B.1.2
No
No
138
145
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
Design Requirements
_______________________________________________
_______________________________________________
_______________________________________________
1
275
650
3,150
40
1
40 (108)
O-0.3s CO-3min CO
By Contractor
By Contractor
By Contractor
60
PCB-2
Description
B.1.3
1
SF6
Dead tank
B.1.5
3000
By Contractor
By Contractor
Motor-Spring Charged
138
Brown
By contractor
Yes
SF6 gas
125 Vdc
a. 138kV
2 electrically independent
trip coils
b. 69kV
2 electrically independent
trip coils
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
Individual foundation
Bushing Characteristics
CONFORME
outdoor
B.1.4
Design Requirements
f.
Number of additional converitble auxiliary contacts above those normally required for
circuit breaker operation
g.
The operating mechanism shall be engineered for single pole closing and tripping
_______________________________________________
_______________________________________________
_______________________________________________
125 V dc
12A, 12B
No
PCB-3
Description
The breakers if engineered for single pole actuation shall be provided with phase
h. discrepancy monitoring and control system for synchronized operation of individual pole
(closing and opening )
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
_______________________________________________
_______________________________________________
_______________________________________________
Design Requirements
N/A
PCB-4
Description
For compressed gas or air blast circuit breakers, on decrease of gas pressure below
minimum value of the circuit breaker
1. If closed, shall be
PT - Prevented from Tripping
TA - Trip Automatically
2. If open, shall be
PC - Prevented from closing
CA - Close Automatically
Current Transformer (CT)
Design Requirements
i.
B.1.6
a. If dead tank type circuit breakers are to be supplied, bushing type current transformers
are to be provided on each bushing turret
If required, they shall be as mentioned in the specifications for current transformer of
b.
Section 6
c. No. of cores per PCB bushing turret
B.1.7
PC
Yes
Yes
Miscellaneous Accessories
a. Breaker Position Indicator (both mechanical & light)
b. Manual Closing Device
c. Operations Counter
Yes
Yes
Yes
d. Cable duct from the control cubicle down to cable trench to be provided by contractor
Yes
Type and size of Line terminal connectors to be furnished by Contractor on the terminals
e. of circuit breaker shall be suitable for (specify size/ampacity of conductor and no. of
conductors)
Type and size of ground terminal connectors to be furnished by the Contractor for the
circuit breaker shall be suitable for (specify size fo conductor)
f.
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
PT
_______________________________________________
_______________________________________________
_______________________________________________
1
2
DPDT
125 Vdc
PCB-5
Description
B.2.2
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
_______________________________________________
_______________________________________________
_______________________________________________
Design Requirements
In accordance with the
operating endurance
capabilities for circuit
breakers
< 1 for all types of breakers
PCB-6
Description
B.3
B.3.1
B.4
B.4.1
B.4.2
B.4.3
B.5
Tools
B.5.1
In addition to those tools and devices recommended by the Manufacturer for the circuit
breaker, the following tools and devices shall be supplied each for substation.
1.
B.6
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative C.
Designation
Design Requirements
Set(s) of SF6 handling equipment composing of but not limited to the following:
1 set
PCB-7
Description
Design Requirements
C.1
The contractor furnished data and information are included in this specification to indicate
the guaranteed performance, interface requirements and construction features of all
Contractor furnished equipement. The accuracy and the compatibility of such information
with overall performance requirements specified by Employer are the sole responsibility of
the Contractor.
C.2
C.2.1
Environmental Considerations
In accordance with Paragraph 2.8 of the General Technical Requirements and the Technical
Data Sheets of Section 2, the operating environment for this installation (will, will not) affect
the life expectancey of the components used in this equipements. if there will be an effect,
the following components will be affected as follows:
Component
_______________________________
Effect
_______________________________
_______________________________
_______________________________
_______________________________
_______________________________
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
_______________________________________________
_______________________________________________
_______________________________________________
PCB-8
Description
C.3
Design Requirements
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
_______________________________________________
_______________________________________________
_______________________________________________
PCB-9
Description
d.
e.
f.
g.
h.
i.
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
_______________________________________________
_______________________________________________
_______________________________________________
Design Requirements
PCB-10
B.1.2
No
No
69
72.5
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
Design Requirements
_______________________________________________
_______________________________________________
_______________________________________________
1
140
325
3,150
40
2
40
O-0.3s CO-3min CO
By Contractor
By Contractor
By Contractor
60
PCB-11
Description
B.1.3
1
SF6
Dead tank
B.1.5
N/A
By Contractor
By Contractor
Motor-Spring Charged
72.5
2247.5
Brown
By Contractor
Yes
SF6 gas
125 Vdc
a.
138kV
2 electrically independent
trip coils
b.
69kV
2 electrically independent
trip coils
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
Individual foundation
Bushing Characteristics
CONFORME
outdoor
B.1.4
Design Requirements
125 Vdc
f.
Number of additional converitble auxiliary contacts above those normally required for circuit
breaker operation
12A, 12B
g.
The operating mechanism shall be engineered for single pole closing and tripping
No
_______________________________________________
_______________________________________________
_______________________________________________
PCB-12
Description
The breakers if engineered for single pole actuation shall be provided with phase
h. discrepancy monitoring and control system for synchronized operation of individual pole
(closing and opening )
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
_______________________________________________
_______________________________________________
_______________________________________________
Design Requirements
N/A
PCB-13
Description
For compressed gas or air blast circuit breakers, on decrease of gas pressure below minimum
value of the circuit breaker
1. If closed, shall be
PT - Prevented from Tripping
TA - Trip Automatically
2. If open, shall be
PC - Prevented from closing
CA - Close Automatically
Current Transformer (CT)
Design Requirements
i.
B.1.6
a. If dead tank type circuit breakers are to be supplied, bushing type current transformers are
to be provided on each bushing turret
If required, they shall be as mentioned in the specifications for current transformer of
b.
Section 6
c. No. of cores per PCB bushing turret
B.1.7
Miscellaneous Accessories
a. Breaker Position Indicator (both mechanical & light)
b. Manual Closing Device
c. Operations Counter
d. Cable duct from the control cubicle down to cable trench to be provided by contractor
PT
PC
Yes
Yes
Three (3)
Yes
Yes
Yes
Yes
Type and size of Line terminal connectors to be furnished by Contractor on the terminals of
e. circuit breaker shall be suitable for (specify size/ampacity of conductor and no. of
conductors)
f.
Type and size of ground terminal connectors to be furnished by the Contractor for the circuit
breaker shall be suitable for (specify size fo conductor)
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
_______________________________________________
_______________________________________________
_______________________________________________
PCB-14
Description
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
_______________________________________________
_______________________________________________
_______________________________________________
Design Requirements
In accordance with the
operating endurance
capabilities for circuit
breakers
< 1 for all types of breakers
Yes
Yes
Yes
Not acceptable
60Hz
Yes
Two (2)
PCB-15
Description
B.3
B.3.1
B.4
B.4.1
B.4.2
B.4.3
B.5
Tools
B.5.1
In addition to those tools and devices recommended by the Manufacturer for the circuit breaker,
the following tools and devices shall be supplied each for substation.
1.
B.6
CONFORME
Name of Bidder
Name SIgnature of Bidder's RepresentativeC.
Designation
Design Requirements
Set(s) of SF6 handling equipment composing of but not limited to the following:
1 set
PCB-16
Description
C.1
C.2
C.2.1
Design Requirements
The contractor furnished data and information are included in this specification to indicate the
guaranteed performance, interface requirements and construction features of all Contractor
furnished equipement. The accuracy and the compatibility of such information with overall
performance requirements specified by Employer are the sole responsibility of the Contractor.
Environmental Considerations
In accordance with Paragraph 2.8 of the General Technical Requirements and the Technical Data
Sheets of Section 2, the operating environment for this installation (will, will not) affect the life
expectancey of the components used in this equipements. if there will be an effect, the following
components will be affected as follows:
Component
_______________________________
Effect
_______________________________
_______________________________
_______________________________
_______________________________
_______________________________
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
_______________________________________________
_______________________________________________
_______________________________________________
PCB-17
Description
C.3
Design Requirements
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
_______________________________________________
_______________________________________________
_______________________________________________
PCB-18
Description
d. Gas per container, kg
e. Total quantity of SF6 gas to be supplied with the original equipment, kg
f. Total quantity of SF6 gas required per breaker, kg
g. Guaranteed maximum SF6 gas leakage rate in kg/yr
h. No. of gas monitoring systems included with the equipment
i. In-service life of gaskets, years
j. Storage shelf life of gaskets, years
8. Maximum Foundation Loading during Operation
a. For horizontal breakers, N
b. For vertical breakers, N
9. Motor Capacity
a. Type
b. Horsepower, hp
c. Current, start/run
CONFORME
Name of Bidder
Name SIgnature of Bidder's Representative
Designation
_______________________________________________
_______________________________________________
_______________________________________________
Design Requirements