ITEM

DESCRIPTION OF ITEM
NO.
A

EXCAVATION AND EARTH WORKS:

001

Excavation in all types of Soil


Up to 5'-0 depth
Excavation in all types of Soil
Up to 5'-0 to 10'-0 depth
Excavation in all types of Soil
Up to 10'-0 to 15'-0 depth
Earth filling including compaction
a) in zari
b) in plinth
Sand filling including compaction
Carting away earth and debris outside the plot as
directed

A002
A003
A004

A005
A006

CONCRETE WORKS

B001

PCC (1:4:8)
a) In foundation up to 6" thick
b) To the floor up to 4"thick
BBCC (1:4:8)
a) In foundation up to 9thick
b) To the floor up to 4" thick

B002

B003
B004
B005
B006
B007
B008
B009
B010
B011
B012
B013
B014
B015
B016

UNIT

RATE
Rs.

Cu. Ft.

7=50

Cu. Ft.

11=25

Cu. Ft.

16=88

Cu. Ft.
Cu. Ft.
Cu. Ft.
Trip

3=50
4=00
4=00
800=00

Sq. Ft.
Sq. Ft.

14=50
9=50

Sq. Ft.
Sq. Ft.

15=00
10=00

R.C.C. Footing
Cu. Ft.
R.C.C. Pedestal
Cu. Ft.
R.C.C. Plinth Beam /Tie Beam
Cu. Ft./R. Ft.
R.C.C. Coping up to 4 thick
Sq. Ft./R. Ft.
R.C.C. Column
Cu. Ft./R. Ft.
R.C.C. Round Shape & L-Shaped Column
Cu. Ft./R. Ft.
R.C.C. Beam
Cu. Ft./R. Ft.
R.C.C. Bracket
Cu. Ft./R. Ft.
R.C.C. Slab 4.5 thick
Sq. Ft.
R.C.C. Slab 5 thick
Sq. Ft.
R.C.C. Slab 6 thick
Sq. Ft.
R.C.C. Weather Shades, Loft, Balcony, Sunk Slab&
Projected Slab
Sq. Ft.
R.C.C. Slopping Slab, Slopping Weather Shades
Sq. Ft.
R.C.C. Cantilever porch slab
Sq. Ft.

55=00
115=00
115=00
50=00
115=00
1.5 times
115=00
1.5 times
40=00
42=00
45=00
1.5 times
2.0 times
68=00

ITEM
DESCRIPTION OF ITEM
NO.

UNIT

B029
B030

R.C.C. Raft Slab 4.5 thick


Sq. Ft.
R.C.C. Lintel on Partition wall up to 6 thick
R. Ft.
R.C.C. Lintel on 9 thick wall up to 6 thick
R. Ft.
R.C.C. Pardi 4.5 thick
Sq. Ft.
R.C.C. Pardi 6 thick
Sq. Ft.
R.C.C. Pardi 9 thick
Sq. Ft.
R.C.C. Projection Patta
R. Ft.
R.C.C. Stair with Waist Slab
R. Ft./ Sq. Ft.
R.C.C. Stair Folded
R. Ft./ Sq. Ft.
Hook / Ghodi
Nos.
Slab Beam / Hidden Steel Beam
R. Ft./Sq. Ft.
Extra for normal Plywood Shuttering(not exposed)
surface area / Do extra for Staging
Sq. Ft.
Do extra for TWO-WAY SLAB
Sq. Ft.
R.C.C. Water Tank
Liter

BRICK MASONRY WORKS:

C001

Brick masonry in foundation up to plinth level (1:6)


(14 thick & above)
9 thick brick masonry in superstructure up to G.F. slab
level (1:6)
4.5" thick brick partition in superstructure up to G.F.
slab level (1:4)
3 thick (kadau) Brick Masonry
3-0 Ft. in height Brick Parapet with inside Plaster
a) 4.5 thick
b) 9 thick
Brick projected patta (kanas Patta)
Fixing of wooden door & window frames, precast grills,
etc. of all sizes in masonry up to 25 sq. ft.
Fixing of MS railing, grills, etc. up to 20 sq. ft.
Masonry Water Tank

B017
B018
B019
B020
B021
B022
B023
B024
B025
B026
B027
B028

C002
C003
C004
C005

C006
C007
C008
D009

RATE
Rs.
25=00
60=00
65=00
100=00
125=00
165=00
45=00
115=00
265=00
12=50
23=50
30=00
6=50
3=25

Cu. Ft.

19=50

Sq. Ft.

20=50

Sq. Ft.

15=00

Sq. Ft.

15=50

R. Ft.
R. Ft.
R. Ft.
Nos.

140=00
165=00
23=50
400=00

Sq. Ft.
Liter

45=00
2=50

ITEM
DESCRIPTION OF ITEM
NO.
D

PLASTER WORKS:

D001
D002

Mala finished single coat plaster / Rough Plaster


Mala plaster in single coat to pardies, weather shades,
Balcony, isolated beams, pillars, and projected slab
Mala plaster in double coat
Mala plaster in double coat to paradis, weather shades,
balcony, isolated beams, pillars and projected slab
Sand-face plaster in double coat
Sand faced double coat plaster to paradis, weather
shades, balcony, isolated beams, pillars, and projecterd
slab
Cement Vata
Zari Finishing for skirting
Ghisi
a) in single coat plaster
b) in double coat plaster
Topak / Patta-Patti
a) in single coat plaster
b) in double coat plaster
Indian patent stone (IPS) 1 to 1.5 thick
Waterproof Plaster
Immediate Finish over Roof
Waterproofing in Terrace
Waterproofing in Sunk
Tailor Tile Roofing
Chicken Mesh
Tancha On R.C.C.

D003
D004
D005
D006

D009
D010
D011

D012

D013
D014
D015
D016
D017
D018
D019
D020

ITEM DESCRIPTION OF ITEM

UNIT

RATE
Rs.

Sq. Ft.
Sq. Ft./R. Ft.

20=50
1.5 times

Sq. Ft.
Sq. Ft./R. Ft.

23=50
1.5 times

Sq. Ft.
Sq. Ft./R. Ft.

28=00
1.5 times

R. Ft.
R. Ft.

12=00
11=50

R. Ft.
R. Ft.

12=50
25=00

R.Ft./Sq.Inch
R.Ft./Sq.Inch
Sq. Ft.
Extra/Sq. Ft.
Extra/Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
R. Ft.
Sq. Ft.

5=50
9=50
16=00
5=00
7=50
35=00
35=00
40=00
9=50
5=50

UNIT

RATE
3

NO.

Rs.

FLOORING WORKS :

EOO1

Laying of Vitrified tiles


a. Flooring/ Skirting (20 X 20 Feet)
b. Flooring/ Skirting (1.00 X 1.00 Meter)
c. Dedo (20 X 20 Feet)
Laying of Kotah stone
a. Flooring
b. Skirting
c. Tread & riser
d. Platform
e. Dado
f. Chamfered
g. Half Molding
h. Full Molding
i. Sill
Laying of Marble (Not Italian Marble)
a. Flooring
b. Skirting
c. Tread & riser
d. Platform
e. Dado
f. Chamfered
g. Half Molding
h. Full Molding
i. Sill
Laying of Granite
a. Flooring
b. Skirting
c. Tread & riser
d. Platform
e. Dado
f. Chamfered
g. Half Molding
h. Full Molding
i. Sill

E002

E003

E004

ITEM
DESCRIPTION OF ITEM
NO.

Sq. Ft.
R. Ft.
Sq. Ft.

20=00
28=00
22=00

Sq. Ft.
R. Ft.
R. Ft.
Sq. Ft.
Sq. Ft.
R. Ft.
R. Ft.
R. Ft.
R. Ft

25=00
27=00
35=00
45=00
27=00
22=00
25=00
28=00
35=00

Sq. Ft.
R. Ft.
R. Ft.
Sq. Ft.
Sq. Ft.
R. Ft.
R. Ft.
R. Ft.
R. Ft

27=00
28=00
40=00
55=00
28=00
25=00
28=00
30=00
40=00

Sq. Ft.
R. Ft.
R. Ft.
Sq. Ft.
Sq. Ft.
R. Ft.
R. Ft.
R. Ft.
R. Ft

38=00
40=00
45=00
75=00
40=00
30=00
35=00
38=00
45=00

UNIT

RATE
Rs.
4

E005

E006

E006

E007

E008
E009
E010
E011
E012
E013
E014
E015

E016

E016

Laying of Italian Marble


a. Flooring
b. Skirting
c. Tread & riser
d. Platform
e. Dado
f. Chamfered
g. Half Molding
h. Full Molding
i. Sill
Bath Ceramic tiles
a. Flooring
b. Dado
Laying of Glazed tiles
a. Flooring
b. Dado
c. Skirting
Laying of China mosaic
a. Flooring
b. Vata
Tini in Tiling work
Sink/Basin Hole
Sink/Basin Fitting
Kachcha on Floor
Small Holes for CP Fittings
Cutting for NT/Box
Spacer in Flooring
Polishing of Kotah Stone
a. Semi mirror
b. mirror
Polishing of Marble
a. Semi mirror
b. mirror
Polishing of Italian Marble
a. Semi mirror
b. mirror

ITEM DESCRIPTION OF ITEM


NO.
F

Sq. Ft.
R. Ft.
R. Ft.
Sq. Ft.
Sq. Ft.
R. Ft.
R. Ft.
R. Ft.
R. Ft

60=00
60=00
75=00
90=00
60=00
38=00
40=00
45=00
75=00

Sq. Ft.
Sq. Ft.

20=00
22=00

Sq. Ft.
Sq. Ft.
R. Ft.

15=00
18=00
18=00

Sq. Ft.
R. Ft.
R. Ft.
Nos.
Nos.
Sq. Ft.
Nos.
Nos.
Nos.

18=00
20=00
15=00
750=00
450=00
12=50
125=00
125=00
30=00

Sq. Ft.
Sq. Ft.

13=00
18=00

Sq. Ft.
Sq. Ft.

15=00
20=00

Sq. Ft.
Sq. Ft.

18=00
25=00

UNIT

RATE
Rs.

GENERAL :
5

F001 Extra for all the above items for work above G. Floor
F002 Department charges
Mason
Helper
Shuttering pair
Bar Binder pair
Terms and Conditions:

% per floor

12.5

per day
per day
per day
per day

850=00
400=00
1500=00
1500=00

1) The above given rates are only for labor work.


2) Except above mentioned items are considered to be extra items. A rate has to be fixed
prior or before work begins.
3) At site water & Electric city supplied by the owner.
4) Above rates are up to l0'0 height only.
5) Rate increase per floor is 12.5%.
6) Responsibility of curing is on owner.
7) If any injury occur on site owner has to pay compensation.
8) All building material should be within 20'0 lead.
9) Above rates are up to 3 months.
10) R.C.C. Work and Plaster Work of R.C.C. Beam, Column, W.S., Loft, Round or Lshaped column and any masonry & plaster in Round shape etc. will be charge 1.5
times more than regular rates.
11) R.C.C. Slopping Slab, W.S. will be Calculated as 2.0 times than the regular rates.
12) Any designing work in Flooring, Exposed R.C.C./Masonry work will be charge extra.
13) Landing in stair = 2 steps.
14) Rent of Mixture machine, Vibrator, Lift, etc will be bare by owner.
15) Payment Terms:

As per work is done 80% Payment of Running Bill should be given in 2 3


Days and another 20% of Payment within 7 days.

Service Tax will be charged extra.

10% Supervision Charge will be calculated on LABOR & MATERIAL Bills.

__________Contractor

__________ Architect

__________Owner