Vous êtes sur la page 1sur 22

PRESENCIA DE LOS FENOMENOS DE INUNDACIN Y

SOCAVACIN A LO LARGO DEL CANAL NATURAL DEL RIO


RIMAC

Integrantes:
-

Ramirez Tinoco, Erick


Valverde Carrasco, Alexia
Daz Chvez, Eddie
Ortiz Reynada, Yamir

CURSO: Taller de Obras Hidrulicas


PROFESOR: Ing. Csar Gonzales Linares
FECHA: 24 de Noviembre de 2014

2014-II

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS

INDICE

1. PROBLEMA.... Pg 3.
2. OBJETIVOS. Pg 3.
3. MARCO TEORICO... Pg 3.
4. MEDIDAS DE SOLUCIONES... Pg 10.
5. RECURSOS......... Pg 11.
6. INUNDACIONES......

Pg 12.

7. SOCAVACIN....

Pg 15.

8. CONCLUSIONES...... Pg 22.
9. BIBLIOGRAFA..... Pg 22.

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


PRESENCIA DE LOS FENOMENOS DE INUNDACIN Y
SOCAVACIN A LO LARGO DEL CANAL NATURAL DEL RIO RIMAC
1. PROBLEMA
Se necesita disponer de un mecanismo que permita estudiar el comportamiento
del flujo de agua del rio Rmac, vinculndolos directamente a la reduccin de
riesgos de inundaciones y erosin fluvial, en el ro Rmac.

2. OBJETIVOS
o

Verificar si el tramo modelado sufrir posibles inundaciones o desbordes de agua,


para el tiempo de retorno de 100 aos.

Proponer soluciones ante la posibilidad de rebose del caudal en el rio Rmac.

Evaluar el canal natural del rio Rmac antes la presencia de socavacin en todos
sus tramos para un tiempo de retorno de 500 aos.

3. MARCO TEORICO
DESCRIPCIN
La cuenca del ro Rmac es una de las cuencas hidrogrficas ms importantes del
pas, al encontrarse dentro de ella la Gran Capital, desempeando un rol vital
como fuente de abastecimiento de agua para el consumo humano, agrcola y
energtico, existiendo en ella 5 centrales hidroelctricas importantes.
La cuenca del ro Rmac se origina en la vertiente occidental de la cordillera de los
Andes a una altitud mxima de aproximadamente 5,508 metros sobre el nivel del
mar en el nevado Paca y aproximadamente a 132 kilmetros al nor-este de la
ciudad de Lima, desembocando por el Callao, en el ocano Pacfico. El rea total
de captacin es de 3,132 km, que incluye aquella de sus principales tributarios,
Santa Eulalia (1,097.7 km) y Ro Blanco (193.7 km), tiene en total 191 lagunas, de
las cuales 89 han sido estudiadas.
La cuenca del Ro Rimac soporta un amplio rango de actividad minera la que es
particularmente intensa en las zonas ms altas, tanto en la parte principal del
Rimac como en la sub cuenca del Santa Eulalia.

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS

UBICACIN Y DEMARCACIN DE LA CUENCA


La cuenca del rio Rmac se encuentra localizada en la regin central y occidental
del territorio Peruano.
Ubicacin geogrfica
La cuenca del ro Rmac se encuentra ubicada entre las coordenadas geogrficas
113652 y 120547 de latitud Sur y entre 761105 y 770436 de longitud Oeste

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


INUNDACIONES
Las inundaciones son un evento natural y recurrente para un ro. Estadsticamente,
los ros igualarn o excedern la inundacin media anual, cada 2,33 aos
(Leopold etal., 1984). Las inundaciones son el resultado de lluvias fuertes o
continuas que sobrepasan la capacidad de absorcin del suelo y la capacidad
de carga de los ros, riachuelos y reas costeras. Esto hace que un determinado
curso de aguas rebalse su cauce e inunde tierras adyacentes.
La frecuencia de inundaciones depende del clima, del material de las riberas del
ro y la pendiente del canal. Cuando ocurre copiosa precipitacin en una
determinada estacin cada ao, o la inundacin anual es resultado del deshielo,
las llanuras de inundacin pueden ser inundadas casi todos los aos, an a lo largo
de grandes ros con muy poca pendiente de canal. En las regiones que no sufren
extensos perodos con temperaturas bajo cero, las inundaciones generalmente
ocurren en la poca de mayor precipitacin. Cuando el mayor nmero de
inundaciones son resultado del deshielo, frecuentemente acompaado por
precipitacin, la poca de inundaciones es la primavera o el inicio del verano.
CAUSAS QUE PROVOQUEN LAS INUNDACIONES
Las causas que provocan las inundaciones pueden ser de tipo climtico,
parcialmente climticas y de otros tipos como por ejemplo antrpicos. En funcin
de las causas tendremos un tipo de inundacin u otro. En el primer grupo destacan
las lluvias intensas y/o muy prolongadas, la fusin de nieve. En un segundo grupo
encontramos factores climticos como causa parcial de las avenidas, por ejemplo
en los estuarios, el embalse de las aguas ros con avenidas en momentos de marea
alta pueden provocar desbordamientos. Tambin en las costas bajas como
consecuencia de la conjuncin de olas de marea muy altas provocadas por bajas
presiones y fuertes vientos se pueden producir inundaciones. El tercer grupo incluye
otras causas de inundacin como los tsunamis, producidas por los terremotos, los
deslizamientos, que taponan un curso fluvial o la rotura de embalses u otras
construcciones.

Inundaciones producidas por las precipitaciones: en este tipo de crecidas, el


hidrograma presenta un flujo rpido o directo. El agua circula por las laderas
superficialmente o de forma subsuperficial segn las caractersticas fsicas de la
cuenca (cubierta vegetal, suelos, pendiente, etc.), y de la lluvia. La crecida no se
produce en toda la cuenca de manera uniforme, es normal que haya unas reas
que contribuyen ms que otros a la formacin del caudal.
5

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


Tipo de crecidas provocadas por la lluvia: la gran variabilidad en las causas de las
crecidas y en los procesos que las generan, dificulta notable su clasificacin. Sin
embargo, atendiendo a la forma del hidrograma, pueden establecerse cuatro
grupos:

Inundaciones por rotura o avera de embalses, son crecidas muy violentas que
provocan gran nmero de prdidas de vidas humanas y de bienes. A veces el
fenmeno se puede producir tambin de forma natural. Algunos ros, sobre todo
en valles estrechos, se taponan con rboles, maleza, etc. o por deslizamientos de
ladera. Las inundaciones por embalses tambin pueden ser por el desage
regulatorio de caudales de agua, por la avera de la toma. Es una hiptesis poco
probable pero de efectos devastadores en una amplia parte del territorio aguas
abajo de los embalses.

En la imagen se puede observar un claro ejemplo de inundacin, que sucedi en


el proyecto Va parque Rimac debido a que no se hizo un buen estudio y no se
consider el clima el muro provisional que se us no soporto el incremento del
caudal del rio Rimac.

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


SOCAVACIN
La socavacin es la remocin de materiales del lecho y de las bancas de un
cauce debido a la accin erosiva del flujo de agua alrededor de una estructura
hidrulica. La socavacin del fondo de un cauce definido es el producto del
desequilibrio entre el aporte slido que trae el agua a una cierta seccin y la
mayor cantidad de material que es removido por el agua en esa seccin.
Los materiales se socavan en diferentes formas: suelos granulares sueltos se
erosionan rpidamente mientras que los suelos arcillosos son ms resistentes a la
erosin. Sin embargo, la socavacin final de suelos cohesivos o cementados
puede ser tan profunda como la socavacin en suelos arenosos, variando el
tiempo en el cual se produce.

Formas de socavacin:
Las formas de socavacin se presentan en un cauce segn que haya o no haya
movimiento de sedimentos desde aguas arriba: socavacin en lecho mvil y
socavacin en agua clara:
Socavacin en lecho mvil: Se presenta cuando hay transporte de sedimentos del
lecho desde aguas arriba hasta el sitio del ponteadero (Lugar escogido para la
construccin o montaje de un puente.) y por lo tanto parte de este sedimento
queda atrapado en el hueco de socavacin. En este caso, la socavacin alcanza
equilibrio cuando la cantidad de material que es transportado iguala la cantidad

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


de material que es removido. Se le conoce tambin como socavacin en lecho
vivo.
Socavacin en agua clara: Se presenta cuando no hay transporte de sedimentos
del lecho desde aguas arriba al sitio del ponteadero y por lo tanto no hay
reabastecimiento del hueco socavado. En este caso, la socavacin alcanza
equilibrio cuando el esfuerzo cortante en el lecho es menor que el requerido para
el inicio del movimiento de las partculas, o sea cuando el flujo no puede remover
ms partculas del hueco formado.
La socavacin local: Tiene dos componentes, la producida por el paso de
crecientes y la correspondiente a la construccin de obras civiles. Para calcular la
primera existe un sinnmero de frmulas, que son modificadas continuamente por
sus autores, a medida que se avanza en la experimentacin de campo. Se basan
principalmente en el efecto de la fuerza tractiva sobre la carga de fondo, y en los
conceptos expuestos por Shields, (Leliavsky). Socavacin local: se refiere a la
remocin del material que circunda pilas, estribos, diques o terraplenes de acceso
a un puente. Est causada por el cambio de direccin de las lneas de corriente,
la turbulencia, la aceleracin del flujo y los vrtices resultantes inducidos por la
obstruccin al flujo. La socavacin local puede presentarse bajo condiciones de
agua clara o lecho mvil.
Socavacin transversal: la reduccin de la seccin de un cauce ocasionada de
forma natural o por alguna obra civil, es compensada por un aumento en su
profundidad hasta alcanzar el gasto normal. Se entiende por socavacin en
estrechamientos la que se produce por el aumento en la capacidad de arrastre
de slidos que adquiere una corriente cuando su velocidad aumenta por efecto
de una reduccin de rea hidrulica en su cauce. El efecto es muy importante en
puentes, donde por lo comn y por razones de economa suelen ocurrir las
mencionadas reducciones, si bien puede presentarse en otros lugares del curso del
ro, en que un estrechamiento ms o menos brusco tenga lugar. Los cambios que
la presencia de un puente impone a la corriente son principalmente los siguientes:
Cambio de la velocidad del flujo del agua en el cauce principal.
Cambio en la pendiente de la superficie libre del agua, hacia arriba y hacia abajo
del puente. Esto origina el mayor arrastre del material del fondo en la seccin del
cauce y, cuando ello es posible, se ensancha el cauce.

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS

En la imagen se muestra, que si no se realiza un buen estudi de caudales mximos


para diferentes tiempos de retornos se producen fallas como por ejemplo la
socavacin, que con el tiempo afecta a las estructuras.

En esta imagen podemos observar el colapso de la estructura a causa del


fenmeno de socavacin generado por las mximas avenidas de los ros.

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


4. MEDIDAS DE SOLUCIONES:

Muro de encauzamiento:
Desde el punto de vista de diseo y operacin son muy parecidos a los
longitudinales, se utilizan principalmente en zonas bajas (las obras para proteccin
de las mrgenes son otro de sus campos de aplicacin). Durante el diseo, se
debe tomar en cuenta que el cauce principal estar ubicado entre ellos (los
muros), dejando una planicie de inundacin no apta para asentamientos urbanos
ni industriales.
Se utilizan, principalmente, cuando los taludes de los bordos resultan muy tendidos
y por tanto el volumen de obra es muy grande, o bien al cruzar zonas urbanas o
terrenos muy costosos donde no hay espacio suficiente para construirlos.
Estas estructuras pueden construirse a base de concreto en masa o armado,
gaviones o mampostera.
TIPOS DE MURO DE ENCAUSAMIENTO
Muros de encauzamiento: Son muros de piedra o de concreto que encauzan las
aguas del ro, sirven como defensa de la ribera del ro y protegen la ventana
decapitacin.
Son estructuras que permiten encauzar el flujo del ro entre determinados lmites
con el fin de formar las condiciones de diseo pre-establecidas (ancho, tirante,
remanso, etc.
Estas estructuras pueden ser de concreto simple a de concreto armado. Su
dimensionamiento est basado en controlar el posible desborde de la mxima
nivel del agua y evitar tambin que la socavacin afecte las estructuras de
captacin y derivacin. En lo referente a la altura de coronacin que estas
estructuras deben tener, se recomienda que su cota superior est por lo menos
0.50 m por encima del nivel mximo de agua. Con respecto a su cota de
cimentacin, se recomienda que sta debe estar por debajo o igual a la posible
profundidad de socavacin (ver diques de encauzamiento).Con la altura definida
se puede dimensionar los espesores necesarios para soportar los esfuerzos que
transmiten el relleno y altura de agua; es prctica comn disear al volteo,
deslizamiento y asentamiento.

10

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS

5. RECURSOS:

Hec-Ras: simulacin del Rio.

Planos: en AutoCAD del tramo del Rio Rmac.

Fotos de la zona (Rio Rmac).

Tablas e informacin adicional, adjuntado por el Ing. Gonzales Linares

Microsoft Excel 2010: clculo de socavacin para Tr = 500 aos.

MTC ( ministerio de transportes y comunicaciones)

11

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


6. INUNDACIONES:
Modelamiento en el programa Hec Ras, de un tramo del Rio Rmac, con los datos
dados por el ing. Gonzales, para poder calcular desbordes o inundaciones que se
pueden generar en el rio.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

En la imagen se muestra la simulacin en 3D del tramo del Rio Rmac, usando un


caudal 286.08 m3/s para un tiempo de retorno Tr = 100 aos.
CUADRO DE CAULDALES MAXIMOS ANUALES
20.
21.
22.
23.
24.
25.
26. El cuadro de caudales mximo se us para la modelacin del Rio Rimac
con el programa hec ras, este cuadro fue proporcionado por el Ing.
Gonzales Linares.

12

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


IDENTIFICANDO ZONAS DE INUNDACIONES:
1er. Tramo inundado:
Inicia en la progresiva 0 + 180.

Se puede observar que en la progresiva 180 se va producir inundacin debido a


que el tirante de agua est por encima de la seccin natural del canal.
Hasta la progresiva 0 + 290

Se puede observar que en la progresiva 290 se va producir inundacin debido a


que el tirante de agua se acerca a la cara laterante de la seccin natural.

13

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


2do. Tramo inundado:
Inicia en la progresiva 0 + 580

Se puede observar que en la progresiva 580 se va producir inundacin por el


margen derecho debido a que el tirante de agua podra sobrepasar la pared del
margen derecho de la seccin del canal natural Rio Rmac.
Hasta la progresista 0 + 620

Se puede observar que en la progresiva 620 se producir inundacin por el


margen izquierdo.

14

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


7. SOCAVACIN:
La socavacin es un fenmeno hidrodinmico que es la causa ms frecuente de
falla que afecta las cimentaciones de los puentes. Dicho fenmeno es una
combinacin de distintos procesos, unos que se producen a largo plazo y otros
transitorios por el paso de avenidas.
El proceso de socavacin en un puente se analiza como erosin potencial total y
es de carcter estimativo, la cual combina la socavacin producida en la seccin
del puente y sus inmediaciones, causada por el estrechamiento del cauce debido
a su construccin y la socavacin local que se produce en las inmediaciones de
los pilares y estribos rodeados por la corriente del ro. Sin embargo, cabe
El clculo de socavacin, se hallara de acuerdo a la informacin disponible de la
informacin dada por el Ingeniero, la socavacin se calculara para un tiempo de
retorno de 500 aos.
Los clculos de la socavacin para periodos de retorno de 100 aos y 500 aos
respectivamente, se presentan en los siguientes cuadros y grficos.

La mxima socavacin calculada se registra en la progresiva 3 + 658.13 con


3.34m. para un Tr = 100 La socavacin promedio calculada se registra con
1.85m. para un Tr =100 aos.

La mxima socavacin calculada se registra en la progresiva 3 + 658.13.00 con


3.98m. para un Tr = 500 La socavacin promedio calculada se registra con 2.17
m. para un Tr =500 aos.

A continuacin se mostrara el cuadro de clculos de socavacin para un periodo


de retorno Tr = 500 aos, y su perfil de socavacin en estado natural para un Tr =
500 aos.

15

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


Anlisis de Socavacin del rio Rimac en su Estado Natural- Lecho no cohesivo - Tramos Malecn de la Amistad (Tr 500 aos)

U=
b=

0.98
1.00

Estacin Progresiva

Q max

C.Fondo

Seccin

0+000

(m3/s)

(m)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

3658.13
3640
3620
3600
3580
3560
3540
3520
3500
3480
3460
3440
3420
3400
3380
3360
3340
3320
3300
3280
3260
3240
3220
3200
3180
3160
3140
3120
3100
3080

345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73

224.53
224.23
224.05
223.74
223.6
223.26
223.15
223.04
222.9
222.82
222.59
222.24
221.78
221.38
221.27
220.82
220.69
220.39
220.17
219.98
219.82
219.44
219
218.65
218.38
218.16
217.83
217.56
217.52
217.35

Dm =
X=
Elev Agua

25
0.44

mm

do

So

Area

(m)

(m)

(m/s)

Pendiente

(m2)

226.53
226.47
226.19
225.89
225.78
225.35
226.40
225.99
226.03
225.50
224.92
224.13
224.60
223.70
223.65
223.55
223.11
222.71
222.43
222.49
222.12
222.09
221.45
221.11
220.65
221.41
221.26
221.28
220.72
220.62

2.00
2.24
2.14
2.15
2.18
2.09
3.25
2.95
3.13
2.68
2.33
1.89
2.82
2.32
2.38
2.73
2.42
2.32
2.26
2.51
2.30
2.65
2.45
2.46
2.27
3.25
3.43
3.72
3.20
3.27

8.56
7.61
7.17
6.88
6.31
6.36
3.48
4.25
3.84
4.71
5.41
6.18
4.48
5.67
5.26
5.03
5.44
5.64
5.69
5.01
5.30
4.91
5.63
5.74
5.98
4.21
4.37
3.98
4.96
4.88

0.040
0.025
0.021
0.019
0.014
0.018
0.004
0.006
0.004
0.008
0.012
0.021
0.008
0.017
0.011
0.009
0.013
0.014
0.014
0.009
0.011
0.009
0.014
0.015
0.016
0.006
0.005
0.004
0.006
0.006

40.40
45.45
48.23
50.24
54.75
54.35
99.31
81.33
89.93
73.39
63.90
55.98
77.24
60.98
65.72
68.70
63.57
61.28
60.81
69.00
65.29
70.43
61.40
60.21
57.81
82.06
79.16
86.81
69.70
70.84

Be

dm

Alfa

(m)

(m)

Coef.

27.76
28.34
28.03
29.65
32.55
35.53
40.38
34.84
35.90
33.84
34.87
37.92
39.20
36.00
34.54
33.43
33.84
33.37
33.80
33.21
32.85
33.86
34.63
33.29
32.06
31.35
29.08
29.61
27.04
27.20

1.46
1.60
1.72
1.69
1.68
1.53
2.46
2.33
2.51
2.17
1.83
1.48
1.97
1.69
1.90
2.06
1.88
1.84
1.80
2.08
1.99
2.08
1.77
1.81
1.80
2.62
2.72
2.93
2.58
2.60

6.80
5.67
5.09
4.94
4.56
4.89
1.95
2.46
2.13
2.87
3.69
4.86
2.91
4.07
3.50
3.18
3.65
3.84
3.92
3.14
3.42
3.07
3.92
3.95
4.12
2.26
2.29
1.98
2.69
2.63

ds

S=ds-do

Cota

(m)

(m)

Socavado

5.98
6.01
5.30
5.21
5.02
5.02
4.41
4.63
4.49
4.62
4.68
4.43
4.94
4.99
4.61
5.05
4.84
4.79
4.71
4.55
4.36
4.78
5.17
5.23
4.90
4.89
5.25
5.21
5.41
5.46

3.98
3.77
3.16
3.06
2.84
2.93
1.16
1.68
1.36
1.94
2.35
2.54
2.12
2.67
2.23
2.32
2.42
2.47
2.45
2.04
2.06
2.13
2.72
2.77
2.63
1.64
1.82
1.49
2.21
2.19

220.55
220.46
220.89
220.68
220.76
220.33
221.99
221.36
221.54
220.88
220.24
219.70
219.66
218.71
219.04
218.50
218.27
217.92
217.72
217.94
217.76
217.31
216.28
215.88
215.75
216.52
216.01
216.07
215.31
215.16

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67

3060
3040
3020
3000
2980
2960
2940
2920
2900
2880
2860
2840
2820
2800
2780
2760
2740
2720
2700
2680
2660
2640
2620
2600
2580
2560
2540
2520
2500
2480
2460
2440
2420
2400
2380
2360
2340

345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73

217.06
216.96
216.82
216.71
216.47
216.37
216.17
216.02
215.5
215.52
214.95
214.86
214.74
214.47
214.18
214.01
213.46
213.4
213.01
212.79
212.44
212.67
212.56
212.45
212.15
211.79
211.14
211.08
210.8
210.75
210.74
210.54
210.4
210.15
209.94
209.73
209.57

220.40
219.90
219.93
219.91
219.33
219.79
219.38
218.93
218.43
218.71
218.31
217.77
217.39
217.13
217.45
216.71
216.94
216.44
217.16
217.19
217.08
216.12
215.03
213.96
215.34
214.25
216.05
215.18
214.42
214.03
213.50
213.29
214.13
213.47
213.19
212.87
212.68

3.34
2.94
3.11
3.20
2.86
3.42
3.21
2.91
2.93
3.19
3.36
2.91
2.65
2.66
3.27
2.70
3.48
3.04
4.15
4.40
4.64
3.45
2.47
1.51
3.19
2.46
4.91
4.10
3.62
3.28
2.76
2.75
3.73
3.32
3.25
3.14
3.11

5.03
5.60
5.11
4.85
5.54
4.37
4.93
5.44
5.87
4.95
5.38
5.91
6.07
6.03
4.98
5.90
4.89
5.48
3.68
3.33
3.55
5.35
6.65
8.34
5.12
6.50
2.54
4.07
5.31
5.69
6.19
6.13
4.11
5.18
5.40
5.67
5.67

0.007
0.010
0.006
0.007
0.012
0.005
0.007
0.010
0.013
0.007
0.010
0.013
0.014
0.014
0.007
0.013
0.008
0.011
0.004
0.003
0.003
0.008
0.016
0.004
0.008
0.017
0.013
0.004
0.007
0.009
0.012
0.011
0.004
0.008
0.009
0.009
0.010

68.75
61.79
67.68
71.27
62.36
79.07
70.14
63.51
58.86
69.86
64.31
58.46
56.95
57.33
69.37
58.58
70.64
63.06
93.87
103.84
97.41
64.57
51.96
41.44
67.47
53.17
136.19
84.85
65.06
60.81
55.90
56.42
84.20
66.71
63.99
60.99
61.02

27.40
27.48
29.71
30.77
28.00
29.56
29.13
28.52
27.74
28.95
27.58
28.63
29.95
29.71
28.35
29.07
30.00
29.01
30.09
30.71
28.34
22.98
25.17
24.43
26.67
26.35
25.08
28.87
23.41
23.49
24.95
26.15
27.47
25.25
23.78
23.79
23.78

2.51
2.25
2.28
2.32
2.23
2.68
2.41
2.23
2.12
2.41
2.33
2.04
1.90
1.93
2.45
2.02
2.35
2.17
3.12
3.38
3.44
2.81
2.06
1.70
2.53
2.02
5.43
2.94
2.78
2.59
2.24
2.16
3.07
2.64
2.69
2.56
2.57

2.78
3.33
3.01
2.83
3.32
2.32
2.80
3.26
3.63
2.81
3.12
3.75
4.04
3.97
2.80
3.77
2.82
3.33
1.76
1.51
1.59
2.74
4.19
5.99
2.82
4.15
0.84
2.03
2.74
3.08
3.69
3.75
1.99
2.77
2.85
3.09
3.08

5.83
5.70
5.66
5.60
5.50
5.28
5.59
5.54
6.03
5.56
6.35
6.11
5.79
5.74
5.70
5.62
6.18
5.93
5.46
5.25
5.78
5.98
5.45
3.95
5.58
5.40
3.96
5.93
6.32
6.12
5.68
5.73
5.25
5.78
5.74
5.84
5.76

2.49
2.76
2.55
2.40
2.64
1.86
2.38
2.63
3.10
2.37
2.99
3.20
3.14
3.08
2.43
2.92
2.70
2.89
1.31
0.85
1.14
2.53
2.98
2.44
2.39
2.94
-0.95
1.83
2.70
2.84
2.92
2.98
1.52
2.46
2.49
2.70
2.65

214.57
214.20
214.27
214.31
213.83
214.51
213.79
213.39
212.40
213.15
211.96
211.66
211.60
211.39
211.75
211.09
210.76
210.51
211.70
211.94
211.30
210.14
209.58
210.01
209.76
208.85
212.09
209.25
208.10
207.91
207.82
207.56
208.88
207.69
207.45
207.03
206.92

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

2320
2300
2280
2260
2240
2220
2200
2180
2160
2140
2120
2100
2080
2060
2040
2020
2000
1980
1960
1940
1920
1900
1880
1860
1840
1820
1800
1780
1760
1740
1720
1700
1680
1660
1640
1620
1600

345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73
345.73

209.5
209.35
209.37
208.97
208.68
208.59
208.4
207.72
207.76
207.41
207.31
207.22
207.01
206.83
206.69
206.47
206.17
206.14
206.32
206.05
205.79
205.47
205.19
205
204.69
204.6
204.32
203.98
203.74
203.56
203.24
202.93
202.56
202.09
201.92
201.75
201.66

212.40
210.82
212.60
212.82
212.76
212.79
212.78
212.50
211.54
209.86
210.72
209.27
209.23
209.67
209.09
210.48
209.63
209.65
209.62
209.37
208.64
207.91
207.38
207.58
207.22
206.75
207.47
207.24
207.35
207.34
206.59
206.23
205.54
204.83
204.91
204.39
204.44

2.90
1.47
3.23
3.85
4.08
4.20
4.38
4.78
3.78
2.45
3.41
2.05
2.22
2.84
2.40
4.01
3.46
3.51
3.30
3.32
2.85
2.44
2.19
2.58
2.53
2.15
3.15
3.26
3.61
3.78
3.35
3.30
2.98
2.74
2.99
2.64
2.78

5.78
8.47
4.31
3.47
3.51
3.27
3.15
3.74
5.45
7.49
5.22
7.00
6.23
4.61
5.32
1.18
3.15
2.89
2.83
3.44
4.86
5.75
6.14
5.12
5.44
5.78
4.12
4.38
3.80
3.60
5.03
5.40
6.08
6.67
5.96
6.37
5.71

0.011
0.004
0.008
0.003
0.003
0.003
0.002
0.003
0.008
0.023
0.008
0.023
0.014
0.008
0.012
0.016
0.003
0.003
0.003
0.004
0.008
0.013
0.017
0.009
0.011
0.014
0.006
0.005
0.003
0.003
0.008
0.008
0.015
0.018
0.011
0.014
0.008

59.79
40.81
80.28
99.59
98.60
105.68
109.83
92.50
63.41
46.15
66.20
49.41
55.48
74.96
65.04
293.43
109.65
119.44
122.11
100.56
71.13
60.14
56.33
67.50
63.55
59.85
83.92
78.86
91.04
96.10
68.79
64.04
56.86
51.83
58.02
54.24
60.59

25.92
24.86
29.26
30.46
28.73
31.34
31.11
26.55
21.71
23.47
24.73
30.31
33.27
35.78
36.86
44.94
42.81
44.47
45.55
37.48
29.98
30.10
32.03
31.04
31.30
33.10
30.36
28.61
29.94
29.87
27.70
28.85
26.93
24.75
24.97
26.15
27.33

2.31
1.64
2.74
3.27
3.43
3.37
3.53
3.48
2.92
1.97
2.68
1.63
1.67
2.09
1.76
6.53
2.56
2.69
2.68
2.68
2.37
2.00
1.76
2.17
2.03
1.81
2.76
2.76
3.04
3.22
2.48
2.22
2.11
2.09
2.32
2.07
2.22

3.38
6.21
2.24
1.61
1.57
1.48
1.39
1.66
2.72
4.87
2.76
5.15
4.52
2.87
3.71
0.34
1.72
1.53
1.50
1.82
2.79
3.70
4.30
3.11
3.46
3.97
2.13
2.28
1.85
1.68
2.80
3.24
3.77
4.16
3.47
4.00
3.42

5.67
3.95
4.82
4.70
4.94
4.90
4.92
6.17
6.62
6.00
5.93
5.08
5.09
4.93
4.86
1.67
4.34
4.07
3.74
4.31
4.85
4.93
4.84
4.66
4.91
4.49
4.52
4.94
4.79
4.73
5.87
6.39
6.31
6.14
5.98
5.70
5.45

2.77
2.48
1.59
0.85
0.86
0.70
0.54
1.39
2.84
3.55
2.52
3.03
2.87
2.09
2.46
-2.34
0.88
0.56
0.44
0.99
2.00
2.49
2.65
2.08
2.38
2.34
1.37
1.68
1.18
0.95
2.52
3.09
3.33
3.40
2.99
3.06
2.67

206.73
206.87
207.78
208.12
207.82
207.89
207.86
206.33
204.92
203.86
204.79
204.19
204.14
204.74
204.23
208.81
205.29
205.58
205.88
205.06
203.79
202.98
202.54
202.92
202.31
202.26
202.95
202.30
202.56
202.61
200.72
199.84
199.23
198.69
198.93
198.69
198.99

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


105

1580

345.73

201.28

203.68

2.40

6.40

0.017

54.04

26.84

2.01

4.09

5.20

2.80

198.48

106

1560

345.73

201.28

204.18

2.90

5.01

0.008

68.95

27.91

2.47

2.80

4.96

2.06

199.22

107

1540

345.73

201.24

203.59

2.35

5.68

0.011

60.90

29.35

2.08

3.56

4.59

2.24

199.00

108

1520

345.73

201.14

203.63

2.49

5.07

0.010

68.23

31.50

2.17

3.09

4.47

1.98

199.16

109

1500

345.73

201.14

202.80

1.66

6.06

0.020

57.08

39.16

1.46

4.81

3.78

2.12

199.02

110

1480

345.73

200.95

202.38

1.43

5.97

0.022

57.95

50.13

1.16

5.53

3.51

2.08

198.87

111

1460

345.73

199.64

201.52

1.88

6.36

0.032

54.40

50.13

1.09

6.14

5.19

3.31

196.33

112

1440

345.73

198.88

200.34

1.46

8.29

0.004

41.71

36.86

1.13

7.79

4.58

3.12

195.76

113

1420

345.73

198.56

201.76

3.20

4.08

0.009

84.72

53.43

1.59

3.06

5.93

2.73

195.83

114

1400

345.73

198.3

201.23

2.93

4.72

0.014

73.21

56.61

1.29

4.06

6.50

3.57

194.73

115

1380

345.73

198.04

200.56

2.52

5.31

0.023

65.16

53.86

1.21

4.77

6.12

3.60

194.44

116

1360

345.73

197.96

199.89

1.93

5.67

0.027

60.93

54.28

1.12

5.36

4.87

2.94

195.02

200.30

2.35

55.31

1.56

3.03

4.11

1.76

196.19

199.69

1.88

54.66

1.32

4.05

3.90

2.02

195.79

199.18

1.78

51.41

1.30

4.43

3.87

2.09

195.31

199.42

2.34

57.29

1.45

3.31

4.36

2.02

195.06

199.33

2.87

60.71

1.46

3.09

5.26

2.39

194.07

4.83

0.017

71.57

52.76

1.36

4.02

5.28

2.82

193.39

117
118
119
120
121

1340
1320
1300
1280
1260

345.73
345.73
345.73
345.73
345.73

197.95
197.81
197.4
197.08
196.46

4.00

0.009

4.78

0.016

5.17

0.018

4.16

0.007

3.90

0.009

86.52
72.32
66.86
83.20
88.74

122

1240

345.73

196.21

198.67

2.46

123

1220

345.73

195.55

197.81

2.26

5.68

0.025

60.89

55.63

1.09

5.45

5.90

3.64

191.91

124

1200

345.73

195.34

197.08

1.74

5.96

0.034

58.02

55.40

1.05

5.90

4.62

2.88

192.46

125

1180

345.73

195.28

196.75

1.47

5.51

0.022

62.71

55.76

1.12

5.20

3.48

2.01

193.27

126

1160

345.73

194.84

197.20

2.36

3.54

0.007

97.54

56.72

1.72

2.52

3.64

1.28

193.56

127

1140

345.73

194.19

197.14

2.95

3.34

0.006

103.52

54.83

1.89

2.23

4.33

1.38

192.81

128

1120

345.73

193.76

197.16

3.40

3.00

0.004

115.32

54.98

2.10

1.87

4.52

1.12

192.64

129

1100

345.73

193.73

196.99

3.26

3.32

0.004

104.05

50.17

2.07

2.08

4.64

1.38

192.35

130

1080

345.73

193.7

196.46

2.76

4.33

0.008

79.89

43.31

1.84

2.94

4.85

2.09

191.61

131

1060

345.73

193.23

195.03

1.80

6.30

0.029

54.89

40.63

1.35

5.26

4.43

2.63

190.60

132

1040

345.73

192.39

193.00

0.61

10.20

0.003

33.88

33.44

1.01

10.32

2.03

1.42

190.97

133

1020

345.73

192.08

195.83

3.75

3.09

0.002

112.04

41.02

2.73

1.61

4.55

0.80

191.28

134

1000

345.73

192.07

195.05

2.98

4.66

0.007

74.22

38.46

1.93

3.07

5.48

2.50

189.57

135

980

345.73

192.11

195.01

2.90

4.42

0.008

78.26

40.47

1.93

2.90

5.09

2.19

189.92

136

960

345.73

191.85

195.18

3.33

3.48

0.004

99.27

40.76

2.44

1.96

4.56

1.23

190.62

137

940

345.73

191.58

195.03

3.45

3.67

0.004

94.18

38.38

2.45

2.06

4.91

1.46

190.12

138

920

345.73

191.47

194.48

3.01

4.64

0.008

74.58

35.15

2.12

2.86

5.27

2.26

189.21

139

900

345.73

191.56

193.82

2.26

5.49

0.013

62.97

35.89

1.75

3.85

4.66

2.40

189.16

140

880

345.73

191.41

194.29

2.88

3.70

0.004

93.42

39.29

2.38

2.12

4.06

1.18

190.23

141

860

345.73

191.42

193.85

2.43

4.49

0.008

77.04

38.85

1.98

2.90

4.15

1.72

189.70

142

840

345.73

190.89

192.85

1.96

5.81

0.019

59.50

37.22

1.60

4.34

4.29

2.33

188.56

143

820

345.73

190.53

193.99

3.46

2.90

0.003

119.02

44.75

2.66

1.54

4.02

0.56

189.97

144

800

345.73

190.16

193.94

3.78

2.95

0.002

117.21

39.05

3.00

1.45

4.28

0.50

189.66

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


145

780

345.73

189.88

193.76

3.88

3.35

0.003

103.07

34.82

2.96

1.66

4.84

0.96

188.92

146

760

345.73

189.51

193.15

3.64

4.58

0.005

75.48

28.24

2.67

2.43

5.85

2.21

187.30

147

740

345.73

189.58

192.82

3.24

4.96

0.008

69.74

28.73

2.43

2.80

5.65

2.41

187.17

148

720

345.73

189.62

192.09

2.47

5.87

0.013

58.93

30.50

1.93

3.86

5.15

2.68

186.94

149

700

345.73

189.19

191.61

2.42

6.17

0.016

56.08

30.27

1.85

4.17

5.30

2.88

186.31

150

680

345.73

189.04

191.33

2.29

6.11

0.014

56.54

32.38

1.75

4.30

5.09

2.80

186.24

151

660

345.73

188.79

191.74

2.95

4.74

0.008

72.95

33.00

2.21

2.85

5.14

2.19

186.60

5.45

0.012

63.47

30.11

2.11

3.38

5.00

2.40

186.17

152

640

345.73

188.57

191.17

2.60

153

620

345.73

188.29

191.57

3.28

4.26

0.008

81.16

32.96

2.46

2.38

5.11

1.83

186.46

154

600

345.73

188.15

191.92

3.77

2.57

0.002

134.27

50.28

2.67

1.36

4.07

0.30

187.85

155

580

345.73

187.89

191.71

3.82

3.10

0.003

111.66

41.49

2.69

1.63

4.70

0.88

187.01

187.63

190.83

3.20

4.93

0.008

70.14

29.26

2.40

2.81

5.58

2.38

185.25

156

560

345.73

157

540

345.73

187.4

190.02

2.62

5.96

0.014

58.05

30.12

1.93

3.92

5.57

2.95

184.45

158

520

345.73

187.28

189.46

2.18

6.32

0.020

54.72

35.81

1.53

4.86

5.23

3.05

184.23

159

500

345.73

187.12

190.65

3.53

2.83

0.002

122.27

46.34

2.64

1.51

4.06

0.53

186.59

2.32

0.001

149.27

51.31

2.91

1.16

3.59

-0.13

187.11

160

480

345.73

186.98

190.70

3.72

161

460

345.73

186.71

189.86

3.15

4.47

0.008

77.36

39.49

1.96

2.91

5.61

2.46

184.25

162

440

345.73

186.38

188.82

2.44

5.88

0.021

58.82

40.18

1.46

4.65

5.79

3.35

183.03

163

420

345.73

186.05

188.62

2.57

5.52

0.015

62.61

42.49

1.47

4.35

5.87

3.30

182.75

5.59

0.018

61.90

45.51

1.36

4.64

5.87

3.40

182.35

164

400

345.73

185.75

188.22

2.47

165

380

345.73

185.52

187.74

2.22

5.71

0.020

60.58

47.62

1.27

4.96

5.44

3.22

182.30

166

360

345.73

185.43

187.35

1.92

5.62

0.020

61.51

47.80

1.29

4.85

4.52

2.60

182.83

167

340

345.73

185.38

187.20

1.82

5.19

0.014

66.67

45.12

1.48

4.08

3.75

1.93

183.45

4.25

0.008

81.37

46.16

1.76

2.97

3.71

1.54

183.70

168

320

345.73

185.24

187.41

2.17

169

300

345.73

184.98

187.07

2.09

4.62

0.011

74.85

44.31

1.69

3.32

3.83

1.74

183.24

170

280

345.73

184.79

187.39

2.60

3.44

0.006

100.36

46.80

2.14

2.11

3.60

1.00

183.79

171

260

345.73

184.44

187.44

3.00

2.92

0.003

118.41

50.71

2.34

1.69

3.64

0.64

183.80

2.88

0.003

120.06

47.43

2.53

1.58

4.66

0.80

182.75

172

240

345.73

183.55

187.41

3.86

173

220

345.73

183.76

186.93

3.17

3.97

0.006

87.10

38.71

2.25

2.36

4.90

1.73

182.03

174

200

345.73

183.57

186.80

3.23

4.06

0.006

85.10

37.72

2.26

2.41

5.08

1.85

181.72

175

180

345.73

183.49

186.77

3.28

3.81

0.004

90.84

37.46

2.42

2.15

4.77

1.49

182.00

4.74

0.008

72.98

33.42

2.18

2.87

4.73

1.99

181.51

176

160

345.73

183.5

186.24

2.74

177

140

345.73

183.36

185.29

1.93

5.97

0.017

57.92

37.62

1.54

4.57

4.36

2.43

180.93

178

120

345.73

183.08

184.98

1.90

5.89

0.017

58.71

38.29

1.53

4.52

4.24

2.34

180.74

179

100

345.73

182.72

184.74

2.02

5.60

0.014

61.77

38.85

1.59

4.19

4.34

2.32

180.40

184.36

1.97

39.94

1.51

4.43

4.36

2.39

180.00

180

80

345.73

182.39

5.72

0.017

60.40

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDRAULICAS


180

80

345.73

182.39

184.36

1.97

5.72

0.017

60.40

39.94

1.51

4.43

4.36

2.39

180.00

181

60

345.73

181.84

184.33

2.49

5.04

0.008

68.62

42.04

1.63

3.71

5.06

2.57

179.27

182

40

345.73

181.9

183.91

2.01

5.23

0.016

66.12

49.25

1.34

4.38

4.44

2.43

179.47

183

20

345.73

181.82

183.48

1.66

5.37

0.019

64.38

52.71

1.22

4.80

3.79

2.13

179.69

184

345.73

181.22

182.86

1.64

5.66

0.025

61.10

54.57

1.12

5.36

4.03

2.39

178.83

Socav acin promedio:


Socav acin maxima:

2.17
3.98

UNIVERSIDAD RICARDO PALMA TALLER DE OBRAS HIDR


8. CONCLUSIONES:
Mediante el modelamiento del hec ras del rio Rimac, se observ que se presentas

dos tramos con probabilidad de inundacin.


Tramo N1: en las progresivas desde 0 + 180 hasta 0 + 290.
Tramo N 2: en las progresivas desde 0 + 580 hasta 0 + 620.

La primera solucin para las inundaciones es aumentar las secciones del canal
natural en los dos tramos que se presenta inundacin, la otra solucin es colorar
muros de encauzamiento entre las progresivas 0 + 180 hasta 0 + 290. Y otro muro
entre las progresivas 0 + 580 hasta 0 + 620.

Se ha determinado mediante los clculos de socavacin que La mxima


socavacin calculada se registra en la progresiva 3 + 658.13 con 3.34m para un
Tr = 100 aos y 3.98m para un Tr = 500 aos.
La socavacin promedio calculada se registra con 1.87 m para un Tr = 100 aos y
2.17 m. para un Tr =500 aos.

9. BIBLIOGRAFIA

http://transparencia.mtc.gob.pe/idm_docs/normas_legales/1_0_2950.pdf

http://www.ana.gob.pe/media/296656/estudio_hidrologico_mala.pdf

INFORME FINAL ESTUDIO HIDROLOGICO DE IDENTIFICACION DE ZONAS DE RIESGO


EN LOS DISTRITOS DE LIMA CERCADO Y EL AGUSTINO, LIMA METROPOLITANA,
PROVINCIA DE LIMA, DEPARTAMENTO DE LIMA,PER.

Apuntes de clase.

http://www.hidrojing.com/wpcontent/uploads/2013/02/19_SOCAVACION_PUENTES_3_C%C3%81LCULO.pdf