Vous êtes sur la page 1sur 73

Customer Training Catalog Training Programs

Customer Training Catalog


Training Programs
PS

HUAWEI Learning Service


2013

COMMERCIAL IN CONFIDENCE

Customer Training Catalog Training Programs

CONTENTS
1

Training Path ....................................................................................................................................................... 4


1.1

PS Training Path.................................................................................................................................. 4

Training Programs ............................................................................................................................................... 4


2.1

PS Training Programs .......................................................................................................................... 7


2.1.1

GPRS/UMTS PS Fundamental Training........................................................................................ 7

2.1.2

EPC Principle Fundamental Training ............................................................................................ 8

2.1.3

EPC Equipment Commissioning Training ...................................................................................... 9

2.1.4

USN ATCA platform Operation and Maintenance Training (2G/3G/4G ) .........................................10

2.1.5

USN9810 (MME) Data Configuration Training (4G) ...................................................................... 11

2.1.6

USN9810 (SGSN/MME) Data Configuration Training (2G/3G/4G) ................................................12

2.1.7

USN9810 (SGSN) Data Configuration Training (2G/3G) ...............................................................13

2.1.8

USN9810 Delta and new feature Training ....................................................................................14

2.1.9

USN9810 APN and Roaming Solution Training ............................................................................15

2.1.10

The Difference between ATCA and CPCI SGSN Training .............................................................16

2.1.11

UGW Routine Operation and Maintenance Training (2G/3G/4G) ..................................................17

2.1.12

UGW (SGW/PGW) Data Configuration Training (4G) ...................................................................18

2.1.13

UGW (SGW/PGW/GGSN) Data Configuration Training (2G/3G/4G) .............................................19

2.1.14

UGW (GGSN) Data Configuration Training (2G/3G) .....................................................................20

2.1.15

UGW9811 Delta and new feature Training ...................................................................................21

2.1.16

CG9812 Operation and Maintenance Training (Windows) ............................................................22

2.1.17

CG9812 Operation and Maintenance Training (UNIX) ..................................................................23

2.1.18

CG9812 Operation and Maintenance Training(ATCA) ..................................................................24

2.1.19

From GPRS to EPC Delta Training ..............................................................................................25

2.1.20

PS Alarm Monitoring and Management Training...........................................................................26

2.1.21

EPC Alarm Monitoring and Management Training ........................................................................27

2.1.22

PS Performance Monitoring and Management Training ................................................................28

2.1.23

PS Performance Analysis Training ...............................................................................................29

2.1.24

EPC Performance Monitoring and Management Training .............................................................30

2.1.25

PS Emergency Recovery Training ...............................................................................................31

2.1.26

EPC Emergency Recovery Training.............................................................................................32

2.1.27

GUL Convergence Training .........................................................................................................33

2.1.28

EPC VOLTE Solution Training (CSFB) .........................................................................................34

2.1.29

EPC VOLTE Solution Training (SRVCC) ......................................................................................35

2.1.30

eMBMS Smart Content Delivery Feature Training ........................................................................36

2.1.31

PS IPv6 Feature Training ............................................................................................................37

2.1.32

GPRS/UMTS SGSN POOL Training ............................................................................................38

2.1.33

MME POOL Training ...................................................................................................................39

2.1.34

GPRS/UMTS PS Network Security Training .................................................................................40

2.1.35

PS QOS Training ........................................................................................................................41

2.1.36

IP Convergence for Packet Core Training ....................................................................................42

COMMERCIAL IN CONFIDENCE

Customer Training Catalog Training Programs


2.1.37

PS Signaling Procedure Analysis and Troubleshooting Training ....................................................43

2.1.38

PS Interface Signaling Analysis and Troubleshooting Training ......................................................44

2.1.39

PS Data Transfer Troubleshooting Training ..................................................................................45

2.1.40

EPC Interface Protocol Analysis Training .....................................................................................46

2.1.41

EPC Signaling Analysis Training ..................................................................................................47

2.1.42

EPC Troubleshooting Training .....................................................................................................48

2.1.43

GPRS/UMTS PS Network Optimize Training................................................................................49

2.1.44

GPRS/UMTS PS Network Planning and Design Training..............................................................50

2.1.45

EPC Network Planning and Design Training ................................................................................51

2.1.46

iManager M2000 PS Operation and Maintenance Training ...........................................................52

2.1.47

DNS9816 Operation and Maintenance Training ...........................................................................53

2.1.48

uBro UAG Operation and Maintenance Training...........................................................................54

2.1.49

WASN Operation and Maintenance Training ................................................................................55

2.1.50

MAG9811 Operation and Maintenance Training ...........................................................................56

2.1.51

TGW9811 Operation and Maintenance Training ...........................................................................57

2.1.52

CDMA WAG Operation and Maintenance Training .......................................................................58

2.1.53

CDMA PDSN Operation and Maintenance Training ......................................................................59

2.1.54

CDMA PDSN-HA Operation and Maintenance Delta Training .......................................................60

2.1.55

PS Nastar Operation and Maintenance Training...........................................................................61

2.1.56

PS PRS Operation and Maintenance Training ..............................................................................62

2.1.57

HCNA LTE HUAWEI Certification ................................................................................................63

2.1.58

HCNP EPC HUAWEI Certification ...............................................................................................65

2.1.59

HCIE EPC HUAWEI Certification .................................................................................................67

2.1.60

GPRS Fundamental(WBT) ..........................................................................................................68

2.1.61

GPRS signaling Procedure(WBT) ................................................................................................69

2.1.62

GTP Protocol Analysis(WBT).......................................................................................................70

2.1.63

EPC Principle(WBT) ...................................................................................................................71

2.1.64

EPC Signaling Analysis (WBT) ....................................................................................................72

2.1.65

EPC Product Survey(WBT) .........................................................................................................73

COMMERCIAL IN CONFIDENCE

1 Training Path
1.1 PS Training Path

2 Training Programs
PS Training Programs are designed as follows:
Duration
Training Programs

Level

(working
days)

Training

Class

Location

Size

PS
GPRS/UMTS PS Fundamental Training

6 ~ 12

EPC Principle Fundamental Training

6 ~ 12

EPC Equipment Commissioning Training

6 ~ 12

6 ~ 12

USN9810 (MME) Data Configuration Training (4G)

6 ~ 12

USN9810 (SGSN/MME) Data Configuration Training (2G/3G/4G)

10

6 ~ 12

USN9810 (SGSN) Data Configuration Training (2G/3G)

6 ~ 12

USN9810 Delta and new feature Training

6 ~ 12

USN9810 APN and Roaming Solution Training

6 ~ 12

The Difference between ATCA and CPCI SGSN Training

6 ~ 12

UGW Routine Operation and Maintenance Training (2G/3G/4G)

6 ~ 12

UGW (SGW/PGW) Data Configuration Training (4G)

6 ~ 12

6 ~ 12

UGW (GGSN) Data Configuration Training (2G/3G)

6 ~ 12

UGW9811 Delta and new feature Training

6 ~ 12

CG9812 Operation and Maintenance Training (Windows)

6 ~ 12

CG9812 Operation and Maintenance Training (UNIX)

6 ~ 12

CG9812 Operation and Maintenance Training(ATCA)

6 ~ 12

From GPRS to EPC Delta Training

6 ~ 12

USN ATCA platform Operation and Maintenance Training


(2G/3G/4G )

UGW (SGW/PGW/GGSN) Data Configuration Training


(2G/3G/4G)

COMMERCIAL IN CONFIDENCE

PS Alarm Monitoring and Management Training

6 ~ 12

EPC Alarm Monitoring and Management Training

6 ~ 12

PS Performance Monitoring and Management Training

6 ~ 12

PS Performance Analysis Training

6 ~ 12

EPC Performance Monitoring and Management Training

6 ~ 12

PS Emergency Recovery Training

6 ~ 12

EPC Emergency Recovery Training

6 ~ 12

GUL Convergence Training

6 ~ 12

EPC VOLTE Solution Training (CSFB)

6 ~ 12

EPC VOLTE Solution Training (SRVCC)

6 ~ 12

eMBMS Smart Content Delivery Feature Training

6 ~ 12

PS IPv6 Feature Training

6 ~ 12

GPRS/UMTS SGSN POOL Training

6 ~ 12

MME POOL Training

6 ~ 12

GPRS/UMTS PS Network Security Training

6 ~ 12

PS QOS Training

6 ~ 12

IP Convergence for Packet Core Training

6 ~ 12

PS Signaling Procedure Analysis and Troubleshooting Training

6 ~ 12

PS Interface Signaling Analysis and Troubleshooting Training

6 ~ 12

PS Data Transfer Troubleshooting Training

6 ~ 12

EPC Interface Protocol Analysis Training

6 ~ 12

EPC Signaling Analysis Training

6 ~ 12

EPC Troubleshooting Training

6 ~ 12

GPRS/UMTS PS Network Optimize Training

6 ~ 12

GPRS/UMTS PS Network Planning and Design Training

6 ~ 12

EPC Network Planning and Design Training

6 ~ 12

iManager M2000 PS Operation and Maintenance Training

6 ~ 12

DNS9816 Operation and Maintenance Training

6 ~ 12

COMMERCIAL IN CONFIDENCE

uBro UAG Operation and Maintenance Training

6 ~ 12

WASN Operation and Maintenance Training

6 ~ 12

MAG9811 Operation and Maintenance Training

6 ~ 12

TGW9811 Operation and Maintenance Training

6 ~ 12

CDMA WAG Operation and Maintenance Training

6 ~ 12

CDMA PDSN Operation and Maintenance Training

6 ~ 12

CDMA PDSN-HA Operation and Maintenance Delta Training

6 ~ 12

PS Nastar Operation and Maintenance Training

6 ~ 12

PS PRS Operation and Maintenance Training

6 ~ 12

HCNA LTE HUAWEI Certification

6 ~ 12

HCNP EPC HUAWEI Certification

13

6 ~ 12

HCIE EPC HUAWEI Certification

6 ~ 12

GPRS Fundamental(WBT)

1h

No limit

GPRS signaling Procedure(WBT)

1h

No limit

GTP Protocol Analysis(WBT)

0.5 h

No limit

EPC Principle(WBT)

2.5 h

No limit

EPC Signaling Analysis (WBT)

6h

No limit

EPC Product Survey(WBT)

1.5 h

No limit

COMMERCIAL IN CONFIDENCE

2.1 PS Training Programs


2.1.1

GPRS/UMTS PS Fundamental Training

Training Path

Objectives

GPRS/UMTS PS Fundamental Training

On completion of this program, the participants will


be able to:

OWA01

Lecture

2d

Describe the UMTS PS Network Structure.


Describe the PS Core Network interface and
Protocol.

Target Audience

Describe the PS Core Network Working

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance
Engineer

Prerequisites

Duration
2 working days

A general mobile communication and data


communication.

Principle.

Class Size
Min 6, Max 12

COMMERCIAL IN CONFIDENCE

2.1.2

EPC Principle Fundamental Training

Training Path

Objectives
On completion of this program, the participants will

EPC Principle Fundamental Training

be able to:
OEA10

2d

Lecture, LVC

Describe the EPC network structure.


Describe the EPC network interface and

Target Audience

protocol.
All Technical and non-Technical Personnel

Prerequisites

Describe the EPC network working procedures.

Duration

A general understanding of mobile communication


and data communication.

2 working days

Class Size

Be familiar with Windows operating system.


Having basic knowledge of mobile network.

Min 6, Max 12

COMMERCIAL IN CONFIDENCE

2.1.3

EPC Equipment Commissioning Training

Training Path

communication.

Objectives
EPC Equipment Commissioning Training
On completion of this program, the participants will
OEB90

2d

Lecture, Lab, Demo

be able to:
Perform USN9810 commissioning.

Target Audience

Perform UGW9811 commissioning.


Field Maintenance Engineer, First line

Duration

Maintenance Engineer, Routine Maintenance


2 working days

Engineer

Class Size

Prerequisites
A general understanding of GPRS network

Min 6, Max 12

principle, mobile communication and data

COMMERCIAL IN CONFIDENCE

2.1.4

USN ATCA platform Operation and Maintenance Training (2G/3G/4G )

Training Path

Describe system structure and hardware


structure of USN9810.

USN ATCA platform Operation and


Maintenance Training
OEB9B

Perform software related installation and


3d

Lecture, Lab, Demo

upgrade procedure.
Perform hardware operation and maintenance.
Perform the Routine Operation and

Target Audience

Maintenance including security management,

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance
Engineer

system information management, alarm


management, trace management, data
management, license management,

Prerequisites

performance management.

A general understanding of mobile communication


and data communication.

Duration
3 working days

Successful completion of the program EPC


Principle Fundamental Training.

Objectives

Class Size
Min 6, Max 12

On completion of this program, the participants will


be able to:

COMMERCIAL IN CONFIDENCE

10

2.1.5

USN9810 (MME) Data Configuration Training (4G)

Training Path

Objectives
On completion of this program, the participants will

USN9810 (MME) Data Configuration


Training (4G)
OEB9B

Lecture, Lab, Demo

be able to:
3d

Describe the functions of protocol stacks of


different interfaces.

Target Audience

Perform configuration of USN hardware,

Field Maintenance Engineer, First line

System Information, interworking with eNodeB,

Maintenance Engineer, Routine Maintenance

HSS, MME, S-GW, DNS and NTP.

Engineer

Perform configuration of mobility management

Prerequisites

and session management.

A general understanding of mobile communication


and data communication.

Duration
3 working days

Successful completion of the program USN ATCA

Class Size

platform Operation and Maintenance Training .


Min 6, Max 12

COMMERCIAL IN CONFIDENCE

11

2.1.6

USN9810 (SGSN/MME) Data Configuration Training (2G/3G/4G)

Training Path

be able to:
Describe the functions of protocol stacks of

USN9810 (SGSN/MME) Data


Configuration Training (2G/3G/4G)
OEB9B

Lecture, Lab, Demo

different interfaces.
10d

Perform configuration of SGSN Gb, Iu-PS, Gn,


Ga and Gr interfaces.
Perform configuration of SGSN basic service.

Target Audience

Perform configuration of USN hardware,

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance
Engineer

System Information, interworking with eNodeB,


HSS, MME, S-GW, DNS and NTP.
Perform configuration of mobility management

Prerequisites

and session management.

A general understanding of mobile communication

Duration

and data communication.


Successful completion of the program USN ATCA
platform Operation and Maintenance Training .

Objectives

10 working days

Class Size
Min 6, Max 12

On completion of this program, the participants will

COMMERCIAL IN CONFIDENCE

12

2.1.7

USN9810 (SGSN) Data Configuration Training (2G/3G)

Training Path

Objectives
On completion of this program, the participants will

USN9810 (SGSN) Data Configuration


Training (2G/3G)
OEB91

Lecture, Lab, Demo

be able to:
9d

Perform configuration of SGSN hardware.


Perform configuration of SGSN Gb, Iu-PS, Gn,

Target Audience

Ga and Gr interfaces.
Field Maintenance Engineer, First line

Perform configuration of SGSN basic service.

Maintenance Engineer, Routine Maintenance

Duration

Engineer
9 working days

Prerequisites

Class Size
A general understanding of mobile communication
Min 6, Max 12

and data communication.


Successful completion of the program USN ATCA
platform Operation and Maintenance Training .

COMMERCIAL IN CONFIDENCE

13

2.1.8

USN9810 Delta and new feature Training

Training Path

Objectives

USN9810 Delta and new feature Training

On completion of this program, the participants will


be able to:

OEB10

Lecture

1d

Perform data Describe basic concept of VPN,


APN and charging.

Target Audience

Perform configuration of VPN, APN and

Field Maintenance Engineer, First line

charging.

Maintenance Engineer, Routine Maintenance


Engineer

Describe the SA principles, content based


charging principles and PCC concepts.
Perform configuration of the SA function,

Prerequisites
A general understanding of mobile communication

service control function and PCC.

Duration

and data communication.


Successful completion of the program USN ATCA
platform Operation and Maintenance Training .

1 working day

Class Size
Min 6, Max 12

COMMERCIAL IN CONFIDENCE

14

2.1.9

USN9810 APN and Roaming Solution Training

Training Path

Objectives
On completion of this program, the participants will

USN9810 APN and Roaming Solution


Training
OEB31

Lecture, Lab, Demo

be able to:
2d

Understand principle of international roaming.


Master roaming data configurations of

Target Audience

SGSN/GGSN/DNS/FW.
Field Maintenance Engineer, First line

Understand principle of APN rectify.

Maintenance Engineer, Routine Maintenance

Master data configurations of APN rectify.

Engineer

Duration

Prerequisites
2 working days
A general understanding of mobile communication

Class Size

and data communication.


Successful completion of the program USN ATCA

Min 6, Max 12

platform Operation and Maintenance Training .

COMMERCIAL IN CONFIDENCE

15

2.1.10 The Difference between ATCA and CPCI SGSN Training


Training Path

Successful completion of the program SGSN


(CPCI) data configuration Training.

CPCI and ATCA SGSN Delta Training


OWB25

Objectives
3d

Lecture, Lab

On completion of this program, the participants will


be able to:

Target Audience

Describe Software Difference Between ATCA

Field Maintenance Engineer, First line

and CPCI.

Maintenance Engineer, Routine Maintenance


Engineer

Describe Hardware Difference Between ATCA


and CPCI.
Describe the Routine Operation and

Prerequisites
A general mobile communication and data

Maintenance of ATCA SGSN.

Duration

communication.
Successful completion of the program

3 working days

GPRS/UMTS Principle Training.

Class Size

Successful completion of the program SGSN


(CPCI) Routine Operation and Maintenance

Min 6, Max 12

training.

COMMERCIAL IN CONFIDENCE

16

2.1.11 UGW Routine Operation and Maintenance Training (2G/3G/4G)


Training Path

Describe system structure and hardware


structure of UGW9811.

UGW Routine Operation and Maintenance


Training
2d
OEB21
Lecture, Lab, Demo

Perform software related installation and


upgrade procedure.
Perform hardware operation and maintenance.
Perform the Routine Operation and

Target Audience

Maintenance including authorization

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance
Engineer

management, system information management,


alarm management, trace management ,log
management, license management ,patch

Prerequisites

management ,data backup and restore.

A general understanding of mobile communication


and data communication.

Duration
2 working days

Successful completion of the program EPC


Principle Training.

Objectives

Class Size
Min 6, Max 12

On completion of this program, the participants will


be able to:

COMMERCIAL IN CONFIDENCE

17

2.1.12 UGW (SGW/PGW) Data Configuration Training (4G)


Training Path

Objectives
On completion of this program, the participants will

UGW (SGW/PGW) Data Configuration


Training
OEB30

be able to:
6d

Lecture, Lab, Demo

Perform data configuration of S1-U/S11, S5/S8


and SGi interfaces Describe basic concept of
VPN, APN and charging.

SA Application Configuration Training


OWD30

Perform configuration of VPN, APN and


2d

Lecture, Lab

charging.
Describe the SA principles, content based

Target Audience

charging principles and PCC concepts.


Perform configuration of the SA function,

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance

service control function and PCC.

Engineer

Describe GGSN SA Structure.

Second line Maintenance Engineer, Senior

Perform the SA application content base


charging and service control.

Maintenance Engineer

Duration

Prerequisites
A general understanding of mobile communication

8 working days

Class Size

and data communication.


Successful completion of the program of UGW
Routine Operation and Maintenance Training.

Min 6, Max 12

COMMERCIAL IN CONFIDENCE

18

2.1.13 UGW (SGW/PGW/GGSN) Data Configuration Training (2G/3G/4G)


Training Path

Objectives
On completion of this program, the participants will

UGW (SGW/PGW/GGSN) Data


Configuration Training
OED99

be able to:
6d

Lecture, Lab, Demo

Perform data configuration of S1-U/S11, S5/S8


and SGi interfaces Describe basic concept of
VPN, APN and charging.

SA Application Configuration Training


OWD30

Perform configuration of VPN, APN and


2d

Lecture, Lab

charging.
Describe the SA principles, content based

Target Audience

charging principles and PCC concepts.


Perform configuration of the SA function,

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance

service control function and PCC.

Engineer

Describe GGSN SA Structure.

Second line Maintenance Engineer, Senior

Perform the SA application content base


charging and service control.

Maintenance Engineer

Duration

Prerequisites
A general understanding of mobile communication

8 working days

Class Size

and data communication.


Successful completion of the program of UGW
Routine Operation and Maintenance Training.

Min 6, Max 12

COMMERCIAL IN CONFIDENCE

19

2.1.14 UGW (GGSN) Data Configuration Training (2G/3G)


Training Path

Objectives

UGW (GGSN) Data Configuration Training

On completion of this program, the participants will


be able to:

OED99

5d

Lecture, Lab, Demo

Perform data Describe basic concept of VPN,


APN and charging.
Perform configuration of VPN, APN and

SA Application Configuration Training


OWD30

charging.
2d

Lecture, Lab

Describe the SA principles, content based


charging principles and PCC concepts.

Target Audience

Perform configuration of the SA function,


service control function and PCC.

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance

Describe GGSN SA Structure.

Engineer

Perform the SA application content base

Second line Maintenance Engineer, Senior

charging and service control.

Duration

Maintenance Engineer

Prerequisites

7 working days

A general understanding of mobile communication


and data communication.
Successful completion of the program of UGW

Class Size
Min 6, Max 12

Routine Operation and Maintenance Training.

COMMERCIAL IN CONFIDENCE

20

2.1.15 UGW9811 Delta and new feature Training


Training Path

Objectives

UGW9811 Delta and new feature Training

On completion of this program, the participants will


be able to:

OED10

Lecture

1d

Perform data Describe basic concept of VPN,


APN and charging.

Target Audience

Perform configuration of VPN, APN and

Field Maintenance Engineer, First line

charging.

Maintenance Engineer, Routine Maintenance


Engineer

Describe the SA principles, content based


charging principles and PCC concepts.
Perform configuration of the SA function,

Prerequisites
A general understanding of mobile communication

service control function and PCC.

Duration

and data communication.


Successful completion of the program of UGW
Routine Operation and Maintenance Training.

1 working day

Class Size
Min 6, Max 12

COMMERCIAL IN CONFIDENCE

21

2.1.16 CG9812 Operation and Maintenance Training (Windows)


Training Path

Objectives
On completion of this program, the participants will

CG9812 Administration (Windows)


Training
OWI30

be able to:
2d

Lecture, Lab

Describe the charging principle of PS core


network.

Target Audience

Describe the CG9812 system structure.

Field Maintenance Engineer, First line

Configure key maintenance parameters in CG

Maintenance Engineer, Routine Maintenance


Engineer

server.
Perform Routine Operation and Maintenance of

Prerequisites

CG server.

A general understanding of mobile communication


and data communication.

Duration
2 working days

Successful completion of the program

Class Size

GPRS/UMTS PS Fundamental Training.


Min 6, Max 12

COMMERCIAL IN CONFIDENCE

22

2.1.17 CG9812 Operation and Maintenance Training (UNIX)


Training Path

Objectives

CG9812 Administration (UNIX) Training

On completion of this program, the participants will


be able to:

OWI31

2d

Lecture, Lab

Describe the charging principle of PS core


network.

Target Audience

Describe the CG9812 system structure.

Field Maintenance Engineer, First line

Configure key maintenance parameters in CG

Maintenance Engineer, Routine Maintenance


Engineer

server.
Perform the Routine Operation and

Prerequisites

Maintenance of CG server.

A general understanding of mobile communication


and data communication.

Duration
2 working days

Successful completion of the program

Class Size

GPRS/UMTS PS Fundamental Training.


Min 6, Max 12

COMMERCIAL IN CONFIDENCE

23

2.1.18 CG9812 Operation and Maintenance Training(ATCA)


Training Path

Get familiar with TCP/IP.

Objectives
CG9812 Operation and Maintenance
Training(ATCA)
OWI50

Lecture, Lab, Demo

On completion of this program, the participants will


2d

be able to:
Perform CG9812 routine maintenance.

Target Audience

Master CG9812 client software installation and


Field Maintenance Engineer, First line

CDR browsing/query.

Maintenance Engineer, Routine Maintenance

Duration

Engineer
2 working days

Prerequisites

Class Size
A general understanding of mobile communication
and data communication.

Min 6, Max 12

COMMERCIAL IN CONFIDENCE

24

2.1.19 From GPRS to EPC Delta Training


Training Path

Objectives
On completion of this program, the participants will

From GPRS to EPC Delta Training

be able to:
OEA11

3d

Lecture

Describe difference between GPRS Protocol


and EPC Protocol.

Target Audience

Describe different interface between GPRS

Field Maintenance Engineer, First line

and EPC network.

Maintenance Engineer, Routine Maintenance


Engineer

Perform the different routine operation and


maintenance between GPRS and EPC

Prerequisites

equipment.

A general understanding of mobile communication


and data communication.

Duration
3 working days

Be familiar with Windows operating system.

Class Size

Having basic knowledge of mobile network.


Min 6, Max 12

COMMERCIAL IN CONFIDENCE

25

2.1.20 PS Alarm Monitoring and Management Training


Training Path

Successful completion of the program of


GPRS/UMTS PS Fundamental Training.

PS Alarm Monitoring and Management


OWB93

Objectives
1d

Lecture, Lab, Demo

On completion of this program, the participants will


be able to:

Target Audience

Understand basic alarm.

Field Maintenance Engineer, First line

Understand basic method of alarm monitoring

Maintenance Engineer, Routine Maintenance


Engineer

and management.

Duration

Prerequisites
1 working day
A general understanding of mobile communication

Class Size

and data communication.


Min 6, Max 12

Get familiar with TCP/IP.


1 years related experience in PS equipment
maintenance.

COMMERCIAL IN CONFIDENCE

26

2.1.21 EPC Alarm Monitoring and Management Training


Training Path

maintenance.
Successful completion of the program of

EPC Alarm Monitoring and Management


Training
1d
OEB93
Lecture, Lab, Demo

GPRS/UMTS PS Fundamental Training.

Objectives
On completion of this program, the participants will

Target Audience

be able to:
Field Maintenance Engineer, First line

Master the basic alarm monitoring.

Maintenance Engineer, Routine Maintenance

Master the basic alarm analysis and process.

Engineer

Duration

Prerequisites
1 working day
A general understanding of mobile communication

Class Size

and data communication.


Min 6, Max 12

Get familiar with TCP/IP.


2 years related experience in PS equipment

COMMERCIAL IN CONFIDENCE

27

2.1.22 PS Performance Monitoring and Management Training


Training Path

Successful completion of the program of


GPRS/UMTS PS Fundamental Training.

PS Performance Monitoring Training


OWB92

Objectives
1d

Lecture, Lab, Demo

On completion of this program, the participants will


be able to:

Target Audience

Master Key Performance Indicator of SGSN.

Field Maintenance Engineer, First line

Master Key Performance Indicator of GGSN.

Maintenance Engineer, Routine Maintenance

Perform KPI collection method.

Engineer

Duration

Prerequisites
1 working day
A general understanding of mobile communication

Class Size

and data communication.


Min 6, Max 12

Get familiar with TCP/IP.


3 years related experience in PS equipment
maintenance.

COMMERCIAL IN CONFIDENCE

28

2.1.23 PS Performance Analysis Training


Training Path

Successful completion of the program of


GPRS/UMTS PS Fundamental Training.

PS Performance Analysis Training


OWW66

Objectives
2d

Lecture, Lab, Demo

On completion of this program, the participants will


be able to:

Target Audience

Master System Resource KPI Analysis.

Field Maintenance Engineer, First line

Master the Signaling Procedure KPI Analysis

Maintenance Engineer, Routine Maintenance


Engineer

overview.

Duration

Prerequisites
2 working days
A general understanding of mobile communication

Class Size

and data communication.


Min 6, Max 12

Get familiar with TCP/IP.


4 years related experience in PS equipment
maintenance.

COMMERCIAL IN CONFIDENCE

29

2.1.24 EPC Performance Monitoring and Management Training


Training Path

Successful completion of the program of


GPRS/UMTS PS Fundamental Training.

EPC Performance Monitoring and


Management Training
OEB92

Objectives
1d

Lecture, Lab, Demo

On completion of this program, the participants will


be able to:

Target Audience

Describe the KPIs in USN.

Field Maintenance Engineer, First line

Describe the KPIs in UGW.

Maintenance Engineer, Routine Maintenance

Describe the KPIs in CG.

Engineer

Master the observation method of KPI.

Prerequisites

Duration

A general understanding of mobile communication


and data communication.

1 working day

Class Size

Get familiar with TCP/IP.


5 years related experience in PS equipment

Min 6, Max 12

maintenance.

COMMERCIAL IN CONFIDENCE

30

2.1.25 PS Emergency Recovery Training


Training Path

Successful completion of the program of


GPRS/UMTS PS Fundamental Training.

PS Emergency Recovery Training


OWB91

Objectives
1d

Lecture, Lab, Demo

On completion of this program, the participants will


be able to:

Target Audience

Master SGSN9810 Emergency O/M.

Field Maintenance Engineer, First line

Master GGSN9811 Emergency O/M.

Maintenance Engineer, Routine Maintenance

Master CG9812 Emergency O/M.

Engineer

Duration

Prerequisites
1 working day
A general understanding of mobile communication

Class Size

and data communication.


Min 6, Max 12

Get familiar with TCP/IP.


1 years related experience in PS equipment
maintenance.

COMMERCIAL IN CONFIDENCE

31

2.1.26 EPC Emergency Recovery Training


Training Path

Successful completion of the program of


GPRS/UMTS PS Fundamental Training.

EPC Emergency Recovery Training


OWB91

Objectives
1d

Lecture, Lab, Demo

On completion of this program, the participants will


be able to:

Target Audience

Master USN9810 Emergency O/M.

Field Maintenance Engineer, First line

Master UGW9811 Emergency O/M.

Maintenance Engineer, Routine Maintenance

Master CG9812 Emergency O/M.

Engineer

Duration

Prerequisites
1 working day
A general understanding of mobile communication

Class Size

and data communication.


Min 6, Max 12

Get familiar with TCP/IP.


1 years related experience in PS equipment
maintenance.

COMMERCIAL IN CONFIDENCE

32

2.1.27 GUL Convergence Training


Training Path

be able to:
Describe EPC Principle.

GUL Convergence Training


OWA90

Outline EPC Network Deployment Policy.


3d

Lecture, LVC

Outline EPC Network Element Deployment


Policy.

Target Audience

Describe the networking of GUL interoperation.

All Technical and non-Technical Personnel

Describe the principle of GUL Interoperation.


Describe key point of GUL Interoperation

Prerequisites

Deployment.

A general understanding of mobile communication

Duration

and data communication.


Successful completion of the program EPC
Principle Fundamental and GPRS/UMTS PS
Fundamental Training.

3 working days

Class Size
Min 6, Max 12

Objectives
On completion of this program, the participants will

COMMERCIAL IN CONFIDENCE

33

2.1.28 EPC VOLTE Solution Training (CSFB)


Training Path

Successful completion of the program EPC


Principle Fundamental Training.

EPC VOLTE Solution Training (CSFB)


OEB33

Lecture

Objectives
1d

On completion of this program, the participants will


be able to:

Target Audience

Understand network structure of CSFB.

Field Maintenance Engineer, First line

Understand signaling analysis of CSFB.

Maintenance Engineer, Routine Maintenance

Duration

Engineer
1 working day

Prerequisites

Class Size
A general understanding of mobile communication
and data communication.

Min 6, Max 12

COMMERCIAL IN CONFIDENCE

34

2.1.29 EPC VOLTE Solution Training (SRVCC)


Training Path

Successful completion of the program EPC


Principle Fundamental Training.

EPC VOLTE Solution Training (SRVCC)


OEB30

Lecture

1d

Objectives
On completion of this program, the participants will
be able to:

Target Audience

Understand network structure of SRVCC.

Field Maintenance Engineer, First line

Understand signaling analysis of SRVCC.

Maintenance Engineer, Routine Maintenance

Duration

Engineer
1 working day

Prerequisites

Class Size
A general understanding of mobile communication
and data communication.

Min 6, Max 12

COMMERCIAL IN CONFIDENCE

35

2.1.30 eMBMS Smart Content Delivery Feature Training


Training Path

Training.

Objectives
eMBMS Smart Content Delivery Feature
Training
1d
OED99
Lecture

On completion of this program, the participants will


be able to:
Understand of the Feature of eMBMS Smart

Target Audience

Content Delivery.
Field Maintenance Engineer, First line

Implementation of eMBMS Smart Content

Maintenance Engineer, Routine Maintenance


Engineer

Delivery.

Duration

Prerequisites
1 working day
A general understanding of mobile communication

Class Size

and data communication.


Successful completion of the program of EPC

Min 6, Max 12

UGW Routine Operation and Maintenance

COMMERCIAL IN CONFIDENCE

36

2.1.31 PS IPv6 Feature Training


Training Path

Successful completion of the program of EPC


Equipment Commissioning Training.

IPv6 Solution for PS/EPC


OEY00

Lecture, Lab, Demo

Objectives
1d

On completion of this program, the participants will


be able to:

Target Audience

Describe the IPv6 implementation for PS and

Field Maintenance Engineer, First line

EPC.

Maintenance Engineer, Routine Maintenance


Engineer

Describe the data configuration for IPv6


solution in PS and EPC.

Prerequisites

Duration

A general understanding of mobile communication


and data communication.

1 working day

Class Size

Get familiar with TCP/IP.


Successful completion of the program of EPC Data

Min 6, Max 12

Configuration Training.

COMMERCIAL IN CONFIDENCE

37

2.1.32 GPRS/UMTS SGSN POOL Training


Training Path

Routine Operation and Maintenance training.


Successful completion of the program SGSN data

SGSN POOL Training


OWB76

configuration Training.
4d

Lecture, Lab, Case,


Discussion

Objectives
On completion of this program, the participants will

Target Audience

be able to:
Understand the principle of SGSN POOL.

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance

Perform data configuration of SGSN POOL.


Perform Operation and Maintenance of SGSN

Engineer

POOL.

Prerequisites

Duration
A general mobile communication and data
4 working days

communication.

Class Size

Successful completion of the program


GPRS/UMTS Principle Training.

Min 6, Max 12

Successful completion of the program SGSN

COMMERCIAL IN CONFIDENCE

38

2.1.33 MME POOL Training


Training Path

Training (2G/3G/4G ).
Successful completion of the program of USN9810

MME POOL Training


OEB32

Data Configuration Training.


2d

Lecture, Lab, Demo

Objectives
On completion of this program, the participants will

Target Audience

be able to:
Field Maintenance Engineer, First line

Understand principle of MME pool.

Maintenance Engineer, Routine Maintenance

Master data configuration of MME pool.

Engineer

Duration

Prerequisites
2 working days
A general understanding of mobile communication

Class Size

and data communication.


Successful completion of the program of USN

Min 6, Max 12

ATCA platform Operation and Maintenance

COMMERCIAL IN CONFIDENCE

39

2.1.34 GPRS/UMTS PS Network Security Training


Training Path

Objectives
On completion of this program, the participants will

PS Network Security Training

be able to:
OWB50

1d

Lecture, Lab

Describe the Common Network Attack to


CN-PS.

Target Audience

Perform the configuration to avoid of typical

Senior Engineer, Specialist, Expert

network attack.

Prerequisites

Duration

Successful completion of the programs.


SGSN9810 Operation and Maintenance Training.

1 working day

Class Size

GGSN9811 Operation and Maintenance Training.


Min 6, Max 12

COMMERCIAL IN CONFIDENCE

40

2.1.35 PS QOS Training


Training Path

Objectives
On completion of this program, the participants will

PS QOS Training

be able to:
OWA11

1d

Lecture

Describe PS QoS parameter.


Describe PS QoS negotiation process.

Target Audience

Describe PS service QoS parameter default


Routine Maintenance Engineer, Optimization
Engineer, Senior Maintenance Engineer.

Prerequisites

value.
Describe SGSN QoS handling.
Describe UE and Radio Part QoS handling.

A general understanding of mobile communication


and data communication.

Duration
1 working day

Get familiar with TCP/IP and GPRS principle.

Class Size

2 years related experience in PS domain.


Min 6, Max 12

COMMERCIAL IN CONFIDENCE

41

2.1.36 IP Convergence for Packet Core Training


Training Path

technology.
Describe interconnection solution between PS

IP Convergence for Packet Core Training


OWA06

4d

Lecture, Lab, Demo

and CE.
Describe IP Planning between PS and CE.
Describe Data configuration between PS and

Target Audience

CE.

Routine Maintenance Engineer, Optimization


Engineer, Senior Maintenance Engineer.

Prerequisites

Describe Iu/Gb/Gr/Gn/Ga interface networking


and reliability solution.
Describe O/M interface networking and
reliability solution.

A general understanding of mobile communication

Describe PS networking troubleshooting


method.

and data communication.


Get familiar with TCP/IP and GPRS Principle.

Common troubleshooting case study.

Duration

Objectives
On completion of this program, the participants will
be able to:

4 working days

Class Size

Describe TCP/IP fundamental related to


Min 6, Max 12

GPRS/UMTS PS network.
Describe IP backbone and key Datacom

COMMERCIAL IN CONFIDENCE

42

2.1.37 PS Signaling Procedure Analysis and Troubleshooting Training


Training Path

Successful completion of the program of


GPRS/UMTS PS Fundamental Training.

PS Signaling Procedure Analysis and


Troubleshooting
OWB76

Objectives
2d

Lecture, Lab, Demo

On completion of this program, the participants will


be able to:

Target Audience

Describe important procedures and parameters

Routine Maintenance Engineer, Optimization


Engineer, Senior Maintenance Engineer.

Prerequisites

of MM/SM.
Perform MM/SM/Service Troubleshooting.

Duration

A general understanding of mobile communication


and data communication.

2 working days

Class Size

Get familiar with TCP/IP.


1 years related experience in PS equipment

Min 6, Max 12

maintenance.

COMMERCIAL IN CONFIDENCE

43

2.1.38 PS Interface Signaling Analysis and Troubleshooting Training


Training Path

Successful completion of the program of


GPRS/UMTS PS Fundamental Training.

PS Interface Signaling Analysis and


Troubleshooting Training
OWB77

Objectives
3d

Lecture, Lab, Demo

On completion of this program, the participants will


be able to:

Target Audience

Describe important procedures and parameters

Routine Maintenance Engineer, Optimization


Engineer, Senior Maintenance Engineer.

of RANAP/MAP/GTP.

Duration

Prerequisites
3 working days
A general understanding of mobile communication

Class Size

and data communication.


Min 6, Max 12

Get familiar with TCP/IP.


1 years related experience in PS equipment
maintenance.

COMMERCIAL IN CONFIDENCE

44

2.1.39 PS Data Transfer Troubleshooting Training


Training Path

Successful completion of the program of


GPRS/UMTS PS Fundamental Training.

PS Data Transfer Troubleshooting Training


OWA78

2d

Lecture, Lab, Demo

Objectives
On completion of this program, the participants will
be able to:

Target Audience

Perform locating method of Data Transfer fault.

Routine Maintenance Engineer, Optimization


Engineer, Senior Maintenance Engineer.

Prerequisites

Perform Troubleshooting method of Data


Transfer fault.

Duration

A general understanding of mobile communication


and data communication.

2 working days

Class Size

Get familiar with TCP/IP.


1 years related experience in PS equipment

Min 6, Max 12

maintenance.

COMMERCIAL IN CONFIDENCE

45

2.1.40 EPC Interface Protocol Analysis Training


Training Path

be able to:
Perform USN9810 signaling tracing method.

EPC Interface Protocol Analysis Training


OEA02

2d

Lecture, Lab, Demo

Perform S1-MME interface signaling flow and


key parameters analysis.
Perform S6a interface signaling flow and key

Target Audience

parameters analysis.

EPC Engineer and Experts, PS Network Planning


Engineer, System Design Engineer

Perform S5/S8 interface signaling flow and key


parameters analysis.

Duration

Prerequisites
A general understanding of GPRS network
principle, mobile communication and data
communication.

2 working days

Class Size
Min 6, Max 12

Objectives
On completion of this program, the participants will

COMMERCIAL IN CONFIDENCE

46

2.1.41 EPC Signaling Analysis Training


Training Path

Objectives
On completion of this program, the participants will

EPC Signaling Analysis Training

be able to:
OEA03

2d

Lecture, Lab, Demo

Perform USN9810 signaling tracing method.


Perform UGW9811 signaling tracing method.

Target Audience

Perform EMM signaling flow and key


EPC Engineer and Experts, PS Network Planning
Engineer, System Design Engineer

Perform ESM signaling flow and key

Prerequisites

parameters analysis.

A general understanding of GPRS network


principle, mobile communication and data
communication.

parameters analysis.

Duration
2 working days

Class Size
Min 6, Max 12

COMMERCIAL IN CONFIDENCE

47

2.1.42 EPC Troubleshooting Training


Training Path

Objectives
On completion of this program, the participants will

EPC Troubleshooting Training

be able to:
OEB04

3d

Lecture, Lab, Demo

Describe USN9810/UGW9811 EMM/ESM


troubleshooting method.

Target Audience

Common USN9810/UGW9811 EMM/ESM

Senior maintenance Engineer, Specialist, Experts

related troubleshooting case study.


Perform USN9810/UGW9811 EMM/ESM

Prerequisites

related fault located with signaling analysis.


A general understanding of mobile communication
and data communication.
Get familiar with TCP/IP.

Duration
3 working days

EPC USN9810 Data Configuration Training.

Class Size

EPC UGW9811 Data Configuration Training.


Min 6, Max 12

COMMERCIAL IN CONFIDENCE

48

2.1.43 GPRS/UMTS PS Network Optimize Training


Training Path

Successful completion of the program


SGSN/GGSN data configuration Training.

PS Network Optimization Training


OWB67

Objectives
3d

Lecture, Lab

On completion of this program, the participants will


be able to:

Target Audience

Outline the general procedure of PS core

GPRS/UMTS PS Network Optimization Engineer,

network optimization.

System Design Engineer, Senior Engineer and

Analyze the PS core network KPI.

Experts

Describe Traffic Statistics Model Extraction.

Prerequisites

Master Evaluation and Optimization of the

A general mobile communication and data


communication.

SGSN9810/GGSN9811/DNS/CG Resource
Capacity.

Duration

Successful completion of the program


GPRS/UMTS Principle Training.

3 working days

Successful completion of the program

Class Size

SGSN/GGSN Routine Operation and Maintenance


training.

Min 6, Max 12

COMMERCIAL IN CONFIDENCE

49

2.1.44 GPRS/UMTS PS Network Planning and Design Training


Training Path

Successful completion of the program


SGSN/GGSN data configuration Training.

PS Network Planning Training


OWB68

Objectives
2d

Lecture

On completion of this program, the participants will


be able to:

Target Audience

Describe PS Network Planning Principle.

GPRS/UMTS PS Network Planning Engineer,

Perform the Networking Scheme for

System Design Engineer, Senior Engineer and

Gb/Iu/SS7/Gn/Gp/OM/Ga/Li/Gy and

Experts

GGSN-SUR, GGSN-SCCG networking

Prerequisites

scheme.

A general mobile communication and data


communication.

Duration
2 working days

Successful completion of the program

Class Size

GPRS/UMTS Principle Training.


Min 6, Max 12

Successful completion of the program


SGSN/GGSN Routine Operation and Maintenance
training.

COMMERCIAL IN CONFIDENCE

50

2.1.45 EPC Network Planning and Design Training


Training Path

Objectives
On completion of this program, the participants will

EPC Network Planning and Design


Training
OEA07 Lecture, Case, Discussion

be able to:
2d

Describe EPC planning and designing steps.


Determine IP address, QoS, APN needs for

Target Audience

different services.
PS Network Planning Engineer, System Design

Determine capacity for different interfaces.

Engineer, Senior Engineer and Experts

Determine the internetworking for different

Prerequisites

interfaces.

A general understanding of mobile communication


and data communication.

Duration
2 working days

Get familiar with TCP/IP.

Class Size

Successful completion of the program of EPC


Min 6, Max 12

Protocol and Procedure Training.


Successful completion of the program of EPC
Equipment Commissioning Training

COMMERCIAL IN CONFIDENCE

51

2.1.46 iManager M2000 PS Operation and Maintenance Training


Training Path

Describe the overall architecture, hardware


architecture, software architecture, typical

M2000 Routine Operation and


Maintenance Training
OWL21

configuration and interfaces of the M2000.


2d

Lecture, Lab

Describe the software structure of the M2000


equipment, the functions of different parts.
Describe the system reliability of the M2000

Target Audience

system from the aspects of system security.


Field Maintenance Engineer, First line
Maintenance Engineer, Routine Maintenance
Engineer

Perform the Routine Operation and


Maintenance of M2000 client.

Duration

Prerequisites
A general mobile communication and data

2 working days

Class Size

communication.

Objectives

Min 6, Max 12

On completion of this program, the participants will


be able to:

COMMERCIAL IN CONFIDENCE

52

2.1.47 DNS9816 Operation and Maintenance Training


Training Path

of DNS9816.
Describe the theory of system realizing and

DNS9816 Operation and Maintenance


Training
OEN11

Lecture, Lab, Demo

query procedure of DNS9816.


1d

Describe the hardware and software


architecture of DNS9816.
Perform the basic data configurations of

Target Audience

DNS9816.

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance
Engineer.

Perform the data configurations of optional


features about equipment.
Perform the routine operation and

Prerequisites

maintenance.

A general understanding of mobile communication

Duration

and data communication.


Get familiar with TCP/IP and GPRS Principle.

1 working day

Class Size

Objectives
On completion of this program, the participants will

Min 6, Max 12

be able to:
Describe the main functions and key features

COMMERCIAL IN CONFIDENCE

53

2.1.48 uBro UAG Operation and Maintenance Training


Training Path

Objectives

UAG Operation and Maintenance Training

On completion of this program, the participants will


be able to:

OWB34

Lecture, Lab

4d

UAG equipment.

Target Audience

Explain the functions of different boards in

Field Maintenance Engineer, First line

UAG.

Maintenance Engineer, Routine Maintenance


Engineer

Perform the hardware, eIU, Iu-PS, Iu-Cs and


AHR/NTP interface data configuration of UAG.

Prerequisites

Duration

A general understanding of mobile communication


and data communication.

Describe the physical and logical structure of

4 working days

Class Size
Min 6, Max 12

COMMERCIAL IN CONFIDENCE

54

2.1.49 WASN Operation and Maintenance Training


Training Path

structure of WASN9770.
Describe signaling flow and message.

WASN9770 Operation and Maintenance


Training
5d
OXE30
Lecture, Lab

Perform operation and maintenance of


hardware and software.
Perform data configuration of basic service,

Target Audience

route, and VPN.


Describe typical application scenarios of IP-CS

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance
Engineer

authentication access, Mobile IP, hot-lining,


Eth-CS.
Perform system commissioning and

Prerequisites

performance management.

A general understanding of mobile communication

Duration

and data communication.


5 working days

Objectives

Class Size
On completion of this program, the participants will
Min 6, Max 12

be able to:
Describe system structure and hardware

COMMERCIAL IN CONFIDENCE

55

2.1.50 MAG9811 Operation and Maintenance Training


Training Path

be able to:
Understand principle of AP and Subscriber

MAG9811 Engineer Training


OXC11

Lecture, Lab, Demo

accessing like some concept of PPPOE and


3d

DHCP.
Understand WLAN network structure solution.
Understand MAG9811 software and hardware

Target Audience

structure.

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance
Engineer

Master MAG9811 Routine O/M.


Master MAG9811 data configuration.
Master MAG9811 Subscriber management.

Prerequisites

Duration
A general understanding of mobile communication
3 working days

and data communication.


Get familiar with TCP/IP and GPRS Principle.

Objectives

Class Size
Min 6, Max 12

On completion of this program, the participants will

COMMERCIAL IN CONFIDENCE

56

2.1.51 TGW9811 Operation and Maintenance Training


Training Path

the TGW.
Describe the board function of TGW.

TGW9811 Operation and Maintenance


Training
OXT11

Perform the software upgrade and


3d

Lecture, Lab, Demo

patch/license loading procedure.


Perform the routine operation and

Target Audience

maintenance.

TGW9811 Operation and Maintenance Engineer,


Second line Engineer, Technical Support Engineer

Prerequisites

Perform configuration of Wu, Wm and Gn


interfaces.
Perform configuration of Charging.
Perform configuration to AAA.

A general understanding of mobile communication


and data communication.

Perform commissioning of TGW.

Duration

Get familiar with TCP/IP and Principle.


3 working days

Objectives

Class Size
On completion of this program, the participants will
Min 6, Max 12

be able to:
Describe WLAN solution and product overview.
Describe the physical and logical structure of

COMMERCIAL IN CONFIDENCE

57

2.1.52 CDMA WAG Operation and Maintenance Training


Training Path

be able to:
Master principle of WAG.

CDMA WAG Operation and Maintenance


Training
4d
OWX90
Lecture, Lab

Describe WAG hardware structure.


Master WAG software structure.
Master WAG routine operation and

Target Audience

maintenance.
Master WAG interface data configuration.

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance

Master WAG service provisioning and related


skill.

Engineer

Duration

Prerequisites
A general understanding of mobile communication

4 working days

Class Size

and data communication.


Get familiar with TCP/IP.

Min 6, Max 12

Objectives
On completion of this program, the participants will

COMMERCIAL IN CONFIDENCE

58

2.1.53 CDMA PDSN Operation and Maintenance Training


Training Path

Objectives

CDMA PDSN Operation and Maintenance


Training
7d
ORP03
Lecture, Lab

be able to:
Perform the routine and emergency operation
of CDMA PDSN equipments.

Target Audience

Perform data configuration for equipment

Field Maintenance Engineer, First line

interconnection and charging of PDSN.

Maintenance Engineer, Routine Maintenance


Engineer

Implement data configuration for service of


CDMA PDSN.

Prerequisites

Duration

A general understanding of mobile communication


and data communication.

On completion of this program, the participants will

7 working days

Class Size
Min 6, Max 12

COMMERCIAL IN CONFIDENCE

59

2.1.54 CDMA PDSN-HA Operation and Maintenance Delta Training


Training Path

Objectives
On completion of this program, the participants will

CDMA PDSN-HA Operation and


Maintenance Delta Training
ORH20

Lecture, Lab, Demo

be able to:
2d

Describe HA system structure and function.


Master deference between HA and PDSN.

Target Audience

Describe HA hardware structure.


Field Maintenance Engineer, First line

Master HA software structure.

Maintenance Engineer, Routine Maintenance

Master HA routine operation and maintenance.

Engineer

Master HA interface data configuration and

Prerequisites

system data configuration.

A general understanding of mobile communication

Describe principle of content based charging.

and data communication.

Describe CSN/Mobile IP/Follow control feature.

Duration

Get familiar with TCP/IP.


Successful completion of the program of CDMA
PDSN Operation and Maintenance.

2 working days

Class Size
Min 6, Max 12

COMMERCIAL IN CONFIDENCE

60

2.1.55 PS Nastar Operation and Maintenance Training


Training Path

Objectives
On completion of this program, the participants will

PS Nastar Training

be able to:
OWT12

2d

Lecture, Lab, Demo

Describe PS Nastar architecture, hardware


deployment and feature function.

Target Audience

Grasp PS Nastar typical networking, software

Routine Maintenance Engineer, Optimization


Engineer, Senior Maintenance Engineer.

Prerequisites

installation.
Perform client service operation, configuration
and maintenance.

A general understanding of mobile communication


and data communication.

Duration
2 working days

Get familiar with TCP/IP and GPRS Principle.

Class Size
Min 6, Max 12

COMMERCIAL IN CONFIDENCE

61

2.1.56 PS PRS Operation and Maintenance Training


Training Path

Routine Operation and Maintenance training.


Successful completion of the program GGSN data

PS PRS Engineer Training


OWW01

configuration Training.
2d

Lecture, Lab, Demo

Objectives
On completion of this program, the participants will

Target Audience

be able to:
Field Maintenance Engineer, First line

Master function and system structure of PRS.

Maintenance Engineer, Routine Maintenance

Master hardware deployment.

Engineer

Master PRS operation and maintenance.

Prerequisites

A general mobile communication and data


communication.

Duration
2 working days

Successful completion of the program

Class Size

GPRS/UMTS Principle Training.


Successful completion of the program GGSN

Min 6, Max 12

COMMERCIAL IN CONFIDENCE

62

2.1.57 HCNA LTE HUAWEI Certification


Training Path

uplink and downlink.


Describe the channel structure of the radio

EPC Principle Fundamental Training


OEA10

interface.
2d

Lecture, LVC

Describe the time-domain structure in the radio


interface in UL and DL for both FDD and TDD
mode.
Describe the Frequency-domain structure in

LTE System Overview Training

the radio interface in UL and DL for both FDD


N/A

1d

Lecture

and TDD mode.


Have a good understanding of the OFDM
principle, signal generation and processing.

LTE Field Maintenance Training


N/A

Detail the reference symbols in DL.


2d

Lecture, Lab

Describe MIMO technology.


Outline MBMS for LTE.
Have a good understanding of the SC-FDMA

EPC Principle Testing Training


OEA07

principle, signal generation and processing.


1d

Lecture, Lab, Demo

Describe Huawei eNodeB Family.


Describe Huawei LTE products and application

Target Audience

scenarios.
Describe Huawei LTE products Operation and

Field Maintenance Engineer, First line

Maintenance System.

Maintenance Engineer, Routine Maintenance

Describe the hardware structure of eNodeB.

Engineer

Describe the logical structure of eNodeB.

Prerequisites

Describe the working principle and functions of


A general understanding of mobile communication
and data communication.

eNodeB boards.
Describe the procedure of eNodeB

Objectives

commissioning.

On completion of this program, the participants will


be able to:
Describe the evolution of cellular networks.
Summarize the evolution of 3GPP releases,
from release 99 to release 10.
Explain the logical architecture of EPS
(E-UTRAN and EPC).
Give an overview of the interfaces in EPS.
Describe the Evolved Packet Core (EPC).
Describe the role of the MME and the S-GW.
Describe the S1, X2 and radio-interface and
their protocol stacks.
Describe the radio interface techniques used in

Describe the related concept of eNodeB


software and configuration file.
Querying the current version of eNodeB.
Use USB disk to commission the eNodeB.
Commission the eNodeB through LMT.
Verify commissioning result
Power up/down the eNodeB and connect up
LMT to the node.
Find the alarm list of eNodeB.
Perform corrective and preventive
maintenance on eNodeB.
Find faulty hardware units and replace them.

Describe the EPC network structure.

COMMERCIAL IN CONFIDENCE

63

Describe the EPC network interface and


protocol.

parameters analysis.

Duration

Describe the EPC network working procedures.


Perform USN9810 signaling tracing method.
Perform UGW9811 signaling tracing method.
Perform EMM signaling flow and key

6 working days

Class Size
Min 6, Max 12

parameters analysis.
Perform ESM signaling flow and key

COMMERCIAL IN CONFIDENCE

64

2.1.58 HCNP EPC HUAWEI Certification


Training Path

management, trace management, data


management, license management,

EPC HSS Data Configuration


OEB34

performance management.
2d

Lecture

Describe the functions of protocol stacks of


different interfaces.
Perform configuration of USN hardware,
System Information, interworking with eNodeB,

USN ATCA platform Operation and


Maintenance Training
N/A

HSS, MME, S-GW, DNS and NTP.


2d

Lecture, Lab, Demo

Perform configuration of mobility management


and session management.
Describe system structure and hardware

USN9810 (MME) Data Configuration


Training (4G) (HC)
N/A

structure of UGW9811.
3d

Lecture, Lab, Demo

Perform software related installation and


upgrade procedure.
Perform hardware operation and maintenance.

UGW Routine Operation and Maintenance


Training (HC)
2d
N/A
Lecture, Lab, Demo

Perform the Routine Operation and


Maintenance including authorization
management, system information management,
alarm management, trace management ,log
management, license management ,patch

UGW (SGW/PGW) Data Configuration


Training (HC)
N/A

management ,data backup and restore.


4d

Lecture, Lab, Demo

Perform data configuration of S1-U/S11, S5/S8


and SGi interfaces Describe basic concept of

Target Audience

VPN, APN and charging.

Operation and Maintenance Engineer; Technical

Perform configuration of VPN, APN and


charging.

Support Engineer

Describe the SA principles, content based

Prerequisites

charging principles and PCC concepts.


A general understanding of mobile communication
and data communication.

Perform configuration of the SA function,


service control function and PCC.

Objectives

Describe HSS9820V900R006 product function

On completion of this program, the participants will

and application.
Describe HSS9820V900R006 interface

be able to:
Describe system structure and hardware

protocol function.
Describe HSS9820V900R006 physical and

structure of USN9810.
Perform software related installation and

logical structure.
Describe HSS9820V900R006 board function.

upgrade procedure.
Perform hardware operation and maintenance.

Describe HSS9820V900R006 signaling flow.

Perform the Routine Operation and

Describe HSS9820V900R006 software

Maintenance including security management,


system information management, alarm

structure.
Describe HSS9820V900R006 IP planning.

COMMERCIAL IN CONFIDENCE

65

Perform installation of operation PGW client.


Perform the method of adding or deleting

Describe data configuration principles and


steps.
Perform Hardware Data Configuration of

subscriber.
Modify subscription according to customer

USCDB.
Perform Local Office Data Configuration of

requirement.
Perform configuration of subscription data.
Describe the steps of HSS9820 data

USCDB.
Perform Signaling Data Configuration of
USCDB.

configuration.
Perform hardware and system data

Duration

configuration.
Perform interface data configuration.
Check the data configuration correctness and
validity.

13 working days

Class Size
Min 6, Max 12

Perform basic debugging of EPC-HSS9820.


Describe Board configuration principle.

COMMERCIAL IN CONFIDENCE

66

2.1.59 HCIE EPC HUAWEI Certification


Training Path

be able to:
Understand network structure of CSFB.

EPC VOLTE Solution Training (CSFB)


OEB33

Understand signaling analysis of CSFB.


1d

Lecture

Perform USN9810 signaling tracing method.


Perform UGW9811 signaling tracing method.
Perform EMM signaling flow and key

EPC Signaling Analysis Training


OEA03

parameters analysis.
2d

Lecture, Lab, Demo

Perform ESM signaling flow and key


parameters analysis.
Describe USN9810/UGW9811 EMM/ESM
troubleshooting method.

EPC Troubleshooting Training

Common USN9810/UGW9811 EMM/ESM


OEB04

3d

Lecture, Lab, Demo

related troubleshooting case study.


Perform USN9810/UGW9811 EMM/ESM
related fault located with signaling analysis.

EPC Network Planning and Design


Training
OEA07 Lecture, Case, Discussion

Describe EPC planning and designing steps.


2d

Determine IP address, QoS, APN needs for


different services.

Target Audience

Determine capacity for different interfaces.

All Technical and non-Technical Personnel,PS


Network Planning Engineer, System Design
Engineer, Senior Engineer and Experts

Prerequisites

Determine the internetworking for different


interfaces.

Duration
8 working days

A general understanding of mobile communication


and data communication.

Class Size
Min 6, Max 12

Objectives
On completion of this program, the participants will

COMMERCIAL IN CONFIDENCE

67

2.1.60 GPRS Fundamental(WBT)


Training Path

Objectives
On completion of this program, the participants will

GPRS Fundamental(WBT)

be able to:
OWA31

WBT

1h

Describe the UMTS PS Network Structure.


Describe the PS Core Network interface and

Target Audience

Protocol.
Field Maintenance Engineer, First line

Describe the PS Core Network Working

Maintenance Engineer, Routine Maintenance


Engineer

Principle.

Duration

Prerequisites
1 hour
A general understanding of mobile communication

Class Size

and data communication.


No limit

COMMERCIAL IN CONFIDENCE

68

2.1.61 GPRS signaling Procedure(WBT)


Training Path

Objectives
On completion of this program, the participants will

GPRS signaling Procedure(WBT)

be able to:
OWB00

WBT

1h

Analysis RANAP/MAP/Gx/Gy Protocol.


Describe important procedures and parameters

Target Audience

of RANAP/MAP/Gx/Gy protocol.
GPRS/UMTS PS Network Engineer, System

Duration

Design Engineer, Senior Engineer and Experts


1 hour

Prerequisites

Class Size
A general understanding of mobile communication
and data communication.

No limit

COMMERCIAL IN CONFIDENCE

69

2.1.62 GTP Protocol Analysis(WBT)


Training Path

Objectives
On completion of this program, the participants will

GTP Protocol Analysis(WBT)

be able to:
OWB01

WBT

0.5h

Analysis GTP Protocol.


Describe important procedures and parameters

Target Audience

of GTP protocol.
GPRS/UMTS PS Network Engineer, System

Duration

Design Engineer, Senior Engineer and Experts


0.5 hour

Prerequisites

Class Size
A general understanding of mobile communication
and data communication.

No limit

COMMERCIAL IN CONFIDENCE

70

2.1.63 EPC Principle(WBT)


Training Path

Objectives
On completion of this program, the participants will

EPC Principle(WBT)

be able to:
OEB00

WBT

2.5h

A general understanding of mobile


communication and data communication.

Target Audience

Be familiar with Windows operating system.

Field Maintenance Engineer, First line

Having basic knowledge of mobile network.

Maintenance Engineer, Routine Maintenance

Duration

Engineer
2.5 hours

Prerequisites

Class Size
A general understanding of mobile communication
and data communication.

No limit

COMMERCIAL IN CONFIDENCE

71

2.1.64 EPC Signaling Analysis (WBT)


Training Path

Equipment Commissioning Training.

Objectives
EPC Signaling Analysis (WBT)
On completion of this program, the participants will
OEA00

WBT

6h

be able to:
Perform signaling flow and key parameters

Target Audience

analysis for EPC, including attach, detach, TAU,


EPC Engineer and Experts, PS Network Planning

S1-release, handover, service-request and

Engineer, System Design Engineer

security procedures.

Prerequisites

Duration

A general understanding of mobile communication


and data communication. Get familiar with TCP/IP.

6 hours

Class Size

Successful completion of the program of EPC Data


No limit

Configuration Training.
Successful completion of the program of EPC EPC

COMMERCIAL IN CONFIDENCE

72

2.1.65 EPC Product Survey(WBT)


Training Path

be able to:
Outline the main function, features and key

EPC Product Survey Training (WBT)


OEB10

WBT

specification of USN9810.
1.5h

Outline the main function, features and key


specification of UGW9811.
Outline the main function, features and key

Target Audience

specification of UPCC.

Field Maintenance Engineer, First line


Maintenance Engineer, Routine Maintenance
Engineer

Outline the main function, features and key


specification of EPC-HSS9820.

Duration

Prerequisites
A general understanding of mobile communication

1.5 hours

Class Size

and data communication.

Objectives

No limit

On completion of this program, the participants will

COMMERCIAL IN CONFIDENCE

73

Vous aimerez peut-être aussi