Académique Documents
Professionnel Documents
Culture Documents
CHAPTER 1
INTRODUCTION
[Type text]
Industrial Training is very important to the students because the current training
conducted situations students will be exposed to real working environment. Students
are able to distinguish the situation in the learning of the world of work. Based on the
experience that students will try to equip themselves with the experience and
knowledge they have learned as a first step to go through the world of work.
Relationship amongst our employees to foster a sense of family among them.
Indirectly, students can see the relationship between the theories learned to the
work done in the course of industrial training. What has been learned in higher
education can be practiced in the training industry.
In practical training, there are some things cannot be acquired during the
studies, but the information can be obtained through a training session this industry.
Therefore, there is no denying industrial training for one semester can offer quite useful
to students pursuing training industry.
[Type text]
COMPANY INFORMATION
[Type text]
[Type text]
JA LEW
PRESIDEN /
Pengarah
Pamela Tan,
Urusan
Setiausaha Eksekutif
IC
Assembl
y
Operatio
s
QUALITY &
CL TEH
RELIABILITY
Pengarah
ASSURANCE
IC TEST
POWER
Customer
Service,
Operations
Operation
s
Planning &
Logistics
IE
IE &
&
PREMBAJ
KK WONG
ST GOH
Facilities
Facilities
Naib
Presiden
CL
Tan
CL Tan
Pengarah
R&D
Pengarah
Pengarah
Pengarah
SH NGU
FINANCE
Pengarah
PROCUREMENT
HUMAN
RESOURCE
S
BAHAROM
KY
CHUNG
Pengarah
CB SOH
INFORMATION
Pengurus
TECHNOLOGY
CV KWONG
KASIM
Naib
Presiden
Pengarah
KT KWAN
Pengarah
NAME
DATE INCORPORATED
July 1974
TYPE OF BUSINESS
Semiconductor Industry
BUSINESS ADDRESS
73 Lorong Enggang
Ulu Kelang Free Trade Zone
54200 Kuala Lumpur, Malaysia
TELEPHONE
603-4257-6222
FAXCIMILE
603-4256-2414
hr.my@statschippac.com
WEBSITE
www.statschippac.com.my
HUMAN RESOURCE
Vision :
[Type text]
Customer focus - "We owe our business to our customers, we strive to meet and
exceed to our customers expectations at all time. We understand our customers'
priorities and deliver to our commitments."
Integrity - "We mean what we say and say what we mean. We establish relationship of
trust, honesty and sincerity with people we deal with."
Teamwork - "We collectively work as a team, bringing our individual talent, experience
and expertise to achieve common goals,"
Ownership - "We are owners of statschippac, we own our responsibilities and are
accountable for our actions."
Passion to win - "We never give up till we succeed. We will strive to excel in everything
we do and perseverse till we do."
Test
Post Test
STI Machine
[Type text]
Hexa Machine
ICOS Machine
STATS ChipPAC provides Final Marking services for customers who require
multiple good bins to segregate their good units based on performance such as speed
grading their devices. These services include:
Re-work ink mark for mold packages (using black top method)
2.2.3 Baking
STATS ChipPAC uses large capacity ovens in a fully automated baking process
with built-in oven control systems that control and monitor the entire bake cycle. This
system automatically tracks the baking process until the lot completes the dry packing
cycle and generates a moisture exposure tracking report at the end of the cycle.
[Type text]
STATS ChipPAC provides 100% taping and de-taping capability. High speed
tape and reel services are available for most package types to avoid late shipments due
to bottlenecks at Post Test. STATS ChipPAC continually replaces its older Tape and
Reel systems with highly integrated Tape and Reel systems that include many of the
services highlighted above to provide the highest possible throughput at the highest
possible quality level.
STATS ChipPAC also has the expertise and flexibility to support custom Post
Test solutions requested by customers, such as serialization of units and special IT data
management requirements. As a service provider, STATS ChipPAC designs into its
standard manufacturing processes the capability for flexibility to quickly support special
requests from customers.
2.2.7 Packing
[Type text]
Page
Drop ship means that STATS ChipPACs customers do not need to bear the
expenses of maintaining inventory at their own facilities. STATS ChipPAC can instead
ship your final products directly to your end customers. Of course, you can also choose
to have STATS ChipPAC ship your final products to your own facility.
CHAPTER 3
[Type text]
Page
PREVENTIVE MAINTENANCE
The care and servicing by personnel for the purpose of maintaining equipment
and facilities in satisfactory operating condition by providing for systematic inspection,
detection, and correction of incipient failures either before they occur or before they
develop into major defects. Maintenance, including tests, measurements, adjustments,
and parts replacement, performed specifically to prevent faults from occurring.
The primary goal of maintenance is to avoid or mitigate the consequences of
failure of equipment. This may be by preventing the failure before it actually occurs
which Planned Maintenance and Condition Based Maintenance help to achieve. It is
designed to preserve and restore equipment reliability by replacing worn components
before they actually fail. Preventive maintenance activities include partial or complete
overhauls at specified periods, oil changes, lubrication and so on. In addition, workers
can record equipment deterioration so they know to replace or repair worn parts before
they cause system failure. The ideal preventive maintenance program would prevent all
equipment failure before it occurs.
While preventive maintenance is generally considered to be worthwhile, there
are risks such as equipment failure or human error involved when performing
preventive maintenance, just as in any maintenance operation. Preventive maintenance
as scheduled overhaul or scheduled replacement provides two of the three proactive
failure management policies available to the maintenance engineer. Common methods
of determining what Preventive (or other) failure management policies should be
applied are; OEM recommendations, requirements of codes and legislation within a
jurisdiction, what an "expert" thinks ought to be done, or the maintenance that's already
done to similar equipment, and most important measured values and performance
indications.
In IC Post Test department, there are several equipment that requires preventive
maintenance, such as :
[Type text]
Page
Zebra Printer
Device that uses high voltage to ionize (electrically charge) air molecules.
Negative ions, or anions, are particles with one or more extra electrons, conferring a net
negative charge to the particle. Cations are positive ions missing one or more electrons,
resulting in a net positive charge. Most commercial air purifiers are designed to
generate negative ions. Another type of air ionizer is the ESD ionizer (balanced ion
generator) used to neutralise static charge.
The ionizer can operate with external sensors to maintain precise balance
(better than 1V) by altering ion output and adapting to environment changes. With the
[Type text]
Page
The Bench Top Blower ioniser employs the safe non-nuclear AC ionization
source. AC systems utilize emitter electrodes that are switched rapidly between positive
and negative high voltage, usually at the power line frequency (50Hz). The ionizer's
unique Faraday Balance System monitors ion output and automatically adjusts the unit
to teach an equilibrium at low offset voltage or balanced ion flow. The ionizer is
designed to achieve balance under extreme condition and is uniquely able to maintain
balance in most any environment.
Ions are emitted in an efficient laminar flow. This reduce air turbulence and ion
recombination, prolongs cleanliness and increases efficiency. The ionizer's unique trimetallic ion emitter electrodes produce a high ion output for rapid charge dissipation.
The Bench Top Ionizer is engineered for efficiency and durability, making the Bench Top
Ionizer highly dependable and cost effective.
[Type text]
Page
Use air gun to blow of the dusts accumulated inside the ionizer blower fan
Clean the ionising needle with erasing rubber or/and cotton stick dampened with
IPA
Performance Check
Place the blower at about 2 feet away from the charge plate of AM5000 or
equivalent with the direction of air flow towards the plate. Perform ion balance
and decay test.
The decay time should not be greater than 5 sec when discharge from +/1000V to +/- 1000V
[Type text]
Page
[Type text]
Page
Faster print speeds - up to 356mm per second for increase batch and print
productivity
Totally reliable
[Type text]
Page
The Zebra printer recommends checking in every months. As with all zebra
printer, periodic maintenance will be needed to provide optimum performance. There
are some method that should to follow regarding on servicing :
Cleaning :
Remove dirt and lint from the interior of the printer using brush and vacuum
cleaner
Rotate and clean the peel-off upper guide rod, plated guide rod, rewind power
roller and lower guide rod with IPA
Blow media, ribbon and stuck media along the media path
[Type text]
Page
Adjustment :
[Type text]
Page
Check the test label and perform adjustment if missing print in printed area,
missing or light vertical line, missing horizontal line, light or no printing on the left
or right hand side, and illegible print.
[Type text]
Page
[Type text]
Page
Cleaning process
Adjustment
process
Print quality
verification
[Type text]
Page
The ICs are directly processed from the sticks and for better performance the
ICs can be automatically fed into an empty stick after preforming. Due to the simple
design of the machine, the operation and setup of the machines are very easy and
large scale adjustments are not required.
The handling of different pitches is achieved by changing the feeding rails. The
standard sets the IC leads to the right pitch. For additional cutting and kinking of the
leads customized machines with special tooling are available.
Before mounting ICs to the PCB, it may be necessary to alter the pitch of the
leads. This product preforms the legs of ICs in order to present a correct entry angle
into the PCB saving valuable production labor time.
The performance of the model can be 3 sec for standard IC tube. The ICs are
directly processed from the sticks and automatically fed into an empty stick after
preforming. Simple and easy operation design.
Rework machine
[Type text]
Page
Lead pitch
Bent lead
Implied coplanarity
Combing (station1)
Servicing method :
[Type text]
Page
Station
1
Station
2
Station
3
[Type text]
Page
A device used as an intermediate in the Transfer of a unit. The transfer unit of the flute
to the tube.
Servicing method of transfer fixture :
[Type text]
Page
[Type text]
Page
CHAPTER 4
4.1 Introduction
for
testing
semiconductors,
namely,
automated
functional,
[Type text]
Page
After the device has been transferred into the embossed pocket of the carrier
tape, just before the device is being sealed up under the cover tape, ME2082 inspection
system performs another full inspection to ensure ultimate quality assurance from
possible visual mechanical defects on the device.
Though ME2085 is a single application, it provides a seamless graphical user
interface that accommodates two independent entities, ME2082 and ME2083.
[Type text]
Page
Detection of lead defects including broken lead, missing lead and wrong lead
count.
ii.
iii.
iv.
Mark inspection
v.
Orientation inspection
ME2085 employs innovative optics technology in that front lighting for mark
inspection and back lighting for 2D/3D lead inspection are combined and blended to
produce a single high quality image by a single camera.
[Type text]
Page
[Type text]
Page
The track insert may be flanged by shoulders of known height above the seating
pedestal
2 reflective surfaces (mirrors) at both sides of the track insert, with adjustable
inclining angle
LED illumination panel at the bottom of the track insert to provide even and
diffused back lighting for lead inspection
Vision stopper, bottom vacuum and track guides (optionally moveable), all built
around the track insert to dynamically stabilize and precise device for inspection
[Type text]
Page
track
insert
side
reflector
[Type text]
Page
It is important to have a focus image, before vision system can perform a good
inspection job. Tune the lens attached to the camera to adjust the focus. Before tuning
the focus, it is recommended to zoom the image to a larger scale (zoom-in). Do not
zoom out the image since it is hard to be observed whether the image is in focus or not.
If fixed focal lens are used instead of zoom lens, adjusting the distance between
camera and object for zoom effect. For focus effect, user needs to adjust the distance
between camera and lens.
There are type of 2D inpection :
Lead pitch
Lead skew
Tip to tip
[Type text]
Page
Lead standoff is vertical distance of a lead tip from the plane (zero datum plane)
along the bottom side of the package.
Since during inspection, the device is vacuumed to ensure its bottom side is fully
resting on the surface of the vision track insert, it follows that lead standoff is
measured as vertical distance from the plane along the surface of the vision
track insert to the lead tip.
Typically, the vision track insert is designed with flanges (of mirror finishing) of 3
mils above the surface of track insert. This design allows negative lead standoff
(lead tip is above the surface of the bottom side of the package) to be
measurable.
Body standoff is the vertical distance from the lead seating plane of the device
to the plane along the bottom side of the package (within the footprint of the
leads). Since body standoff concerns with the distance between two planes, to
meet complete measurement interest, minimum and maximum body standoffs
are computed.
[Type text]
Page
Since device being dealt with is with rigid and flat surface at the bottom side,
one way to measure this parameter on an external gauge (such as a profile
projector) for verification or correlation purposes is by measuring vertical
distances of the package body from its seating plane at four extreme corners, as
illustrated.
[Type text]
Page
1. Lead picth
Pitch is the distance between adjacent lead tips and is measured along Xdirection of
the package.
2. Lead skew
Skew is the deviation of a lead tip from its ideal position measured along Xdirection of
the package. Skew in clockwise direction is signed positive and vice versa.
[Type text]
Page
3. Tip to tip
Tip to tip is the distance between two opposite lead tips, measured along Ydirection of
the package.
4. Lead sweep
Sweep at a side is the average of lead skews of all the leads on the same side.
[Type text]
Page
In a machine, there are several related jam units used in the inspection process.
Each machine will normally occur jam. Jam resulting from various aspects, one aspect
may be the type of the unit itself, the type of machine for a hammer, or a pound of
negligence modifications of the machine. In addressing the jam, there are a number of
analytical solutions have been made. In this machine, Pareto diagram analysis chosen
as a way of determining a jam. Therefore, a solution to overcome the jam is to use your
method of 'fishbone' analysis.
[Type text]
Page
Common uses of the fishbone diagram are product design and quality defect
prevention, to identify potential factors causing an overall effect. Each cause or reason
for imperfection is a source of variation. Causes are usually grouped into major
categories to identify these sources of variation. The categories typically include:
From the pareto chart, the major errors that need to be analyzed are :
i.
[Type text]
Page
ii.
[Type text]
Page
iii.
[Type text]
Page
iv.
[Type text]
Page
v.
[Type text]
Page
[Type text]
Page
Corrective Actions
input stacker.
Clean the 3D
maintenance
Adjust the track width following the specific
guide
Blow the reject tube in every changing of
reject tube
Align the reject tube track following the
in
every
preventive
specific guide
Corrective Actions
Mold flash
Bent lead
Tube dimension
production
Only provide high quality material tubes for
production
Check for base package
Inspection
by
MA
before
inserting
inserting
[Type text]
Corrective Actions
Page
conversion is done
Replace stopper pin with the new one in
preventive maintenance
Adjust the the holder to avoid being too
tight or loose
Align the output track following the specific
every
time
at
guide
Corrective Actions
Tube loading
Cleaning
Stopper replacement
Cylinder replacement
Track adjustment
Tube placement
CHAPTER 5
RECOMMANDATION
[Type text]
Page
5.1 Comments
5.2 Suggestion
My suggesting is Statschippac Malaysia must give training and schedule for new
trainee to make sure they can learn and get knowledge faster rather than self-centered
in the beginning, After two weeks then let the trainee be self-centered so they may
explore new thing and understanding the principle of works that were given.
Im also suggesting that Statschippac Malaysia assign each trainee to only one
engineer, it is to make sure the engineer and the company know the valuable and
potential of the trainee. The engineer can works as a mentor give new knowledge to
[Type text]
Page
CHAPTER 6
CONCLUSION
6.1 Conclusion
Page
[Type text]
Page