TYPICAL SECTION OF RCC DUCT ALONGWITH C.C. CHAMBER FOR LAYING OF OFC BY VARIOUS TELECOM AGENCIES

PCC 1:2.5:5
0.40

500 MM DIA HUME PIPE

500 MM DIA HUME PIPE

CC 1:3:6

0.60

0.15

1.60
DETAIL OF QTY. FOR ONE CHAMBER
1 E/W

1 1.60

1.60

1.20

3.07 CUM

2 PCC 1:3:6

1 1.60

1.60

0.15

0.38 CUM

3 PCC 1:2.5:5

2 1.30
2 0.9

0.20
0.2

1.00
1.00

0.52 CUM
0.36 CUM
0.88 CUM

DEDUCTION:2 3.14 0.30 0.20


NET QTY.

0.113 CUM
0.77 CUM

4 P/L RCC 1:1.5:3


1 1.30

1.30

0.10

0.17 CUM
Executive Engineer
Nalagarh Division
HPPWD Nalagarh

DETAIL OF MEASUREMENT
NAME OF WORK:- PROVIDING RCC HUME PIPE DUCT 500 MM DIA ALONGWITH CC CHAMBER FOR
LAYING OF OFC BY VARIOUS TELECOM AGENCIES ON BADDI SAI RAMSHEHAR ROAD IN KM. 0/0 TO
4/200
Qty
S.No.
Description of Item
No
Length
Breadth
Height

1 Excavation of earth work and disposal of


all excavated earth upto a lead of 20
mtr. and lift upto 1.50 mtr
PCC Chambers
Excavation for pipes
0/0 to 4/200
4200-(18X0.90)= 4183.80 MTR.

18

3.07
(qty as per drawing attached)
4183.80

0.60

1.00

Total
2 P/L PCC 1:3:6

18

0.38
(qty as per drawing attached)

Total

3 P/L PCC 1:2.5:5

2510.28
2565.54
cum
6.84
6.84
cum

18

0.77
(qty as per drawing attached)

Total
4 P/L RCC 1:1.5:3

55.26

18

0.17
(qty as per drawing attached)

Total

13.86
13.86
cum
3.06
3.06
cum

5 Providing tor steel reinforcement


3.06 cum @ 90 kg/ cum

3.06

90.00

275.40
kg
275.40
kg
or 0.275 MT

4183.80

1
12

1000
10.00

0.60
0.60

0.10
0.10

1
12

1000
10.00

0.60
0.60

0.08
0.075

1
12

1000
10.00

0.60
0.60

0.08
0.075

Total

6 P/L Hume pipe 500 mm dia with 1st


class bedding
0/0 TO 4/0
4000-(17X0.90)= 3984.70 MTR.

4183.80
4183.80
Rmt

Total
7 P/L WBM G-I
0/0 to 1/0
On T-junctions
Total
8 P/L WBM G-II
0/0 to 1/0
On T-junctions
Total
9 P/L WBM G-III
0/0 to 1/0
On T-junctions
Total

60.00
7.20
67.20
cum
45.00
5.40
50.40
cum
45.00
5.40
50.40
cum

S.No.
1

Description of Item
2

10 P/A tack/priming coat @1kg/sqm


On T-junctions
0/0 to 1/0

No
3

Length
4

Breadth
5

Height
6

12
1

10.00
1000

0.60
0.60

12
1

10.00
1000

0.60
0.60

12
1

10.00
1000

0.60
0.60

72.00
600.00
672.00
sqm

12
1

10.00
1000

0.60
0.60

72.00
600.00
672.00
sqm

72.00
600.00
672.00
sqm

Total

11 P/L bitumen macadam


On T-junctions
0/0 to 1/0
Total

12 2 cm consolidated thick premix


carpet
On T-junctions
0/0 to 1/0
Total
13 Providing seal coat
carpet
On T-junctions
0/0 to 1/0
Total

Qty
7

0.05
0.05

3.60
30.00
33.60
cum

ABSTRACT OF COST
NAME OF WORK:- PROVIDING RCC HUME PIPE DUCT 500 MM DIA ALONGWITH CC CHAMBER FOR LAYING OF OFC BY
VARIOUS TELECOM AGENCIES ON BADDI SAI RAMSHEHAR ROAD IN KM. 0/0 TO 4/200
Through Rate
S.No
DESCRIPTION OF ITEMS
.
Earthwork
in
excavation
for
structures as per drawing and technical
1
specifications Clause 305.1 including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material and disposal upto a
lead of 50 m, dressing of sides and bottom and backfilling in trenches with
excavated suitable material. Ordinary soils

2 Providing concrete for plain/reinforced concrete in open foundations complete


as per drawings and technical specifications Clause 802, 803, 1202 & 1203(
P.C.C grade M 10) (1:3:6)

Labour Rate

Quantity

Rates

Unit

Amount
(Rs.)

Rates

Amount

2565.54 cum

128.15

Cum

328774

21.45

55,031

6.84 cum

2928.35

Cum

20030

346.10

2,367

3 Plain/reinforced cement concrete in substructure complete as per drawings


and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
(P.C.C grade M 15)

13.86 cum

2,997.70

Cum

41548

346.10

4,797

3.06 cum

3,949.40

Cum

12085

367.05

1,123

17639 1,376.80

379

4 Providing concrete for plain/reinforced concrete in open foundations complete


as per drawings and technical specifications Clause 802, 803, 1202 & 1203
(R.C.C. grade M 25 1:1/1/2:3)

5 Supplying, fitting and placingTMT bar reinforcement in foundation complete as


per drawings and technical specifications Clauses 1000 and 1202

0.275 MT

64142.8

MT

756.30

Rmt

3164208

Cum

64361

6 Laying Cement Concrete Pipe NP2 (burried conduits) on first class bedding of
granular material including fixing collar with cement sand mortar 1:2 but
excluding excavation, protection works, backfilling, concrete and masonary
work in head wall and parapets
4183.8 Rmt

21.45

89,743

7 Providing laying, spreading and compacting stone aggregates of specific sizes


to water bound macadam specification including spreading in uniform
thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages
to proper grade and camper applying and brooming, stone screening /binding
materials to fill-up the interstices of coarse aggregate, watering and compactly
to the required density grading-I as per Technical Specification Clause 405
(four hundred five) (A) By Manual Means, including carriage of all labour,
equipments and materials to various locations through all modes of
transportation in all leads, lifts and all incidental charges.

67.2 cum
Total carried over

957.75

3648645

153,439

S.No
.

DESCRIPTION OF ITEMS

Quantity

Rates

Unit

Amount
(Rs.)
3648645

Rates

Amount

153,439

8 Providing laying, spreading and compacting stone aggregates of specific sizes


to water bound macadam specification including spreading in uniform
thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages
to proper grade and camper applying and brooming, stone screening /binding
materials to fill-up the interstices of coarse aggregate, watering and compactly
to the required density grading-II as per Technical Specification Clause 405
(four hundred five) (A) By Manual Means, including carriage of all labour,
equipments and materials to various locations through all modes of
transportation in all leads, lifts and all incidental charges.
50.40 cum

1,015.70

Cum

51191.28

50.40 cum

995.50

cum

50173.2

sqm

47074

9 Providing laying, spreading and compacting stone aggregates of specific sizes


to water bound macadam specification including spreading in uniform
thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages
to proper grade and camper applying and brooming, stone screening /binding
materials to fill-up the interstices of coarse aggregate, watering and compactly
to the required density grading-III as per Technical Specification Clause 405
(four hundred five) (A) By Manual Means, including carriage of all labour,
equipments and materials to various locations through all modes of
transportation in all leads, lifts and all incidental charges.

10 Providing and applying primer coat with bitumen VG-10 on prepared surface of
granular base including cleaning of road surface and spraying primer at the
rate of 10 kg/10 sqm using mechanical means as per Technical Specification
Clause 502 (five hundred two) , including carriage of all labour, equipments
and materials to various locations through all modes of transportation in all
leads, lifts and all incidental charges.

672.00 Sqm

Total carried over

70.05

3797083

153,439

S.No
.

DESCRIPTION OF ITEMS

Quantity

Rates

Unit

Amount
(Rs.)

Rates

3797083

11 Providing and laying bituminous macadam with hot mix plant using crushed
aggregates of grading as per Table 500.4 premixed with bituminous binder,
transported to site upto a lead of 1000 m laid over a previously prepared
surface with paver finisher to the required grade, level and alignment and
rolled to achieve the desired compaction as per Technical Specification
Clause
504.
Providing
and Laying and rolling of open graded premix carpet 20 (twenty)

33.60 cum

5,882.75

cum

197660

Amount

153,439

12

millimeters thickness composed of 13.2 mm to 5.6 mm (thirteen point two


millimeters to five point Six millimeters) aggregates either using penetration
grade bitumen S-Ninety (S-90) to required line, grade and level to serve as
wearing course on a previously prepared base, including mixing in a suitable
plant, laying and rolling with a three wheel 80-100 kN( Eighty to one hundred
kN) static roller capacity, finished to required level and grades to be followed
by seal coat of type B as per Technical Specification Clause 508 (Five
hundred Eight), including carriage of all labour, equipments and materials to
various locations through all modes of transportation in all leads, lifts and all
incidental charges.

672.00 Sqm

125.20

sqm

84134

672.00 Sqm

47.30

sqm

31786
4110664
30,688
538810
386936
5067098
152012.93
5219110

13 Providing and laying seal coat sealing the voids in a bituminous surface laid to
the specified levels, grades and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 (five hundred ten) By Manual
Means, bitumen S-Ninety (S-90), including carriage of all labour,
equipments and materials to various locations through all modes of
transportation in all leads, lifts and all incidental charges.

Total
Add @ 20% Labour Enhancement Rs. 180248/Add extra cost of material as per annexure 'B'
Add extra cost of carriage material as per annexure 'A'
Add 3% contingency charges

GRAND TOTAL

say Rs 52.19 lacs


Executive Engineer
Nalagarh Division
HPPWD Nalagarh

153,439

64,142.80

EXTRA COST OF MATERIAL

NAME OF WORK:- PROVIDING RCC HUME PIPE DUCT 500 MM DIA ALONGWITH CC CHAMBER FOR LAYING OF OFC
AGENCIES ON BADDI SAI RAMSHEHAR ROAD IN KM. 0/0 TO 4/200

S NO

DESCRIPTION OF ITEMS

1
2
3
4
5
6
7
8
9

CEMENT
SAND
AGGRGATE 40 mm & Below
TOR STEEL
G-I
G-II
G-III
BITUMEN
RCC Hume Pipe 500 MM dia

TOTAL

QTY

UNIT

MARKET RATE

AMOUNT

6.19
15.18
73.19
294
89.37
67.03
67.03
5.07
4183.8

MT
CUM
CUM
KG
CUM
CUM
CUM
MT
RMT

5900
525
725
48
780
800
850
44500
700

36521
7970
53063
14112
69709
53624
56976
225615
2928660

3446248

CONSUMPTIO

NAME OF WORK:- PROVIDING RCC HUME PIPE DUCT 500 MM DIA


AGENCIES ON BADDI SAI RAMS

ANNEXURE-B

IAL

S. No.

Description of Items

Unit

C CHAMBER FOR LAYING OF OFC BY VARIOUS TELECOM


D IN KM. 0/0 TO 4/200

HPSR 2009

AMOUNT

DIFFERENCE

4900
300
440
45
400
430
440
43940
600

30331
4554
32204
13230
35748
28823
29493
222776
2510280

6190
3416
20859
882
33961
24801
27482
2839
418380

2907439

Executive Engineer
Nalagarh Division
HPPWD Nalagarh

538810

PCC 1:3:6 (40 mm nominal size)

6.84

cum

PCC 1:2.5:5 (20 mm nominal size)

13.84

cum

PCC 1:1.5.:3 (20 mm nominal size)

PROVIDING TOR STEEL

PROVIDING 500 MM HUME PIPE

3.06 cum
0.28

MT

4183.80

RMT

P/L WBM G-I

67.20

CUM

P/L WBM G-I

50.40

CUM

P/L WBM G-I

50.40

CUM

P/A TACK COAT

672.00

SQM

10

BM 50 MM THICK

33.60

cum

11

2 CM PC

672.00

SQM

12

SEAL COAT

672.00

SQM

TOTAL

CONSUMPTION OF MATERIAL

PIPE DUCT 500 MM DIA ALONGWITH CC CHAMBER FOR LAYING OF OFC BY VARIOUS TELECOM
IES ON BADDI SAI RAMSHEHAR ROAD IN KM. 0/0 TO 4/200
Consumption of material
Sand C.A. 40
3.215

mm &
BELOW

cement

6.088

30.10

6.505

12.318

69.20

1.438

2.723

BITUMEN

G-I

G-II

G-III

RCC PIPES
500 MM

STEEL

24.48
0.294
1743
89.376
67.032
67.032
672

33.60

2956.8

19.44

981.12

4.032
15.190 74.169
CUM
CUM

456.96
123.78 5066.88 89.376
BAGS
KG
CUM
6.19 MT 5.07 MT
MT

67.032 67.032
CUM
CUM

1743
NOS

0.294
MT