BLD-CSTN-3-15/page no:25
Vibrated Reinforced Cement Concrete M 20 Design Mix (by weigh batching) to the required strength as per SS and IS456:2000 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved
quarry, using a minimum quantity of 300 kgs of cement per cum of concrete mixing Concrete as per design mix in
mechanical Weigh Batching units upto 15 Cum/hr capacity, and placing necessary reinforcement in position including
cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, and water to work site,
seigniorage charges on all materials, including shuttering and scaffolding with props and steel plate as per the
approved shuttering plan and other accessories as per norms and stability calculations using steel centering form work
using adjustable jack screw props and Acro span beams including all pipe bracings, clamps, coupling, prefabricated
steel "H" frames, cross members, all taxes and all operational, incidental, labour charges, mixing concrete, laying and
lift charges, vibrating, curing etc., complete for finished item for Retaining wall

Item Discription
Materials
Cement
20mm HBG graded metal
10mm HBG graded metal
Sand
Labour
Mason 1st class P229/SL11
Mason 2nd class P230/SL35

Quantity

Rate Rs

Per unit

kg
cum
cum
cum

4.40
1229.53
902.02
222.33

0.17 Day
0.17 Day

224.00
206.00

1.00 Day
1.00 Day

Mazdoor ( both men & women) P230/SL-III


Add for MA @ 20.0%
Machinery

5.60 Day
0.20

170.00
1023.81

1.00 Day

Batching plant 0.5 cum ( 6 Cum/hr) P325/SL09


Vibrator hire charges P325/SL40

1.33 hour
1.33 hour

307.96
95.48

1.00 hour
1.00 hour

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

328.00
0.52
0.35
0.40

Unit

DGM(P)
APRSCL/SKLM

1.00
1.00
1.00
1.00

kg
cum
cum
cum

GM(P)
APRSCL/SKLM

Add for MA @ 20.0% on crew charges


=(160.96+80.48) x 1.333
Water ( including curing)
Item code: M-189;Page no:250
Basic Cost
Unit : 1cum
Basic cost per 1 cum FROMN PG 10 OF TB
Hire charges of centering and scoffolding
Page No:259;Public health SSR SL:33b(4)

Add Overr head and contracter profit @ 14%


Total
Add sundries
Total rate as per 1 cum

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

0.20
1.20 KI

321.84
50.00

1.00 Cum

4377.92

1.00 Cum

1.00 Cum

572.00

1.00 Cum

0.14

DGM(P)
APRSCL/SKLM

4949.92

GM(P)
APRSCL/SKLM

h as per SS and ISm approved


design mix in
position including
ter to work site,
as per the
entering form work
, prefabricated
ncrete, laying and

Amount
1443.20
639.36
315.71
88.93
37.41
34.40
952.00
204.76

410.51
127.27

RSCL/SKLM

64.37
60.00
4377.92
4377.92

572.00
4949.92
692.99
5642.91
0.00
5642.91

RSCL/SKLM

BLD-CSTN-7-23
35
Providing skirting to internal walls to 15 cm height/risers of steps with 25 mm thick
polished Shahabad stone length equal to flooring stones, set over base coat of CM
(1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of
3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching
shade to full depth, including cost of all materials like Shahabad stone, cement, sand
and water etc., complete including seigniorage charges, etc., complete for finished item
of work, but excluding the cost of conveyance of all materials

Item Discription
Quantity
Unit = 10 sqm
A. MATERIALS:
25 mm thick polished
10.10
Shahabad stone
Sand for cm 1:5 base coat
0.12
Cement for cm 1:3 base
coat
Cement for slurry
B. LABOUR
Mason Ist class
Mason 2nd class
Mazdoor (unskiled)
Add MA 20 % on Labour
Add water charges 1%
Grand Total
Add Overheads &
Contractors Profit 14%
Page No:6; S No:16 AP
Revised Standard Data
Total
Add sundries
Total rate as per 10 Sqm

Unit

Rate Rs

Per unit

Amount

sqm

750.00

sqm

757.5

cum

432.34

cum

51.8808

34.56

kgs

4.40

kgs

152.064

33.00

kgs

4.40

kgs

145.2

0.96
2.24
3.10
0.20
1.00%

day

285.00
260.00
215.00
1522.50
2933.64

day

273.6
582.4
666.5
304.5
29.336448
2962.9812

day

0.14

2962.98

day

414.82
3377.80
0.00
3377.80

Total rate as per 1 Sqm

337.78

Total rate as per 1 Rmt

33.78

DGM(P)
AGM(P)
AGM(P)
APRSCL/SKLM
APRSCL/SKLM APRSCL/SKLM

GM(P)
APRSCL/SKLM

36

Supplying and laying of Shahbad Stone of 25mm thick of required size in a single piece
over a base of 12 mm thick in CM (1:6) pointed to full depth including grey cement slurry of
honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m. including cost and
conveyance of all materials and labour charges for laying, Rounding the edges of stone slabs
of any thickness including polishing the same cutting flat nosing to the exposed edges
including seignorage fee and all taxes, labour charges etc. complete for finished item of work
for steps of staircase (Treads of width 0.25m & lengths of 1.05m & 2.00m). BLD CSTN 919
Item Discription
Quantity
Unit
Rate Rs
Per unit
Amount
Treads of 0.25 m width &
1.05m length
For 1 mt length
Cost of polished green
marble BMT B-03
10.50 Sqm
750.00
1.00 Sqm
787.50
sand for base coat
0.12 Cum
432.34
Cum
51.88
Cement for base coat
28.80 Kgs
4.40
Kgs
126.72
cement for slurry
33.00 Kgs
4.40
Kgs
145.20
white cement for jointing
and pointing BMS-W.68
5.00 Kgs
25.00
Kgs
125.00
Flat Nosing charges BMMV.13
66.67 rmt
10.00
1.00 rmt
666.70
Machine cutting charges
67.67 rmt
10.00
1.00 rmt
676.70
BMM-V.12
Labour
0.00
Mason 1st Class
2.10 day
285.00
day
598.50
Man Mazdoor
4.90 day
215.00
day
1053.50
mazdoor for polishing and
rubbing
4.00 day
215.00
day
860.00
Woman mazddoor
4.00 day
215.00
day
860.00
Add MA 20 % on Labour
0.20 day
3372.00
day
674.40
Total For 10 Sqm
6626.10
For 1 sqm
662.61
Add Overheads &
Contractors Profit 14%
Page No:6; S No:16 AP
Revised Standard Data
0.14
662.61
92.77
Total
755.38
Add sundries
0.00
Total rate as per 1 Sqm
755.38

AGM(P)
APRSCL/SKLM

DGM(P)
APRSCL/SKLM

GM(P)
APRSCL/SKLM

37

Providing and fixing 3-layer SFMC brand PP-R (Polypropylene random copolymer)
pipes SDR 7.4 & SDR 11 UV Stabilizes and antimicrobial fusion welded heavy
thermal stability for hot &cold water supply including fixing the pipe with clamps at
1.0m spacing. This includes cost of cutting charges and making including testing of
joints complete.
PN 16/SDR 7.4/ 32mm
OD
Cost of Pipe as per
communicated vide
circular Memo No
6/APRSCL/DT/2008/ of
the Executive Director
APRSCL , Hyderabad
Add Overheads &
Contractors Profit 14%
Page No:6; S No:16 AP
Revised Standard Data
Total
Add sundries
Total rate as per 1 Rm

AGM(P)
APRSCL/SKLM

1.00 Rm

313.50

0.14

313.50

DGM(P)
APRSCL/SKLM

1.00 Rm

313.50

43.89
357.39
0.00
357.39

GM(P)
APRSCL/SKLM

118

PCC (1:3:6) Prop: Mix with graded hard granite stone aggregate of size 20 mm SS-5 HBG graded including cost and
conveyance of all materials and water to work site seignorage, all operational incidential, labour charges such as
centering form work (steel centering), mixing concrete, laying, lift charges, tamping, curing etc. complete for finished item
of work as per standard specifications for Bed Blocks to hold fast as directed by the department. ForBed Blocks
Ground Floor & First Floor
Item Discription
Quantity Unit
Materials
Cement
216.00 kg
Coarse aggregate 20 mm
0.90 cum
Fine aggregate (Sand)
0.45 cum
Water ( including curing)
Item code: M-189;Page no:250
1.20 KI
Labour
Mason 1st class P229/SL11
0.10 Day
Mazdoor(Unskilled)P230/SL-III
1.39 Day
Add for MA @ 20.0%
0.20
Machinery
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity vide
SSR page no:325; Item No: 18
1.00 hour
Add for MA @ 20.0% on crew charges =(174.20)
0.20
Total
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
0.14
Add sundries
cost per 1 cum G.F & F.F

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

Rate Rs
4.40
1393.48
521.26

Per unit
1.00 kg
1.00 cum
1.00 cum

100.00
350.00
280.00
424.20

1.00 Day
1.00 Day

303.10
174.20

1.00 hour

3406.08

GM(P)
APRSCL/SKLM

Supply and fixing of European Water Closet of first quality confirming to IS 2556 part-2, 1973 of
Hindusthan/Neycer/Parryware make white glazed with "P or S" trap ISI mark including plastic seat and lid with rubber or
plastic buffers as per IS-2548, 1986, P.V.C low level cistern with internal components with short bend equilent to
Parryware slimline 10 lts Capacity, fixed as per the direction of Engineer in charge, 12mm stop cock heavy duty
119 400grams with P trap of European water closet shall be encased in C.C. (1:2:4), 6" thick alround well above the joint to
stop leakage at the joint including cost, all taxes and conveyance of all materials and C.C. bed etc., complete for
different floors, including all labour charges for all operations complete for finished item of work.

Item Discription
Cost (SI.No.150, P.90) Item Code: BMW-D.14
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total
Add sundries
Total rate as per 1 N0

Quantity Unit
1.00 No

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

0.14

Rate Rs
Per unit
1582.00 1.00 NO
1582.00

GM(P)
APRSCL/SKLM

BLD-CSTN-7-13
Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 10 mm size hard granite machine crushed metal laid
over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the
top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand
and water etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the
120 cost of conveyance of all materials
Item Discription
Unit = 10 sqm
A. MATERIALS:
10mm HBG Graded
Cement
Sand
B. LABOUR
Mason 1st class
nd
Mason 2 class
Mazdoor (unskiled)
MA On Labour 20 %
Add water charges 1%
Grand Total
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total
Add sundries
Total rate as per 10 SQm
Total rate as per 1 SQm

Quantity Unit

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

Rate Rs

Per unit

0.17
120.00
0.085

cum
kg
cum

1021.48
4.40
521.26

cum
kg
cum

1.25
0.06
3.00
0.20
1.00%

day
day
day

350.00
320.00
280.00
1296.70
2302.00

day
day
day

0.14

2325.02

GM(P)
APRSCL/SKLM

RBR-PTWK-5
121 Providing and laying pitching on slopes laid over prepared filter media as per drawing and
technical specifications Clause 1302 MORD / 2504 MORTH
I

Stone/Boulder
Unit = cum
(a) Material
Stone boulder (25 kg minimum) /(MORTH - 40 kg)
Stone spalls of minimum 25 mm size
(b) Labour
Mate
Lead Of 100 mm by head Load For Truck Loading
Lead Of 1 Km Through Tipers
Mason 1st Class
Mazdoor (Unskilled)
MA 20 % on Labour
Total
c&d) Overheads & Contractors Profit
Rate Per 1 Cum

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

cum
cum

1.00
0.20

0.00
0.00

day
100
1
day
day

Meters
Km
0.35
0.79
0.20

45.60
28.90
350.00
280.00
343.70

0.14

DGM(P)
APRSCL/SKLM

486.94

0
0

45.60
28.90
122.50
221.20
68.74
486.94
68.17
555.11

GM(P)
APRSCL/SKLM

Manufacture supply and delevering of HDPE Pipes conforming to IS 4984-1995 including transportationj in any where in
122 AP Excluding sales tax ,Specials ,Excise DutyEtc.. For 63 mm Dia 4kg/Cm2
Item Discription
hdpe s.No 15 63 mm dia pg No 133
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total

Quantity Unit
1.00 Rmt

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

0.14

Rate Rs
77

Per unit
1 Rmt

77.00

GM(P)
APRSCL/SKLM

Manufacture supply and delevering of HDPE Pipes conforming to IS 4984-1995 including transportationj in any where in
123 AP Excluding sales tax ,Specials ,Excise DutyEtc.. For 110 mm Dia 4kg/Cm2
Item Discription
hdpe s.No 15 110 mm dia pg No 133
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total

Quantity Unit
1.00 Rmt

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

0.14

Rate Rs
Per unit
224
1 Rmt
224.00

GM(P)
APRSCL/SKLM

Manufacture supply and delevering of HDPE Pipes and fittings(Specials) Conforming to IS No 4984-1995 at site of work
Anywhere in A.P including Loading unloading , tansporting to site of work ,stackig at site transit Risk and package,
excluding taxes and duties For 63 mm dia
124
Item Discription
Pipe Ends Long Neck
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total

Quantity Unit
1 Each

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

0.14

Rate Rs
87

Per unit
1 Each

87.00

GM(P)
APRSCL/SKLM

125

Manufacture supply and delevering of HDPE Pipes and fittings(Specials) Conforming to IS No 4984-1995 at site of work
Anywhere in A.P including Loading unloading , tansporting to site of work ,stackig at site transit Risk and package,
excluding taxes and duties For 110 mm dia
Item Discription
Pipe Ends Long Neck
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total

Quantity Unit
1 Each

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

0.14

Rate Rs
Per unit
187
1 Each
187.00

GM(P)
APRSCL/SKLM

126

Manufacture supply and delevering of HDPE Pipes and fittings(Specials) Conforming to IS No 4984-1995 at site of work
Anywhere in A.P including Loading unloading , tansporting to site of work ,stackig at site transit Risk and package,
excluding taxes and duties For 63mm dia
Item Discription
MS Flanges
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total

Quantity Unit
1 Each

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

0.14

Rate Rs
Per unit
137
1 Each
137.00

GM(P)
APRSCL/SKLM

Manufacture supply and delevering of HDPE Pipes and fittings(Specials) Conforming to IS No 4984-1995 at site of work
Anywhere in A.P including Loading unloading , tansporting to site of work ,stackig at site transit Risk and package,
127 excluding taxes and duties For110mm dia
Item Discription
Quantity Unit
Rate Rs
Per unit
MS Flanges
1 Each
196
1 Each
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
0.14
196.00
Total

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

GM(P)
APRSCL/SKLM

128

129

130

Manufacture supply and delevering of HDPE Pipes and fittings(Specials) Conforming to IS No 4984-1995 at site of work
Anywhere in A.P including Loading unloading , tansporting to site of work ,stackig at site transit Risk and package,
excluding taxes and duties For63mm dia
Item Discription
END Caps
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total

Quantity Unit
1 Each

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

0.14

Rate Rs
56

Per unit
1 Each

56.00

GM(P)
APRSCL/SKLM

Manufacture supply and delevering of HDPE Pipes and fittings(Specials) Conforming to IS No 4984-1995 at site of work
Anywhere in A.P including Loading unloading , tansporting to site of work ,stackig at site transit Risk and package,
excluding taxes and duties For110mm dia
Item Discription
END Caps
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total

Quantity Unit
1 Each

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

0.14

Rate Rs
Per unit
106
1 Each
106.00

GM(P)
APRSCL/SKLM

Manufacture supply and delevering of HDPE Pipes and fittings(Specials) Conforming to IS No 4984-1995 at site of work
Anywhere in A.P including Loading unloading , tansporting to site of work ,stackig at site transit Risk and package,
excluding taxes and duties For63mm dia
Item Discription
TEES
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total

Quantity Unit
1 Each

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

0.14

Rate Rs
Per unit
142
1 Each
142.00

GM(P)
APRSCL/SKLM

131

Manufacture supply and delevering of HDPE Pipes and fittings(Specials) Conforming to IS No 4984-1995 at site of work
Anywhere in A.P including Loading unloading , tansporting to site of work ,stackig at site transit Risk and package,
excluding taxes and duties For110mm dia
Item Discription
TEES
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total

Quantity Unit
1 Each

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

0.14

Rate Rs
Per unit
357
1 Each
357.00

GM(P)
APRSCL/SKLM

Manufacture supply and delevering of HDPE Pipes and fittings(Specials) Conforming to IS No 4984-1995 at site of work
Anywhere in A.P including Loading unloading , tansporting to site of work ,stackig at site transit Risk and package,
132 excluding taxes and duties For63mm dia
Item Discription
Quantity Unit
Rate Rs
Per unit
Bends
1 Each
125
1 Each
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
0.14
125.00
Total

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

133

DGM(P)
APRSCL/SKLM

GM(P)
APRSCL/SKLM

Manufacture supply and delevering of HDPE Pipes and fittings(Specials) Conforming to IS No 4984-1995 at site of work
Anywhere in A.P including Loading unloading , tansporting to site of work ,stackig at site transit Risk and package,
excluding taxes and duties For110mm dia
Item Discription
Bends
Add Overheads & Contractors Profit 14% Page No:6;
S No:16 AP Revised Standard Data
Total

Quantity Unit
1 Each
0.14

Rate Rs
Per unit
366
1 Each
366.00

AGM(P)
AGM(P)
APRSCL/SKLM APRSCL/SKLM

DGM(P)
APRSCL/SKLM

GM(P)
APRSCL/SKLM

d including cost and


arges such as
plete for finished item
orBed Blocks

Amount

RSCL/SKLM

950.40
1254.13
234.57
120.00
0.00
35.00
389.20
84.84
0.00
303.10
34.84
3406.08
476.85
0.00
3882.93

and lid with rubber or


nd equilent to
k heavy duty
well above the joint to
complete for

Amount
1582.00

RSCL/SKLM

221.48
1803.48
0.00
1803.48

crushed metal laid


m and finishing the
cement, metal, sand
, but excluding the

Amount

RSCL/SKLM

173.65
528.00
44.31
0.00
437.50
19.20
840.00
259.34
23.02
2325.02
325.50
2650.52
0.00
2650.52
265.05

RSCL/SKLM

ationj in any where in


Amount

RSCL/SKLM

77
10.78
87.78

ationj in any where in


Amount

RSCL/SKLM

224
31.36
255.36

4-1995 at site of work


k and package,

Amount

RSCL/SKLM

87
12.18
99.18

4-1995 at site of work


k and package,
Amount

RSCL/SKLM

187
26.18
213.18

4-1995 at site of work


k and package,
Amount
137
19.18
156.18

RSCL/SKLM

4-1995 at site of work


k and package,
Amount

RSCL/SKLM

196
27.44
223.44

4-1995 at site of work


k and package,
Amount
56
7.84
63.84

RSCL/SKLM

4-1995 at site of work


k and package,
Amount
106
14.84
120.84

RSCL/SKLM

4-1995 at site of work


k and package,
Amount

RSCL/SKLM

142
19.88
161.88

4-1995 at site of work


k and package,
Amount
357
49.98
406.98

RSCL/SKLM

4-1995 at site of work


k and package,
Amount
125
17.50
142.50

RSCL/SKLM

4-1995 at site of work


k and package,
Amount
366
51.24
417.24

RSCL/SKLM