PROJECT REPORT

ON

INDUSTRIAL VISIT AT WANAKBORI (T.P.S)


Submitted in accordance with the INDUSTRIAL VISIT requirements for
5th semester of the BE course
In the branch of
ELECTRICAL ENGINEERING
Of
GUJARAT TECHNOLOGICAL UNIVERSITY
YEAR 2013

Submitted By:Mr. D.A.DIVRANIA


Mr. B.G.RADADIA

W.T.P.S
Page 1

ACKNOWLEDGEMENT

We are gladly thankful to our Principal Dr. H. M. Nimbark, H.O.D Mr. Rahul A. Parmar and our
staff members who give us a great guidance regarding training and instruct us the importance of training
in electrical field. So we decided to take visit in thermal power plant which is situated at Wanakbori.
We are especially thankful to respected chief engineer. Thermal power station, Wanakbori
because we granted us permission for taking visit in wonderful campus.

W.T.P.S
Page 2

INDEX

Introduction

(5)

Purpose of Visit

(6)

Block diagram of power plant

(6)

Working Power Plant Models

(9)

Future

(10)

Equipments Details

(11)

Switch Yard

(12)

Other Details

(16)

Control Room

(17)

10

Conclusion

(18)

W.T.P.S
Page 3

INTRODUCTION:-

W.T.P.S is the biggest power plant in GUJARAT.


Wanakbori Thermal Power Station is a coal-fired power station in Gujarat, India. It is located on
the bank of Mahi river in Kheda district.
There are 7 Turbo Generator sets each of 210MW out of which first 3 units are equipped with
Russian Turbines and other 4 Units are equipped with German Turbines. Unit no 7 is entirely
Computerised and well advanced. All the above units are of BHEL make.

Unit Number Installed Capacity (MW) Date of Commissioning Status


Stage I

210

March 1982

Running

Stage I

210

January, 1983

Running

Stage I

210

March, 1984

Running

Stage I

210

March, 1986

Running

Stage I

210

September 1986

Running

Stage I

210

November 1987

Running

Stage II

210

December 1998

Running

W.T.P.S
Page 4

PURPOSE OF VISIT:Electrical Engineering Dept. of OM Engineering College, Junagadh decided to arrange one day
industrial visit for 5th Electrical Engineering students to improve practical knowledge and get benefited
their theoretical knowledge
In W.T.P.S, Students will get benefit regarding their theoretical subject of conventional power
engineering, Electrical Power and Electrical & Electronic Measurement

BLOCK DIAGRAM OF POWER PLANT:Coal to Electricity Process

W.T.P.S
Page 5

Energy Balance

W.T.P.S
Page 6

Feed Water & Steam Flow Diagram:-

W.T.P.S
Page 7

WORKING POWER PLANT MODELS:-

Generator, Generator Transformer


Turbine
Boiler, Boiler Drum
Boiler Burners, Dampers arrangement
Boiler Feed Pump
Air Pre-heater
ID Fan, FD Fan, PA Fan
Coal Mill
FW Pump

W.T.P.S
Page 8

FEATURES:-

Installed Capacity : 7 210 = 1470 MW


Total Area of Project : 1571 Acres
PLF % : Between 84.64 to 91.24%
Plant Area : 626.2 ha
Ash Dump Area : 215.7 ha
Cooling Water Quantity Required : From
Canal of Mahi River Reservoir 60 to 70 Cusecs / month
Cooling Tower Heights :
Stage I & II 112 Mtrs, Stage III 118 Mtrs.

W.T.P.S
Page 9

EQUIPMENT DETAILS:Fuel Details:-

Fuel: Bituminous Coal


Linked Coal Mines : Coal India
From Bihar, Orissa, M.P., West Bengal, Andhra Pradesh
Generally 400 Wagons [ 07 Racks ] received per day
Record of Unloading Wagons : 650 Wagons / Day
Gross Calorific Value of Coal : 4400 Kcal/Kg
Nos of Wagon Tipplers: 05 NOS.
Coal Quantity Required :
With Design Coal : 16000 MT / Day
With Actual Coal: 18000 MT / Day
Stock Yard: Storage Capacity: 02 Lacks MT (Approx.)
Area : 48000 m2
Oil : LSHS / LDO

W.T.P.S
Page 10

Boiler Details: Stage I & II : Tangentially Fired, Balance Draft,


Natural Circulation, Radiant Reheat Type
Stage III : Vertically Suspended Water Tubes,
Radiant Reheat Cycle, Natural Circulation
Capacity : 700 Tones / hr / unit
Feed Water Temp. : 241 C
Steam Pressures at Boiler Outlets :
[1] SH: 137 Kg / Cm2
[2] RH: 25.8 Kg / Cm2

W.T.P.S
Page 11

Turbine Details:Type: Three Cylinders Condensing Tandem,


Compound Horizontal Reheat Type.
Makes: LMW (Russian), KWU (German).
Nos. of Stages:
1. Stage I: HP 12, IP -11,
LP Double Flow each having 4 stages.
2. Stage II: HP 25,
IP Double Flow each having 20 stages,
LP Double Flow each having 4 stages

Generator Details:

Type: THW - 210 2B (Water & Hydrogen Cooled Turbo Generator)


Rated Capacity: 210 MW, 247 MVA
Power Factor: 0.85 Lag
Stator: 15.75 Volts, 9050 A
Rotor: 310 V DC, 2600 A
Excitation System: Static
Type of Cooling: Water, Hydrogen
Hydrogen Pressure: 3.5 Kg / Cm2

W.T.P.S
Page 12

Transformers Details:Generator Transformer:


Stage I: 250 MVA, 15.75 / 220KV
Stage II: 250 MVA, 15.75/400KV

Interconnection Transformer: 500 MVA (167 x 4, 3+1 St by), 220 / 400 KV


Station Transformers: 25 MVA, 220 / 07 KV
Unit Auxiliary Transformers: 15 MVA, 15.75 / 07 KV
Unit Service Transformers: 07 KV / 433 Volts
Station Service Transformers: 02 MVA, 07 KV / 433 Volts

W.T.P.S
Page 13

SWITCH YARD:-

The control room, in case of remote control, houses all the necessary measuring instruments for each
panel or alternator and feeder, synchronizing gear, protective gear, automatic voltage regulator,
communication arrangement etc

Switch Yard.
The switchyard houses transformers, circuit breaker sand switches for connecting and disconnecting the
transformers and circuit breakers. It also has lightning arrestors for the protection of the power station
against lighting strokes.

W.T.P.S
Page 14

OTHER DETAILS:-

D.M.Water Requirement:
35 M3/hr/Unit
Ash Evacuation:
Fly Ash Dry Wet/Vacuum
Bottom Ash Mechanical

W.T.P.S
Page 15

CONTROL ROOM:-

Types of Control Panel

Fuel Gas Panel


Combustion Air Panel
Primary Air & Coal Panel
Steam Panel(Boiler)
Feed Water panel
Condensate & Cooling Water Panel
Turbovisory Panel

W.T.P.S
Page 16

CONCLUSION:-

After visit at the Wanakbori Thermal Power Station I can say that one can visualize the complex
study of power generation using coal as a fuel, which will help me a lot in future in many field & I can
understand the function of each component in thermal power station, their importance, their arrangement
& precautions that to be used for the safety in the plant.
At last I will only say that I really enjoyed my visit over here and I again want to thank all my
faculties, staff of Wanakbori Thermal Power Station to give me this great pleasure of the training.

W.T.P.S
Page 17

W.T.P.S
Page 18

W.T.P.S
Page 19

Thank you

W.T.P.S
Page 20