Model
The Naval Ship Life Cycle Cost Model estimates these costs
throughout any stage of a ship designs evolution.
Early cost estimates have a high degree of variability and
high risk. The Cost Model computes both the cost and the
cost risk that can be updated on a regular basis as design
and construction progresses.
The Cost Model also can be used to evaluate ship upgrades
and modernization trade-off studies.
Conception Stage: All activities necessary to develop and define a means for
meeting a stated requirement. For ships and equipment, this normally includes
research and development, design, contract specifications, identification of all
support necessary for introduction into service, and identification of funding
required and managerial structure for the acquisition.
Acquisition Stage: All activities necessary to acquire the ship and provide support
for the ship and equipment identified in the conception stage.
In-Service Stage: All activities necessary for operation, maintenance, support and
modification of the ship or equipment throughout its operational life. The inservice stage is normally the longest stage.
Disposal Stage: All activities necessary to remove the ship or equipment and its
supporting materials from service.
Sample List of
Structural Materials
Additional Selection of
Machinery Emissions
Reduction Components
Filling out
Maintenance
& Repair
Scenarios
Sample Detail Estimate for Anti-Fouling Hull Bottom (10 Year Cycle)
Filling out
Estimated
Casualty
Repairs
Scenarios
Filling out
Modernization
& Upgrade
Scenarios
User Caution
Users of a cost model are cautioned that it is intended to provide only an estimate of
cost information. There are limits to the capabilities of these calculations beyond
which results may not be accurate.
The data provided in the cost model is not a substitute for judgment, analysis and
sound estimating practice. The cost model is an aid in developing an informed
opinion of cost. If you are using the cost model as your sole cost authority for
contract bids, you are reading more into the cost model than what has been
intended.