Vous êtes sur la page 1sur 62

Cebu city Rapid bus transport Hub and mixed-use commercial development: Addressing traffic

congestion in the Metro

A Thesis Presented to the


School of Architecture, Industrial Design & the Built Environment
Mapua Institute of Technology

In Partial Fulfillment of the Requirements in Architectural Design 11/ AR200/ AR200S


for the Degree of BACHELOR OF SCIENCE IN ARCHITECTURE

Presented by
ETRATA,CHRISTIAN ANGELO
2010122720

Architect Junar Pakingan Tablan, uap, MSAE


Adviser

DECEMBER 2014

PART I: THE PROBLEM BACKGROUND


CHAPTER I.1 GENERAL OVERVIEW
INTRODUCTION
Cebu is considered as one of the most developed provinces in the Philippines, with Cebu City
which had always been the center of commerce, trade and industry, and in education as well since the
arrival of the Spaniards. It was named as the 7th best island destination in the Indian Ocean Asia Region
in 2007 by the Cond Nast Traveler Magazine. Through the years Cebu city had been able to transform
itself to become a global hub of tourism and industries.
Transportation is one of the key aspects in the development of nations. It functions as an
intermediary of one space to the other. Without transportation, civilization as we know it will cease to
exist, furthermore progress and commercialization would be impossible. Today, the rapid urbanization
of cities has become a global trend in these past few decades and with progress comes disadvantages;
the uncontrollable growth of the population. This produces a chain reaction of drawbacks, and one of
which is the growing need for an alternative means of transportation, wherein people can get to their
destination at a convenient time without the risk of getting into traffic at the most convenient way
possible. It is undeniable that Cebu city can be considered as one of the Metro Cities of the Philippines,
due to the fact that it has been able to evolve and transform itself into central business district and a
core of industries and investments, it is then evident that an alternative means of transportation that
can cater its growing needs and complement its vision of becoming a highly urbanized city is needed.

The city of Cebu, mainly the Cebu Central business district is heavily concentrated and has
become a place where road networks improvements are difficult to introduce. Most of its vehicles such
as PUJs and taxis are not enough to cater the large volume of passengers throughout the metro. The
congestion of people accompanied by the unavailability of transport systems and poor road networks in
a highly urbanized district has made it difficult for people to go around and are very disadvantageous to
the continuous growth of the city.

In the year 2010 census, the Citys population has grown from 799,762 from 2007 to 866,171 in
just 3 years. The current population of Cebu is 900,000 with a land area of 326 sq. km with and an
overall population density of 2450 persons per sq.km. About 66 percent of the citys total population is
concentrated within 15 percent of the land area.

In terms of motorization, the number of vehicle registration in Cebu City has displayed an annual
growth rate of 7 percent from the year 1994 to 2000 and 4 percent from the year 2000 to 2006. Existing
Public transport is dominated by PUJ market; large buses operate across the island but do not provide
for travel within the intercity. Taxi use is high with a large number of taxis operating throughout the city.
According to CITOM there are around 8329 units of PUJ, 5788 units of taxis and 952 units of buses and
mini buses operating in the city in 2007. According to Cebu City CLUP (2000), air pollution is also an
increasing problem for the city. With the absence of industrial and coal fired power plants, the main
contributor of carbon emissions is no other than the motor vehicles.

Cebu city had been consciously developing itself to be the center of excellence, to be able to
achieve such; the government would have to address the issues that go along with the problem of traffic
and transportation. Perhaps the need of providing solutions to such is very apparent as it affects the
environment and the productivity of the city itself.

The main logic of the study is to provide Cebu city a Rapid bus transit Hub that will address the problem
regarding the crowding and unavailability of a transportation core that would serve the busy avenues of
the city. The research would also encompass a mixed-use commercial development which will serve as
an ancillary facility for the primary project. The project will also use an innovation that will help in the
reducing carbon particulates in the air effectively improving the ambient air quality.

STATEMENT OF THE PROBLEM


With the presented data above and the enumerated problems to be addressed, it is a fact that
there is certainly a need for the improvement of road networks and solutions to traffic in Cebu City, but
the provisions of such that can address the problems on traffic and transportation is absent. In addition,
these lacking had proven significant loss on the productivity of the city furthermore it has also became a
considerable hindrance in the development of Cebu city.
As the research carry on, it needed to specifically address the following questions:
1. Why is there a need to develop this proposal? Can the proposed transport hub and mixeduse commercial development provide solutions being addressed on the study? How?
2. What are special design considerations necessary in order to plan a facility or structure for a
mixed-used terminal-commercial development such as this?

How can the architecture of the project provide safety to the end-users?

3. What are the other possible benefits this structure could contribute to the community?

How can it help improve the air quality of the city?

ASSUMPTIONS
The results of the study will confirm that there is a need of developing the proposal. It
will verify that the structure is beneficial not only to the Citys populace and commuters but also
to the city itself as well in terms of physical, social, economic and environmental aspects.
SIGNIFICANCE OF THE STUDY
Based from the data presented earlier, it is undeniable that over the years of progress and
development of Cebu city, the problem of transportation and air pollution is greater than ever.
Regardless of these data, the availability of structures that can solve the predicament on traffic is few
and more often than not it is not designed accordingly. In addition the upsetting news on the degrading
air quality of the city is definitely a timely issue to address since there has not been any solution
presented. In relation to this, a proposed Cebu city Rapid bus transport Hub and mixed-use commercial
development: Addressing traffic congestion in the Metro is proposed to be able to address these issues.
The project will benefit the city and its populace by helping alleviate and solve the
problem of traffic congestion in a highly urbanized area. To create a space in which
transportation and trade could be incorporated together and create a convenient atmosphere
for the passengers needs. This study addresses the safety of people-vehicular circulation within
the terminal. This Study also addresses the reduction of harmful particulates in the air.
The results of the study can contribute in establishing design considerations taking the
fact that the problem of traffic congestion is also palpable on other Metro and developing cities.
It will serve as an addition to the existing guidelines in designing terminals and can be a great
help for future research and endeavors.

SCOPE AND LIMITATIONS


The main purpose of the study is to address existing problems about traffic congestion in
general but the main sampling and scope of the study will only be in Cebu City most specifically in the
Central Business District. This study will only cover the architectural planning of the various spaces of
the project and shall no longer tackle the structural, plumbing & electrical aspects of the project. The

study is conducted from October 2013 up to June 2014. The study is subject to variables that are not in
the control of the researcher such as economic status, behavior of the growth of population.
CONCEPTUAL FRAMEWORK

CEBU CITY RAPID BUS TRANSIT HUB AND MIXED-USE COMMERCIAL DEVELOPMENT:
ADDRESSING TRAFFIC CONGESTION IN THE METRO

REVIEW OF RELATED
LITERATURE

INTERVIEW
PROFESSIONALS

COMPARATIVE
ANALYSIS OF OTHER
BRTS IN OTHER
COUNTRIES

COLLATE DATA
GATHERED

ANALYSIS &
RECOMMENDATION
STRENGTHS &
WEAKNESSES
CONCLUSION
RESEARCH INNOVATIONS
THAT MAY BE APPLIED TO
THE PROJECT.

APPLICATION
TO PROJECT

DEFINITION OF TERMS
URBANIZATION- is the increasing number of people that migrate from rural to urban areas. It
predominantly results in the physical growth of urban areas, be it horizontal or vertical.
Mixed-Use development-is in a broad sense any urban, suburban or village development, or even a
single building, that blends a combination of residential, commercial, cultural, institutional, or
industrial uses, where those functions are physically and functionally integrated, and that provides
pedestrian connections.
Census- is the procedure of systematically acquiring and recording information about the members of a
given population.
Population density- is a measurement of population per unit area or unit volume

ACRONYMS
CLUP is an abbreviation for Comprehensive Land Use Plan.
CITOM- is an abbreviation for Cebu City Traffic Operations Management. The local government body is
responsible for the traffic management of the whole Metro Cebu.
CBD- commonly known as central business district is the commercial and often geographic heart of a
city.
PUJ- Public Utility Jeepney or commonly known as Jeepney was first introduced by the Americans during
the second world war as a means of transportation for the people and was later used as a means of
transportation throughout the country.

CHAPTER I.2 REVIEW OF RELATED LITERATURE


LOCAL
SUBJECT OF THE STUDY
The Coastal Mall is located along the intersection of Manila-Cavite Expressway and Sea Side
Drive, Pasay City. Uniwide Coastal Mall was a shopping mall prominent in the 90s era, unfortunately
due to the Asian financial crisis of 1998; the establishment had to close down permanently. Now the
remaining structural husk of the building serves as an intermodal terminal for both city and provincial
buses.
Since the BRT system if implemented would be the first of its kind in the Philippines, The
researcher has picked this as a local facility mainly because it would be the closest control structure for
the basis of the proposed project in Cebu city since it is also located in the Metro. The location of the
structure furthermore resembles the conditions of the proposed site in Metro Cebu.
RESEARCH INSTRUMENTS
To further the information about the subject, the researcher conducted a study regarding the
existing condition of structure. The following types of research will be conducted to provide conclusive
and detailed data to avoid redundancy in the area of study:

INTERVIEW- the Researcher shall gather information from reliable sources such as
engineers or personnel in charge of the Coastal Mall Bus Terminal in Pasay City. The
information gathered should be reliable enough to make generalizations about the
buildings current condition.

OCULAR VISIT-the researcher must also gather information using the basic senses to
provide data regarding the sites state. The researcher shall carefully analyze the
behavioral patterns of the respondents in the site and document its conditions.

ONLINE RESEARCH- Gathering data related to the subject will be very useful in creating
a basis for the space programming, design and planning of the main project.

SITE STUDY- Sensory analysis of the site is important in the data gathering and will be
considered in the planning and design process of the proposed transport hub in Cebu
City.

Fig.1 Top view of Coastal Mall Bus Terminal

Fig.2 Manila-Cavite Expressway

Fig.3 Macapagal-Sucat Road


Observation: The lack of exclusive busways makes it hard for both public utility vehicles and private cars
to progress through the busy road.

Fig.4 Coastal Mall Overpass Cavite Bound


Observation: Overpass is crowded with vendors making it hard for commuting passengers move around.

Fig.5 Coastal Mall Overpass Exit


Observation: Stairs are not PWD friendly. Security is also a concern due to the lack of surveillance
systems.

Fig.6 City Bus Terminal


Observation: Upon exiting the overpass, Signage can be easily spotted.

Fig.7 Provincial Terminal


Observation: Signage is also visible although no apparent lighting is found near the vicinity thus making
it hard for others to read the signs when nightfall comes. Provision of catwalks to leading to terminal
adds comfort to the people.

Fig.8 Provincial Terminal Entrance


Observation: Entrance has poor security measures. Metal railings are inconsistent and dont seem to
provide its right purpose.

Fig.9 Waiting Area Exterior


Observation: Waiting areas are provided for. Greeneries and vegetation can be found near the area
also.

Fig.10 Waiting Area Interior


Observation: Waiting areas lack seats for waiting passengers. Television is provided for. The area is
passively ventilated; Most of the foreign particulates can be inhaled from here.

Fig.11 Docking Area


Observation: Although waiting areas are provided for, passenger must still walk through the bus ways to
get to their respective transportation.

Fig.12 Bus Departure Lane


Observation: Passengers are subjected to the mercy of unsafe bus departure lanes, safety of the endusers are compromised. Proper circulation of users must be considered.

Fig.13 Bus Exit


Observation: Height gradient of Bus way to passenger waiting area is enough to prevent accidents.

Fig.14 Passenger Waiting Area (Seaside Drive)


Observation: No visible height gradient between passenger waiting area and bus way. No bollards or
metal fencing to provide safety for waiting passengers.

Fig.15 Passenger Waiting Area (Seaside Drive)


Observation: Although seats are provided, it is not enough for the amount of passengers coming inside
the terminal.

Fig.16 Administration Office


Observation: surveillance system is also located inside. Located near Macapagal road.

Fig.17 Prayer Room


Observation: Prayer rooms are also provided for those people who are in need of divine guidance
before a long trip. Limited seats are also provided inside.

Fig.18 Ancillary Facilities


Observation: Other ancillary facilities have been added to the terminal such as additional airconditioned waiting areas and Comfort rooms.

Fig.19 Waiting Area (Air-conditioned)


Observation: Waiting areas such as this one must be encouraged so passengers will be much safer and
more comfortable while waiting.

Fig.20 Dispatching Area


Observation: Dispatching area is located along Macapagal road, congesting the area. Lack of space for
incoming buses tends to crowd the major roads and congest it.

PRESENTATION OF THE COLLECTED DATA: STRENGTHS, WEAKNESSES, OPPORTUNITIES AND


THREATS (SWOT)
The following Strengths, Weaknesses, Opportunities and Threats are based on the observations of the
researcher throughout the Case Study.
Analyses on the Strengths of the facility

Location
The location of the terminal benefits from both the city proper and the nearby provinces as it is
located in between Metro Manila and Cavite. A huge number of commuters came from these
nearby cities which made the location of the terminal appropriate for transportation within and
outside the metro.

Variety of transport systems


The location was made more appealing because of the road connections, as of the current state,
a flyover is under construction which connects the airport road to C5, this infrastructure benefits
the terminal location as it opens to more accessible areas and other cities.

Analyses on the Weaknesses of the facility

Poor Maintenance of facilities


A lot of public spaces are close to public for either keeping the spaces clean and protected or
being closed due to poor maintenance.

Inability to hold future expansion


There is no room for the future development as the building extends from property to property.
This problem results to the lack of bus parking spaces from within the building wherein a lot of
buses park along the road which causes traffic for private vehicles.

Analyses on the Opportunities of the Facility

The terminal is located on a abandoned mall and that space can be used for the expansion of
the terminal building that can cater a larger number of transits.

Utilizing the abandoned mall will also open commercial spaces within the premises that will
encourage more commuters.

Cavitex is the bridge between Manila and Cavite hence, transportation, shipping and tourism
can grow. Making Coastal Mall a community.

Analyses on the Threats of the Facility

Congestion on the area creates smaller terminals (legal & illegal) which also offers a direct route
from within the city and outside the metro.

Security has been a challenge in the area as numerous crimes were reported within the vicinity
since its crowded at peak hours.

CONCLUSION AND RECCOMENDATION


Coastal Terminal has the advantage of its location as it is located in between the metro and the
southern provinces an d cities. However, because of the threats in security and property maintenance,
the terminal faces a problem in maintaining its effectiveness in catering the safety and needs of the
commuters necessities. Moreover, the terminal is experiencing problems in routing from within the city
and provinces but because of the advantages offered by the utilization of the abandoned mall, a
problem of expansion can be resolved and commercial spaces can be added to attract more commuters
and transit operators.
FOREIGN

GUANGZHOU BUS RAPID TRANSIT SYSTEM


(Hurst, 2011) Said that dedicated bus lanes, subway-like stations, intermodal terminals and
infrastructure improvements to move buses more efficiently are all features you might see in one of the
many Bus Rapid Transit (BRT) systems that are popping up in cities all over the world. After the success
of the world's first BRT in Curitiba, Brazil, planners in cities including Bogota, Mexico City, Sao Paulo,
Hanoi, Seoul, Istanbul and Quito, among others, began implementing BRT systems to not only provide a
valuable mode of transportation for the city's inhabitants, they address traffic congestion and associated
air quality. And as planners learn what works and what doesn't with the new bus systems, some creative
new designs are being implemented.

He also added that one of the newest BRTs is also one of the most advanced. Only one year old,
the BRT in Guangzhou is already carrying up to one million passengers daily. China has eleven BRT
systems currently in operation but the 4.3-mile (23 km) Guangzhou bus corridor design is the first to
integrate bicycles into its design - five thousand of them.

The Guangzhou bus rapid transit (BRT) corridor opened in February 2010 after an extensive
planning and design process by the Guangzhou Municipal Engineering Design and Research Institute in
partnership with the Institute for Transportation and Development Policy (ITDP). The Guangzhou BRT is
the is the first metro replacement level BRT system outside South America. The system carries more
than triple the single-directional passenger flows of any other BRT system in Asia, and is second only to
Bogotas BRT, Transmilenio, worldwide. (Nations, 2010)
It has the worlds highest BRT bus flows, with one bus every 10 seconds into the city in the
morning rush hour. The system features a range of innovative and transformational features, and is the
first high capacity BRT system worldwide to operate direct service routes. Guangzhous BRT has no
terminals and no interchanges, and uses predominantly regular 12 meter buses.

This new operational model is having a profound impact on BRT worldwide, as most cities now
opt for direct service rather than trunk-feeder BRT operations. It is the first BRT system in China with
more than one bus operator and the first with private sector operators. It is also the first BRT system
worldwide with a bike sharing system planned and implemented at the same time along the corridor.
Guangzhou BRT is a model for the affordable, low-carbon high-volume public transit desperately needed
by fast-growing cities in the developing world. (Nations, 2010)

Mitigation / Adaptation

Improvements
sustainable
improve

Social and environmental benefits

Potential

for

scaling-up

and

replication

in Over 850,000 people now use this The Guangzhou BRT system is
transport much-enhanced bus service every day. scalable
health The

immediate

at

national

and

neighborhoods international levels.

outcomes by decreasing surrounding the BRT include urban


air

pollution. villages where many low-income


immigrants live and the BRT system

Nationally: ITDP, which led the


planning

of

the

activityin

Passengers
combined

save
32

a improves their mobility.

partnership with the City of

million

hours each year on daily


commutes, with 850,000
average weekday riders.

Guangzhou, is currently working


Improvements in sustainable transport
improve economic outcomes for the
city overall by lowering the cost of
travel, giving improved access to jobs,

Higher bus speeds and


fewer

bus

provide

kilometres,
operational

savings, which also result


in a projected average
annual saving of 84,000
tonnes of CO2 emissions
per year over the first 10
years of the activity.

and

decreasing

congestion

for

economic activity.

benefits

different
to

significant

City

of

residents,

especially

travel

on

this

local

Guangzhou

those

whom
corridor:

Travel times on the corridor have


improved for motorists and bus riders
along the corridor 20 per cent and 29

A recent impact analysis


study found that the
Guangzhou BRT system
reduces 14 tons of the
particulate
emissions

matter
that

cause

respiratory illness on an
average

annual

basis.

per

cent

respectively;

Quality of bus service has improved


dramatically with the implementation
of real time bus info, new stations;
Thirty per cent higher bus speeds,
resulting in an average time saving of
6.63 minutes per BRT trip, or 88,000
passenger-hours per day, or more than
30 million passenger-hours saved each

The

BRT

delivers

significant environmental
benefits for all residents
of the city of Guangzhou
(population 13 million).

year;

bus trip costs for passengers, from 4.9


yuan (December 2009) to 2.6 yuan
(August

2010);

A 15 percent decrease in bus waiting

activity in

new BRT corridor is about to


open in Lanzhou and many more
projects are in development and
including

Yichang,

which will begin construction in


2013,

having

been

directly

influenced by the Guangzhou BRT


system.
Internationally: The success of
the Guangzhou BRT system is
spurring BRT planning and design
all over Asia and beyond. Study
tours from multiple nations and
multi-lateral institutions like the
Asian Development Bank are
ongoing in Guangzhou to learn
from this design. As of October
2012, ITDP has hosted more than
65 visiting delegations to the
Guangzhou
related
pedestrian

Reduction by half for out-of-pocket

the

several other Chinese cities. A

planning,

A recent Impact Analysis Study found


several

on replicating

BRT

system

improvements
and

and
to

cycling

infrastructure and public space


projects such as greenways.

times

along

the

BRT

corridor;
A 50% increase in cycling along the
BRT corridor in the highest demand
locations.

(Zeng, 2013)The rapid growth of bus rapid transit (BRT) in China is leading to future opportunities to
improve the overall quality of sustainable transport in China. Although the debate on who has the rightof-way on city streets remains, cities could still exert the maximum benefit of BRT by prioritizing the
integration of BRT with other sustainable modes.
BRT GROWTH IN CHINA
Like many other things happening in China, BRT has experienced rapid growth over the past few
years. Though BRT in China has not received as much worldwide attention as underground rail systems
the growth of BRT is still impressive. The first BRT in China was introduced to the city of Kunming in
1999, followed by the BRT in Beijing in 2004, which brought national attention to BRT as a new transport
solution. In 2010, the launch of the Guangzhou BRT broke out of the existing mold of low-to-medium
capacity BRTs in China by transporting more passengers than most of the nations metro lines. The city
adopted a direct service model, which allows for defined BRT routes (not only the trunk routes) passing
by the corridor to use the dedicated BRT lanes. (Zeng, 2013)
BRT PERFORMANCE IN CHINA
According

to BRTdata.org,

comprehensive,

global

database

created

in

2012

by EMBARQ and the Bus Rapid Transit Centre of Excellence, in collaboration with the International
Energy Agency, BRT systems have spread out across different regions in China. Though most systems are
concentrated along the coast, BRT recently established roots in the western region of China, in Lanzhou,
Urumqi, and Yinchuan three cities that, together, account for 7.7 million people. Most BRT systems are
located in second and third-tier cities, or municipalities with populations of less than 5 million. Since
these cities usually do not have urban rail systems, BRT systems are designed as the backbone public
transport system. According to a recent study by Tongji University, there has been a diversification of
BRT models in China, with much success in operations.
On average, each BRT system in China serves 30,000 to 40,000 passengers every day. Even
though most systems consist of one or two corridors, averaging 40 kilometers in length, they have

shown their potential for playing a central role in public transport. In Changzhou, BRT ridership accounts
for more than 25% of total passenger trips on public transit. Its two corridors run north-south and eastwest, transecting the city. With good planning and design, the Changzhou BRT is accessible to many city
residents and commuters and has been regarded as one of the most successful BRT systems in China.
(Zeng, 2013)

CHANGES
Despite the rapid growth and good performance, BRT face challenges in terms of public debate
over the right-of-way on city streets, as well as integrating with other modes of transport. As is the case
in many other countries, doubts over BRTs right-of-way in China have never ceased. The doubts over
BRT arise from unfamiliarity with the BRT concept and a mindset that private cars own the right-of-way
in cities. Early BRT systems like that of Hangzhou raised questions from residents when it came to the
use of two lanes for moving buses exclusively, and this criticism only ceased when the systematic effects
of BRT such as convenience, became gradually evident. Similarly, in Guangzhou, locals called BRT, Bu
Rang Tong, meaning it is not allowed (for cars) to pass through.
In Chongqing, public opposition to a 2008 dedicated BRT lane, which was believed to cause
congestion, prompted the government of Chongqing to allow other buses to use the lanes a move
which did not deter complaints from private car drivers nor ultimately save the corridor from
being demolished. Chongqing also holds the dubious distinction of being first BRT that has been torn
down in China. (Zeng, 2013)
Although BRT systems generally perform well, cities could still maximize their impact through
better integration with other public transit modes, such as the subway, traditional buses, and nonmotorized transport modes. Currently in this area, most BRT systems fall short. In terms of information
integration, few BRT systems provide clear maps of the BRT in relation with other public transit modes
a feature which would assist passengers in making multi-modal trips. The Urumqi BRT set up a new
website, providing real time info from each individual BRT line, but it is hard for users to find an overall
map of the BRT system and understand how it connects with other bus routes. In terms of physical
integration, Hangzhous 100-km BRT system is yet not integrated with the metro system, while in Beijing
the BRT lines are only linked with Metro Line 2. Some cities in China are setting a precedent for modal
integration, such as the Guangzhou, which integrates bike-sharing stations alongside its BRT stations and

also provides direct, built-in connections between BRT and subway stations. This design is also
considered a best practice worldwide. (Zeng, 2013)
THE FUTURE OF BRT
BRT is likely to continue its rapid growth in China. According to data shared by the China
Sustainable Transport Center, there are about 1000-km BRT in China under planning now. Recent policy
directives by the State Council also recommend BRT as a key component to include in surface public
transport system in China. In the second and third-tier cities, BRT can serve as the backbone system, as
seen in Changzhou, while in large cities where the conditions for rail transit are available BRT could
still play a supplementary role to metro and rail systems, such as the case in Beijing and Guangzhou.
(Zeng, 2013)
It is unquestionable that the right-of-way debate will continue in China. A change of public
mindset toward a people first street design requires public education and time, as some awakened
urban transport professionals in China are now trying to address this issue in transportation planning.
The design and information integration of BRT with other systems will add great value to the promotion
of sustainable transport in cities and could be applied to new BRT projects in China. With forthcoming
opportunities, taking these considerations into account will help BRT to exert maximum impact to
catalyze better and bigger changes in Chinas urban transport system. (Zeng, 2013)
TRANSMILENIO BUS RAPID TRANSIT SYSTEM
Introduction
Serving the city of Bogot, Colombia, TransMilenio is one of the worlds premier Bus Rapid
Transit (BRT) systems. In January 2006, the system carried over one million passengers per day on a
network of high capacity trunk corridors, supported by feeder services that extend system coverage to
peripheral areas of the city. TransMilenio is also the centerpiece of a long-term urban renewal and
mobility strategy that prioritizes walking and cycling and discourages private vehicle use. Encouraged by
TransMilenios success, the Colombian government is now embarking on a major program to construct
similar systems in cities throughout Colombia. This report has been prepared to provide a detailed
description of the TransMilenio system, to discuss its applicability to transit in the United States, and to
summarize potential business opportunities that may exist in Colombia for the U.S transit industry.
(DOT-USA, 2006)

System Performance / Impacts

Travel Time:
TransMilenio implementation has increased average public transit travel speeds by
approximately 15kph to 26.7kph (9.3mph to 16.6mph).
This has resulted in an estimated system-wide travel time saving of 136,750 hours per day for
TransMilenio Phase I, equating to a 32 percent reduction in average travel times for transit
users (Yepes, 2003). This equates to an average travel time saving of around 16 minutes per
trip for transit users and 13 minutes per trip for the city as a whole (Martnez, 2005).
Travel time savings have been greatest for the citys lower-income groups that tend to be
concentrated in the city periphery. (DOT-USA, 2006)

Safety and Security:


Reduction in vehicle-vehicle traffic conflicts and pedestrian-vehicle traffic conflicts has
reduced the number of collisions on the service corridors by 79 percent, which has, in turn,
dramatically reduced the number of injuries and fatalities.
The number of robberies on system corridors has also been reduced. This may relate to the
significant police presence in and around TransMilenio stations. (DOT-USA, 2006)

Environmental Quality:
TransMilenio has had a positive impact on air quality in the vicinity of Caracas Avenue, with
a 43 percent reduction in sulphur dioxide, an 18 percent reduction in nitrogen dioxide, and a
12 percent reduction in particulate matter.
For the city as a whole, particulate matter has increased by 12 percent and sulphur dioxide
has increased by 15 percent, while nitrogen dioxide, carbon monoxide, and ozone have been
reduced. Overall, this suggests that, while TransMilenio may have induced localized
reductions in air pollution, this is unlikely to have translated into citywide air quality
improvements. (DOT-USA, 2006)
Capacity :

(DOT-USA, 2006)TransMilenio carries very high passenger volumes of up to 41,000 pphpd. This is made
possible by a variety of system design features:
high capacity articulated vehicles (160 passengers) with multiple doors
high average bus occupancies (TransMilenio buses carry an average of 1,600 pax per day)
exclusive runningways unaffected by traffic congestion, with double lanes allowing express
buses to overtake local buses
high capacity station design featuring level boarding and off-board fare payment
centralized control of bus operations, which coordinate local and express services, reduce
bunching, and improve reliability
high service frequency (280 buses per hour per direction on busy trunk sections, resulting in
a combined headway 13 seconds at busy stations)

CHAPTER I.3 RESEARCH METHODOLOGY


SUBJECT OF THE STUDY
Cebu City, officially the City of Cebu is the capital city of the province of Cebu and is the "second
city" of the Philippines, being the center of Metro Cebu, the second most populous Metropolitan area in
the Philippines after Metro Manila. With a population of 866,171 as per the 2010 census, it is the fifth
most populated city in the country.Cebu City is a significant center of commerce, trade and education in
the Visayas area. The City of Cebu is also known as the "Queen City of the South."
The city is located on the eastern shore of Cebu Island. It is the first Spanish settlement and the
oldest city in the Philippines.Cebu is the Philippines' main domestic shipping port and is home to about
80% of the country's domestic shipping companies.
It is the center of a metropolitan area called Metro Cebu, which includes the cities of Carcar,
Danao, Lapu-lapu, Mandaue, Naga, Talisay and the municipalities of Compostela, Consolacion, Cordova,
Liloan, Minglanilla and San Fernando. Metro Cebu has a total population of about 2.55 million people
(2010 Census). Cebu City is bordered to the northeast by Mandaue City and the town of Consolacion, to
the west are Toledo City and the towns of Balamban and Asturias, and to the south are Talisay City and
the town ofMinglanilla. Across Mactan Strait to the east is Mactan Island.

RESEARCH INSTRUMENTS
To further the information about the subject, the researcher conducted a study regarding the
existing condition of structure. The following types of research will be conducted to provide conclusive
and detailed data to avoid redundancy in the area of study:

INTERVIEW- the Researcher shall gather information from reliable sources such as Chief
officials, engineers or other relevant personnel regarding transportation systems in
Cebu. The information gathered should be reliable enough to make generalizations
about the buildings current condition.

OCULAR VISIT-the researcher must also gather information using the basic senses to
provide data regarding the sites state. The researcher shall carefully analyze the
behavioral patterns of the respondents in the site and document its conditions.

ONLINE/ LIBRARY RESEARCH- Gathering data related to the subject will be very useful
in creating a basis for the space programming, design and planning of the main project.

SITE STUDY- Sensory analysis of the site is important in the data gathering and will be
considered in the planning and design process of the proposed transport hub in Cebu
City.

ARCH BISHOP REYES AVENUE

Most of the vehicles at arch bishop avenue consists of private vehicle, if not taxis are mostly in the area.

Side walk areas are utilized by the pedestrians. Minimal sidewalk vendors can be observed in the
vicinity.

Greeneries can be seen at the center islands.

AYALA SHOPPING MALL

Pedestrians observe proper lanes. Sidewalks have proper ramp placements.


Center islands have greeneries and various green elements.

Private vehicles can be observed at the vicinity, PUJs and other public vehicles can also be seen in the
area. Minimal Traffic Congestion can be felt.

BULACAO STREET

The road at Bulacao Street is crowded with PUVs.


No Center islands are provided. Minimal green elements are provided for shade.

Bus stops and waiting sheds are rarely seen throughout this street.

ESCARIO STREET

No Central Islands provided, sparse amount trees can be seen at the sidewalks. Streets in Cebu are much
like the streets in Metro Manila.

OSMENA STREET

Central Islands are provided for. There are enough spacing of lanes for an exclusive bus lane.

Pedestrian lanes are scattered throughout the Osmena Street.

INTERVIEW
Engineer Arnel Manresa, The Chief of road transport and planning in DOTC was asked to answer the
following questions for the interview:

1. Q: Can the proposed BRT terminal and mixed-use commercial development present
solutions regarding traffic congestion and air quality of the city? How?
A: Yes, With the BRT System in place, the present passenger car users and para transit
system riders such as jeepneys are expected to change mode to the BRT system. By reducing
motorized trips along the corridor, the number of vehicles along the road will decrease and
motor vehicle emissions will likewise naturally follow.
2. Q: Will a commercial development be feasible in a transport terminal such as this?
A: Yes, commercial spaces can be incorporated in bigger terminals or stations and
advertisements can also be posted at the buildings exterior.
3. Q: What are the special design considerations necessary in order to plan a facility or
structure for a mixed-used terminal-commercial development if so?
A: There is no special considerations in the design of the terminal but will mainly depend on
the availability of space and project cost.
4. Q: How can the architecture of the BRT project provide safety to the end-users?
A: Provisions of safety railings, ramps for PWDs, elevators and escalators and use of nonskid flooring tiles can provide safety to passengers. For visually impaired passengers, tack
tiles should be installed, for hearing impaired passengers, audible sounds or warnings
should also be installed.
5. Q: How can creating a BRT system help improve the air quality of the city?
A: As in number one, reduction of vehicles resulting from the advantages offered by the BRT
system to passengers will reduce vehicle emissions. Operation of newer buses such as Euro
5 compliant, CNG buses, Electric buses or hybrid buses will address vehicle pollution and
GHG emissions. BRT system is synonymous to operating LRT/MRT systems but using bus as a
means of conveyance.
6. Q: What are the other possible benefits this structure could contribute to the community?
A: The possible benefits the BRT system can contribute to the country are reduction in travel
cost, efficient use of limited road network, tourism attraction and efficient public transport
system.

POPULATION SAMPLING
The sample population of this study is limited to those people who live or have experienced traversing
the busy street ways of Cebu City. These people can give practical knowledge in creating an effective
type of structure that will assess the transportation needs of the commuters. The amount of people will
not be specified because the method used is qualitative method.
RESEARCH INSTRUMENTS
For the researcher to be able to achieve data, the researcher first scheduled an interview a professional
well versed in the field of road planning and transportation. Photo documentation was taken from the
major arterial roads throughout the Metro. Then Interview questions were formulated to evaluate the
issues at hand and were distributed to the carefully selected individuals to gather data regarding the
project.
PRESENTATION OF COLLECTED DATA

1.HOW LONG HAVE YOU BEEN


COMMUTING?
18%

18%
0-5 YEARS

27%

37%

6-10 YEARS
11-20 YEARS
21-30 YEARS

The 37% of the respondents have been using public transportation for 6-10 years,27% of the
respondents have been using public transportation 11-20 years. While the age bracket of 0-5 years and
21-30 years are in a meager 18%.

2.CAR OWNERSHIP
18%

NO
YES

82%

82% of the respondents dont have their own cars. This concludes that majority of the respondents are
commuters.

3.MODE OF TRANSPORTATION USED

36%

37%
BUS
JEEPNEY

0%
27%

FX
TAXI

37% of the respondents uses bus as a mode of transportation, taxis secure the second spot by having
36%,27% goes to the PUJs and 0% for the FX. We can conclude that a need for mass transportation is
imminent.

4.ROUTE OF TRIP
0%

WITHIN THE CITY


PROVINCIAL

100%

100% of the respondents routes goes throughout the city. This further supports the idea of a mass
intercity transportation.

5. WHAT IS THE PURPOSE OF YOUR TRIP?

8%

8%

25%
HOME-SCHOOL
HOME-WORK

59%

WORK-WORK
RECREATION

59% of the respondents purposes for travel is from home to work, 25% comes from home to school,
while the remaining 16% is divided equally for recreation and work to work. This concludes that most of
the commuters are coming from the working district.

6.BOARDING TIME
18%
36%
0-15 MINS.
16-30 MINS.

46%

31-ABOVE MINS.

46% of the respondents board their respective modes of transportation from 16-30 mins, 36% board
theirs at 0-15 mins mark, while 18% had to wait for 31 mins and above just to beard their
transportation.

7.WHAT AFFECTS YOUR MOOD

32%

44%

HEAT
LACK OF AIR
LACK OF LIGHT

24%

0%

CROWDEDNESS
STANDING TOO LONG

44% of the respondents said that heat is a major factor in their mood change, second is standing too
long with 32%, 24% was for crowdedness.

8.WHAT FACILITIES ARE AVAILABLE AT YOUR


TERMINAL
WAITING AREA
TOILETS

21%

FASTFOOD

3%

17%

31%

GROCERY
SHOPS

0%
4%
0% 10%

14%
PARKS
DOCKING AREA
ARRIVAL AND DEPARTURE
LANES
OTHERS: ILLEGAL VENDORS

31% of transport terminals consists of waiting areas,21% arrival and departure lanes,17% docking area
for the public transports,14% for the toilets,10% for fast foods and 0% for parks. 3% of the respondents
said there are illegal vendors at their terminal,

9.WHAT OTHER FACILITIES DO YOU WANT AT


YOUR TERMINAL?
WAITING AREA
TOILETS

4%

8%

8%

12%

FASTFOOD

12%
GROCERY

20%
8% 4%

24%

SHOPS
PARKS
DOCKING AREA
ARRIVAL AND DEPARTURE
LANES

Determining the spaces that the commuters need in a terminal would be crucial in the designing phase
of the proposed structure. 24% of the respondents said that fast foods are needed in the structure, 20%
said that parks are needed not just for aesthetic purposes but for relaxation as well. All else is
mandatory to a terminal.

10. DO YOU HAVE TO CROSS THE ROAD TO


GET TO YOUR TRANSPORTATION?
27%
73%

YES
NO

73% of the respondents replied that they are forced to cross the perilous road to get to their
transportation. This concludes that safety of passengers is paramount even before they depart the
terminal.

11.WOULD YOU RATHER HAVE DIRECT ACCESS


FROM THE WAITING AREA TO YOUR
TRANSPORTATION?
0%

100%

100% of the commuters prefer that they have direct access from the waiting area to the transportation
itself.

YES
NO

CHAPTER I.4 SUMMARY OF FINDINGS AND ANALYSIS


PRESENTATION OF COLLECTED DATA
The study collected states that 37% of the respondents have been using public transportation
for 6-10 years, 82% of the respondents dont have their own cars. 37% of the respondents used bus as a
mode of transportation, 100% of the respondents routes goes throughout the city. 59% of the
respondents purposes for travel is from home to work, 46% of the respondents board their respective
modes of transportation from 16-30 mins, 44% of the respondents said that heat is a major factor in
their mood change.

NEED ANALYSIS
According to the data presented above, a mass transport terminal that can cater large volumes
of people is needed. The structure must have a waiting area that is comfortable enough for the users. It
must have fast foods so commuters could eat while they wait for their bus. Mini pocket parks can also
be incorporated in the design of the structure.

QUALITATIVE ANALYSIS
Commuters that will be using the bus terminal would like 31% of transport terminal consists of
waiting areas, 21% arrival and departure lanes, 17% docking area for the public transports, 14% for the
toilets, 10% for fast foods while most of them suggested that 24% of the respondents said that fast
foods are needed in the structure, 20% said that parks are needed not just for aesthetic purposes but for
relaxation as well.

CHAPTER I.5 CONCLUSION RECOMMENDATION


With the data collected and compiled above, the researcher can say that there is indeed a need to
develop an improved mass transit terminal that would cater the commuters transportation needs as
well as its safety and comfortability while waiting at the terminal.

CHAPTER II
RATIONALE
The reason this research is being is conducted is because the researcher want to provide Cebu
city a Rapid bus transit Hub that will address the problem regarding the crowding and unavailability of a
transportation core that would serve the busy avenues of the city. The research would also encompass a
mixed-use commercial development which will serve as an ancillary facility for the primary project. The
project will also use an innovation that will help in the reducing carbon particulates in the air effectively
improving the ambient air quality of Cebu city.

PRINCIPLES AND RELEVANCE TO THE PROJECT


This research will benefit the people of Cebu city mainly the commuters and the tourists who
use public transportation as a means to go around the city. This study if successful will give the
government a benchmark for future terminal design that can be implemented into other metros around
the Philippines.

APPLICATION TO THE PROJECT


Based on the data collected, the researcher must take into consideration all of those factors and
synergize it to be able to come up with a terminal design that is both practically efficient and
aesthetically pleasing. These are some of the design approaches that must be taken into account to
maximize the design of the terminal:
SAFETY AND SECURITY
-provision for safety railings and ramps for persons with disabilities must be implemented.
-provide necessary elevator, escalators for the elderly, PWDs and pregnant passengers.
-Non skid flooring tiles for safety.
-Tack tiles should be installed for visually impaired passengers.
-Audible sounds or warnings should also be installed as precaution.
-Necessary Signs should be installed in the bus lanes to prevent accidents.
COMFORTABILITY
-placing of air-conditioned waiting areas for waiting passengers.
-Fast-food areas, coffee shops and other relevant shop can be added adjacent to the staging area.
-Pocket gardens and greeneries can also both alleviate stress while waiting for transportation and also
reduce carbon dioxide emissions.

-waiting area must be connected or at least adjacent to the staging area of the buses to alleviate the
stress of walking to the bus and boarding it.
AESTHETICS AND SUSTAINABILITY
-The design should be eco-friendly in such a way that the structure also helps in reducing the carbon
dioxide emission of the buses within the compound.
-The building must also have advertisements to attract prospective investors to put up a business in the
terminal.
-The building must strictly follow road and traffic provisions in the building code of the Philippines.
-Natural lighting of the building is encouraged to lessen electricity consumption.

PART III SITE IDENTIFICATION AND ANALYSIS


CHAPTER III.1.1 SITE SELECTION PROCESS
CRITERIA FOR SITE SELECTION
1. Lot Size
2.

Site Physical Characteristics

3. Utilities
4. Zoning/Permitting
5. Neighborhood
The site selection criteria guidelines or requirements of the site that will be analyzed and will undergo
site selection process with various proposed sites. Once a suitable site has been established, the
researcher will create schemes that will be used. This are the criterias identified: Lot size, Site physical
Characteristics, Utilities, Zoning/Permitting and Neighbourhood.
Below is an itemized list of the criteria, along with specific questions that were considered when
evaluating each variation and option.

1. Lot/Site Location
-

Is the site large enough to accommodate future development? Will there be enough outdoor
areas?

Is the existing road accommodating vehicular and pedestrian traffic safe and accessible? Thus
unloading and loading for commuters available?

Will the frontage of the development accessible to the eye? Will there any hindrances exist that
will block a sight?

Will the frontage of the development accessible to the eye? Will there any hindrances exist that
will block a sight?

2. Site Physical Characteristics


-

What is the slope of the terrain? Flat, rolling, etc. (5% for parking; 10% for buildings)

Are the soils well drained?

Was it located in a hazardous area? Flood? Earthquake?

3. Utilities
-

Are water and sewer connections available?

Is the electrical service sufficient?

Thus the telephone and cable television available?

Any provisions for storm water disposal?

4. Zoning/Permitting
-

Are some parts of the land under protection of the government?

Are there any restrictions or laws?

Could the site comply with Planning/Zoning criteria?

5. Neighborhood
-

Is the site located or near a mixedUse area?

Is this a rural, suburban or urban setting?

CHAPTER III.1.2 SITE OPTION DESCRIPTION


These are 3 possible sites picked from the BRT system route in Cebu City which is the target region of
the proposal.
1. A site located in Bulacao,Cebu City.
2. A site located in Ayala Mall,Cebu City.
3. A site located in San Nicolas Pob., Concepcion municipality of Tarlac Province.

BULACAO, CEBU CITY

The terminal site has been identified approximately 250 meters down stream(towards cebu), directly
adjacent to Jollibee fast food restaurant . The site is currently used as a lumber yard business although
part of the site is vacant. In terms of overall area, the site measures 1.3 Ha.Whilst the site is currently
occupied, this area for the Bulacao terminal has the following significant advantages:
-

The site is flat and would require minimal leveling

An adjacent skywalk would contribute and assist with pedestrian accessibility

The overall site area would support the operational requirements for the terminal

Minimal social and environmental impact.

AYALA MALL,CEBU CITY

The PUJ terminal that opened in 2010 on the northside of Ayala Shopping Mall, and adjacent to
ArchBishop Reyes Avenue presents a perfect opportunity to integrate with feeder services and provide a
direct access from BRT services into the Ayala Mall and terraces Area. Here are some of its functional
components:
-

Signalized intersection at Mindanao Avenue/Bohol.

Reconfigured highway link along Bohol, with a dedicated BRT lane provided on the North side of
the carriageway.

Drop-off layover, configured as a saw tooth arrangement on Bohol.

Incorporation of 6 BRT bays, accommodating 13.7 meters vehicle on the vacant plot of land
located adjacent to the PUJ terminal.

BRT egress onto Arch Reynes Avenue and a new traffic intersection constructed at Apitong
Street to enable BRT vehicles to access Escario and begin a return journey towards Bulacao.

Apitong Street to become one-way.

Local access street onto Apitong (southern end) to be stopped-up to reduce impact on BRT
operations along Apitong.

TALAMBAN,CEBU CITY

This area for the Talamban terminal has the following significant advantages:
-

The site is flat and would require minimal leveling

The site is near large areas of trees making it eco friendly.

The overall site area would support the operational requirements for the terminal

Minimal social impact.

III.1.3 SITE SELECTION AND JUSTIFICATION


The site that was selected was the site located in Bulacao, Cebu City mainly because of the
advantages of the site compared to the other two. In addition, there is a strong strategic justification for
accommodating provincial bus services at this location. Provincial buses terminate at the south bus
terminal but with the BRT terminal in place, this would see a large scale buses operating alongside the
BRT running way between Bulacao and South Bus terminal before dropping passengers for their onward
journey. Accommodation of within the Bulacao Terminal would shorten their trip length and enable
passengers to interchange with the BRT.

CHAPTER III.2 SITE EVALUATION ANALYSIS


CHAPTER III.2.1 THE MACRO SETTING
Second only to Manila in terms of population density with a population of 866,171 as per 2010 census,
Cebu City has grown to be one of the most populated areas throughout the whole country. Also known
as the Queen City of the South Cebu is the centre of commerce, trade and education in the Visayas
Area.

The population of the city of Cebu was 91,000 in 1960s. Now the city has grown up to 866,171 in over
161,151 households based on the 2010 census. The center of the metropolitan area called Metro Cebu
includes the large cities of Mandaue, Danao, Talisay, Naga, Carcar, Lapu-Lapu, Municipalities of
Compostela, Consolacion, Cordova, Lilioan, Minglanilla and San Fernando.

The

combined

population of these rivals that of Metro Manila with 2.55 million people based on the 2010 census.

The land area of Cebu is 315 square kilometres from the northeast town of
Mandaue City to the town of Minglanilla. The large parcel of land is further subdivided into 80
barangays. These are grouped into 2 congressional districts, 46 of those barangays belong to the
northern district and 34 to the Southern district.
BULACAO

Bulacao is a barangay in Cebu City. The name Bulacao was derived from the visayan word dawa or
kabogtrees. These trees are indigenous to this part of Cebu and were raised by most of the original
settlers of this barangay. Bulacao alone has a estimated population of 9,125.
Nearby cities: Claveria, Misamis Oriental, Cagayan de Oro City, Misamis Oriental, Municipality of
Esperanza
CHAPTER III.2.2 MICRO SETTING
THE SITE

The site is estimated to be 13321.76 m.located near four academic buildings namely, East Visayan
Academy, Asian College of Technology,St.Paul College and Bulacao Community College. The site is
adjacent to a Major arterial of road Natalio B. Bacalso Avenue. The site is near subdivisions and a
hardware store. Mall establishments and mixed use commercial developments are far from the site.

CHAPTER III.2.3 LAWS AND ORDINANCES PERTAINING TO THE SITE


CEBU CITY TRAFFIC ORDINANCE 1784
An Ordinance requiring all public utility buses including mini-buses from the south to load and unload
passengers at the South Bus Terminal
CEBU CITY TRAFFIC ORDINANCE 1958
An Ordinance regulating the establishment and operation of terminals for public utility jeepneys and vhire vehicles in the City of Cebu, repealing City Ordinance No. 1773
SANITATION CODE OF THE PHILIPPINES P.D. 856
SECTION 5. GENERAL REQUIREMENTS FOR REST AREAS, BUS TERMINALS, BUS STOPS AND SERVICE
STATIONS
5.1 Rest areas, bus terminals, bust stops and service stations with one or more
permanent sheds, buildings, and service facilities for motor vehicles shall be
provided with sanitary facilities for the convenience and personal necessities of the
traveling public. They shall be well lighted and ventilated in accordance with the
standards of DOH.
5.2 Rest areas and bus stops shall be constructed by concerned agencies (DPWH, DOT,
LGUs ETC.) at least one for every two hours travel interval but not shorter than 30
kilometres interval along national highways and shall preferably occupy a one
hectare area. They shall be erected at a reasonable distance from the shoulder of
the road, with due regard to traffic flow, zoning regulations, fire safety,
environmental concerns and aesthetic.

CHAPTER III.3 SITE DEVELOPMENT OPTIONS


SITE ANALYSIS
VICINITY MAP

The site is easily accessible to Natalio B. Bacalso Avenue. The barangay and municipal roads near the site
are connected to the main avenue. The site is near 4 academic institutions. The site is near a
government institution, Bureau of Internal Revenue. The Natalio B. Bacalso Avanue will intersect Cebus
main thoroughfare meaning most of the vehicles, PUVs or private cars will most likely converge on
these arterials.

SUNPATH DIAGRAM

WIND ANALYSIS

NOISE ANALYSIS

The almost all sides of the site releases minimal noise, the only excessive noise comes from Bacalso
Avenue which is understandable because it is a major arterial.

PROPOSED SITE DEVELOPMENT PLAN


SCHEME 1

SCHEME 2

RELATED APPENDICES

Vous aimerez peut-être aussi