Additional Works at Linen Room Exposed Ceiling & Wall Painting- Quantity Take-of
Location: Linen Room, Typical Floors, Hotel Tower
Date: 27-09-'07
Quantities
Sl
No
Item Description
Unit
No.
L
Remarks
Area Calculation:A
Total Area
Ceiling
m2
10
Walls
m2
10
Sub Total
m2
166.8
Net Total
m2
583.8
28.2
30
0.45
13.5
282.0
135.0
417.0
Prepared By:
Concurred By:
Approved By:
S. Lawrence
Project Engineer-ICC
Project Manager-ICC
Project Manager-SCADO
Page No.1/4
Additional Works at Linen Room Exposed Ceiling & Wall Painting- Rate Derivation
Location: Linen Room, Typical Floors, Hotel Tower
Scope of work:- Apply 3 coats of black "Jotun Fenomastic Mat Emulsion" paint on exposed structures of linen room ceilin
exposed walls including all ducts and pipes after smoothening the surface with joint filler compound and making smooth
surface.
Sl No
Item Description
Unit
No.
Qty
Rate SR
Amount SR
Kg
11.5
1.80
20.70
Materials
Litre
0.883
3.33
2.94
Putty-2 coats
Litre
3.333
3.22
21.48
Litre
0.883
8.50
15.00
LS
8.50
Scaffolding
LS
9.00
II
Manpower
Hrs
0.85
22.00
18.70
Painter
Hrs
0.85
15.00
25.50
Labour
Hrs
0.85
12.50
21.25
III
Machineries/ Tools
Sanding Machines
Hrs
0.85
10.00
17.00
Roller Brushes
LS
23.00
LS
9.00
IV
Sub Total
VI
240.10
24.01
192.08
48.02
Prepared By:
Concurred By:
S. Lawrence
Project Engineer-ICC
Project Manager-ICC
Page No.2/4
un Fenomastic Mat Emulsion" paint on exposed structures of linen room ceiling &
fter smoothening the surface with joint filler compound and making smooth
Remarks
coverage 11.33m2/
litre
coverage 3m2/ litre
coverage 11.33m2/
litre
Approved By:
Page No.3/4
Additional Works at Linen Room Exposed Ceiling & Wall Painting- Variation Order
Location: Linen Room, Typical Floors, Hotel Tower
Date: 27-09-'07
Omissions
Sl
No
Item Description
m2
Net Total
m2
Unit
Additions
Amount SR
Net
Variation
Amount SR
14,016.89
14,016.89
Rate SR
Quantity
24.01
Amount SR
Quantity
583.8
Remarks
14,016.89
Prepared By:
Concurred By:
Approved By:
S. Lawrence
Project Engineer-ICC
Project Manager-ICC
Project Manager-SCADO
Page No.4/4