TYPICAL SECTION OF RCC DUCT ALONGWITH C.C. CHAMBER FOR LAYING OF OFC BY VARIOUS TELECOM AGENCIES
PCC 1:2.5:5
0.40
CC 1:3:6
0.60
0.15
1.60
DETAIL OF QTY. FOR ONE CHAMBER
1 E/W
1 1.60
1.60
1.20
3.07 CUM
2 PCC 1:3:6
1 1.60
1.60
0.15
0.38 CUM
3 PCC 1:2.5:5
2 1.30
2 0.9
0.20
0.2
1.00
1.00
0.52 CUM
0.36 CUM
0.88 CUM
0.113 CUM
0.77 CUM
1.30
0.10
0.17 CUM
Executive Engineer
Nalagarh Division
HPPWD Nalagarh
DETAIL OF MEASUREMENT
NAME OF WORK:- PROVIDING RCC HUME PIPE DUCT 500 MM DIA ALONGWITH CC CHAMBER FOR
LAYING OF OFC BY VARIOUS TELECOM AGENCIES ON BADDI SAI RAMSHEHAR ROAD IN KM. 0/0 TO
4/200
Qty
S.No.
Description of Item
No
Length
Breadth
Height
18
3.07
(qty as per drawing attached)
4183.80
0.60
1.00
Total
2 P/L PCC 1:3:6
18
0.38
(qty as per drawing attached)
Total
2510.28
2565.54
cum
6.84
6.84
cum
18
0.77
(qty as per drawing attached)
Total
4 P/L RCC 1:1.5:3
55.26
18
0.17
(qty as per drawing attached)
Total
13.86
13.86
cum
3.06
3.06
cum
3.06
90.00
275.40
kg
275.40
kg
or 0.275 MT
4183.80
1
12
1000
10.00
0.60
0.60
0.10
0.10
1
12
1000
10.00
0.60
0.60
0.08
0.075
1
12
1000
10.00
0.60
0.60
0.08
0.075
Total
4183.80
4183.80
Rmt
Total
7 P/L WBM G-I
0/0 to 1/0
On T-junctions
Total
8 P/L WBM G-II
0/0 to 1/0
On T-junctions
Total
9 P/L WBM G-III
0/0 to 1/0
On T-junctions
Total
60.00
7.20
67.20
cum
45.00
5.40
50.40
cum
45.00
5.40
50.40
cum
S.No.
1
Description of Item
2
No
3
Length
4
Breadth
5
Height
6
12
1
10.00
1000
0.60
0.60
12
1
10.00
1000
0.60
0.60
12
1
10.00
1000
0.60
0.60
72.00
600.00
672.00
sqm
12
1
10.00
1000
0.60
0.60
72.00
600.00
672.00
sqm
72.00
600.00
672.00
sqm
Total
Qty
7
0.05
0.05
3.60
30.00
33.60
cum
ABSTRACT OF COST
NAME OF WORK:- PROVIDING RCC HUME PIPE DUCT 500 MM DIA ALONGWITH CC CHAMBER FOR LAYING OF OFC BY
VARIOUS TELECOM AGENCIES ON BADDI SAI RAMSHEHAR ROAD IN KM. 0/0 TO 4/200
Through Rate
S.No
DESCRIPTION OF ITEMS
.
Earthwork
in
excavation
for
structures as per drawing and technical
1
specifications Clause 305.1 including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material and disposal upto a
lead of 50 m, dressing of sides and bottom and backfilling in trenches with
excavated suitable material. Ordinary soils
Labour Rate
Quantity
Rates
Unit
Amount
(Rs.)
Rates
Amount
2565.54 cum
128.15
Cum
328774
21.45
55,031
6.84 cum
2928.35
Cum
20030
346.10
2,367
13.86 cum
2,997.70
Cum
41548
346.10
4,797
3.06 cum
3,949.40
Cum
12085
367.05
1,123
17639 1,376.80
379
0.275 MT
64142.8
MT
756.30
Rmt
3164208
Cum
64361
6 Laying Cement Concrete Pipe NP2 (burried conduits) on first class bedding of
granular material including fixing collar with cement sand mortar 1:2 but
excluding excavation, protection works, backfilling, concrete and masonary
work in head wall and parapets
4183.8 Rmt
21.45
89,743
67.2 cum
Total carried over
957.75
3648645
153,439
S.No
.
DESCRIPTION OF ITEMS
Quantity
Rates
Unit
Amount
(Rs.)
3648645
Rates
Amount
153,439
1,015.70
Cum
51191.28
50.40 cum
995.50
cum
50173.2
sqm
47074
10 Providing and applying primer coat with bitumen VG-10 on prepared surface of
granular base including cleaning of road surface and spraying primer at the
rate of 10 kg/10 sqm using mechanical means as per Technical Specification
Clause 502 (five hundred two) , including carriage of all labour, equipments
and materials to various locations through all modes of transportation in all
leads, lifts and all incidental charges.
672.00 Sqm
70.05
3797083
153,439
S.No
.
DESCRIPTION OF ITEMS
Quantity
Rates
Unit
Amount
(Rs.)
Rates
3797083
11 Providing and laying bituminous macadam with hot mix plant using crushed
aggregates of grading as per Table 500.4 premixed with bituminous binder,
transported to site upto a lead of 1000 m laid over a previously prepared
surface with paver finisher to the required grade, level and alignment and
rolled to achieve the desired compaction as per Technical Specification
Clause
504.
Providing
and Laying and rolling of open graded premix carpet 20 (twenty)
33.60 cum
5,882.75
cum
197660
Amount
153,439
12
672.00 Sqm
125.20
sqm
84134
672.00 Sqm
47.30
sqm
31786
4110664
30,688
538810
386936
5067098
152012.93
5219110
13 Providing and laying seal coat sealing the voids in a bituminous surface laid to
the specified levels, grades and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 (five hundred ten) By Manual
Means, bitumen S-Ninety (S-90), including carriage of all labour,
equipments and materials to various locations through all modes of
transportation in all leads, lifts and all incidental charges.
Total
Add @ 20% Labour Enhancement Rs. 180248/Add extra cost of material as per annexure 'B'
Add extra cost of carriage material as per annexure 'A'
Add 3% contingency charges
GRAND TOTAL
153,439
64,142.80
NAME OF WORK:- PROVIDING RCC HUME PIPE DUCT 500 MM DIA ALONGWITH CC CHAMBER FOR LAYING OF OFC
AGENCIES ON BADDI SAI RAMSHEHAR ROAD IN KM. 0/0 TO 4/200
S NO
DESCRIPTION OF ITEMS
1
2
3
4
5
6
7
8
9
CEMENT
SAND
AGGRGATE 40 mm & Below
TOR STEEL
G-I
G-II
G-III
BITUMEN
RCC Hume Pipe 500 MM dia
TOTAL
QTY
UNIT
MARKET RATE
AMOUNT
6.19
15.18
73.19
294
89.37
67.03
67.03
5.07
4183.8
MT
CUM
CUM
KG
CUM
CUM
CUM
MT
RMT
5900
525
725
48
780
800
850
44500
700
36521
7970
53063
14112
69709
53624
56976
225615
2928660
3446248
CONSUMPTIO
ANNEXURE-B
IAL
S. No.
Description of Items
Unit
HPSR 2009
AMOUNT
DIFFERENCE
4900
300
440
45
400
430
440
43940
600
30331
4554
32204
13230
35748
28823
29493
222776
2510280
6190
3416
20859
882
33961
24801
27482
2839
418380
2907439
Executive Engineer
Nalagarh Division
HPPWD Nalagarh
538810
6.84
cum
13.84
cum
3.06 cum
0.28
MT
4183.80
RMT
67.20
CUM
50.40
CUM
50.40
CUM
672.00
SQM
10
BM 50 MM THICK
33.60
cum
11
2 CM PC
672.00
SQM
12
SEAL COAT
672.00
SQM
TOTAL
CONSUMPTION OF MATERIAL
PIPE DUCT 500 MM DIA ALONGWITH CC CHAMBER FOR LAYING OF OFC BY VARIOUS TELECOM
IES ON BADDI SAI RAMSHEHAR ROAD IN KM. 0/0 TO 4/200
Consumption of material
Sand C.A. 40
3.215
mm &
BELOW
cement
6.088
30.10
6.505
12.318
69.20
1.438
2.723
BITUMEN
G-I
G-II
G-III
RCC PIPES
500 MM
STEEL
24.48
0.294
1743
89.376
67.032
67.032
672
33.60
2956.8
19.44
981.12
4.032
15.190 74.169
CUM
CUM
456.96
123.78 5066.88 89.376
BAGS
KG
CUM
6.19 MT 5.07 MT
MT
67.032 67.032
CUM
CUM
1743
NOS
0.294
MT