Vous êtes sur la page 1sur 14

Faculty of Information and Communication Engineering

B.E. Electronics and Communication Engineering


(R 2013) Semester I
I Year
ear B.E. / B.Tech
ech.
GE 2115 COMPUTER PRACT ICE LABORAT ORY I
Requi
quirements for a batch of 30 stude
udents

S.No.

Description of Equipment

Quantity
required

Quantity
available

Hardware
1.

LAN system with 33 nodes (OR)


standalone PCs

33 Nos.

2.

Printer

3 Nos.

Software
1.

Operating System

Windows /
Unix Clone

2.

Compiler

C compiler

3.

Application package

Office suite

Available / Not
Available
Available / Not
Available
Available / Not
Available

Deficiency %

Faculty of Information and Communication Engineering


B.E. Electronics and Communication Engineering
(R 2013) Semester I
I Year
ear B.E./ B.Tech.
ech.
GE 2116 Engi
ngineer
eering Pract
actices Labor
boratory
Requi
quirements for a batch of 30 stude
udents

Sl.No.

Description of Equipment

Quantity
required

CIVIL

1.

Assorted components for plumbing


consisting of metallic pipes, plastic
pipes, flexible pipes, couplings, unions,
elbows, plugs and other fittings.

15 sets

2.

Carpentry vice (fitted to work bench)

15 No.

3.

Standard woodworking tools

15 sets

4.

Models of industrial trusses, door joints,


furniture joints

5 each

5.

Power Tools:
(a) Rotary Hammer
(b) Demolition Hammer
(c) Circular Saw
(d) Planer
(e) Hand Drilling Machine
(f) Jigsaw

2 Nos
2 Nos
2 Nos
2 Nos
2 Nos
2 Nos

MECHANICAL
1.

Arc welding transformer with cables and


holders

5 No.

2.

Welding booth with exhaust facility

5 No.

3.

Welding accessories like welding shield,


chipping hammer, wire brush, etc.

5 sets

4.

Oxygen and acetylene gas cylinders,


blow pipe and other welding outfit.

2 No.

5.

Centre lathe

2 No.

6.

Hearth furnace, anvil and smithy tools

2 sets

Quantity
available

Deficiency %

7.

Moulding table, foundry tools

2 sets

8.

Power Tool: Angle Grinder

2 Nos

9.

Study-purpose items: centrifugal pump,


air-conditioner

One Each.

ELECTRICAL
1.

Assorted electrical components for


house wiring

15 sets

2.

Electrical measuring instruments

10 sets

3.

Study purpose items: Iron box, fan and


regulator, emergency lamp

4.

Megger (250V/500V)

1 No.

5.

Power Tools:
(a) Range Finder
(b) Digital Live-wire detector

2 Nos
2 Nos

One each

ELECTRONICS
1.

Soldering guns

10 No.

2.

Assorted electronic components for


making circuits

50 No.

3.

Small PCBs

10 No.

4.

Multi Meters

10 No.

5.

Study purpose items: Telephone, FM


radio, low-voltage power supply

2 each

Faculty of Information and Communication Engineering


B.E. Electronics and Communication Engineering
(R 2013) Semester I
I Year
ear B.E. / B.Tech
ech.
PHYS ICS & CHEMISTRY L ABORATORY - I
Requi
quirements for a batch of 30 stude
udents
Physi
ysics Labor
boratory

S.No.

Description of Equipment

Quantity
required

1.

Lees disc apparatus


(With accessories)

5 Nos.

2.

Air Wedge apparatus


(With traveling microscopes and
accessories)

5 Nos.

3.

Spectrometer
(With grating, prism and accessories)

5 Nos.

4.

Diode laser (2 mW power) or


He-Ne laser (2mW)
(Lycopodium powder, Optical fibre Kit
and accessories)

5 Nos.

5.

Ultrasonic interferometer
(With accessories)

5 Nos.

6.

B-H Curve traces apparatus

5 Nos.

Quantity
available

Deficiency %

Faculty of Information and Communication Engineering


B.E. Electronics and Communication Engineering
(R 2013) Semester I
I Year
ear B.E. / B.Tech
ech.
Chemistry Labor
boratory

S.No.

Description of Equipment

Quantity
required

1.

Electronic balance

1 No.

2.

pH meter

8 Nos.

3.

Conductivity bridge

8 Nos.

4.

Potentiometer

8 Nos.

5.

Platinum electrodes

8 Nos.

6.

Calomel electrodes

8 Nos.

7.

Spectrophotometer

1 No.

8.

Flame photometer

1 No.

9.

Oswald viscometer

15 Nos.

10.

Glassware

Sufficient
Quantity

Quantity
available

Deficiency %

Faculty of Information and Communication Engineering


B.E. Electronics and Communication Engineering
(R 2013) Semester II
GE6262 Physics and Chemistry Laboratory - II
Requirements for a batch of 30 students
Physics Laboratory

Sl.
No.

Description of Equipment

Quantity
required
(R)

1.

Torsional Pendulum apparatus


(With accessories)

2.

Non-uniform Bending apparatus


(With accessories)

3.

Viscosity (Poiseuilles flow) apparatus


(With accessories)

4.

Band gap apparatus/ Post office box

5.

Spectrometer
(With grating, prism and accessories)

6.

Carey Foster Bridge

Quantity
available
(A)

Deficiency
(R-A)

Faculty of Information and Communication Engineering


B.E. Electronics and Communication Engineering
(R 2013) Semester II
GE6262 Physics and Chemistry Laboratory - II
Requirements for a batch of 30 students
Chemistry Laboratory

Sl.
No.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Description of Equipment

Electronic balance

pH meter

Conductivity bridge

Potentiometer

Platinum electrodes

Calomel electrodes

Spectrophotometer

Flame photometer

Oswald viscometer

Glassware

Quantity
required
(R)
1

15

25

Quantity
available
(A)

Deficiency
(R-A)

Faculty of Information and Communication Engineering


B.E. Electronics and Communication Engineering
(R 2013) Semester II
EC6211 Circuits and Devices Laboratory
Requirements for a batch of 30 students
Sl.
No.

Description of Equipment

Quantity
required
(R)

1.

BC 107, BC 148,2N2646,BFW10

25

2.

1N4007, Zener diodes

25

3.

Resistors, Capacitors, Inductors -

100

4.

Bread Boards

15

5.

CRO (30MHz).

10

6.

Function Generators (3MHz)

10

7.

Dual Regulated Power Supplies ( 0


30V)

10

Quantity
available
(A)

Deficiency
(R - A)

Faculty of Information and Communication Engineering


B.E. Electronics and Communication Engineering
(R 2013) Semester III
EC6311 ANALOG AND DIGITAL CIRCUITS LABORATORY

Requirements for a batch of 30 students


Sl.
No.
1

Description of Equipment

Quantity
required
(R)

CRO (30MHz)

15

Signal Generator /Function Generators


(3 MHz)

15

Dual Regulated Power Supplies ( 0


30V)

15

Standalone desktop PCs with SPICE


software

15

Transistor/FET (BJT-NPN-PNP and


NMOS/PMOS)

50

Dual power supply/ single mode power


supply

15

IC Trainer Kit
15

7
Bread Boards

15

8
Computer with HDL software

15

9
Seven segment display

15

10
11

12

Multimeter
ICs 7400/ 7402 / 7404 / 7486 / 7408 /
7432 / 7483 / 74150 / 74151 / 74147 /
7445 / 7476/7491/ 555 / 7494 / 7447 /
74180 / 7485 / 7473 / 74138 / 7411 /
7474

15

50

Quantity
available
(A)

Deficiency
(R - A)

Faculty of Information and Communication Engineering


B.E. Electronics and Communication Engineering
(R 2013) Semester III
EC6312

OOPS AND DATA STRUCTURES LABORATORY

Requirements for a batch of 30 students


Sl.
No.
1

Description of Equipment

Quantity
required
(R)

Standalone desktops (or) Server


supporting

30

C++ compiler

30

Quantity
available
(A)

Deficiency
(R - A)

Faculty of Information and Communication Engineering


B.E. Electronics and Communication Engineering
(R 2013) Semester IV
EC6411 CIRCUITS AND SIMULATION LABORATORY

Requirements for a batch of 30 students


Sl.
No.
1

Description of Equipment

Quantity
required
(R)

CRO (Min 30MHz)

15

Signal Generator /Function Generators


(2 MHz)

15

Dual Regulated Power Supplies ( 0


30V)

15

Digital Multimeter

15

Standalone desktops PC

15

Transistor/FET (BJT-NPN-PNP and


NMOS/PMOS)

50

Transistors, Resistors, Capacitors,


diodes, Bread Boards, Transformers

50

SPICE Circuit Simulation Software


(any public domain or commercial
software)

15

Quantity
available
(A)

Deficiency
(R - A)

Faculty of Information and Communication Engineering


B.E. Electronics and Communication Engineering
(R 2013) Semester IV
EC6412 LINEAR INTEGRATED CIRCUITS LABORATORY

Requirements for a batch of 30 students


Sl.
No.
1

Description of Equipment

Quantity
required
(R)

CRO (Min 30MHz)

15

Signal Generator /Function Generators


(2 MHz)

15

Dual Regulated Power Supplies ( 0


30V)

15

Digital Multimeter

15

IC tester

Standalone desktops PC

15

SPICE Circuit Simulation Software

Transistors, Resistors, Capacitors,


diodes, Zener diodes, Bread Boards,
Transformers, wires, Power transistors,
Potentiometer, A/D and D/A convertors,
LEDs

Quantity
available
(A)

Deficiency
(R - A)

15

50

Note: Op-Amps uA741, LM 301, LM311, LM 324, LM317, LM723, 7805, 7812, 2N3524, 2N3525,
2N3391, AD 633, LM 555, and LM 565 may be used.

Faculty of Information and Communication Engineering


B.E. Electronics and Communication Engineering
(R 2013) Semester IV
EE6461

ELECTRICAL ENGINEERING AND CONTROL SYSTEM LABORATORY

Requirements for a batch of 30 students


Sl.
No.
1

Quantity
required
(R)

Description of Equipment

DC Shunt Motor with Loading Arrangement

3HP,220V,14A,750RPM,0.6A(Shunt field)

DC Shunt Motor Coupled With Three phase


Alternator

DC Shunt Motor - kW: 5.2 / volts: 220 / Amps: 27.5/


Speed: 1500 RPM/ Field current: 0.9A

Three phase Alternator - kVA: 7.5/ volts: 415/ Amps:


10.4
Speed: 1500 RPM/ Field current: 2A.

Single Phase Transformer; 2 KVA,230/110-166 V

Three Phase
Arrangement

Induction

Motor

with

Loading
1

(3.7KW,415v,7.5A,1430 RPM)

Single Phase
Arrangement

Induction

Motor

with

Loading
1

(230V,5HP,17A)
DC Shunt Motor Coupled With DC Compound
Generator
(DC Shunt Motor: kW: 7.4/ volts: 220/ Amps: 38.5/
Speed: 960 RPM
Field current1.2A)

(DC Compound Generator: kW: 7.5/ volts: 220/


Amps: 38.5/
Speed: 960 RPM / Field current1.2A)

Tachometer Digital/Analog

Quantity
available
(A)

Deficiency
(R - A)

10

Single Phase Auto Transformer;(0-270)V

11

Three Phase Auto Transformer;(0-270)V

12

MC Voltmeter-(0-300/600)V

13

MC Ammeter (0-10/20)A

14

MC Ammeter (0-2/1)A

15

MI Voltmeter (0-300/600)V

16

MI Ammeter (0-10/20)A

17

MI Ammeter (0-1/2)A

18

UPF Wattmeter (300/600V,10/20A)

19

LPF Wattmeter (300/600V,10/20A)

20

Single Phase Resistive Loading Bank(10KW)

21

Three Phase Resistive Loading Bank(10KW)

22

SPST switch

23

Fuse various ranges

As per the
requirement

24

Wires

As per the
requirement

25

Rheostats(100,1A;250,1.5A;75,16A,1000,1A)

26

Computers with MATLAB or equivalent Software

Each 2
30

Note:
The lists of equipments for 3rd & 4th semester laboratory courses are tentative and subject to the approval
of the Academic Council.

Vous aimerez peut-être aussi