sand
earth
work principle: a moving fluid dislocates particles and
carries them away
usable for:
Water cannons
hidromonitor
1 - vehicle
Water cannons
work schemes
from downhill
o Lmin, Lmax
from uphill
1- water cannon;
2 trench for water flow;
3, 4 order of excavating
anything wrong?
advantages/disadvantages
productivity
flow direction & slope
worker
transport
depositing (placing)
destination/purpose:
removal
filling
placing
when the velocity of sludge/silt decreases under the critical
value, particles start settling (first large diameter ones)
in limited space
p
settled material
small dikes
water evacuation pipe(s)
sludge
l d pipe
i
unconsolidated core
fitforsmallareas
4
3
2
1 retentiondike
2 elevatingdikes
3 scaffold(trestle)
4 flume
5 sludgepipe
6 settling(decantation)slope
1 sludgepipe
g pp
2 nozzle
3 scaffold(trestle)
4 retentiondike
5 verticaldrain(watercollection)
6 horizontalpipeforwater
elimination
7 imperviouscore(ifany)
example of
rapid pipe joint
Arrangement of worksite
presence of underground water (including artesian) most sites
rain, snow, snow melting
capacity of water release
necessary utilities
water
electricity
compresses air
technological
h l i l steam
communication (cable phones, radio)
existing utilities
existing structures