CHAPTERS I

INTRODUCTION

1 .1

Background
Drilling line are the link from all the series adoption system (
Hoisting System) who became a unity to speed up the process
drilling. To avoid an accident that might have happened because
wears then made " slip and cut off programs." Slip and c ut off the
program is the pull cable based on strength and revealed with metric
ton -mile that suffered cable heavy burdens. suffered by drilling line at
the time :
a.

Take off and check-in drill string (round trip).

b.

Drilling Operations or Connection.

c.

The casing (running casing).

1.2 The theme Final


The theme will be taken in the work is about the count metric
Ton-Mile (CE) drilling rig Pertamina line in Drilling Services Indonesia
you onshore Drilling Area Java - KTI and the things most
fundamental about the safety suffered in drilling line (Ton-Mile) in the
operation task drilling started on October 01 last s/d October 21, 201
4 precisely in R ig PDSI #37.3/F200 - E.

1.3 The Final


General Purpose 1.3.1
1. U to fulfill the requirement k u rikulum lectures Students Study
Program Diploma III Oil Engineering as a requirement for
graduation at the Academy Oil and gas Balongan Indramayu.
2. Apply a scientific in abundant when lectures by clicking on the
field application is his drilling.
3. Increase power creativity and knowledge of the students to
produce new innovation in the world oil drilling especially in the
field.
1 3 .2 specific purpose.
1. Collecting information from drilling line that is used to process
drilling.
2. M engetahui determining metric Ton-Mile cutting and metric TonMile moving.
3. Know determining long-term cutting and long-term moving.
4. Knowing the metric Ton-Mile Drilling.
5. Knowing the metric Ton-Mile Round Trip.
6. Knowing the metric Ton-Mile casing.
7. Knowledge is shifting drilling line .

1.4 Final benefit

1.4.1 Benefits For Companies


1. Company can use power university students who work in help
resolve duties to needs in unit-work units that are relevant.
2. Perusahaa n get alternative candidates for employees on
specialization that is in the company.
3. Created this mutually beneficial relationship and beneficial
between company where the end majoring in oil engineering
AKAMIGAS BALONGAN.
1.4.2 Benefits For Akamigas Balongan
1. As a means to build network and cooperation with the company
in the oil.
2. Be Merged a curriculum that is compatible with the needs real in
the field.
3. To increase the capacity and quality of education by involving
skilled from the field in the end .
1.4.3 Benefits For students
1. Can identify closely and real conditions of the working
environment.
2. Can apply scientific about oil engineering, bench lectures in
practice and working conditions, especially regarding the count
metric Ton-Mile in drilling line .
3. Be able to contribute a positive to company where students final.

Vous aimerez peut-être aussi