Estimate for the work:-Construction of Office septic tank

Sl.No.
1

Description
Earthwork in excavation in hard & gravelly soil in foundation & plinth including
rough dressing an levelling the beds depoisting the soil within 50mtrs initial
lead & labour required for the work complete.
,1
X
2.50 X
2.00 X
2.50 =
12.5 Cum.
@ Rs
Sand filling in foundation & plinth including watering, ramming, cost,
conveyance, royalty, curing, taxes of all materials etc. & labour required for the
work complete.
,1

2.00 X

0.10 =

0.5 Cum.
@

Rs

2.50 X

2.00 X

0.10 =

0.5 Cum.
@

Rs

R.C.C work with cement concrete (1:11/2:3)using 12 mm C.B.H.G. Chips


including,hoisting,laying,labour,cost
conveyance,royalty,centering&shutering complete.
SlabBedWall-

2.50 X

Cement Concrete (1:4:8) using 40 mm sized hand broken hard granite metal
including cost, conveyance, royalty, curing &taxes of all materials etc. & labour
required for the work complete.
,1

,1
,1
,1

X
X
X

2.50 X
2.50 X
9.50 X

0.15 =
0.75
0.10 =
0.50
2.20 =
5.23
Total
6.48 Cum.
@
Supply,cutting, bending, fitting and placing in position including cost,
conveyance, taxes of binding materials, labour & M.S. Road (HYSD Bar)
complete.
Qnty. Same as item No.4

2.00 X
2.00 X
0.25 X

Asst. Engineer
Sambalpur Municipality

6.48 Qntl
@

Rs

Rs
TOTAL:
OR SAY

Junior Engineer
Sambalpur Municipality

Technically sanctioned for Rs.81,000/(Rupees eightyone thousand) only

Municipal Engieer
Sambalpur Municipality

Municipal Engieer
Sambalpur Municipality

Administrator
Sambalpur Municipality

nk
Rate/ Cum

Amount in Rs.

87.55

1094.38

345.20

172.60

2996.20

1498.10

5417.25

6609.6

35076.69

TOTAL:
OR SAY

42830.21
80671.98
81000.00

Junior Engineer
Sambalpur Municipality

Administrator
Sambalpur Municipality

Estimate for the work :- Construction of Paving Yard and Erection of Stainless steel grill for fencing at Remed
Chowk,Sambalpur for Biju Pattnaik Statue.
Sl.N
o.
Description
Nos.
1 Dismentaling of existing iron grill &
brick wall and concrete wall
etc.complete.
2
Earthwork in excavation in hard and
gravelly soil inF&P including rough
dressing &breaking that clod minimum
5/7 Cm in layer not as per the
direction of Engineer - in -charge.

Length Width

Height

Vol.

Unit

L.S

2
1
1
1

7.60
6.65
3.14
92.19

39.73 Cum @

0.60
0.6
0.6

Rs.

0.60
0.6
0.6
0.3
Total=
87.55

Rs

5.47
5.47
1.13
27.66
39.73
/Cum

Cum
Cum
Cum
Cum
Rs.

3
Sand filling in f&p including
watering,ramming , cost
conveyance,royalty,curring& labour
required for the work complete.
2
1
1
paved area

7.60
0.60
6.65
0.60
3.14
3.88
area=92.19

30.76 Cum @
4

Rs.

0.15
0.15
0.15
0.30

345.20

0.68 Cum
0.60
1.83
27.66
30.76 Cum
/Cum

Rs.

R.C.C(1:11/2:3) using 40 mm sized hbhg


metal including cost, conveyance,
royalty, curring &taxes of all material
etc.and labour required for the work
complete.
2
1
1

7.60
6.65
12.16

0.60
0.6
0.6

0.15
0.15
0.15
Total=

3.06 Cum @

Rs.

5417.30

1.37
0.60
1.09
3.06
/Cum

Cum
Cum
Cum
Cum
Rs.

5 Supplying,cutting,bending,binding,&
placing in position including
cost,conveyance,taxes of all
material,labour & M.S Rod(HYSD)ar
complete.
Same Qty. as per
item No.4=

3.06
Rod

3.06 Qntl @

Rs.

Cum.

6609.60

3.06 Qntl.
/Cum

Rs.

6
Cement concrete with(1:2:4)using 12
mmC.B.H.G. metal including curing
,cost conveyance, royalty, c&s,taxes
etc.& labour required for the work
complete.
1

7.60

0.25

0.25

0.48 Cum

3.00

0.25

0.25

0.19

Total:
0.66 Cum @

Rs.

0.66 Cum

4702.3 /Cum

Rs.

7
Supplying ,fitting,fixing of stainless
steel of 30m grade in hand railing
using 50mm pipe with dia 2 mm thick
circular pipe with balustrade of size (32
x 32x 2) mm @0.90m C/C of stain less
circular pipe brasing of (32x32x2) mm
in 3 rows in staircase as per approved
design & specification
,bugging,polishing etc. with cost,
conveaynce , taxes of all materials
,labour in F & P etc. complete
34.61 R.M
113.52 Rft. @

=
Rs.

113.52 R.Ft.
1000.00

Rs.

8
12mm thick Cement plaster with C.M(
1:6) including curing etc. complete.
2

34.61

29.42 Sqm @

0.425
Rs.

29.4185 Sqm
85.40

/Sqm

Rs.

9 Weather coat with primer


29.42 sqm

Qnty.same as item no.6


29.42 Sqm @

Rs.

84.00

/Sqm

Rs.

10 Supplying ,fitting,fixing of paver tile


including cost with all taxes
transpotation etc.complete.

deduct

7.3

1
1

3.14
1.75

3.75
1.75

92.19 Sqm @

51.1
3.75

Rs.

1200.00

44.16
3.06
92.19 sqm
/Sqm

Rs.

11
Providing ,fitting,fixing of black granite
tile including curing etc.complete.
Top

1.75

1.575

11.025

1.75

1.75

3.0625
Total:
=

46.21 Sq.ft @

Rs.

14.0875 sqm
46.21 Sq.ft

200.00

/Sq.ft

Rs.

12 Providing,supplying ,fitting,fixing of
stain less steel stair case for garlanding
with railing including all
cost,conveyance ,taxes labour T&P
etc.complete.
L.S
say
(Rupees Three Lakhs Seventy Six thousand)only
Submitted to

Junior Engineer
Sambalpur Municipality

Assistant Engineer
Sambalpur Municipality
Technically sanctioned for
Rs.3,76,000/-

Municipal Engineer
Sambalpur Municipality

ill for fencing at Remed

Amount

10000.00

3478.36

10618.35

16576.94

20225.38

3103.52

113520.00

2512.34

2471.15

110628.00

9242.00

74000.00
376376.04
376000.00

ed to

nt Engineer
pur Municipality

Estimate for the work: -Construction of .shed at Govindtola daily market,w.no.-2


Sl.No
1

Description
Earthwork in excavation in hard & gravelly soil in foundation & plinth including
rough dressing an levelling the beds depoisting the soil within 50mtrs initial lead
& labour required for the work complete.
5X
5X

3X
2X

11.20 X
2.67 X

0.60 X
0.60 X

0.60 =
0.60 =
Total

60.48
9.61
70.09 Cum.

@ Rs

2
Sand filling in foundation & plinth including watering, ramming, cost,veyance,
royalty, curing, taxes of all materials etc. & labour required for the work
complete.

Floor
area
3

Floor
area
4

5
Floor
area
6
7

Floor
area
8

5X
5X

3X
2X

11.20 X
2.67 X

0.60 X
0.60 X

0.15 =
0.15 =

5X

1X

10.21 X

2.51 X

0.60 =

5X

1X

10.97 X

3.60 X

0.10 =

5X

1X

10.97 X

3.600 X

0.075 =

15.12
2.40

76.88
94.40 Cum. @ Rs
Cement Concrete (1:4:8) using 40 mm sized hand broken hard granite metal
5X
3X
11.20 X
0.60 X
0.15 =
15.12
5X
2X
2.67 X
0.60 X
0.15 =
2.40
19.75
37.27 Cum. @ Rs
Brick work with K.B brick in F & P using CM(1:6) including all cost, labour, T
5X
3X
10.97 X
0.375 X
0.90 =
55.54
5X
2X
2.51 X
0.375 X
0.90 =
8.47
64.01 Cum. @ Rs
R.C.C work (1:11/2:3)using12mm&down graded C.B.H.G. Chips
14.81
14.81 Cum.
Supply,cutting, bending, fitting and placing in position including cost,
=
4.44 Cum.
Qnty. Same as item no.5=14.80cm@0.3qtl./cum
12mm. Thick cement plaster in CM(1:6) over brick work with neat
5X
2X
10.97 X
0.60
=
65.82
5X
2X
3.66 X
0.60
=
21.96
5X

1X

10.97 X

3.60

197.46
285.2 sqm
Supplying ,fitting ,fixing of gable truss including all cost conveyance
45.5qntl
.
=
35 nos @1.3 qntl.per each
=
4550 kg

@ Rs
@ Rs

@ Rs

Ridge
beam

5X

2X

11.4 =

Eaves

5X

2X

11.4 =

3kg/mtr =
3.0
114 X kg/mtr =

2.5 =

8.47 kg
175 X /mtr
=

Round
tube pipe
9

10

11
Pipe
Ridge
beam
Eaves
Truss

5X

342 kg
342 kg

1482.25 kg
6716.25 kg
Suppling fitting ,fixing of GCI sheet including cost of all materials , labour,
5 X ### X
4.2 =
=
239.4
Add
5% =
=
11.97
251.37 sqm
Cost of J.hooks,cup washer ,bitumen washer,domond G.I washer.
Qnty.same as item no.9 @0.30 kg/sqm
=
75.41 kg
orsay=75 kg
Enamel painting 2 coats including cost of paint ,labour ,taxes etc.
5 x 14 x
3.14 x
0.075 x
1.8 =
29.673 sqm
5x
5x
5x

14 X

114

2x
2x
5 sqm

0.2 x
11.4 x

11.4
0.2

=
=
=

22.8
22.8
25
100.273

sqm
sqm
sqm
sqm

@ Rs

@ Rs

@ Rs

@ Rs.

Add 1% contigency
or say=

Rupees Ten lakhs thirty five thousa

arket,w.no.-2
Rate

Amount in
Rs.

87.55 =

6136.55

345.2 =

32588.36

2996.20 =

111665.38

2880.50 =

184371.80

5417.25 =

80226.76

6609.60 =

29346.62

96.30 =

27468.61

69.65 =

467786.81

291.77 =

73342.22

60.00 =

4500.00

71.20 =

7139.44
1024572.58
=
10245.72
or say=
1034818.30
OR
=
1035000.00
ees Ten lakhs thirty five thousand only

Estimate for the work: -Construction of Culvert at Tibriwallgali


Amount in Rs.
Sl.No.
1

Description

Rate/ Cum

Earthwork in excavation in hard & gravelly soil in foundation & plinth


including rough dressing an levelling the beds depoisting the soil
within 50mtrs initial lead & labour required for the work complete.

,1

5.00 X

1.50 X

1.20 =

9 Cum. @ Rs

87.55 =

2
Sand filling in foundation & plinth including watering, ramming, cost,
conveyance, royalty, curing, taxes of all materials etc. & labour
required for the work complete.

,1
3

5.00 X

1.50 X

0.10 =

5.00 X

1.50 X

0.10 =

345.20 =

0.75 Cum. @ Rs

2996.20 =

R.C.C work with cement concrete M 20 grade (1:11/2:3)using 20


mm&down graded C.B.H.G. Chips including,
hoisting,laying,labour,cost conveyance,royalty,centering&shutering
complete.
Bed- ,1

5.00 X

1.50 X

0.10 =

0.75 Cum.

Wall- ,1

5.00 X

0.25 X

0.90 =

2.25 Cum.

Slab- ,1

5.00 X

1.50 X

0.15 =

1.13 Cum.

Total
5

0.75 Cum. @ Rs

Cement Concrete (1:4:8) using 40 mm sized hand broken hard granite


metal including cost, conveyance, royalty, curing &taxes of all
materials etc. & labour required for the work complete.

,1
4

4.13 Cum. @ Rs

5417.25 =

Supply,cutting, bending, fitting and placing in position including cost,


conveyance, taxes of binding materials, labour & M.S. Road (HYSD
Bar) complete.
3.60 Qntl. @ Rs
6609.6 =
TOTAL:
OR SAY

Asst. Engineer
Sambalpur Municipality
Technically sanctioned for Rs.49,500/-only
(Rupees forty nine thousand five hundred only)

Junior Engineer
Sambalpur Municipality

Municipal Engieer
Sambalpur Municipality

Executive Officer
Sambalpur Municipality

Administrator
Sambalpur Municipality

Amount in Rs.

cv
787.95

258.90

2247.15

22346.16

23794.56
49434.72
49500.00

nior Engineer

dministrator
lpur Municipality

Estimate for the work: -Construction of Culvert at

Sl.No
.
Description
1

Amount in
Rs.

Rate/
Cum

Earthwork in excavation in hard & gravelly soil in foundation & plinth


including rough dressing an levelling the beds depoisting the soil
within 50mtrs initial lead & labour required for the work complete.

Cum. @

Rs

Rs

Rs

Rs

Rs

Rs

Rs

2
Sand filling in foundation & plinth including watering, ramming, cost,
conveyance, royalty, curing, taxes of all materials etc. & labour
required for the work complete.
X

Cum. @

3
Cement Concrete (1:4:8) using 40 mm sized hand broken hard
granite metal including cost, conveyance, royalty, curing &taxes of
all materials etc. & labour required for the work complete.
X

Cum. @
1

Cement concrete with M-20 grade (1:1 /2:3) using 12mm & down
graded C.B.H.G. Chips including cost, conveyance, royalty, curing,
hoisting & taxes of all materials and labour required for the work
complete.
X
5

Cum. @

Cement concrete (1:2:4) using 12mm C.B.H.G. Chips including


cost, conveyance, royalty, curing & taxes of all materials and labour
required for the work complete.
X

Cum. @

6
12mm. Thick cement plaster in CM(1:6) over brick work including
cost, conveyance, curing, royalty, and taxes, labour etc. complete.
X
7

Cum. @

Supply,cutting, bending, fitting and placing in position including cost,


conveyance, taxes of binding materials, labour & M.S. Road (HYSD
Bar) complete.
X

Cum. @

TOTAL:
OR SAY

Asst. Engineer
Sambalpur Municipality

Junior Engineer
Sambalpur Municipality

Technically sanctioned for Rs.


(Rupees

Municipal Engieer
Sambalpur Municipality

Municipal Engieer
Sambalpur Municipality

Administrator
Sambalpur Municipality

Estimate for the work:- Supplying,Making, Fitting & fixing of Sign board for City Bus stop

Sl.No.
Description
Supplying of M.S angle as per prevalling market rate.
1
M.S angle(0.065x0.005x0.00375)

No.

Length

2.85
2.85m

MS angle(0.030x0.005x0.00125)

Breadth

4.2
4.2m@

Supplying of m.s plate of 16 gauge size(0.9x0.6)m as per


prevalling market rate.
1
1.8

3
4

5
6

Straightening ,welding and fitting of MS angle and M.S


plate ,labour etc complete.
Earth work in excavation in hard & gravely soil including
rough dressing & levelling of beds with all cost,
conveyance& labour required etc. complete.
Sand filling in F&P with well watering & ramming properly
etc. complete.
C.C ( 1:2:4) with 12mm size CBHG chips including all
cost, conveyance,royality ,taxes etc.& labour required for
the work complete .

mt@

0.3 kg/mt

0.45

0.45

0.45

0.45

0.45

0.45
Total=

7
8

Transportation of angular post to the proper site for fixing


with C.C on display board
Painting 2 coats with enamel paint with cost of paint &
cost of labour etc. complete.

Cost Flax with writing each

1
1
1

0.075
0.05

Rate per 01 no. of stand pos


for
10

Junior Engineer
Sambalpur Municipality
Sambalpur
Techinically Sanctioned for

Rs.35,200/-only

Municipal Engineer
Sambalpur Municipality
Sambalpur
Executive Officer,
Sambalpur Municipality
Sambalpur

n board for City Bus stop at different placess.

Height

Volume

Unit

Rate in
Rs.

Amount

m
5kg/m

14.25

kg

45.00

641.25

2.22kg/m

9.33

m
kg

44.00

410.52

60.00

360.00

600

600.00

87.55

10.50

345.2

10.50

4586.6

412.79

50

50.00

72

17.28
1000.00
3512.84

3512.84
say

35128.40
35200.00

1.8

mt.
6

kg

0.6

0.12

0.15

0.03

cum

0.45

0.09

Cum

0.09

Cum

2.4
1.2
Total

0.18
0.06
0.24

Sqm.
Sqm.
Sqm.

Rate per 01 no. of stand post


10 nos
each
or

Assistant Engineer,
Sambalpur Municipality
Sambalpur

Administrative approved
for Rs.35,200/-only

Administrator,
Sambalpur Municipality
Sambalpur

Estimate for the work:- :-highmast

Sl.No.
Rate/ Cum
Description
1 Earthwork in excavation in hard & gravelly soil in foundation & plinth
5.5 X
1X
0.25 X
0.30 =
0.41 Cum.
@ Rs
87.55 =
2 Sand filling in foundation & plinth including watering, ramming, cost,
1X
5.5 X
0.25 X
0.1 =
0.14 Cum.
1X
3.141 X
0.44 X
0.4 =
0.55 Cum.
Total
0.69 Cum.
@ Rs
345.2 =
3 Cement Concrete (1:4:8) using 40 mm sized hand broken hard granite metal
1X
5.5 X
0.25 X
0.1 =
0.14 Cum.
1X
3.141 X
0.44 X
0.1 =
0.14 Cum.
Total
=
0.28 Cum.
@ Rs
2996.2 =
4
Brick work with K.B brick in (1:6) C.M for F&P etc.
5
6

1X
5.5 X
0.25 X
0.5 =
0.69 Cum.
Cement concrete (1:2:4) using 12mm C.B.H.G. Chips including cost,
3.14 X
0.75 X
0.75 X
0.05 =
0.09 Cum.

@ Rs

2880.5 =

@ Rs

4586.6 =

12mm. Thick cement plaster in CM(1:6) over brick work including cost,
conveyance, curing, royalty, and taxes, labour etc. complete.
1X
1X

6.3
3.141 X

0.5 =
1X
1=
Total
=

3.15 Cum.
3.141 Cum.
6.291 Cum.

@ Rs
81.4 =
TOTAL:
OR SAY

For 5 numbers=

Asst. Engineer
Sambalpur Municipality

Junior Engineer
Sambalpur Municipality

Technically sanctioned for Rs.20,000/(Rupees Twenty thousand only)

Municipal Engieer
Sambalpur Municipality

Municipal Engieer
Sambalpur Municipality

Administrator
Sambalpur Municipality

Amount in Rs.
36.11

238.30

839.00

1980.34
405.18

512.09
4,011.26
4,000.00
20,000.00

Junior Engineer
r Municipality

Administrator
mbalpur Municipality

Estimate For the work:-Construction of R.C.C Road At


Description

Sl.
N
o.

Qnty

Earth work in excavation in hard & gravelly


soil in foundation and plinth including rough
dressing and levelling the bed depositing
the soil with in 50 mtrs initial lead and all
lifts and labour required for the work etc
complete. and as per the direction of Eng-InCharge 1 x 120.0
Drain
x 0.65
0.70
Wall
Road

1x
1x

130.00 x
130.00 x

0.25 x
4.10 x

0.250 =
0.100 =

54.60
8.13
53.30
116.03

Rate/
Cum

Unit

Amount in Rs.

CUM
CUM
CUM
CUM
@

87.55 =

10157.99

345.20 =

28440.17

2996.20 =

167487.58

Supplying all materials, labour, T&P and


filling in foundation and plinth with sand
well watered and rammed including
conveyance of all materials to work site,
payment of royalty , taxes etc all complete
as per specification and direction of
Engineer-in-charge.
Drain
Wall
Road

1x
1x
1x

=
120.00 x 0.65
x 0.10
130.00 x
0.25 x 0.075 =
130.00 x
4.10 x 0.150 =

7.80
2.44
79.95
82.39

CUM
CUM
CUM
CUM

Cement Concrete (1:3:6) using 40 mm sized


hand broken hard granite metal in F & P
including cost, conveyance, royalty, curing
&taxes of all materials etc. & labour
required for the work complete.
Drain
1 x 120.00
Wall
Road

1x
1x

x 0.65

130.00 x
130.00 x

x 0.10

0.20 x
4.10 x

=
0.100 =
0.100 =

7.80 CUM
2.60 CUM
53.30 CUM
55.90 CUM

Supplying all labour, materials ,T&P and


providing Cement concrete (1:1:3)
with crusher broken hard granite chips
on 12mm size RCC works including cost
of

conveyance&

watering

royalty

,curing

,sundries,

&lifting

&laying

concrete at a height of 5mtr. Maximum


complete etc all complete(Excluding cost
of reinforcement But including cost of
centering & shuttering)
Drain
L/S
R/S
Bed
Wall
Road

1 x 120.00
1 x 120.00

x 0.1
x 0.25

x 0.60
x 0.60

=
1 x 120.00 x 0.65
x 0.075 =
1 x 130.00 x
0.20 x 0.325 =
1 x 130.00 x
4.10 x 0.150 =

7.20 CUM
18.00 CUM
5.85 CUM
8.45 CUM
79.95 CUM
119.45 CUM
@

Supplying all materials, labour, T&P and


providing M.S. reinforcement for R.C.C.
work including cutting, bending, binding
and laying the grill and position
including cost of binding wire 18 to 20
gauge, conveyance of all materials to
Work site, payment of royalty taxes, etc
all complete as per specification and
direction of Engineer-in-charge
Quantity vide RCC item
@
0.30 qntl
/ cum

5417.25 =

433109.14

@ 6609.600 =
Total

Or say

238434.05
877628.92
8776.289207
2000.00
888405.21
888405.00

36.07

Add contingency 1%
Add for Display board and photographs

Techinically Sanctioned for


For
888405.00
ONLY

Administrative approved

For 888405.00

ONLY

130.0

sand road metal road

5.0

0.15

0.10

Rate
e/w
sand
metal
Rcc

rod

LENGTH
87.55
120
345.20
2996.20
5417.25

6609.600

drain
RIGHT

LEFT
2

0.1

0.25

wall metal

rcc road

0.10

OPEN

TOTAL
0.30

0.15

0.25

0.10

METAL
RCC
0.10
0.075

SAND
0.7

WALL WIDTH

116.03
82.39
55.90
119.45
36.07

Estimate For the work:-preparation of bill


Sl.
N
o.

Description
Qnty

Amount in Rs.

Rate/
Cum

Unit

Earth work in excavation in hard & gravelly


soil in foundation and plinth including rough
dressing and levelling the bed depositing
the soil with in 50 mtrs initial lead and all
lifts and labour required for the work etc
complete. and as per the direction of Eng-InCharge

#REF!

#REF!

#REF!

#REF!

Supplying all materials, labour, T&P and


filling in foundation and plinth with sand
well watered and rammed including
conveyance of all materials to work site,
payment of royalty , taxes etc all complete
as per specification and direction of
Engineer-in-charge.
Drain
#REF! #REF!
Cement Concrete (1:3:6) using 40 mm sized
hand broken hard granite metal in F & P
including cost, conveyance, royalty, curing
&taxes of all materials etc. & labour
required for the work complete.

Drain
#REF! #REF!
@
Supplying all labour, materials ,T&P and
providing Cement concrete (1:1:3)
with crusher broken hard granite chips
on 12mm size RCC works including cost
of

conveyance&

watering

,curing

royalty
&lifting

,sundries,
&laying

concrete at a height of 5mtr. Maximum


complete etc all complete(Excluding cost
of reinforcement But including cost of
centering & shuttering)

#REF!

#REF!

Drain

0.00 =

0.00

0.000 =
Total

Or say

#REF!
#REF!
#REF!
2000.00
#REF!
#REF!

Supplying all materials, labour, T&P and


providing M.S. reinforcement for R.C.C.
work including cutting, bending, binding
and laying the grill and position
including cost of binding wire 18 to 20
gauge, conveyance of all materials to
Work site, payment of royalty taxes, etc
all complete as per specification and
direction of Engineer-in-charge
Quantity vide RCC item
@
0.30 qntl
/ cum
#REF!

Add contingency 1%
Add for Display board and photographs

Junior Engineer
Sambalpur Municipality
Sambalpur

Techinically Sanctioned for


For
#REF!
ONLY

Municipal Engineer
Sambalpur Municipality
Sambalpur

Assistant Engineer,
Sambalpur Municipality
Sambalpur

Administrative approved

For #REF!

Executive Officer,
Sambalpur Municipality
Sambalpur

ONLY

Administrator,
Sambalpur Municipality
Sambalpur

Vous aimerez peut-être aussi