Vous êtes sur la page 1sur 4

MOVENPICK HOTEL PROJECT, AL- KHOBAR

Consul Consultant: SCADO


Main Contractor: International Center Co. (ICC)

Additional Works at Linen Room Exposed Ceiling & Wall Painting- Quantity Take-of
Location: Linen Room, Typical Floors, Hotel Tower

Date: 27-09-'07

Quantities

Sl
No

Item Description

Unit

Qty Total Qty.

No.
L

Unit Rate Total Amount


SR
SR

Remarks

Area Calculation:A

Total Area

Ceiling

m2

10

Walls

m2

10

Sub Total

Add: 40% extra over the above


area for all exposed pipes, ducts
etc.

m2

166.8

Net Total

m2

583.8

28.2
30

0.45

13.5

282.0
135.0
417.0

Prepared By:

Concurred By:

Approved By:

S. Lawrence

Mohammed Rasheed Khan

Ayman Al- Nowaeam

Project Engineer-ICC

Project Manager-ICC

Project Manager-SCADO

Page No.1/4

MOVENPICK HOTEL PROJECT, AL- KHOBAR


Consul Consultant: SCADO
Main Contractor: International Center Co. (ICC)

Additional Works at Linen Room Exposed Ceiling & Wall Painting- Rate Derivation
Location: Linen Room, Typical Floors, Hotel Tower

Rate Derivation:- (for 10 m2 area)

Scope of work:- Apply 3 coats of black "Jotun Fenomastic Mat Emulsion" paint on exposed structures of linen room ceilin
exposed walls including all ducts and pipes after smoothening the surface with joint filler compound and making smooth
surface.
Sl No

Item Description

Unit

No.

Qty

Rate SR

Amount SR

Kg

11.5

1.80

20.70

Materials

Ventonite Cement Mortar for filling


voids on slab

Masonry Primer-1 coat

Litre

0.883

3.33

2.94

Putty-2 coats

Litre

3.333

3.22

21.48

Jotun Fenomastic Mat Emulsion-2 coat

Litre

0.883

8.50

15.00

Masking Tapes/Cotton/ Sand paper etc

LS

8.50

Scaffolding

LS

9.00

II

Manpower

Foreman (Painting works)

Hrs

0.85

22.00

18.70

Painter

Hrs

0.85

15.00

25.50

Labour

Hrs

0.85

12.50

21.25

III

Machineries/ Tools

Sanding Machines

Hrs

0.85

10.00

17.00

Roller Brushes

LS

23.00

Misc. Tools (Scraper,Hand brushes etc

LS

9.00

IV

Sub Total

Add: Over Heads & Profits (25%)

VI

Grand Total Rate / 10m2

240.10

Rate per 1m2

24.01

192.08
48.02

Prepared By:

Concurred By:

S. Lawrence

Mohammed Rasheed Khan

Project Engineer-ICC

Project Manager-ICC

Page No.2/4

oom Exposed Ceiling & Wall Painting- Rate Derivation


Date: 27-09-'07

un Fenomastic Mat Emulsion" paint on exposed structures of linen room ceiling &
fter smoothening the surface with joint filler compound and making smooth
Remarks

coverage 11.33m2/
litre
coverage 3m2/ litre
coverage 11.33m2/
litre

for painting &


scaffolding

Approved By:

Ayman Al- Nowaeam


Project Manager-SCADO

Page No.3/4

MOVENPICK HOTEL PROJECT, AL- KHOBAR


Consul Consultant: SCADO
Main Contractor: International Center Co. (ICC)

Additional Works at Linen Room Exposed Ceiling & Wall Painting- Variation Order
Location: Linen Room, Typical Floors, Hotel Tower

Date: 27-09-'07

Omissions

Sl
No

Item Description

Additional Black Painting to


Linen Room ceiling and walls at
Typical floors, Hotel Tower

m2

Net Total

m2

Unit

Additions
Amount SR

Net
Variation
Amount SR

14,016.89

14,016.89

Rate SR
Quantity
24.01

Amount SR

Quantity
583.8

Remarks

14,016.89

Prepared By:

Concurred By:

Approved By:

S. Lawrence

Mohammed Rasheed Khan

Ayman Al- Nowaeam

Project Engineer-ICC

Project Manager-ICC

Project Manager-SCADO

Page No.4/4