Académique Documents
Professionnel Documents
Culture Documents
1 of 5
http://www.ieees.com/f-3/3345/
:
:
:2
:qjjiijiqjiij
:
:qjjiijiqjiij
:
..
:eng_seaidy007
.kostarica
AM 11:33
.
<
,0
< department
Condenser Ball
04:43 08-21-2011
4
Khaled Hamza
Cleaning System _
PM
Update
11:11 08-17-2011
Khaled Hamza
PM
system
03:48 08-09-2011
Lv switchgear and
8
PM
Switchgear
qjjiijiqjiij
equipment
02:48 08-06-2011
10
AM
Mechanical and
09:56 02-26-2011
10
PM
25/11/2014 03:44 PM
http://www.ieees.com/f-3/3345/
,Buildings
LinkBack
PM 12:33 ,03-26-2011
( CONDENSER AIR EXTRACTION EQUIPMENT ( 1 Of 3
Khaled Hamza
Aug 2010 :
2771 :
Egypt :
68 :
10 :
designed for a particular operating conditions like pressure, steam inlet temperature and turbine exhaust
2 of 5
25/11/2014 03:44 PM
http://www.ieees.com/f-3/3345/
traction EQUIPMENT must be capable of meeting two met during normal operation, the other when raising
turbo-generator unit
vacuum the air extraction equipment must deal large quantity of air and sufficient capacity must be
reduce pressure quickly in the CONDENSER to a level
the turbine to be started. The last row blades of a 500
overheat if they run at speed and at low load in a
Thus, a vacuum of 20 in.Hg must be obtained before
3 of 5
25/11/2014 03:44 PM
http://www.ieees.com/f-3/3345/
http://science-hamza.blogspot.com
4 of 5
[2] :
AM 01:42 ,08-11-2011
bigleve2100
Aug 2011 :
10569 :
:
1,189 :
10 :
StumbleUpon
del.icio.us
Digg
(Tags)
condenser, equipment, extraction
25/11/2014 03:44 PM
5 of 5
http://www.ieees.com/f-3/3345/
BB code is
[IMG]
HTML
Trackbacks are
Pingbacks are
Refbacks are
.PM 12:36
:
-
25/11/2014 03:44 PM