by
Frank Gad
International Cement Production Seminar
June 2002
Value creation
NOPAT
WACC <
CAPITAL EMPLOYED
Note:
WACC =
NOPAT =
Example
5.25 US $/MT
4.30 US $/MT
40.00 US $/MT
120,000 US $/DAY
5,000 US $/HOUR
500,000 US $/YEAR
123,000 US $/YEAR
Operating Costs
Example
US $ / MT OF CEMENT
RAW MATERIALS :
FUEL (700 KCAL/KG):
POWER (105 KWH/MT + DEMAND) :
MANPOWER :
SPARES & SUPPLIES :
TOTAL:
4.50 US $ / MT
4.30 US $ / MT
7.40 US $ / MT
4.30 US $ / MT
3.50 US $ / MT
24.00 US $ / MT
QUARRY
CRUSHERS
PREBL.+TRANSP.
RAW MILL DEPT.
RAW MEAL SILO
KILN FEED
KILN & COOLER
COAL MILL
CEMENT MILL
PACK HOUSE
OTHER
TOTAL
Example
Sustainable future
Respect for the environment
(emission)
Safety (people)
Limited resources (substitute fuel
and raw materials)
HOTDISC
Trimming with
Raw Meal
Waste Inlet
Cold Raw Meal Inlet
Raw Meal
Outlet for:
Combustion Gases
Hot Raw Meal
Ashes
Kiln Gases
Ashes
Rotating Disc
Scraper
Burning Material
Inlet for:
Waste
Hot Air
Hot Raw Meal
HOTDISC
Example only
HOTDISC
HOTDISC ECONOMY FOR A 3600 MTPD CEMENT PLANT
Fuel Heat Value
330 days
Kiln Fuel
Calciner Fuel
720,000 EUR
700,000 EUR
Total investment
1,420,000 EUR
The environment
SO2, NOx, and CO
VOCs, Dioxins/Furans, HCl,
heavy metals, etc.
Dust emissions
Hazardous Waste
Bypass Dust
Regeneration of Dust
Permitting
Environmental Groups
Public Pressure
CO Reduction
SO2 Reduction
DeSOx System
Lime Injection
Gas Suspension Absorber (GSA)
Micromist ML System
Wet Scrubber
Use of Baghouses
Ventless Cooler Systems
Use of GSA Bypass System
Heat Exchangers
Dust Recovery System
Safety
Capital employed
Built cement plants better, faster
and cheaper
De-bottleneck existing plants
Improve efficiency (e-stocking,
consultancy, training, systems, people)
Example only
(Country specific)
280
260
240
RECENT JOBS
US$/MTPY
220
200
180
NORMAL COST
160
140
LOW COST
120
100
80
60
1000
2000
3000
4000
5000
6000
Capacity (MTPD)
7000
8000
9000
10000
Cost distribution
Typical cost distribution new plant
Mechanical
36 %
Electrical
7%
Construction
57 %
Total
100 %
Engineering
Mechanical
Construction /
equipment costs
F=CONSTRUCTION/EQUIPMENT
2.5
2
1.5
F=C/E
1
0.5
0
0
1000
2000
3000
4000
5000
6000
Equipment cost
US$/MTPY
90
80
70
60
50
40
30
20
10
0
US$/MTPY
MTPD
0
1000
2000
3000
4000
5000
6000
Ball mill
OK Roller Mill
%
%
cm 2/g
95
5
4,000
95
5
4,000
kWh/t
kWh/t
kWh/t
kWh/t
38.0
0.4
4.5
42.9
20.0
0.4
8.0
28.4
Power Savings:
Cost Savings:
$725,000 USD/yr
Pyroprocessing System
Production Increase
Cyclone Modifications
High Efficiency Separators
New Calciners
High Efficiency Fans
Roller Presses
Vertical Pregrinders
Cooler Upgrade/Cross-bar Cooler
Automation
Information
Trouble Shooting/Plant Guide
Quality
Smooth Operation
Energy Control
Refractory Control
Manpower
WACC
Source of capital
Tax
New financial
solutions (BOT, etc.)
Our mission
Thank you