capacity as a function of time in clayey and sandy
soils. Proc. Fifth Inter. Conf. and Exhibition on Piling and Deep Foundations, Bruges, 13-15 June: 1.11.11.11.8, Rotterdam: Balkema.
Thorburn, S. & W.J. Rigden 1980. A practical study of pile behavior. Proc. 12th Annual Offshore Technology
Conf., Houston.
Tomlinson, M.J. 1971. Some effects of pile driving on skin friction behavior of piles. Proc. Institution of Civil
Engineers: 107-114, London.
Wardle, I.F., G. Price & T.J. Freeman 1992. Effect of time and maintained load on the ultimate capacity of
piles in stiff clay. Piling: European practice and worldwide trends, Proc. Institution of Civil Engineers: 92-99,
London: Telford.

Vous aimerez peut-être aussi