GOVERNMENT OF DEMOCRATIC SOCIALIST

REPUBLIC OF SRI LANKA


MINISTRY OF HIGHWAYS, PORTS & SHIPPING
ROAD DEVELOPMENT AUTHORITY
EXTENSION OF SOUTHERN EXPRESSWAY
FROM MATARA TO HAMBANTOTA
SECTION 1 MATARA TO BELIATTE (FROM 0+000 30+000)

VIADUCT - 2
CH.8+920.60 - 10+390.96

GEOTECHNICAL CAPACITY OF PILES

Prepared & Submitted By


China National Aero-Technology International Engineering Corporation (CATIC-ENG)
No-06, Cambridge Place,
Colombo 07.

NOVEMBER 2014

CONTENTS
Page
A.

INTRODUCTION

01

B.

SUBSURFACE CONDITION AT PIER P1 OF VD2

02

C.

ALLOWABLE AXIAL LOADS ON SINGLE PILES : AT PIER P1

03

C-1

Introduction

03

C-2

Allowable axial load on single pile

04

C-2-1 Allowable Geotechnical Capacity

04

C-3

C-2-1-1 Estimation of Pultimate in End Bearing (Pb)

04

C-2-1-2 Estimation of Skin Friction

06

Geotechnical Capacity

Appendix I - Summary
Appendix II - Calculation of SPT (Nw)
Appendix III - End bearing Calculation
Appendix Iv - Drawings

09

Reference

Calculation

Output

A. INTRODUCTION
This design report presents the calculations that determine the Geotechnical capacity of
the Pile at Pier P1 (CH. 8+950) of the Viaduct, VD2 of the Extention of Southern
Expressway Project - Section 1 from Matara to Beliatta (CATIC Section).
The subsurface condition assumed in this document is inferred from the SPT N values
indicated along Borehole B3-BH-108, as given in Borehole Investigations Report,
submitted by Geo Engineering Consultants (Pvt) Ltd. Analysis and design have been
carried out considering the load effects due to 2-Lane Concept.

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

Output

B. SUBSURFACE CONDITION AT PIER P1 OF VD2


The proposed site for Viaduct 2, at the location of foundations has been investigated
by the direct method of boring along with standard penetration test carried out at 1.5
m intervals starting from the existing ground level.
The inferred subsurface condition at Pier 01 of VD2 based on the borehole log
reports.

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

Output

C ALLOWABLE AXIAL LOADS ON SINGLE PILES : AT PIER P1


C-1. INTRODUCTION
Allowable load on single bored and cast-insitu piles is estimated through the
prediction of the ultimate load capacities using static approach along with structural
considerations.
In the static approach, as a reliable means of predicting the geotechnical capacity, the
ICTAD publication, GUIDLINES FOR INTERPRESENTATION OF SITE
INVESTIGATION DATA FOR ESTIMATING THE CARRYING CAPACITY OF SINGLE
PILES FOR DESIGN OF BORED AND CAST IN-SITU REINFORCED CONCRETE
PILES has been used.

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

C-2

Output

ALLOWABLE AXIAL LOAD ON SINGLE PILE

C-2.1 ALLOWABLE GEOTECHNICAL CAPACITY


References:
Ref 1 - Guidelines for interpretation of site investigation data for estimating the
carrying capacity of single piles for design of bored and cast in-situ reinforced
concrete piles
Ref 2 - Foundation Analysis and Design by J E Bowles
Ref 3 - Pile Design and Construction Practice by M J Tomlinson
Ref 4 - Specifications for bored and cast insitu reinforced concrete piles
For piles terminating on Rock
Ref 1

-ICTAD publication

-ICTAD publication

The allowable carrying capacity of a single pile, Pallowable is given by;

2.2

Pallowable

= qu Ab / Fb + fu As / Fs

Where,
qu = Ultimate end resistance per unit area of base
fu = Ultimate value of skin friction coefficien per unit pile shaft surface area
Ab = Area of the base of the pile shaft
As = Surface area of pile shaft
Fb = Safety factors with respect to end bearing
Fs = Safety factors with respect to skin friction
Analysis is carried out considering bore hole no. B3-BH-108.
Pile type
Diameter

: Circular
= 1800 mm

Ref 1
3.3

C-2.1.1

ESTIMATION OF Pultimate in End Bearing ( Pb )


Pb

= qu Ab

Where,
Ab = Area of pile base
qu = Ultimate unit end capacity
In this bore hole the bedrock is not found
Allowable Endbearing Capacity is calculated using Hansen's equation by
assuming pile is on gravel
Ref 1
16-8

c
Hence,

Ref 1
Table 4-1

=
=
=
=
=

0
0
1

(Cohesion of soil)

( L= 50
(17-9.81)x61
=

= 18.4

m)
143.8 kN

( Assume = 30o)

Ref 1
Table 4-5a
= 1.443

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

Output

= 1.018
Ref 1
Table 4-1

= 15.07

= 0.986

2
qu = 3983 kN/m

Pb = 10136

kN

Pallowable = 3379 kN

( Safety factor= 3 )

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

Output

C-2.1.2 ESTIMATION OF SKIN FRICTION


Design theory
The ultimate skin friction of a pile, Psu is given by;
Psu = Psu, Soil+ Psu, WR + Psu, rock
Where,
Psu, Soil
= Ultimate skin resistance capacity of soil/Highly weathered rock(H.W.R.)
Psu, WR
= Ultimate skin resistance capacity of Weathered rock
Psu, rock
= Ultimate skin resistance capacity of rock
Estimation of Psu
Psu = As (fu,soil)

+ Aw(fu,WR)

+ AR (fu,rock)

Where,
As = the gross surface area of pile shaft in soil(sq m)
Aw = the gross surface area of pile shaft in weathered rock(sq m)
AR = the net sectional area of socket (sq m)
fu,rock =

(No rock layer found)

2
fu,Soil = 1.3 x Ns < 100 kN/m
Ns = Navg*zi) / zi

Ref 1
4.2.2

Ns is the standard penetration test number, N, at Soil


2
fu,WR = 2.0 x NW < 200 kN/m
NW = Navg*zi) / zi

Nw is the standard penetration test number, N, at weathered rock

PILE DATA
Diameter of pile,
D
Length of pile,
L
Where,
L0 = Pile shaft length in Clay
Ls = Pile shaft length in soil
Lw = Pile shaft length in weathered rock
LR = Pile shaft length in rock
L

= 1.800 m
= L0
+ Ls
=
=
=
=
=

11.3
2.1
42.6
0.0
56.0

m
m
m
m
m

=>
=>
=>
=>

+
A0
AS
Aw
AR

LW + LR
=
=
=
=

63.9
11.9
240.9
0.0

m2
m2
m2
m2

CALCULATIONS
Ultimate skin resistance of rock socket, Psu,rock
2
fu,rock = 0.000 N/mm
PSU,Rock = AR (fu,rock)
= 0
kN
Ultimate skin resistance of weathered rock, Psu, WR
Nw = Navg*zi)/zi
= 2245
/ 42.6
= 53
fu,WR = 2 x NW
= 105.4 kN/m2

<200 kN/m2

Psu, weathered rock = Aw(fu,WR)


= 25389
kN

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation
Ultimate skin resistance of soil, Psu, soil
Ns =
=
=
fu,WR =
=

Output

Navg*zi)/zi
28
/
2.1
13
1.3 x NW
17.3 kN/m2

<100 kN/m2

PSU,Soil = As (fu,soil)
= 206
kN
Variation of SPT N values down the depth at at Pier P1

2m Gravel fill
Existing Ground Level taken
as ZERO depth

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

Output

at Pier P1 (B3 BH 108)


Z

Layer Depth
43.5

12.0

45

N
86

16

1.5

13.4

16

1.5

28

1.5

1.5

33
52.5

19

1.5
16.5

29
54.0

21

1.5
18.0

32
55.5

41.5

1.5
19.5

62
57.0

64

1.5
21.0

96

67

67

1.5
22.5

101

67
1.5

24.0

61.5

92

41.5

62

26.5

40

38

57

50

75

50

75

55

83

73

110

86

129

86

129

86

129

86

129

86

129

86

129

56
1.5

25.5

27
1.5

27.0

26
1.5

28.5

50
1.5

30.0

74

28.5

43

24.5

37

27

41

35

53

39

59

59.5

89

83

125

86

-215

2245

40
1.5

61

49

38
1.5

22

104

32
1.5

20

69

22
1.5

18

117

27

51.0

22

1.5
15.0

78

30

49.5

26

Navg*Z

68

48.0

21

0.1
13.5

22

Navg

70

46.5

16

1.4
13.4

79
1.5

58.5

87
-2.5

56.0

85

50
1.5

31.5

50
1.5

33.0

60
1.5

34.5

86
1.5

36.0

86
1.5

37.5

86
1.5

39.0

86
1.5

40.5

86
1.5

42.0

86
1.5

43.5

16

Completely Weathered Rock

Navg*Z

1.5
11.3
0.7

Soil

Navg

Completely Weathered Rock

Clay

Layer Depth
0

86

Ls
Lw
EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

=
=

2.1
42.6

Ns =
NW =

13.3
52.7

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation
C-3.

Output

GEOTECHNICAL CAPACITY

Factors of safety considered :


1
2.2

Case 1
Fb =
Fs =

3
2

Pallowable = Pb/ 3 + PS / 2
= Pb,allowable
+ PS / 2
25389 +
= 3379 +(
16176 kN
=

206 )/2

Case 2
Fb =
Fs =

2.5
2.5

Pallowable = ( Pb + PS )/ 2.5
= Pb,allowable
+ PS / 2.5
206 )/2 .5
25389 +
= 3379 +(
13617 kN
=

Therefore,
Pallowable

= 13617

kN

Applied Vertical Load


Load from Substructure (P1)
Weight of Pile (W)
Ref 3
4.8

= 7555 kN
= 3563 kN

Negative skin friction(PN)


Negative skin friction stress s neg

= 'vo

Clay layer thickness

Ref 3
Figure 4.39

11.3

= 0.3

Assume 1.0 m Gravel fill over existing ground


'vo = 0 + (20x1.0 + 18x11.3)
2
= 117.35
kN/m2
s neg = 35.21

kN/m2

PN = x 1.8 x 11.3 x s neg

Therefore,
Total Vertical Load (Papp)
Papp

Geotechnical Capacity

= 2250

kN

= 7555 +

3563 +

2250

kN

= 13367

>

Total Vertical Load

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

Hence ok

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

APPENDIX I

SUMMARY - GEOTECHNICAL CAPACITY OF PILE FOR VIADUCT 02


Skin Friction
Pier No. and
Pile
Referance Bore Hole Diameter
No.
(m)

S0il/H.W.R.
Ls (m)

NW

fu,S0il/H.W.R.
(kN/m2)

Weathered Rock
PSU,Soil/H.W.R.
(kN)

Ls
(m)

NW

fu,WR
(kN/m2)

End Bearing

Rock Layer 01
PSU,WR
(kN)

LR1 (m)

quc
(kN/m2)

RQD%

Applied Vertical Load

Negative Skin Friction

Rock Layer 02

fu,rock
(kN/m2)

PSU,Rock
(kN)

LR2
(m)

quc
(kN/m2)

RQD%

fu,rock
(kN/m2)

PSU,Rock
(kN)

Total Skin
Friction (kN)

qall
(kN/m2)

Pall,End
(kN)

Lo
(m)

'vo
(kN/m2)

PN
(kN)

P1
(kN)

W
(kN)

Papp
(kN)

Pall
(kN)

*Pile
Length
(m)

*Pile
Bottom
Elevation
(MSL)(m)

A1
P1(B3 BH 108)

1.8

8.2

20

25.9

1199 36.5

58

115.5

23844

25043

1.373 3493.9

11.3

117.4

2250

7350

3563

13162

13511

56.0

-55.7

P2(B3 BH 109)

1.8

9.8

20

25.8

1432 33.2

66

132.1

24808

26241

1.374 3496.4

10.0

105.0

1781

6885

3372

12038

13993

53.0

-52.8

P3(B3 BH 110)

1.8

7.2

9.3

377 39.1

44

87.0

19244

1.8

100.86

0.09

81 0.62 0.86

1.952

19865

19621

3.5 8906.4

3.0

38.5

196

7533

3251

10980

36620

51.1

-51.1

P4(B3 BH 111)

1.8

9.2

20

25.5

1327 40.7

34

69.0

15879

2.0

26.70

0.10

0 0.20 0.64

0.427

4832

17205

1.371 3488.8

4.3

50.9

371

6826

3575

10772

15202

56.2

-56.2

P5(B3 BH 112)

1.8

5.6

25

32.1

1016 27.4

57

113.6

17606

2.0

28.13

0.09

0 0.20 0.64

0.405

4581

18622

1.377

3504

10.0

105.0

1781

7425

2863

12069

15534

45.0

-44.9

P6(B3 BH 113)

1.8

35.8

44

88.2

17847

2.0

28.13

0.10

53 0.24 0.67

0.471

5329

17847

1.375 3498.9

13.3

136.4

3076

7062

3251

13389

15967

51.1

-51.1

P7(B3 BH 114)

1.8

22.6

43

85.6

10946

2.0

88.02

0.09

56 0.27 0.69

1.367

15455

10946

3.5 8906.4

13.7

140.2

3257

7682

2437

13376

28740

38.3

-38.2

P8(B3 BH 115)

1.8

21.5

50

100.0

12158

4.5

0.00

0.200

5089

12158

3504

13.2

135.4

3032

6766

2990

12788

13457

47.0

-46.8

P9(B3 BH 116)

1.8

0.5

2.0

9.8

52.50

0.04

0 0.20 0.65

0.341

18911

0.765 1946.7

10.2

106.9

1850

7368

1304

10522

20860

20.5

-20.2

P10(B3 BH 117)

1.8

39.3

42

83.1

18458

8.0

14.98

0.13

47 0.20 0.65

0.316

14316

18458

3.5 8906.4

10.4

108.8

1920

6814

3785

12519

36216

59.5

-59.4

P11(B3 BH 118)

1.8

1.9

26

52.8

568

8.0

0.200

9048

568

0.739 1880.5

8.1

87.0

1195

7561

1145

9901

11155

18.0

-18.4

P12(B3 BH 119)

1.8

1.2

50

100.0

679

4.5

51.84

0.09

9 0.20 0.65

0.758

19293

679

0.465 1183.3

25.0

124.9

5296

7160

1953

14409

20748

30.7

-30.6

P13(B3 BH 120)

1.8

2.4

50

100.0

1357

9.8

50.00

0.09

16 0.20 0.64

0.720

39901

1357

0.888 2259.7

15.0

152.5

3881

7671

1730

13282

42703

27.2

-27.1

P14(B3 BH 121)

1.8

25.9

30

60.1

8802

3.0

70.30

0.09

31 0.20 0.64

1.012

17174

1.8

70.3

0.09

64 0.37 0.75

1.186

12075

8802

3.5 8906.4

5.1

58.5

506

7031

2277

9814

41676

35.8

-35.5

P15(B3 BH 122)

1.8

9.0

41

82.3

4190

7.4

0.200

8369

2.5

22.01

0.11

70 0.44 0.79

0.478

6760

4190

1.2 3053.6

22.5

113.4

4328

7154

2634

14116

19859

41.4

-41.2

P16(B3 BH 123)

1.8

15.5

27

53.7

4711

2.0

12.84

0.13

70 0.44 0.79

0.330

3728

4711

3.5 8906.4

7.5

81.3

1034

7083

1590

9707

14519

25.0

-24.8

P17(B3 BH 124)

1.8

19.0

53

106.2

11406

2.0

50.21

0.09

32 0.20 0.64

0.723

8177

11406

1 2544.7

13.5

138.3

3166

7451

2195

12812

15284

34.5

-34.3

P18(B3 BH 125)

1.8

20.9

65

129.1

15259

1.0

53.71

0.09

78 0.56 0.84

1.015

5740

1.0

64.99

0.09

78 0.56 0.84

1.228

6946

15259

3.5 8906.4

7.1

77.5

933

7236

1909

10077

27696

30.0

-29.8

P19(B3 BH 126)

1.8

1.8

50

100.0

1018

2.0

11.48

0.14

77 0.54 0.83

0.333

3772

1.8

74.67

0.09

77 0.54 0.83

1.394

14194

1018

3.5 8906.4

22.5

113.4

4328

7655

1788

13771

27279

28.1

-27.9

P20(B3 BH 127)

1.8

7.2

39

77.1

3137

3.0

63.31

0.09

0 0.20 0.64

0.912

15466

1.8

63.31

0.09

58 0.30 0.71

1.011

10295

3137

3.5 8906.4

7.1

77.5

933

7121

1215

9269

35922

19.1

-18.9

P21(B3 BH 128)

1.8

12.9

45

89.9

6557

3.0

15.93

0.12

20 0.20 0.64

0.306

5189

1.8

22.01

0.11

48 0.20 0.64

0.387376

3943

6557

3.5 8906.4

13.5

138.3

3166

7226

1985

12377

20661

31.2

-31.1

P22(B3 BH 129)

1.8

35.3

50

100.3

20030

2.5

0.200

2827

20030

1.375 3498.9

10.5

109.8

1955

7012

3073

12040

14338

48.3

-48.1

P23(B3 BH 130)

1.8

8.1

20

39.9

1827

21.0

0.200

23750

1827

1.38 3511.7

13.5

138.3

3166

7535

2710

13411

13743

42.6

-42.6

P24(B3 BH 131)

1.8

51.8

34

68.3

19992

19992

1.371 3488.8

3.8

45.6

290

7326

3531

11147

11486

55.5

-55.5

P25(B3 BH 132)

1.8

44.7

35

70.2

17745

5.9

42.96

0.09

<50 0.20 0.64

0.619

20640

17745

3.5 8906.4

0.0

10.0

7596

3334

10930

45105

52.4

-52.1

P26(B3 BH 133)

1.8

15.6

61

121.7

10733

1.8

44.87

0.09

99 0.98 0.99

0.999

10173

10733

3.5 8906.4

7.4

80.3

1008

7216

1578

9802

23373

24.8

-24.6

P27(B3 BH 134)

1.8

2266 21.1

54

108.3

12924

6.4

0.200

7238

15190

1.375 3498.9

9.0

95.5

1458

7639

2990

12087

12470

47.0

-47.0

P28(B3 BH 135)

1.8

18.9

43

86.8

9280

1.8

2.034

20702

9280

3.5 8906.4

7.4

80.3

1008

7219

1788

10015

33321

28.1

-27.9

P29(B3 BH 136)

1.8

42.5

46

92.2

22150

2.0

0.200

2262

22150

1.373 3493.9

9.0

95.5

1458

7525

3404

12387

14616

53.5

-53.0

P30(B3 BH 137)

1.8

39.0

65

130.2

28713

8.0

0.338

15287

28713

1.372 3491.3

6.0

67.0

682

7264

3372

11318

30263

53.0

-52.6

P31(B3 BH 138)

1.8

0.0

0 44.0

67

133.9

33310

33310

1.373 3493.9

6.0

67.0

682

7615

3181

11478

16818

50.0

-49.5

P32(B3 BH 139)

1.8

9.8

165 32.1

44

87.9

15964

16129

1.376 3501.5

6.0

67.0

682

7073

2742

10497

12215

43.1

-42.5

P33(B3 BH 140)

1.8

0.0

0 45.5

38

75.1

19331

19331

1.373 3493.9

4.5

52.8

403

7054

3181

10638

11226

50.0

-49.4

P34(B3 BH 141)

1.8

3.9

33 45.5

46

91.1

23439

23473

1.372 3491.3

3.0

38.5

196

7042

3181

10419

12880

50.0

-49.3

P35(B3 BH 142)

1.8

0.0

0 47.0

44

88.3

23473

23473

1.372 3491.3

3.0

38.5

196

7385

3181

10762

12881

50.0

-49.2

P36(B3 BH 143)

1.8

12.0

204 33.4

65

130.4

24634

2.0

18.75

0.11

0 0.20 0.64

0.330

3732

24838

1.375 3498.9

3.0

38.5

196

7224

2634

10054

17166

41.4

-40.6

P37(B3 BH 144)

1.8

0.0

0 33.4

57

113.1

21353

6.0

13.95

0.13

0 0.20 0.64

0.290

9845

21353

3.5 8906.4

3.0

38.5

196

7591

2812

10599

32267

44.2

-43.8

P38(B3 BH 145)

1.2

0.0

0 39.7

43

85.2

12752

1.8

30.78

0.10

100 1.00 1.00

0.770

5222

12752

3.5 3958.4

3.0

38.5

131

7031

1258

8420

14281

44.5

-44.2

P39(B3 BH 146)

1.8

22.7

2197 20.4

40

79.9

9215

3.0

80.60

0.09

9 0.20 0.64

1.161

19690

11412

3.5 8906.4

3.6

44.2

270

7672

2920

10862

45344

45.9

-45.6

7.8

10.5

3.0

1.5

3.0

17.1

19

29

17

38.2

105.11

17.60

0.09

0.12

81 0.62 0.86

<50 0.20 0.64

2.0

0.200

1.8

1.8

33.92

42.96

0.1

0.09

20 0.20 0.65

81 0.62 0.86

0.551

0.831

5611

8461

2262

1.8

1.8

27.15

80.6

0.1

0.09

60 0.32 0.72

52 0.22 0.66

0.489

1.197

4974

12183

1.377

SUMMARY - GEOTECHNICAL CAPACITY OF PILE FOR VIADUCT 02


Skin Friction
Pier No. and
Pile
Referance Bore Hole Diameter
No.
(m)

S0il/H.W.R.
Ls (m)

NW

fu,S0il/H.W.R.
(kN/m2)

Weathered Rock
PSU,Soil/H.W.R.
(kN)

Ls
(m)

NW

fu,WR
(kN/m2)

End Bearing

Rock Layer 01
PSU,WR
(kN)

LR1 (m)

quc
(kN/m2)

P40(B3 BH 147)

1.8

0.0

0 15.0

46

91.9

7792

12.0

P41(B3 BH 148)

1.8

0.0

9.2

33

66.6

3465

1.8

52.83

0.09

P42(B3 BH 149)

1.8

3.9

40

52.5

1157

2.6

15

30.0

441

6.0

57.00

P43(B3 BH 150)

1.8

2.3

16

21.4

471

4.7

29

58.8

1564

4.0

26.81

P44(B3 BH 151)

1.8

0.0

2.7

52

103.5

1580

6.0

P45(B3 BH 152)

1.8

0.0

2.1

67

134.0

1591

3.0

49.34

0.09

P46(B3 BH 153)

1.8

2.6

44

57.1

839

2.7

88

176.8

2700

3.0

48.36

P47(B3 BH 154)

1.8

2.5

10

12.6

178

9.1

14.2

732

3.0

44.10

P48(B3 BH 155)

1.8

0.4

25

50.0

113

20.0

A2(B3 BH 156)

* Lengths and Elevations are taken from relevant bore hole log, it may be changed according to actual site condition.

RQD%

Negative Skin Friction

Applied Vertical Load

Rock Layer 02

fu,rock
(kN/m2)

PSU,Rock
(kN)

LR2
(m)

quc
(kN/m2)

RQD%

fu,rock
(kN/m2)

PSU,Rock
(kN)

Total Skin
Friction (kN)

qall
(kN/m2)

Pall,End
(kN)

Lo
(m)

'vo
(kN/m2)

PN
(kN)

P1
(kN)

W
(kN)

Papp
(kN)

Pall
(kN)

*Pile
Length
(m)

*Pile
Bottom
Elevation
(MSL)(m)

0.200

13572

7792

1.382 3516.8

11.1

115.5

2174

7047

2424

11645

12062

38.1

-37.7

56 0.27 0.69

0.820

8348

3465

3.5 8906.4

11.8

122.1

2444

7575

1450

11470

18641

22.8

-22.8

0.09

0 0.20 0.64

0.821

27849

1.8

57.00

0.09

72 0.46 0.80

1.026

10443

1599

3.5 8906.4

8.2

87.9

1223

7132

1431

9786

47838

22.5

-22.5

0.10

26 0.20 0.64

0.429

9703

1.8

26.81

0.1

91 0.82 0.95

0.637

6481

2035

3.5 8906.4

7.7

83.2

1086

7617

1304

10007

25904

20.5

-20.5

0.200

6786

1.8

31.36

0.1

100 1.00 1.00

0.784

7980

1580

3.5 8906.4

8.9

94.6

1428

7023

1234

9685

24304

19.4

-19.5

21 0.20 0.64

0.710

12053

1.8

49.34

0.09

55 0.26 0.69

0.766

7797

1591

3.5 8906.4

10.5

109.8

1955

7137

1107

10199

29393

17.4

-17.4

0.09

20 0.20 0.64

0.696

11814

1.8

48.36

0.09

61 0.33 0.73

0.794

8085

3538

3.5 8906.4

9.0

95.5

1458

6980

1215

9653

30221

19.1

-18.6

0.09

30 0.20 0.64

0.635

10773

1.8

44.1

0.09

54 0.25 0.68

0.675

6868

911

3.5 8906.4

7.5

81.3

1034

7406

1520

9960

26912

23.9

-23.8

0.200

22619

113

1.389 3534.6

17.2

89.0

2598

6922

2392

11912

12628

37.6

-37.1

APPENDIX II

Reference

Calculation

Output

at Pier P1 (B3 BH 108)

Clay

Layer Depth
0

Navg*Z

Layer Depth
43.5

N
86

1.5
11.3

45

0.7
12.0

6
46.5

21

1.5

32
48.0

22

1.5
15.0

33
49.5

19

1.5
16.5

29
51.0

21

1.5
18.0

32
52.5

22

1.5
19.5

33
54.0

163

2.0

101

67
1.5

24.0

61.5

92

41.5

62

26.5

40

38

57

50

75

50

75

55

83

73

110

86

129

86

129

86

129

86

129

86

129

86

129

56
1.5

25.5

27
1.5

27.0

26
1.5

28.5

50
1.5

30.0

28.5

43

24.5

37

27

41

35

53

39

78

59.5

89

83

125

86

86

79
1.5

59.0

Completely Weathered Rock

67

1.5

Completely Weathered Rock

96

67

22.5

87
1.0

60.0

85

50
1.5

31.5

50
1.5

33.0

60
1.5

34.5

86
1.5

36.0

86
1.5

37.5

86
1.5

39.0

86
1.5

40.5

86
1.5

42.0

86
1.5

43.5

57.5

64

1.5
21.0

74

40
1.5

61

49

38

56.0
19.5

104

32
1.5

22

69

22
1.5

22

117

27
1.5

20

78

30
1.5

18

Navg*Z

68
1.5

26

Navg

70
1.5

16

13.5
Soil

Navg

86

Ls
Lw

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

=
=

8.2
36.5

Ns =
NW =

2108
19.9
57.8

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

15

0
0.5

10.5

26.5

40
6.0
32

19

18

1.5
15.0

7.5

27
9.0

19.5

1.5
16.5

29

19.5

1.5
18.0

17

1.8
19.8

17

19.8

17

49

0.3

195

1.5

59

86.5

130

1.5

92

138
16.5

90

1.5

135
18.0

88

1.5
27.0

132
19.5

88

1.5
28.5

132

88

70

1.5
30.0

105

52

41.5

1.5
31.5

62

31

32.5

1.5
33.0

49

34

40

1.5
34.5

60

46

58

1.5
36.0

87

1.5
1.5
22.5

65

1.5
1.5
1.5
27.0
1.5
1.5

1.5
1.5
1.5

20

18

27

31

47

43.5

65

37.5

56

31.5

47

31.5

47

30.5

46

28.5

43

27.5

41

56

84

84

126

61

92

38.5

58

44.5

67

50

590

1702

50
11.8

49.3

50

2194

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

13.5

39

37.5

=
=

14

38

36.0

Ls
Ls

9.5

84

34.5

19.9
66.1

14

84
1.5

Ns =
NW =

9.5

28

33.0

9.8
33.2

17

27

1.5

=
=

11

30

31.5

Ls
Lw

31

30.0

15.5

32

25.5

1105

51

31

24.0

60

44

28.5

17.0
53.0

23

43

21.0

70

19

19
1.5

88

29

17
1.5

88

19

10
1.5

92

32

15.0

1.5

21

10
1.5

92

34

12

13.5

1.5

25.5

19

31

81

24.0

10.2

12.0

1.2

22.5

19

10.5

21.0

10.2
29

17

22.5

19
1.2

22

29

19
1.5

17

19

23
1.5

Soil

21

1.5
13.5

Navg*Z

22
1.5

23

Navg

16
1.5

4.5

1.5

Completely Weathered Rock

30

12.0

Soil

Navg*Z

Clay

10

Navg

Output

at Pier P3 (B3 BH 110)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P2 (B3 BH 109)


Layer Depth Z
N
0

7.2
39.1

Ns =
NW =

7.13
43.5

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

0
0.2

4.5

12.5

19
12.0
44

45

31

1.5
9.0

13.5

47
15.0

16.5

1.5
10.5

25

16.5

1.5
12.0

14

1.5
13.5

11

13.5

11

8.5

0.9

180

1.5

13

27

41

1.5

56

84
25.5

58

1.5

87
27.0

57

1.5
21.0

86

62

62

1.5
22.5

93

62

62

1.5
24.0

93

62

55

1.5
25.5

83

48

49.5

1.5
27.0

74

51

67

1.5
28.5

101

83
1.5

30.0

83

125

65

98

49.5

74

52

156

66

99

66.5

100

57

42

25

138

30.5

27

39.5

59

70

105

80

120

63.5

286

50

75

59

89

72.5

109

80

120

79

119

78

117

39

332

1557

80
1.5

52

38

80
4.5

64

37

60

21.0

1.5

24.5

19
1.5

48

17

17

19.5

1.5

19.5

42

21

18.0

15.6

18.0

1.5

16.5

42

16.5

15.0

15.6
25

17

11.5

42
0.6

16

34
1.5

17

15
1.5

Soil

29

1.5
7.5

Navg*Z

8
1.5

13

Navg

0
0.5

10.5

1.5

Completely Weathered Rock

10

12

6.0

Soil

Navg*Z

Clay

4.3

Navg

Output

at Pier P5 (B3 BH 112)


Layer Depth Z
N
0

47
1.5

28.5

Completely Weathered Rock

Clay

at Pier P4 (B3 BH 111)


Layer Depth Z
N
0

53
1.5

30.0

65
1.5

31.5

80
1.5

33.0

80
1.5

34.5

78
8.5

43.0

78

83
1.5

31.5

47
1.5

33.0

52
3.0

36.0

52
1.5

37.5

80
1.5

39.0

53
15.2

54.2

53

Ls
Ls

=
=

9.2
40.7

Ns =
NW =

1404

19.6
34.5

Ls
Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

=
=

5.6
27.4

Ns =
NW =

24.7
56.8

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

10

10
0.2

13.5

10.5

1.5

11.5

17
18.0

11.5

1.5
18.0

17
19.5

30.5

1.5
19.5

46
21.0

50

1.5
21.0

75
22.5

50

1.5
22.5

75
24.0

50

1.5
24.0

75
25.5

50

1.5
25.5

75
27.0

50

1.5
27.0

75
28.5

50

1.5
28.5

75

50

50

1.5
30.0

75

50

50

1.5
31.5

75

50

50

1.5
33.0

75

50

50

1.5
34.5

75

50

50

1.5
36.0

1.5
1.5

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

55

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

15

968

50
1.5

33.0

50
1.5

34.5

50
1.5

36.0

50
0.3

36.3

1.5
37.5

65

50

31.5

75

43

50

30.0

50

50

50
1.5

50

33

50
1.5

50

41

50
1.5

50

27

50
1.5

50

31

50
1.5

50

20.5

36
1.5

50

18

30
1.5

11

13.5

24
1.5

12

Navg*Z

17

16.5

1.5
16.5

50

50
1.5

39.0

50
1.5

40.5

50
1.5

42.0

50
1.5

43.5

50
1.5

45.0

50
1.5

46.5

50
1.5

48.0

50
1.1

49.1

50

16

11

Navg

10
1.3

15.0

1.5

Ls

13.7

10

15.0

Completely Weathered Rock

Navg*Z

Clay

13.3

Navg

Output

at Pier P7 (B3 BH 114)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P6 (B3 BH 113)


Layer Depth Z
N
0

35.8

NW =

1578

44.1

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

22.6

NW =

42.8

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

13.5

10.2

19

29

23

35

14.5

22

11

17

31

47

151

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

100

1075

Navg

Navg*Z

1
0.5

10.7

1.5

27
1.5

16.5

19
1.5

18.0

10
1.5

19.5

12
1.5

21.0

50

21.0

50
1.5

22.5

50
1.5

24.0

50
1.5

25.5
Completely Weathered Rock

11

15.0

50
1.5

27.0

50
1.5

28.5

50
1.5

30.0

50
1.5

31.5

50
1.5

33.0

50
1.5

34.5

50
1.5

36.0

50
1.5

37.5

50
1.5

39.0

50
1.5

40.5

50
2.0

42.5

=
=

11.5

12
0.3

Ls
Ls

Navg*Z

Clay

13.2

Navg

Output

at Pier P9 (B3 BH 116)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P8 (B3 BH 115)


Layer Depth Z
N
0

50

7.8
21.5

Ns =
NW =

19.4
50

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

0.5

NW =

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

10.5

8.1

43

65
10.0

1.5
13.5

31.5

47

14.5

22

18.5

28

26.5

40

41

62

40.5

61

38.5

58

48

72

31

47

14

21

33

50

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

235

1632

Navg*Z

18

16

34

34

50

34
1.0

50

Navg

2
0.9

9.0

1.5

34

13
1.5

15.0

16
1.5

16.5

21
1.5

18.0

32
1.5

19.5

50
1.5

21.0

31
1.5

22.5

46
1.5

24.0
Completely Weathered Rock

36

12.0

50
1.5

25.5

12
1.5

27.0

16
1.5

28.5

50
1.5

30.0

50
1.5

31.5

50
1.5

33.0

50
1.5

34.5

50
1.5

36.0

50
1.5

37.5

50
1.5

39.0

50
1.5

40.5

50
1.5

42.0

50
1.5

43.5

50
1.5

45.0

50
4.7

49.7

20.5

5
0.1

Ls

Navg*Z

Clay

10.4

Navg

Output

at Pier P11 (B3 BH 118)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P10 (B3 BH 117)


Layer Depth Z
N
0

50

39.3

NW =

41.5

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

1.9

NW =

26.4

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

25

Navg

Navg*Z

50

60

50
1.2

26.2

Output

at Pier P13 (B3 BH 120)


Layer Depth Z
N
0
Clay

Clay

at Pier P12 (B3 BH 119)


Layer Depth Z
N
0

15
16.5

50

75

50

45

120

50
0.9
50

Completely Weathered Rock

17.4

Completely Weathered Rock

Navg*Z

50
1.5

50

Navg

Ls

1.2

NW =

60

50

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

2.4

NW =

50

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

6.0

22.5

22

33
25.5

21

1.5
9.0

32
27.0

21

1.5
10.5

32
28.5

33.5

1.5
12.0

50
30.0

28.5

1.5
13.5

43
31.5

1.5
15.0

14.5

22

16.5

25

34.5

52

36.5

55

28.5

43

24

36

15.5

23

33.5

50

50

75

50

75

50

75

50

50

778

46

41.5

62

50

75

50

75

50

75

371

50
1.5

15

30.5

50
1.5

42

38

50
1.5

25

25

33
1.5

17

Navg*Z

28
1.5

25

Navg

22
1.5

24.0

1.5

50

14
1.5

16.5

19
1.5

18.0

50
1.5

19.5
Completely Weathered Rock

19

7.5

23
1.5

21.0

34
1.5

22.5

14
1.5

24.0

17
1.5

25.5

50
1.5

27.0

50
1.5

28.5

50
1.5

30.0

50
1.0

31.0

10

1
0.9

Ls

Navg*Z

Clay

5.1

Navg

Output

at Pier P15 (B3 BH 122)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P14 (B3 BH 121)


Layer Depth Z
N
0

50

25.9

NW =

30

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

9.0

NW =

41.2

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

7.5

Navg

Navg*Z

17

26

12
1.5

9.0

Output

at Pier P17 (B3 BH 124)


Layer Depth Z
N
0
Clay

Clay

at Pier P16 (B3 BH 123)


Layer Depth Z
N
0

13.5
15.0

17.5

1.5
10.5

26
16.5

13

1.5
12.0

20
18.0

16

1.5
13.5

24
19.5

20

1.5
15.0

30
21.0

20

1.5
16.5

30
22.5

21

1.5
18.0

32
24.0

36.5

1.5
19.5

55
25.5

50

1.5
21.0

75
27.0

50

2.0

100
28.5

Ls

15.5

NW =

30.0

35.5

53

55.5

83

65

98

65

98

65

98

65

98

65

98

65

65

65
1.5

31.5

65
1.0

32.5

65

417

26.9

35

65
1.5

Completely Weathered Rock

23.5

65
1.5

50

Completely Weathered Rock

23.0

65

65
1.5

50

43.5

65
1.5

50

90

46
1.5

23

60

25
1.5

19

81

22
1.5

21

54

65
1.5

19

48

55
1.5

13

32
53

1.5

13

Navg*Z

11
1.5

22

Navg

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

19.0

NW =

1009

53.1

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

Reference

Calculation

25.5

10

1
0.4

7.5

50

75

50

75

50

75

50

75

50

75

61

92

78

117

71.5

107

59.5

89

68.5

103

82.5

124

85

128

82

123

82

82

Navg*Z

50

90

90

50

50
1.5

10.5

50
1.5

12.0

50
1.5

13.5

50
1.5

15.0

50
1.5

16.5

72
1.5

18.0

84
1.5

19.5

59
1.5

21.0

60
1.5

22.5

77
1.5

24.0

88
1.5

25.5

82
1.5

27.0

82
1.0

28.0

82

Navg

50
1.8

24.3

1.5

Ls

22.5

50

9.0

Completely Weathered Rock

Navg*Z

Clay

7.1

Navg

Output

at Pier P19 (B3 BH 126)


Layer Depth Z
N
0

20.9

NW =

Completely Weathered Rock

Clay

at Pier P18 (B3 BH 125)


Layer Depth Z
N
0

1349

64.6

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

1.8

NW =

50

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

10

Reference

Calculation

7.1

Navg

Navg*Z

8.5

1
0.4

7.5

Output

at Pier P21 (B3 BH 128)


Layer Depth Z
N
0
Clay

Clay

at Pier P20 (B3 BH 127)


Layer Depth Z
N
0

13.5
15.0

19.5

1.5
9.0

29
16.5

36.5

1.5
10.5

55
18.0

50

1.5
12.0

75
19.5

50

1.5
13.5

75
21.0

50

0.8
14.3

40
22.5

70

50

75

50

75

50

75

50

75

50

75

50

45

580

50
1.5

24.0

50
1.5

25.5

50
0.9
50

Completely Weathered Rock

26.4

Completely Weathered Rock

46.5

50
1.5

50

57

50
1.5

50

38

50
1.5

50

33

43
1.5

50

22
33

1.5

23

Navg*Z

11
1.5

16

Navg

Ls

7.2

NW =

277

38.5

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

12.9

NW =

44.9

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

11

Reference

Calculation

29

44

8
1.5

12.0

51.5

1.5

58.5

88
18.0

74

1.5
16.5

111
19.5

84

1.5
18.0

126
21.6

1.5
19.5

84

126

84

126

81

122

72.5

109

40.5

61

17

26

25.5

38

35

53

38.5

58

41.5

62

52

78

59

89

44

66

30

45

31

47

31

47

40.5

61

50

75

50

40

21

32

22.5

34

22.5

34

23

48

162

23
2.1

84

14

22
1.5

84

9.5

23
1.5

64

Navg*Z

19

16.5

1.5
15.0

23

84
1.5

21.0

84
1.5

22.5

78
1.5

24.0

67
1.5

25.5

14
1.5

27.0

20
1.5

28.5

31
1.5

30.0

39
1.5

31.5

38
1.5

33.0

45
1.5

34.5

59
1.5

36.0

59
1.5

37.5

29
1.5

39.0

31
1.5

40.5

31
1.5

42.0

31
1.5

43.5

50
1.5

45.0

50
0.8

45.8

50

77

53

Navg

0
1.5

15.0

1.5

Ls

13.5

50

13.5

Completely Weathered Rock

Navg*Z

Clay

10.5

Navg

Output

at Pier P23 (B3 BH 130)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P22 (B3 BH 129)


Layer Depth Z
N
0

35.3

NW =

1771

50.2

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

8.1

NW =

19.9

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

12

Reference

Calculation
Navg

Output

Layer Depth
40.5

N
50

1.5
3.75

15

42.0

17.5

0.8
4.5

22

33

1.5

21

32
46.5

10.5

1.5
9.0

16
48.0

3.5

1.5
10.5

5
49.5

35.5

1.5
12.0

53
51.0

65.5

1.5
13.5

98
52.5

56.5

1.5
15.0

85
54.0

48.5

1.5
16.5

73
55.5

49

1.5
18.0

74

50

50

1.5
19.5

75

50

50

1.5
21.0

75

50
1.5

22.5

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50
1.5

24.0

50
1.5

25.5

63

48

72

47.5

71

49

74

48.5

73

48.5

73

40.5

61

33

50

42.5

64

50

75

656

31
1.5

57.0

35
1.5

58.5

50
1.5

60.0

42

50
1.5

48

63

47
1.5

49

42

50
1.5

64

53

48
1.5

67

35.5

47
1.5

54

49
1.5

36

35
1.5

18

Navg*Z

49

45.0

1.5
7.5

50

50
1.5

27.0

50
1.5

28.5

50
1.5

30.0

50
1.5

31.5

50
1.5

33.0

50
1.5

34.5

50
1.5

36.0

50
1.5

37.5

50
1.5

39.0

50
1.5

40.5

50

1.5

24

Navg

22

43.5

1.5

Ls

13

20

6.0

Completely Weathered Rock

Navg*Z

Completely Weathered Rock

Clay

at Pier P24 (B3 BH 131)


Layer Depth Z
N
0

51.8

NW =

1606

34.2

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

13

Reference

Calculation

1.5

7.4

12.5

19
9.0

16.5

1.5
4.5

25
10.5

10

1.5
6.0

15
12.0

6.5

1.5
7.5

10
13.5

12

1.5
9.0

18
15.0

19.5

1.5
10.5

29
16.5

31

1.5
12.0

47
18.0

40.5

1.5
13.5

61
19.5

47

1.5
15.0

71
21.0

50

1.5
16.5

75

50

50

1.5
18.0

75

50
3.0

21.0

50

150

50

75

50

75

50

75

50

75

50

75

47.5

71

26

39

6.5

10

13

20

24

36

39

59

50

360

1569

50
1.5

22.5

50
1.5

24.0

50
1.5

25.5

45

52

78

71

107

80

120

86

129

86

129

86

129

86

129

86

43

949

86
1.5

50

30

86
1.5

44

25

86
1.5

37

16.5

74
1.5

25

15

68
1.5

14

10

36
1.5

10

24
1.5

7.5

9
1.5

17

Navg*Z

11
1.5

16

Navg

4
0.1

7.5

1.5

Completely Weathered Rock

3.0

86
1.5

22.5

86
0.5

23.0

86

50
1.5

27.0

50
1.5

28.5

50
1.5

30.0

45
1.5

31.5

7
1.5

33.0

6
1.5

34.5

20
1.5

36.0

28
1.5

37.5

50
7.2

44.7

4.5

0
1.5

Ls

Navg*Z

Clay

Navg

Output

at Pier P26 (B3 BH 133)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P25 (B3 BH 132)


Layer Depth Z
N
0

50

44.7

NW =

35.1

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

15.6

NW =

60.8

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

14

Reference

Calculation

Navg

Navg*Z

25.5

38

26
1.5

10.5

Output

at Pier P28 (B3 BH 135)


Layer Depth Z
N
0
Clay

Clay

at Pier P27 (B3 BH 134)


Layer Depth Z
N
0

7.4
7.5

25

1.5
12.0

38
9.0

24.5

1.5
13.5

37
10.5

25.5

1.5
15.0

38
12.0

30

1.5
16.5

45
13.5

36

1.5
18.0

54
15.0

39

1.5
19.5

59
16.5

1.5
1.5
1.5

48.5

1.5
22.5

73

37

35

1.5
24.0

53

33
1.5

25.5

35

53

39

59

50.5

76

60

90

60

90

67.5

101

75

113

78

117

64

96

44.5

67

42

67

37
1.5

27.0

39

59

43.5

65

57.5

86

58

87

57

86

22.5

58

87

49.5

74

50

75

50

40

821

49
1.5

24.0

50
1.5

25.5

50
0.8

26.3

50

41
1.5

28.5

60
1.5

30.0

60
1.5

31.5

60
1.5

33.0

75
1.5

34.5

75
1.5

36.0

81
1.5

37.5

47
1.5

39.0

42
1.6

40.6

42

=
=

90

60

50

67
1.5

Completely Weathered Rock

Completely Weathered Rock

60

1.5
21.0

Ls
Lw

308

33

47

21.0

42

69

19.5

60

28

46

18.0

19.5

40

41
1.5

39

26.5

37
1.5

39

29

29
1.5

33

19.5

27
1.5

27

26
1.5

24

12.5
13

1.5

25

Navg*Z

12
0.1

25

Navg

10.5
21.1

NW =
NW =

1143

29.4
54.2

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

18.9

NW =

43.4

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

15

Reference

Calculation

11

17

10
1.5

10.5

6
7.5

15.5

1.5

23
9.0

23.5

1.5
13.5

35
10.5

39

1.5
15.0

59
12.0

50

1.5
16.5

75
13.5

50

1.5
18.0

75
15.0

50

1.5
19.5

75
16.5

50

1.5
21.0

75
18.0

50

1.5
22.5

75
19.5

50

1.5
24.0

75
21.0

50

1.5
25.5

75

50

50

1.5
27.0

75

50

50

1.5
28.5

75

50

50

1.5
30.0

75

50

50

1.5
31.5

75

50

50

1.5
33.0

1.5
1.5
1.5
25.5

50

1.5
1.5
1.5

50

75

1.5

50

75
34.5

50

1.5
39.0

75
36.0

50

1.5
40.5

75
37.5

50

1.5
42.0

75
39.0

50

9.5
51.5

475
40.5

1.5
3.0

42.5

NW =

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

116

77

116

77

116

77

116

77

116

77

116

77

116

77

116

77

116

77

116

77

116

77

116

77

116

77

231

2539

77

1959

46.1

77

77

45.0

Ls

95

77

42.0

63.5

77
1.5

50

67

77
1.5

50

44.5

77
1.5

50

72

77
1.5

50

48

77
1.5

50

75

77

33.0

1.5
37.5

50

77
1.5

50

92

77

31.5

1.5
36.0

61.5

77

28.5

75

98

77

27.0

50

65

77

30.0

1.5
34.5

69

77

24.0

75

46

50

22.5

50

68

39
1.5

50

45

57
1.5

50

95

43
1.5

50

63

80
1.5

50

65

50
1.5

50

43

42
1.5

50

12

48
1.5

50

78
1.5

28

Navg*Z

8
1.5

19

Navg

8
1.5

12

12.0

Completely Weathered Rock

Navg*Z

Clay

Navg

Output

at Pier P30 (B3 BH 137)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P29 (B3 BH 136)


Layer Depth Z
N
0

39.0

NW =

65.1

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

16

Reference

Calculation

26

Clay

17.5

11
1.5

7.5

24

25

1.5
9.0

38

49

1.5

7.5

72

1.5

72
72

1.5

72

108

1.5

108
108

1.5

99
16.5

60

90
18.0

66

1.5
21.0

99
19.5

72

1.5
22.5

108
21.0

72

1.5
24.0

108

72

72

1.5
25.5

108

72

72

1.5
27.0

108

72

72

1.5
28.5

108

72

72

1.5
30.0

108

72

72

1.5
31.5

108

1.5
1.5
24.0

72

1.5
1.5
1.5
28.5

72

1.5

72

1116
34.5

1.5
1.5
1.5
1.5
0.6

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

30

50

2945

66.9

50

50

41.1

NW =

75

50

40.5

44.0

50

50

39.0

75

50

37.5

Ls

50

50

36.0

68

50
1.5

72

45

50

33.0

15.5
50.0

53

50
1.5

108

35.5

50
1.5

72

47

50

31.5

1.5
34.5

31.5

50

27.0

108

50

50

25.5

72

33

50

30.0

1.5
33.0

30

50

22.5

72

20

50
1.5

72

50
1.5

72

40
1.5

60

Ls
Lw

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

=
=

23

31
1.5

60
1.5

11

32

15.0

66

34
1.5

72
1.5

12

13.5

1.5

19.5

108

72

18.0

9.0

12.0

1.5

72

16.5

10.5

1.5

15.0

9.0
74

72

13.5

Navg*Z

8
1.5

72

12.0

Navg

8
1.5

26

10.5

Completely Weathered Rock

Navg*Z

Soil

Navg

Output

at Pier P32 (B3 BH 139)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P31 (B3 BH 138)


Layer Depth Z
N
0

3.0
32.1

NW =
NW =

1412

7.5
44

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

17

Reference

Calculation

17

11.5

17

Clay

11

10
1.5

6.0

12
1.5

7.5

12.5

1.5

14

1.5

15
19
37.5

1.5

46

23

1.5

29
56

36

1.5

54

1.5

29

44
15.0

25

1.5
21.0

38
16.5

31.5

1.5
22.5

47

38

41.5

1.5
24.0

62

45

35.5

1.5
25.5

53

26

27.5

1.5
27.0

41

29

31.5

1.5
28.5

47

34

39

1.5
30.0

59

1.5
1.5
19.5

47.5

1.5
1.5
1.5
24.0

51

1.5

51

77
30.0

51

1.5
36.0

77
31.5

51

1.5
37.5

77
33.0

51

1.5
39.0

77
34.5

51

11.0
50.0

561
50.0

45.5

NW =

Ls
Lw

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

=
=

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

75

50

775

2073

50

1709

37.6

75

50
15.5

51

50

50
1.5

51

75

50
1.5

51

50

50
1.5

51

75

50
1.5

51

50

50

28.5

1.5
34.5

75

50
1.5

77

50

50
1.5

51

51

50

27.0

1.5
33.0

34

50

22.5

71

26

50

21.0

51

17.5

50

25.5

1.5
31.5

22

50

18.0

44

14.5

50
1.5

25

32

50
1.5

25

21.5

50

13.5

1.5
19.5

41

18

12.0

33

27.5

17
1.5

69

12
1.5

39
1.5

31

10.5

1.5

21

53

18.0

24

9.0

1.5

22

16.5

4.5

7.5

1.5

15.0

19

16

13.5

4.5

6.0

1.5

Navg*Z

3
1.5

14

12.0

Ls

3.0

14

10.5

Navg

11

9.0

Completely Weathered Rock

Navg*Z

Soil

4.5

Navg

Output

at Pier P34 (B3 BH 141)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P33 (B3 BH 140)


Layer Depth Z
N
0

1.5
45.5

NW =
NW =

3
45.5

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

18

Reference

Calculation

11

6
1.5

4.5

11

1.5
6.0

17

3
4.5
1.5

14

21
7.5

19.5

1.5
9.0

29
9.0

26.5

1.5
10.5

40
10.5

39

1.5
12.0

59
12.0

50

1.5
13.5

75
13.5

50

1.5
15.0

75
15.0

50

1.5
16.5

75
16.5

50

1.5
18.0

75
18.0

50

1.5
19.5

75
19.5

50

1.5
21.0

75
21.0

50

1.5
22.5

75
22.5

50

1.5
24.0

75
24.0

50

1.5
25.5

75
25.5

50

1.5
27.0

75
27.0

50

23.0
50.0

1150
28.5

1.5
1.5
1.5
1.5
1.5

81

122

81

122

81

122

78

117

75

113

78

117

81

122

81

122

81

122

81

122

81

122

81

122

81

122

81

122

81

32

81
1.5

37.5

81
1.5

39.0

81
0.4

39.4

81

2076

44.2

122

81

36.0

NW =

81

81

34.5

47.0

122

81

33.0

81

81

31.5

Ls

80

81

30.0

53.5

81
1.5

50

32

75
1.5

50

21.5

75
1.5

50

26

81
1.5

50

17.5

81
1.5

50

26

81
1.5

50

17

81
1.5

50

30

81
1.5

50

20

81
1.5

50

26

26
1.5

50

17

17
1.5

50

15

18
1.5

50

10

16
1.5

28

13

24
1.5

25

8.5

10
1.5

14

Navg*Z

10

6.0

1.5

Navg

7
1.5

14

7.5

Completely Weathered Rock

Navg*Z

Clay

Navg

Output

at Pier P36 (B3 BH 143)


Layer Depth Z
N
0

Soil

Clay

at Pier P35 (B3 BH 142)


Layer Depth Z
N
0

Ls
Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

=
=

3.0
33.4

NW =
NW =

2178

9.25
65.2

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

19

Reference

Calculation

9.5

14

10
1.5

4.5

3
4.5

13

1.5

20
6.0

14.5

1.5
7.5

22
7.5

11.5

1.5
9.0

17
9.0

13.5

1.5
10.5

20
10.5

16.5

1.5
12.0

25
12.0

20

1.5
13.5

30
13.5

27

1.5
15.0

41
15.0

55.5

1.5
16.5

83
16.5

80

1.5
18.0

120
18.0

80

1.5
19.5

120

80

77.5

1.5
21.0

116

75

75

1.5
22.5

113

75

75

1.5
24.0

113

75

75

1.5
25.5

113

75

75

1.5
27.0

1.5
1.5
1.5
22.5

81.5

1.5
1.5
1.5

87.5

131

1.5

87

131
31.5

87

1.5
33.0

131
33.0

87

1.5
34.5

131
34.5

87

1.5
36.0

131
36.0

87

0.4
36.4

35
37.5

1.5
3.7

33.4

NW =

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

75

50

75

50

75

50

75

50

75

40.5

61

33.5

50

43

65

50

75

46

69

57.5

86

73

110

73

110

73

270

1691

73

1888

56.5

50

73

42.7

Ls

75

73

39.0

50

73
1.5

87

65

42
1.5

87

43

50
1.5

87

50

50
1.5

87

33

36
1.5

87

44

31

30.0

1.5
31.5

29

50
1.5

87

50

50

28.5

1.5
30.0

33.5

50

25.5

122

47

50

24.0

88

31.5

50

27.0

1.5
28.5

34

50

21.0

113

22.5

50

19.5

75

18

36
1.5

80

12

30
1.5

80

12

28
1.5

31

39
1.5

23

17

24
1.5

17

11

21
1.5

16

11

3
1.5

11

7.5

13
1.5

12

Navg*Z

9
1.5

17

Navg

6
1.5

6.0

Completely Weathered Rock

Navg*Z

Clay

Navg

Output

at Pier P38 (B3 BH 145)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P37 (B3 BH 144)


Layer Depth Z
N
0

39.7

NW =

42.6

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

20

Reference

Calculation

4.5

17.5

26

1.5

20

30
15.0

19.5

1.5
9.0

29
16.5

16

1.5
10.5

24
18.0

17

1.5
12.0

26
19.5

19

1.5
13.5

29
21.0

18

1.5
15.0

27
22.5

17.5

1.5
16.5

26
24.0

17

1.5
18.0

26
25.5

15

1.5
19.5

23

16
1.2

20.7

16

20.7

16
1.8

22.5

16

19

299

23.5

42

27

41

37.5

56

55

83

47

71

37

56

36

54

35.5

53

33

50

31

47

44

66

55

198

815

31
1.5

24.0

23
1.5

25.5

70

46.5

70

40

60

46

69

52

78

53.5

80

54

81

54

32

689

54
1.5

14

46.5

53
1.5

20

63

51
1.5

15

42

41
1.5

21

66

39
1.5

17

44

54
1.5

17

20

39
1.5

15

22

45
1.5

24

Navg*Z

43

13.5

1.5

Navg

1
0.9

16

7.5

Soil

11.1
12.0

1.5

Completely Weathered Rock

15

19

6.0

54
0.6

26.1

54

52
1.5

27.0

58
1.5

28.5

36
1.5

30.0

38
1.5

31.5

34
1.5

33.0

37
1.5

34.5

29
1.5

36.0

33
1.5

37.5

55
3.6

41.1

=
=

16.5

14
0.9

Ls
Lw

Navg*Z

Clay

3.6

Navg

Output

at Pier P40 (B3 BH 147)


Layer Depth Z
N
0

Completely Weathered Rock

Clay

at Pier P39 (B3 BH 146)


Layer Depth Z
N
0

55

17.1
20.4

NW =
NW =

17.5
39.9

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

15.0

NW =

45.9

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

21

Reference

Calculation
Navg*Z

5.5

Clay

11.8

Navg

2
0.2

12.0

Output

at Pier P42 (B3 BH 149)


Layer Depth Z
N
0
8.2

9.0

10

1.5
13.5

15

11

30.5

1.5
15.0

1.5

46

50

1.5
16.5

40.5

1.5
18.0

12.1

15

61

1.4

34.5

52
14.7

1.5

38

57

306

20

53.5

80

35.5

57

157

15

21

15

18

39

15
1.2

38

15

38

Completely Weathered Rock

Completely Weathered Rock

21.0

15

13.5

1.5
19.5

12.1
75

31

25.5

56
1.6

50

Navg*Z

51

10.5

50

Navg

0
0.8

Soil

Clay

at Pier P41 (B3 BH 148)


Layer Depth Z
N
0

Ls

9.2

NW =

33.3

Ls
Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

=
=

3.9
2.6

NW =
NW =

40.4
15

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

22

Reference

Calculation

7.7

Navg*Z

16

21

15
1.3

Soil

Navg

9.0

Output

at Pier P44 (B3 BH 151)


Layer Depth Z
N
0
Clay

Clay

at Pier P43 (B3 BH 150)


Layer Depth Z
N
0

8.9
9.0

17

1.0
10.0

17

10.0

17

1.5

38

15.5

14.5

22

32.5

49

50

60

138

44

66

66

73

140

66
1.1

11.6

0.5

11
22

10.5

10.5

17

Navg*Z

0
0.1

17

Navg

66

14
1.5

12.0

15
1.5

13.5

50
1.2
50

Completely Weathered Rock

Completely Weathered Rock

14.7

Ls
Lw

=
=

2.3
4.7

Ns =
NW =

16.4
29.4

Ls

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

2.7

NW =

51.7

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

23

Reference

Calculation
Navg*Z

67

101

Clay

10.5

Navg

67
1.5

12.0

Output

at Pier P46 (B3 BH 153)


Layer Depth Z
N
0
9

67

10.5

67

0.6
12.6

40

67

Navg*Z

35

53

56

62

114

56
1.1

11.6

56

11.6

56
0.4

12.0

73.5

29

91

137

91

73

239

91
1.5

13.5

91
0.8

14.3

91

Completely Weathered Rock

Completely Weathered Rock

Navg

14
1.5

Soil

Clay

at Pier P45 (B3 BH 152)


Layer Depth Z
N
0

Ls

2.1

NW =

141

67

Ls
Lw

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

=
=

2.6
2.7

Ns =
NW =

43.9
88.4

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

24

Reference

Calculation

7.5

Navg*Z

9.5

14

9
1.5

Soil

Navg

9.0

Output

at Pier P48 (B3 BH 155)


Layer Depth Z
N
0
Clay

Clay

at Pier P47 (B3 BH 154)


Layer Depth Z
N
0

17.2
17.6

1.0
10.0

10

10.0

10
0.5

10.5

10

10

24

3.5

2.5

4.5

11

12

18

15

17

65

Navg*Z

25

10

10

25
0.4

10

Navg

25

6
1.5

12.0

1
1.5

13.5

4
1.5

15.0

5
1.5

16.5

9
1.5

18.0

15
1.1
15

Completely Weathered Rock

Completely Weathered Rock

19.1

Ls
Lw

=
=

2.5
9.1

Ns =
NW =

9.7
7.12

Lw

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

0.4

NW =

25

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001

DESIGN OFFICE

Designed

CHINA NATIONAL AERO-TECHNOLOGY


INTERNATIONAL ENGINEERING CORPORATION LTD

Checked
Job Code

Page

25

APPENDIX III

Reference
ESTIMATION OF Pultimate in End Bearing ( Pb ) for piles which has no bedrock

= 0 ( c=0 for gravel )


Pier and BH no.

P1(B3 BH 108)
P2(B3 BH 109)
P3(B3 BH 110)
P4(B3 BH 111)
P5(B3 BH 112)
P6(B3 BH 113)
P7(B3 BH 114)
P8(B3 BH 115)
P9(B3 BH 116)
P10(B3 BH 117)
P11(B3 BH 118)
P12(B3 BH 119)
P13(B3 BH 120)
P14(B3 BH 121)
P15(B3 BH 122)
P16(B3 BH 123)
P17(B3 BH 124)
P18(B3 BH 125)
P19(B3 BH 126)
P20(B3 BH 127)
P21(B3 BH 128)
P22(B3 BH 129)
P23(B3 BH 130)
P24(B3 BH 131)
P25(B3 BH 132)
P26(B3 BH 133)
P27(B3 BH 134)
P28(B3 BH 135)
P29(B3 BH 136)
P30(B3 BH 137)
P31(B3 BH 138)
P32(B3 BH 139)
P33(B3 BH 140)
P34(B3 BH 141)
P35(B3 BH 142)
P36(B3 BH 143)
P37(B3 BH 144)
P38(B3 BH 145)
P39(B3 BH 146)
P40(B3 BH 147)
P41(B3 BH 148)
P42(B3 BH 149)
P43(B3 BH 150)
P44(B3 BH 151)
P45(B3 BH 152)
P46(B3 BH 153)
P47(B3 BH 154)
P48(B3 BH 155)
A2(B3 BH 156)

1
1

17
17

44.7 143.8
43 143.8

30
30

18.4
18.4

1.44 1.02 15.1 0.984


1.44 1.021 15.1 0.983

4119
4121

1373
1374

1
1
1

17
17
17

51.9 143.8
35 143.8
37.8 143.8

30
30
30

18.4
18.4
18.4

1.44 1.017 15.1 0.986


1.44 1.026 15.1 0.979
1.44 1.024 15.1 0.981

4113
4130
4126

1371
1377
1375

1
1

17
17

33.8 143.8
10.3 74.06

30
30

18.4
18.4

1.44 1.027 15.1 0.979


1.40 1.087 15.1 0.93

4132
2294

1377
765

1
1
1

17
17
17

9.9 71.18
5.7 40.98
12.2 87.72

30
30
30

18.4
18.4
18.4

1.40 1.091 15.1 0.927


1.37 1.158 15.1 0.874
1.41 1.074 15.1 0.941

2216
1394
2663

739
465
888

1
1
1

17
17
17

37.8 143.8
29.1 143.8
51.75 143.8

30
30
30

18.4
18.4
18.4

1.44 1.024 15.1 0.981


1.44 1.031 15.1 0.975
1.44 1.017 15.1 0.986

4126
4141
4113

1375
1380
1371

17

38 143.8

30

18.4

1.44 1.024 15.1 0.981

4126

1375

1
1
1
1
1
1
1
1

17
17
17
17
17
17
17
17

143.8
143.8
143.8
143.8
143.8
143.8
143.8
143.8

30
30
30
30
30
30
30
30

18.4
18.4
18.4
18.4
18.4
18.4
18.4
18.4

1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44

0.984
0.985
0.984
0.981
0.984
0.985
0.985
0.981

4119
4117
4120
4127
4118
4117
4117
4126

1373
1372
1373
1376
1373
1372
1372
1375

17

27 143.8

30

18.4

1.43 1.033 15.1 0.973

4146

1382

17

20.4 143.8

30

18.4

1.43 1.044 15.1 0.965

4168

1389

44.5
47
44
37.1
45.5
47
47
38.4

qallowable

EXTENSION OF SOUTHERN EXPRESSWAY (ESE)

1.02
1.019
1.02
1.024
1.02
1.019
1.019
1.023

15.1
15.1
15.1
15.1
15.1
15.1
15.1
15.1

RDA-ESE-ST-EW-D-S1-VD2-FD-DO-001
Designed
Checked
Job Code

Page

APPENDIX IV

18
00

Employer

PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY


No 74 Kaduwela Road, Battaramula.
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk

ROAD DEVELOPMENT AUTHORITY

DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA


MINISTRY OF HIGHWAYS,PORTS & SHIPPING

SCALE :- 1:125

SECTION 1-1

75 TK.SCREED
CONCRETE

TIE BEAM

TIE BEAM

3500

18
00

Approved

Date

Date

C AT IC

Email: markmsy2005@sina.com

Email: JC.W@outlook.com

No.6, Cambridge Place,


Colombo 07
Sri Lanka.
Contact: Wu Jichao
Mobile: (0094) 770103059

ENGINEERING CORPORATION

No.6, Cambridge Place,


Colombo 07
Sri Lanka.
Contact: Meng Shiying
Mobile: (0094) 775077725

C AT IC

Designer

ENGINEERING CORPORATION

C
L

CHINA NATIONAL AERO-TECHNOLOGY INTERNATIONAL

CHINA NATIONAL AERO-TECHNOLOGY INTERNATIONAL

Contractor

HARD BED ROCK


OR ROCK FORMATION
(TO BE DECIDED BY THE ENGINER)

1800 BORED AND CAST


IN-SITU R/C PILES

PILE CUT OFF LEVEL

PILE CAP TOP LEVEL

3500

Checked

Reviewed by

Engineer

SCALE :- 1:75

PLAN

PIER -P(n)
C
L

SOCKET LENGTH
Date

Approved

Checked

Drawn

Designed

Scale

05 Nove. 2014

As given

REV

SCALE :- 1:75

DATE

TYPICAL ELEVATION OF A PILE

PILE CUT OFF LEVEL

DESCRIPTION

DEPTH VARIES

Drawing No.

Drawing Title

Project Title

PILE CONCRETE OUT LINE

VIADUCT (VD2)

EXTENSION OF SOUTHERN EXPRESSWAY


SECTION -1 (ESE-S1)
FROM MATARA TO BELIATTE

Sheet No.

REV

1800

SCALE:- NTS

PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY


No 74 Kaduwela Road, Battaramula.
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk

ROAD DEVELOPMENT AUTHORITY

Date

Checked

Reviewed by

Engineer

TYPICAL ELEVATION OF A PILE

Date

Approved

(TO BE DECIDED BY THE ENGINER)

HARD BED ROCK OR ROCK FORMATION

T12 @ 150
SPIRAL LINK

nT
EQUALLY SPACED
VERTICAL RF

DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA


MINISTRY OF HIGHWAYS,PORTS & SHIPPING

CUT OFF LEVEL

CONCRETE IN THIS PART OF PILE TO BE


REMOVED LATER WITHOUT DAMAGING
REINFORCEMENT

EXISTING GROUND LEVEL

C AT IC

Email: markmsy2005@sina.com

Email: JC.W@outlook.com

No.6, Cambridge Place,


Colombo 07
Sri Lanka.
Contact: Wu Jichao
Mobile: (0094) 770103059

ENGINEERING CORPORATION
C AT IC

ENGINEERING CORPORATION
No.6, Cambridge Place,
Colombo 07
Sri Lanka.
Contact: Meng Shiying
Mobile: (0094) 775077725

CHINA NATIONAL AERO-TECHNOLOGY INTERNATIONAL

Designer

Date

Approved

Checked

Drawn

Designed

Scale

05 Nove .2014

As given

T 25 BAR
WELDED TO THE VERTICAL
REINFORCEMENTS AT 2.000 mm
INTERVALS

T12 SPIRAL LINK

VERTICAL REINFORCEMENT
nT

CHINA NATIONAL AERO-TECHNOLOGY INTERNATIONAL

Contractor

SCALE: 1:40

SECTION R-R

SCALE: 1:40

SECTION P-P

2Nos. T 25 BAR
WELDED TO THE VERTICAL
REINFORCEMENTS AT TOP &
BOTTOM OF THE PILE

VERTICAL REINFORCEMENT

.
REV

.
DATE

.
DESCRIPTION

Drawing No.

Drawing Title

Project Title

PILE No.01

Employer

SOCKET LENGTH

LEVEL -1 (12m Bar)

LEVEL -2 (12m Bar)

LEVEL -3

150

DEPTH VARIES (D)

0
18

SPRIAL LINK PITCH = 150mm

PIER-P(n)
CL

TIE BEAM

3500

18
00

PILE No.02

PIER
CL

VIADUCT (VD2)
PILE REINFORCEMENT DETAILS

EXTENSION OF SOUTHERN EXPRESSWAY


SECTION -1 (ESE-S1)
FROM MATARA TO BELIATTE

SCALE :- 1:200

KEY PLAN -P(n)

3500

Sheet No.

REV