Basic Dimensions of the Bridge:

Length (L)
Width (W)
Height (h)
Distance between supp

30
2
2.5
3

m
m
m
m

Design of walk way


Width of walkway
Weight of checkered pl. (10 o/p)
Live load on walkway (@500 kg/m2)

1.225 m
2
85 kg/m
3
500 kg/m
2
585 kg/m

Total UDL
Using MC200 Channel, udl on channel
Self weight of channel
Total UDL
Span
Moment
Section modulus
Bending stress
Load on bridge:
Load from walkway support

Load from pipe

358.3125
22.1
380.4125
3
42797
181.9
235.27763

kg/m
kg/m
kg/m
m
kg.cm
cm3
kg/cm2

< 1650 kg/m2

DL:

(Intermediate support)
(End support)

223 kg
111.5 kg

LL:

(Intermediate support)
(End support)

919 kg
459.5 kg

DL:

(Intermediate support)
(End support)
(Intermediate support)
(End support)

LL:

202.5
101.25
288
144

kg
kg
kg
kg

Wind load
Basic wind speed, V b

Risk coefficient, k 1

Terrain, ht and structure size factor, k 2

Topography factor, k3

44 m/s (as per specification)


1
1.03 Structure class B, Terrain category 1
[Value at 10.0m height considered]
1

Design wind speed, V z

Design wind pressure, p z

45.32 m/s
2
1232.3414 N/m

2
0.126 T/m

0.079 T/m

Considering 50% opening


UDL on Top and bottom chord

Seismic load calculation:


The seismic load is calculated using built in algorithm of STAAD.
The followings are the parameters considered for seismic analysis through STAAD.
Seismic zone II, zone factor, Z: 0.1
Importance factor, I: 1.5
Response reduction factor, R: 4.0
Soil type: soft
Damping coefficient: 0.02

Primary Load cases:


1 Seismic load: in +ve x-direction
2 Seismic load: in -ve x-direction

SL:1
SL:2

3 Wind Load 1

WLL1

4 Wind Load 2

WLL2

5 Dead Load

DL

6 Live load

LL

Load Combinations:
(For Steel design)
Sl. No.

Description

Factor

7 DL+LL
8
9
10
11
12
13
14
15

DL+LL+SL:1
DL+LL+SL:2
DL+LL+WLL1
DL+LL+WLL2
DL+SL:1
DL+SL:2
DL+WLL1
DL+WLL2

(For Foundation design)


Sl. No.
Description
7 DL+LL
12 DL+SL:1
13 DL+SL:2
14 DL+WLL1
15 DL+WLL2
16 DL+LL+SL:1
17 DL+LL+SL:2
18 DL+LL+WLL1
19 DL+LL+WLL2
(For Column design)
Sl. No.
Description
20 DL+LL
21 DL+LL+SL:1
22 DL+LL+SL:2
23 DL+LL+WLL1
24 DL+LL+WLL2
25 DL+SL:1
26 DL+SL:2
27 DL+WLL1
28 DL+WLL2

1
0.75
0.75
0.75
0.75
1
1
1
1

Factor
1
1
1
1
1
1
1
1
1

Factor
1.5
1.2
1.2
1.2
1.2
1.5
1.5
1.5
1.5

Design of Columns:
Grade of construction material:
Concrete
Reinforcing steel

M 25
Fe 415

Type C-1

Location:
Column dimension:

500 mm

Corresponding unsupported length, lb

Minimum eccentricity, eD =

Corresponding unsupported length, lD


900 mm
Vertical load, Pu
Moment about minor axis
Moment about major axis
38 mm; Minimum eccentricity moment MD =

Minimum eccentricity, eb =

25 mm; Minimum eccentricity moment Mb =

D
7
27

The critical member no. is


The critical load comb no.

Slenderness eccentricity, e'


eD =

Reinforcements

Nos. of bars
16

Clear cover to reinforcements


Design vertical load, Pu
Design moment about minor axis, Muy
Design moment about major axis, Muz
2

2
32.16 cm

p
p / fck

=
=

0.714 %
2
0.02856 N/mm

Pu / fckbD

2
-0.001 N/mm

602.73 T

Pu / Puz

=
=

-0.001
1

Use 10Y column links @ 250c/c

mm
T
Tm
Tm
Tm

0 Tm
0 Tm
0 Tm

Ast (cm )
32.16
0

=
=
=

4000
-1
9
7
0

50 mm

Ast, provided (cm )

Puz

=
=
=

MD =
0 mm; Slenderness eccentricity moment M'
mm;
Slenderness
eccentricity
moment
M'
0
b =

Slenderness eccentricity, e'b =


Bar dia (mm)
16

4000 mm

-1 T
9 Tm
7 Tm
d' / d (minor axis)
Mu / fckbD2 (minor axis)

=
=

0.116
2
0.041391 N/mm

Mu (minor axis)

23.28 Tm

d' / d (major axis)


Mu / fckbD2 (major axis)

0.064

2
0.044443 N/mm

Mu (major
( j axis)
i )

44
99 Tm
T
44.99

Interaction ratio

0.542188 ...Okay

Design of footings
Coeff. of friction between soil and concrete
=
Factor of safety against uplift
=
Factor of safety against overturning
=
Factor of safety against sliding
=
Allowable gross bearing pressure =
=

0.4
1.25
1.4
1.4

Depth of foundation below NGL


2
Grade of concrete
M
Grade of steel
Fe
Allowable net bearing pressure
10
2
13.6 T/m (Transient loads excluded)
2
16.1 T/m (Transient loads included)

m
25
415
T/m2

Details of Footing
Footing
mkd.
F1
F1

Footing Dim
L (m) // W (m) T (m)
to x
// to z
1 River end
1.9
4.2
0.7
67 River end
1.9
4.2
0.7

Node no
no. Location

Bott. Reinf
Top. Reinf
Col / ped dim
B (m)
D (m) // to z // to x // to z
// to x
// to x
// to z
0.5
0.9 12-125 12-200 10-250 10-250
0.5
0.9 12-125 12-200 10-250 10-250

Footing marked: F1 (Joint no. 1)


Footing
Width (along
g Dimension:
(
g x-axis))

4.2
0.7
0.5
0.9

m
m
m
m

50 mm
644 mm

deff of footing for moment about minor axis


Weight of concrete:
13.97 T
Weight of soil:
17.62 T
Total weight of footing and soil
31.59 T

632 mm

Footing-geometrical parameters:
h
=
2000 mm
L
=
1900 mm
B
=
4200 mm
t
=
700 mm
L1x
=
700 mm
L2x
=
56 mm

Length (along z-axis)


Thickness
Width (along x-axis)
Length (along z-axis)

Clear cover to reinforcement


g for moment about major
j axis
deff of footing

L1z

1650 mm

L2z

1018 mm

Footing-reinforcements:
a 12Y @ 125 c/c
b 12Y @ 200 c/c
c 10Y @ 250 c/c
d 10Y @ 250 c/c

pmax

pshear

pmom

L
pmin

Column dimension:

At River end
1.9 m

L2
L1
L

Pframe

Pgross

(T)

(T)

Mom: Mom: Shear


x
z
(T)

Factor of safety*
OT: x OT: z Sliding

7 COMBINATION LOAD CASE 7


8 COMBINATION LOAD CASE 8
9 COMBINATION LOAD CASE 9
10 COMBINATION LOAD CASE 10
11 COMBINATION LOAD CASE 11
12 COMBINATION LOAD CASE 12
13 COMBINATION LOAD CASE 13
14 COMBINATION LOAD CASE 14
15 COMBINATION LOAD CASE 15
16 COMBINATION LOAD CASE 16
17 COMBINATION LOAD CASE 17
18 COMBINATION LOAD CASE 18
19 COMBINATION LOAD CASE 19

2.168
1.113
1.573
-0.363
3.561
-0.26
0.355
-2.227
3.005
1.483
2.098
-0.484
4.748

33.76
32.70
33.16
31.23
35.15
31.33
31.95
29.36
34.60
33.07
33.69
31.11
36.34

2.124
0.963
0.352
1.258
2.95
0.38
1.195
3.341
2.269
1.284
0.47
1.677
3.933

0.012
0.405
0.008
0.967
0.982
0.55
0.001
1.299
1.3
0.54
0.011
1.289
1.31

0.93
0.53
0.13
1
1.6
0.52
0.58
1.91
1.52
0.71
0.16
1.33
2.14

30 2405.2
64.1
69
178 3544.2
46.9
27.6
22.5
30.6
155.8
48.7
50.5 27313
16.6
19.3
28.8
22.7
48.6
52.3
135.4 2618.4
35
20.6
17.4
23.7

13.06
22.21
91.83
11.24
7.9
21.69
19.82
5.53
8.19
16.76
75.79
8.41
6.11

Pm
max,
(grross)
T/m2
T/

Load combinations description with


Sl. Nos.

4.62
4.44
4.23
4.53
5.33
4.22
4.22
4.8
5.26
4.59
4.32
4.71
5.78

Calculation of reinforcements for moments about x-axis


Load
Pgross ((T))
Ex ((m))
pmax
pmin
pm
ps
Mmax
SFcr Mu/bd2
comb sl.
(T/m2)
(T/m2) (T/m2) (T/m2) (Tm/m) (Tm/m) (MPa)
7
33.76
0.063
4.62
3.85
4.32
4.44
0.765
0.582 0.029
8
32.7
0.03
4.28
3.93
4.15
4.2
0.379
0.287 0.012
9
33.16
0.011
4.23
4.1
4.18
4.2
0.347
0.261 0.011
10
31.23
0.041
4.15
3.69
3.97
4.04
0.179
0.139 0.006
11
35.15
0.084
4.94
3.88
4.53
4.69
1.15
0.872 0.035
12
31.33
0.013
4
3.86
3.95
3.97
0.034
0.027 0.002
13
31.95
0.038
4.23
3.79
4.06
4.13
0.293
0.226 0.009
14
29.36
0.114
4.28
3.09
3.82
4
0.229
0.185 0.007
15
34 6
34.6
0.066
0 066
4.75
4 75
3.93
3 93
4.43
4 43
4.56
4 56
0.933
0 933
0.709
0 709 0.029
0 029
16
33.07
0.039
4.38
3.92
4.2
4.27
5.881
0.373 0.177

pt

Ast

v ((MPa))

0.009
0.004
0.004
0.002
0.01
0.001
0.003
0.002
0.009
0 009
0.05

(cm2/m
0.57
0.26
0.26
0.13
0.64
0.07
0.19
0.13
0.57
0 57
3.16

0.02
0.01
0.01
0.01
0.02
0.01
0.01
0.01
0.02
0 02
0.01
0.01

17

33.69

0.014

4.31

4.14

4.25

4.27

5.84

0.338

0.176

0.05

3.16

18

31.11

0.054

4.2

3.6

3.97

4.06

5.613

0.175

0.169

0.048

3.04

0.01

19

36.34

0.109

5.27

3.85

4.72

4.93

6.925

1.162

0.209

0.059

3.73

0.03

Area of steel required in z-direction

3.73 cm2/m

Calculation of reinforcements for moments about z axis:


SFcr Mu/bd2
Load
Pgross ((T))
Ez ((m))
pmax
pmin
pm
ps
Mmax
comb sl.
(T/m2)
(T/m2) (T/m2) (T/m2) (Tm/m) (Tm/m) (MPa)
no.
7
33.76
0.001
4.25
4.22
4.24
4.25
0.071
0.017 0.003
8
32.70
0.013
4.27
3.93
4.15
4.26
0.067
0.018 0.002
9
33.16
0.001
4.17
4.15
4.17
4.17
0.052
0.012 0.002
10
31.23
0.031
4.3
3.54
4.02
4.28
0.061
0.019 0.002
11
35.15
0.028
4.8
4.02
4.52
4.78
0.184
0.047 0.006
12
31.33
0.018
4.15
3.71
3.99
4.14
0.034
0.011 0.001
13
31.95
0.001
4.02
4
4.02
4.02
0.016
0.004 0.001
14
29 36
29.36
0 045
0.045
4 21
4.21
3 16
3.16
3 83
3.83
4 18
4.18
0 031
0.031
0 014 0.001
0.014
0 001
15
34.60
0.038
4.86
3.82
4.48
4.83
0.19
0.05 0.006
16
33.07
0.017
4.37
3.93
4.21
4.36
1.058
0.023 0.031
17
33.69
0.001
4.24
4.21
4.23
4.24
1.038
0.016 0.031
18
31.11
0.042
4.42
3.39
4.05
4.39
1.053
0.025 0.031
19
36.34
0.037
5.09
4.03
4.7
5.06
1.216
0.063 0.036

A
Area
off steell required
i d in
i x-direction
di
i

0.65
0 65 cm2/m
/

pt

0.001
0.001
0.001
0.001
0.002
0.001
0.001
0 001
0.001
0.002
0.009
0.009
0.009
0.01

Ast
(cm2/m
)
0.07
0.07
0.07
0.07
0.13
0.07
0.07
0 07
0.07
0.13
0.58
0.58
0.58
0.65

v ((MPa))

0.01
0.01
0.01
0.01
0.01
0.01
0.01
0 01
0.01
0.01
0.01
0.01
0.01
0.01

Provide following reinforcements:


Bottom:
In z- direction

Bar diameter
Spacing
Area of reinf provided

=
=
=

12 mm
125 mm
2
9.04 cm /m

In x-direction

Bar diameter
Spacing
Area of reinf provided

=
=
=

12 mm
200 mm
2
5.65 cm /m

In z- direction

Bar diameter
Spacing
Area of reinf provided

=
=
=

10 mm
250 mm
2
3.14 cm /m

In x-direction

Bar diameter
Spacing
Area of reinf provided

=
=
=

10 mm
250 mm
2
3.14 cm /m

Top:

Check for 1-way shear:


Shorter direction:
pt (provided)
c
Longer direction:
pt (provided)
c

0.14
2
0
0.28
28 N/mm

=
=
2
0.23 N/mm

2
0
0.03
03 N/mm

>

0.09
>

0.01 N/mm

Footing marked: F1 (Joint no. 67)


Footing
Width (along
g Dimension:
(
g x-axis))

4.2
0.7
0.5
0.9

m
m
m
m

50 mm
644 mm

deff of footing for moment about minor axis


Weight of concrete:
13.97 T
Weight of soil:
17.62 T
Total weight of footing and soil
31.59 T

632 mm

Footing-geometrical parameters:
h
=
2000 mm
L
=
1900 mm
B
=
4200 mm
t
=
700 mm
L1x
=
700 mm
L2x
=
56 mm

Length (along z-axis)


Thickness
Width (along x-axis)
Length (along z-axis)

Clear cover to reinforcement


g for moment about major
j axis
deff of footing

L1z

1650 mm

L2z

1018 mm

Footing-reinforcements:
a 12Y @ 125 c/c
b 12Y @ 200 c/c
c 10Y @ 250 c/c
d 10Y @ 250 c/c

pmax

pshear

pmom

L
pmin

Column dimension:

At River end
1.9 m

L2
L1
L

7 COMBINATION LOAD CASE 7


8 COMBINATION LOAD CASE 8
9 COMBINATION LOAD CASE 9
10 COMBINATION LOAD CASE 10
11 COMBINATION LOAD CASE 11
12 COMBINATION LOAD CASE 12
13 COMBINATION LOAD CASE 13
14 COMBINATION LOAD CASE 14
15 COMBINATION LOAD CASE 15
16 COMBINATION LOAD CASE 16
17 COMBINATION LOAD CASE 17
18 COMBINATION LOAD CASE 18
19 COMBINATION LOAD CASE 19

Pframe

Pgross

(T)

(T)

3.415
1.12
2.466
-1.002
6.223
-1.211
0.583
-4.041
5.592
1.494
3.288
-1.336
8.297

35.01
32.71
34.06
30.59
37.81
30.38
32.17
27.55
37.18
33.08
34.88
30.25
39.89

Mom: Mom: Shear


Factor of safety*
x
z
(T)
OT: x OT: z Sliding
0.169
0.115
0.756
0.096
0.107
0.024
1.138
0.001
0.014
0.154
1.008
0.129
0.143

0.191
0.863
0.144
1.437
1.158
1.004
0.046
1.771
1.689
1.151
0.192
1.917
1.543

0.17 391.4
0.45 537.5
0.19
85.1
0.67 602.2
0.44 667.9
0.47 2392.3
0.22
53.4
0.78 52068
0.71 5019.5
0.59
406
0.25
65.3
0.9 443.2
0.59 527.1

156.6
32.4
202.2
18.1
27.9
25.8
597.9
13.3
18.8
24.5
155.3
13.4
22.1

74.12
26.16
64.52
16.43
30.93
23.26
52.64
12.71
18.85
20.18
50.22
12.1
24.33

Pmax,
(
(gros
s)

Load combinations description with


Sl. Nos.

4.5
4.47
4.46
4.42
5.22
4.21
4.26
4.16
5.34
4.63
4.63
4.58
5.64

Calculation of reinforcements for moments about x-axis


SFcr
Load
Pgross ((T))
Ex ((m))
pmax
pmin
pm
ps
Mmax
comb sl.
(T/m2)
(T/m2) (T/m2) (T/m2) (Tm/m) (Tm/m)
7
35.01
0.005
4.42
4.36
4.4
4.41
0.619
0.465
8
32.71
0.004
4.13
4.08
4.12
4.12
0.229
0.17
9
34.06
0.023
4.41
4.13
4.3
4.35
0.565
0.429
10
30.59
0.004
3.86
3.82
3.85
3.86 -0.139 -0.101
11
37.81
0.003
4.76
4.72
4.75
4.76
1.087
0.816
12
30.38
0.001
3.82
3.81
3.82
3.82 -0.189 -0.142
13
32.17
0.036
4.24
3.83
4.08
4.15
0.311
0.241
14
27.55
0.001
3.46
3.45
3.46
3.46 -0.679 -0.508
15
37 18
37.18
0 001
0.001
4 67
4.67
4 66
4.66
4 67
4.67
4 67
4.67
0 969
0.969
0 725
0.725
16
33.08
0.005
4.18
4.12
4.16
4.17
5.681
0.221

pt
Ast
v ((MPa))
Mu/bd2
(MPa)
(cm2/m
0.024 0.007
0.45
0.02
0.007 0.002
0.13
0.01
0.017 0.005
0.32
0.01
-0.005 -0.002 -0.13
-0.01
0.033
0.01
0.64
0.02
-0.006 -0.002 -0.13
-0.01
0.01 0.003
0.19
0.01
-0.021 -0.006 -0.38
-0.01
0 03 0.009
0.03
0 009
0 57
0.57
0 02
0.02
0.171 0.048
3.04
0.01

17

34.88

0.029

4.56

4.19

4.42

4.48

6.144

0.572

0.185

0.052

3.29

0.02

18

30.25

0.005

3.82

3.77

3.81

3.81

5.196

-0.147

0.157

0.044

2.79

-0.01

19

39.89

0.004

5.03

4.98

5.02

5.02

6.843

1.086

0.206

0.058

3.67

0.03

Area of steel required in z-direction

3.67 cm2/m

Calculation of reinforcements for moments about z axis:


Load
Pgross ((T))
Ez ((m))
pmax
pmin
pm
comb sl.
(T/m2)
(T/m2) (T/m2)
no.
7C
8C
9C
10
11
12
13
14
15
16
17
18
19

35.01
32.71
34.06
30.59
37.81
30.38
32.17
27.55
37.18
33.08
34.88
30.25
39.89

0.006
0.027
0.005
0.047
0.031
0.034
0.002
0.065
0.046
0.035
0.006
0.064
0.039

4.48
4.45
4.34
4.41
5.21
4.22
4.06
4.17
5.34
4.61
4.46
4.56
5.62

Area of steel required in x-direction

4.31
3.75
4.21
3.27
4.28
3.4
4.01
2.75
3.99
3.69
4.29
3.03
4.39

ps
(T/m2)

4.42
4.2
4.3
3.99
4.87
3.92
4.05
3.65
4.85
4.28
4.4
4
5.17

4.48
4.43
4.34
4.38
5.19
4.2
4.06
4.13
5.31
4.59
4.46
4.52
5.59

Mmax
SFcr Mu/bd2
(Tm/m) (Tm/m) (MPa)
0.123
0.1
0.091
0.077
0.279
0.04
0.025
0.01
0.299
1.103
1.088
1.072
1.341

0.03
0.027
0.022
0.025
0.07
0.015
0.006
0.011
0.077
0.036
0.029
0.033
0.093

0.71 cm2/m

0.005
0.003
0.003
0.003
0.009
0.002
0.001
0.001
0.009
0.032
0.032
0.032
0.039

pt

Ast

v ((MPa))

(cm2/m
)
0.002
0.001
0.001
0.001
0.003
0.001
0.001
0.001
0.003
0.009
0.009
0.009
0.011

0.13
0.07
0.07
0.07
0.2
0.07
0.07
0.07
0.2
0.58
0.58
0.58
0.71

0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01

Provide following reinforcements:


Bottom:
In z- direction

Bar diameter
Spacing
Area of reinf provided

=
=
=

12 mm
125 mm
2
9.04 cm /m

In x-direction

Bar diameter
Spacing
Area of reinf provided

=
=
=

12 mm
200 mm
2
5.65 cm /m

In z- direction

Bar diameter
Spacing
Area of reinf provided

=
=
=

10 mm
250 mm
2
3.14 cm /m

In x-direction

Bar diameter
Spacing
Area of reinf provided

=
=
=

10 mm
250 mm
2
3.14 cm /m

Top:

Check for 1-way shear:


Shorter direction:
pt (provided)
c
Longer direction:
pt (provided)
c

0.14
2
0
0.28
28 N/mm

=
=
2
0.23 N/mm

2
0
0.03
03 N/mm

>

0.09
>

0.01 N/mm

Wednesday, January 22, 2014, 06:47 PM


PAGE NO.

****************************************************
*
*
*
STAAD.Pro V8i SELECTseries4
*
*
Version 20.07.09.31
*
*
Proprietary Program of
*
*
Bentley Systems, Inc.
*
*
Date=
JAN 22, 2014
*
*
Time=
16: 7:11
*
*
*
*
USER ID: Voyage Technovision
*
****************************************************

1. STAAD SPACE
INPUT FILE: Intake Well 30m Bridge.STD
2. START JOB INFORMATION
3. ENGINEER DATE 25-OCT-13
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER MTON
7. JOINT COORDINATES
8. 1 0 -1.804 0; 2 0 0.8 0; 4 2 -1.804 0; 5 2 0.8 0; 8 0 0.8 30; 11 2 0.8 30
9. 13 0 3.3 3; 14 0 3.3 6; 15 0 3.3 9; 16 0 3.3 12; 17 0 3.3 15; 18 0 3.3 18
10. 19 0 3.3 21; 20 0 3.3 24; 21 0 3.3 27; 22 2 3.3 3; 23 2 3.3 6; 24 2 3.3 9
11. 25 2 3.3 12; 26 2 3.3 15; 27 2 3.3 18; 28 2 3.3 21; 29 2 3.3 24; 30 2 3.3 27
12. 31 0 0.8 3; 32 0 0.8 6; 33 0 0.8 9; 34 0 0.8 12; 35 0 0.8 15; 36 0 0.8 18
13. 37 0 0.8 21; 38 0 0.8 24; 39 0 0.8 27; 40 2 0.8 3; 41 2 0.8 6; 42 2 0.8 9
14. 43 2 0.8 12; 44 2 0.8 15; 45 2 0.8 18; 46 2 0.8 21; 47 2 0.8 24; 48 2 0.8 27
15. 49 0 0.496 0; 50 2 0.496 0; 51 0 0.496 30; 52 2 0.496 30; 54 0 1.85685 28.7318
16. 55 2 1.85685 28.7318; 57 0 1.85685 1.26822; 58 2 1.85685 1.26822
17. 59 0 -5.33 15; 60 0 0.496 15; 61 2 -5.33 15; 62 2 0.496 15; 63 0 -3.87 9
18. 64 0 0.496 9; 65 2 -3.87 9; 66 2 0.496 9; 67 0 -6.678 21; 68 0 0.496 21
19. 69 2 -6.678 21; 70 2 0.496 21; 71 0 -2.417 15; 72 2 -2.417 15; 73 0 -1.687 9
20. 74 2 -1.687 9; 75 0 -3.091 21; 76 2 -3.091 21
21. MEMBER INCIDENCES
22. 1 1 49; 3 4 50; 6 2 5; 12 8 11; 14 13 14; 15 14 15; 16 15 16; 17 16 17
23. 18 17 18; 19 18 19; 20 19 20; 21 20 21; 24 22 23; 25 23 24; 26 24 25; 27 25 26
24. 28 26 27; 29 27 28; 30 28 29; 31 29 30; 33 2 31; 34 31 32; 35 32 33; 36 33 34
25. 37 34 35; 38 35 36; 39 36 37; 40 37 38; 41 38 39; 42 39 8; 43 5 40; 44 40 41
26. 45 41 42; 46 42 43; 47 43 44; 48 44 45; 49 45 46; 50 46 47; 51 47 48; 52 48 11
27. 53 31 13; 54 32 14; 55 33 15; 56 34 16; 57 35 17; 58 36 18; 59 37 19; 60 38 20
28. 61 39 21; 62 2 57; 63 13 32; 64 14 33; 65 15 34; 66 16 35; 67 18 35; 68 19 36
29. 69 20 37; 70 21 38; 71 8 54; 72 40 22; 73 41 23; 74 42 24; 75 43 25; 76 44 26
30. 77 45 27; 78 46 28; 79 47 29; 80 48 30; 81 5 58; 82 22 41; 83 23 42; 84 24 43
31. 85 25 44; 86 27 44; 87 28 45; 88 29 46; 89 30 47; 90 11 55; 91 13 22; 92 14 23
32. 93 15 24; 94 16 25; 95 17 26; 96 18 27; 97 19 28; 98 20 29; 99 21 30
33. 102 14 22; 103 23 13; 104 15 23; 105 24 14; 106 16 24; 107 25 15; 108 17 25
34. 109 26 16; 110 18 26; 111 27 17; 112 19 27; 113 28 18; 114 20 28; 115 29 19
35. 116 21 29; 117 30 20; 120 31 40; 121 32 41; 122 33 42; 123 34 43; 124 35 44
36. 125 36 45; 126 37 46; 127 38 47; 128 39 48; 129 31 5; 130 40 2; 131 32 40
37. 132 41 31; 133 33 41; 134 42 32; 135 34 42; 136 43 33; 137 35 43; 138 44 34
38. 139 36 44; 140 45 35; 141 37 45; 142 46 36; 143 38 46; 144 47 37; 145 39 47

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 1 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.

-- PAGE NO.

146 48 38; 147 8 48; 148 11 39; 149 49 2; 150 50 5; 151 51 8; 152 52 11
154 54 21; 155 55 30; 157 57 13; 158 58 22; 159 49 50; 160 59 71; 161 61 72
162 60 35; 163 62 44; 164 71 72; 165 63 73; 166 65 74; 167 64 33; 168 66 42
169 73 74; 170 67 75; 171 69 76; 172 68 37; 173 70 46; 174 75 76; 175 71 60
176 72 62; 177 73 64; 178 74 66; 179 75 68; 180 76 70
START USER TABLE
TABLE 1 _STARANGLES.UPT
END
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.09042E+007
POISSON 0.3
DENSITY 7.83341
ALPHA 1.2E-005
DAMP 0.03
TYPE STEEL
STRENGTH FY 25819.2 FU 41584 RY 1.5 RT 1.2
ISOTROPIC CONCRETE
E 2.21467E+006
POISSON 0.17
DENSITY 2.40262
ALPHA 1E-005
DAMP 0.05
TYPE CONCRETE
STRENGTH FCU 2812.28
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 3 160 161 165 166 170 171 175 TO 180 PRIS YD 0.5 ZD 0.9
154 155 157 158 TABLE TB ISMB200 WP 0.14 TH 0.008
14 TO 21 24 TO 31 TABLE ST ISMB200
92 TO 98 TABLE ST ISMB150
56 TO 58 75 TO 77 TABLE ST ISMB150
54 55 59 60 73 74 78 79 TABLE ST ISMB150
*64 TO 69 83 TO 88 UPTABLE 1 2*L50X50X6
*102 TO 117 129 TO 148 UPTABLE 1 2*L50X50X6
*62 63 70 71 81 82 89 90 TABLE FR ISMC150 SP 0.02
63 65 TO 68 70 82 84 TO 87 89 TABLE ST ISA75X75X10
106 TO 113 TABLE ST ISA50X50X6
6 12 53 61 72 80 91 99 TABLE ST ISMB300
33 TO 52 TABLE ST ISMB150
120 TO 128 TABLE ST ISMB150
*WP 0.25 TH 0.012 BW 0.25 BT 0.012
*WP 0.155 TH 0.012 BW 0.155 BT 0.012
62 71 81 90 TABLE ST ISMB400
149 TO 152 TABLE TB ISMB400 WP 0.16 TH 0.01 BW 0.16 BT 0.01
MEMBER PROPERTY INDIAN
159 164 169 174 PRIS YD 0.75 ZD 0.4
162 163 167 168 172 173 TABLE ST ISMB300
102 TO 105 114 TO 117 133 TO 144 TABLE ST ISA75X75X10
64 69 83 88 129 TO 132 145 TO 148 TABLE ST ISA100X100X10
*SP 0.39
CONSTANTS
BETA 90 MEMB 149 TO 152 162 163 167 168 172 173
BETA 45 MEMB 63 TO 70 82 TO 89 102 TO 117 129 TO 148
MATERIAL STEEL MEMB 6 12 14 TO 21 24 TO 31 33 TO 99 102 TO 117 120 TO 152 154 155 157 158 162 163 167 168 172 173

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 2 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE
95.
96.
97.
98.
99.
100.
101.
102.
103.
104.
105.
106.
107.
108.
109.
110.
111.
112.
113.
114.
115.
116.
117.
118.
119.
120.
121.
122.
123.
124.
125.
126.
127.
128.
129.
130.
131.
132.
133.

-- PAGE NO.

MATERIAL CONCRETE MEMB 1 3 159 TO 161 164 TO 166 169 TO 171 174 TO 180
MEMBER TRUSS
14 TO 21 24 TO 31 33 TO 52
*MEMBER TRUSS
*62 TO 71 81 TO 90
*MEMBER TRUSS
*91 TO 99 120 TO 128
MEMBER TENSION
102 TO 117 129 TO 148
SUPPORTS
1 4 59 61 63 65 67 69 FIXED
*BUT FX MX MY MZ
51 52 PINNED
*BUT FZ MX MY MZ
MEMBER RELEASE
149 150 162 163 167 168 172 173 START MY MZ
DEFINE 1893 LOAD
ZONE 0.1 RF 4 I 1.5 SS 1 DM 0.02
SELFWEIGHT 1
MEMBER WEIGHT
*DL
6 12 CON 0.075 0.2
120 TO 128 CON 0.15 0.2
6 12 CON 0.075 1.4
120 TO 128 CON 0.15 1.4
6 12 CON 0.19 1.7
120 TO 128 CON 0.375 1.7
*50% LL
6 12 CON 0.225 0.2
120 TO 128 CON 0.45 0.2
6 12 CON 0.225 1.4
120 TO 128 CON 0.45 1.4
DEFINE WIND LOAD
TYPE 1 WIND 1
INT 0.15 HEIG 10
EXP 1 JOINT 2 5 8 11 13 TO 52 60 62 64 66 68 70
LOAD 1 LOADTYPE SEISMIC TITLE LOAD CASE 1
1893 LOAD X 1
PERFORM ANALYSIS

P R O B L E M
S T A T I S T I C S
----------------------------------NUMBER OF JOINTS
NUMBER OF PLATES
NUMBER OF SURFACES

68
0
0

NUMBER OF MEMBERS
NUMBER OF SOLIDS
NUMBER OF SUPPORTS

162
0
10

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 3 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER


ORIGINAL/FINAL BAND-WIDTH=
TOTAL PRIMARY LOAD CASES =
SIZE OF STIFFNESS MATRIX =
REQRD/AVAIL. DISK SPACE =

47/
9/
60 DOF
1, TOTAL DEGREES OF FREEDOM =
22 DOUBLE KILO-WORDS
12.5/ 42706.9 MB

354

*********************************************************
*
*
* TIME PERIOD FOR X 1893 LOADING =
0.12434 SEC
*
* SA/G PER 1893=
3.500, LOAD FACTOR= 1.000
*
*
FACTOR V PER 1893=
0.0656 X
71.00
*
*
*
*********************************************************
**START ITERATION NO.
**START ITERATION NO.
**START ITERATION NO.

2
3
4

**NOTE-Tension/Compression converged after

134.
135.
136.
137.

CHANGE
LOAD 2 LOADTYPE SEISMIC
1893 LOAD Z 1
PERFORM ANALYSIS

4 iterations, Case=

TITLE LOAD CASE 2

*********************************************************
*
*
* TIME PERIOD FOR Z 1893 LOADING =
0.08778 SEC
*
* SA/G PER 1893=
3.243, LOAD FACTOR= 1.000
*
*
FACTOR V PER 1893=
0.0608 X
71.00
*
*
*
*********************************************************
**START
**START
**START
**START
**START
**START

ITERATION
ITERATION
ITERATION
ITERATION
ITERATION
ITERATION

NO.
NO.
NO.
NO.
NO.
NO.

2
3
4
5
6
7

**NOTE-Tension/Compression converged after

7 iterations, Case=

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 4 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

138. CHANGE
139. LOAD 3 LOADTYPE WIND TITLE LOAD CASE 3
140. MEMBER LOAD
141. 14 TO 21 24 TO 31 33 TO 52 62 71 81 90 154 155 157 158 UNI GX 0.079
142. PERFORM ANALYSIS
**START ITERATION NO.
2
**NOTE-Tension/Compression converged after

2 iterations, Case=

143. CHANGE
144. LOAD 4 LOADTYPE WIND TITLE LOAD CASE 4
145. MEMBER LOAD
146. 14 TO 21 24 TO 31 33 TO 52 62 71 81 90 154 155 157 158 UNI GX -0.079
147. PERFORM ANALYSIS
**START ITERATION NO.
2
**NOTE-Tension/Compression converged after

148.
149.
150.
151.
152.
153.
154.
155.
156.
157.
158.
159.
160.
161.
162.
163.
164.
165.
166.
167.
168.
169.
170.
171.
172.
173.
174.

2 iterations, Case=

CHANGE
INACTIVE MEMBER 102 TO 117
LOAD 5 LOADTYPE NONE TITLE LOAD CASE 5
*SELFWEIGHT Y -1
MEMBER LOAD
6 12 CON GY -0.112 0.2
120 TO 128 CON GY -0.224 0.2
12 CON GY -0.112 1.425
120 TO 128 CON GY -0.224 1.425
6 12 CON GY -0.102 1.7
120 TO 128 CON GY -0.204 1.7
*PERFORM ANALYSIS
*CHANGE
LOAD 6 LOADTYPE NONE TITLE LOAD CASE 6
MEMBER LOAD
6 12 CON GY -0.46 0.2
120 TO 128 CON GY -0.92 0.2
6 12 CON GY -0.46 1.425
120 TO 128 CON GY -0.92 1.425
6 12 CON GY -0.144 1.7
120 TO 128 CON GY -0.288 1.7
LOAD COMB 7 COMBINATION LOAD CASE 7
5 1.0 6 1.0
LOAD COMB 8 COMBINATION LOAD CASE 8
1 0.75 5 0.75 6 0.75
LOAD COMB 9 COMBINATION LOAD CASE 9
2 0.75 5 0.75 6 0.75

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 5 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE
175. LOAD COMB 10 COMBINATION
176. 3 0.75 5 0.75 6 0.75
177. LOAD COMB 11 COMBINATION
178. 4 0.75 5 0.75 6 0.75
179. LOAD COMB 12 COMBINATION
180. 1 1.0 5 1.0
181. LOAD COMB 13 COMBINATION
182. 2 1.0 5 1.0
183. LOAD COMB 14 COMBINATION
184. 3 1.0 5 1.0
185. LOAD COMB 15 COMBINATION
186. 4 1.0 5 1.0
187. LOAD COMB 16 COMBINATION
188. 1 1.0 5 1.0 6 1.0
189. LOAD COMB 17 COMBINATION
190. 2 1.0 5 1.0 6 1.0
191. LOAD COMB 18 COMBINATION
192. 3 1.0 5 1.0 6 1.0
193. LOAD COMB 19 COMBINATION
194. 4 1.0 5 1.0 6 1.0
195. LOAD COMB 20 COMBINATION
196. 5 1.5 6 1.5
197. LOAD COMB 21 COMBINATION
198. 1 1.2 5 1.2 6 1.2
199. LOAD COMB 22 COMBINATION
200. 2 1.2 5 1.2 6 1.2
201. LOAD COMB 23 COMBINATION
202. 3 1.2 5 1.2 6 1.2
203. LOAD COMB 24 COMBINATION
204. 4 1.2 5 1.2 6 1.2
205. LOAD COMB 25 COMBINATION
206. 1 1.5 5 1.5
207. LOAD COMB 26 COMBINATION
208. 2 1.5 5 1.5
209. LOAD COMB 27 COMBINATION
210. 3 1.5 5 1.5
211. LOAD COMB 28 COMBINATION
212. 4 1.5 5 1.5
213. PERFORM ANALYSIS
**START ITERATION NO.
**START ITERATION NO.
**START ITERATION NO.

-- PAGE NO.
LOAD CASE 10
LOAD CASE 11
LOAD CASE 12
LOAD CASE 13
LOAD CASE 14
LOAD CASE 15
LOAD CASE 16
LOAD CASE 17
LOAD CASE 18
LOAD CASE 19
LOAD CASE 20
LOAD CASE 21
LOAD CASE 22
LOAD CASE 23
LOAD CASE 24
LOAD CASE 25
LOAD CASE 26
LOAD CASE 27
LOAD CASE 28

2
3
4

**NOTE-Tension/Compression converged after

**START ITERATION NO.


**START ITERATION NO.
**START ITERATION NO.

4 iterations, Case=

4 iterations, Case=

2
3
4

**NOTE-Tension/Compression converged after

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 6 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

214. CHANGE
215. LOAD LIST 1 TO 6
216. PRINT SUPPORT REACTION

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 7 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

SUPPORT REACTIONS -UNIT MTON METE


----------------JOINT

59

61

63

65

67

69

STRUCTURE TYPE = SPACE

LOAD

FORCE-X

FORCE-Y

FORCE-Z

MOM-X

MOM-Y

MOM Z

1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4

-0.47
0.00
-0.97
0.97
0.00
0.01
-0.47
0.00
-0.97
0.97
0.00
0.00
-0.52
0.00
-0.87
0.89
-0.06
-0.18
-0.53
0.00
-0.89
0.88
0.06
0.18
-0.57
0.00
-1.09
1.13
-0.09
-0.30
-0.59
0.00
-1.13
1.09
0.09
0.29
-0.43
0.00
-0.73
0.74
-0.04
-0.12
-0.43
0.00
-0.74
0.73

-0.68
-0.07
-2.65
2.58
0.42
1.74
0.68
-0.07
2.58
-2.65
0.46
1.52
-1.80
0.01
-4.37
4.35
0.62
2.36
1.80
0.01
4.35
-4.37
0.74
2.07
-1.53
0.10
-4.40
4.45
0.72
2.75
1.53
0.10
4.45
-4.40
0.87
2.42
-1.92
-0.13
-4.75
4.88
0.71
2.70
1.95
-0.12
4.88
-4.75

-0.40
-0.77
-1.83
0.97
0.20
0.73
0.19
-0.77
0.96
-1.82
0.22
0.64
0.00
-0.25
0.00
-0.01
0.00
0.00
0.00
-0.25
0.01
-0.02
0.00
0.01
-0.01
-0.28
0.00
0.00
0.00
-0.02
0.00
-0.28
-0.01
0.00
0.00
-0.01
0.00
-0.21
0.00
0.00
0.01
0.02
0.00
-0.21
0.00
0.00

-0.84
-1.65
-3.80
1.81
0.46
1.66
0.35
-1.66
1.79
-3.78
0.50
1.48
-0.03
-1.09
0.01
-0.07
0.00
0.00
0.00
-1.09
0.06
-0.11
0.02
0.08
-0.02
-0.86
-0.02
-0.01
-0.02
-0.09
0.00
-0.86
-0.03
0.00
-0.01
-0.04
-0.02
-1.18
-0.04
-0.03
0.04
0.13
-0.02
-1.18
-0.03
-0.04

-0.12
0.00
-0.55
0.55
0.00
0.02
-0.12
0.00
-0.55
0.55
0.00
0.02
0.00
0.00
-0.01
0.01
0.00
-0.01
0.00
0.00
-0.01
0.01
0.00
-0.01
0.00
0.00
0.00
0.00
0.00
-0.01
0.00
0.00
0.00
0.00
0.00
-0.01
0.00
0.00
0.00
0.00
0.00
-0.01
0.00
0.00
0.00
0.00

0.55
0.00
1.30
-1.30
0.00
-0.01
0.55
0.00
1.30
-1.30
0.00
0.00
0.97
0.00
1.73
-1.75
0.05
0.17
0.97
0.00
1.75
-1.73
-0.05
-0.17
0.83
0.00
1.72
-1.75
0.06
0.19
0.84
0.00
1.75
-1.72
-0.05
-0.19
0.96
0.00
1.73
-1.73
0.05
0.15
0.96
0.00
1.74
-1.73

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 8 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

SUPPORT REACTIONS -UNIT MTON METE


----------------JOINT

51

52

STRUCTURE TYPE = SPACE

LOAD

FORCE-X

FORCE-Y

FORCE-Z

MOM-X

MOM-Y

MOM Z

5
6
1
2
3
4
5
6
1
2
3
4
5
6

0.03
0.11
-0.35
0.00
-1.25
1.11
0.07
0.25
-0.30
0.00
-1.11
1.25
-0.07
-0.23

0.86
2.43
-0.30
0.09
-1.84
1.74
0.46
1.75
0.29
0.09
1.74
-1.85
0.55
1.53

0.01
0.02
0.83
-0.65
3.28
-2.39
-0.19
-0.77
-0.60
-0.65
-2.40
3.29
-0.23
-0.62

0.06
0.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
-0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-0.03
-0.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

************** END OF LATEST ANALYSIS RESULT **************

217.
218.
219.
220.
221.
222.
223.
224.
225.
226.
227.

LOAD LIST 7 TO 15
PARAMETER 1
CODE INDIAN
MAIN 250 MEMB 6 12 14 TO 21 24 TO 31 33 TO 99 102 TO 117 120 TO 152 154 155 157 158 162 163 167 168 172 173
KY 0.85 MEMB 14 TO 21 24 TO 31 33 TO 52
KY 0.85 MEMB 63 TO 70 82 TO 89
KZ 0.85 MEMB 63 TO 70 82 TO 89
LY 3.9 MEMB 62 71 81 90 154 155 157 158
CHECK CODE MEMB 6 12 14 TO 21 24 TO 31 33 TO 99 102 TO 117 120 TO 152 154 155 157 158 162 163 167 168 172 173

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 9 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

STAAD.Pro CODE CHECKING - (IS-800:1984)


***********************

10

v1.1

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

TABLE

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

6 ST

ISMB300
PASS
0.68 C

12 ST

ISMB300
PASS
0.90 C

14 ST

ISMB200
PASS
2.20 C

15 ST

ISMB200
PASS
0.58 C

16 ST

ISMB200
PASS
1.00 C

17 ST

ISMB200
PASS
0.78 C

18 ST

ISMB200
PASS
0.78 C

19 ST

ISMB200
PASS
1.09 C

20 ST

ISMB200
PASS
0.73 C

(INDIAN SECTIONS)
IS-7.1.1(A)
0.163
0.12
-0.41
(INDIAN SECTIONS)
IS-7.1.1(A)
0.186
0.14
0.48
(INDIAN SECTIONS)
COMPRESSION
0.111
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.029
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.050
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.039
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.040
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.055
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.037
0.00
0.00

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

15
2.00
15
0.00
11
0.00
14
0.00
10
0.00
14
0.00
14
0.00
10
0.00
14
0.00

Page 10 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

11

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

21 ST

TABLE

ISMB200
PASS
2.13 C

24 ST

ISMB200
PASS
2.13 C

25 ST

ISMB200
PASS
0.60 C

26 ST

ISMB200
PASS
0.98 C

27 ST

ISMB200
PASS
0.79 C

28 ST

ISMB200
PASS
0.79 C

29 ST

ISMB200
PASS
1.07 C

30 ST

ISMB200
PASS
0.73 C

31 ST

ISMB200
PASS
2.07 C

(INDIAN SECTIONS)
COMPRESSION
0.107
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.108
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.030
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.049
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.040
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.040
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.054
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.037
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.105
0.00
0.00

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

11
0.00
10
0.00
15
0.00
11
0.00
15
0.00
15
0.00
11
0.00
15
0.00
10
0.00

Page 11 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

12

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

33 ST

TABLE

ISMB150
PASS
0.91 C

34 ST

ISMB150
PASS
0.92 C

35 ST

ISMB150
PASS
0.54 C

36 ST

ISMB150
PASS
0.92 C

37 ST

ISMB150
PASS
0.24 T

38 ST

ISMB150
PASS
0.39 C

39 ST

ISMB150
PASS
0.79 C

40 ST

ISMB150
PASS
0.76 C

41 ST

ISMB150
PASS
0.80 C

(INDIAN SECTIONS)
COMPRESSION
0.118
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.119
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.071
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.119
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.008
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.051
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.103
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.098
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.104
0.00
0.00

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

14
0.00
14
0.00
14
0.00
11
0.00
15
0.00
14
0.00
7
0.00
14
0.00
14
0.00

Page 12 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

13

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

42 ST

TABLE

ISMB150
PASS
0.94 C

43 ST

ISMB150
PASS
0.88 C

44 ST

ISMB150
PASS
0.89 C

45 ST

ISMB150
PASS
0.52 C

46 ST

ISMB150
PASS
0.89 C

47 ST

ISMB150
PASS
0.24 T

48 ST

ISMB150
PASS
0.40 C

49 ST

ISMB150
PASS
0.78 C

50 ST

ISMB150
PASS
0.74 C

(INDIAN SECTIONS)
COMPRESSION
0.122
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.114
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.116
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.068
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.115
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.008
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.052
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.101
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.096
0.00
0.00

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

15
0.00
15
0.00
15
0.00
15
0.00
10
0.00
14
0.00
15
0.00
7
0.00
15
0.00

Page 13 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

14

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

51 ST

TABLE

ISMB150
PASS
0.78 C

52 ST

ISMB150
PASS
0.92 C

53 ST

ISMB300
PASS
0.58 T

54 ST

ISMB150
PASS
1.21 T

55 ST

ISMB150
PASS
0.87 C

56 ST

ISMB150
PASS
0.54 T

57 ST

ISMB150
PASS
0.18 C

58 ST

ISMB150
PASS
0.46 T

59 ST

ISMB150
PASS
0.92 C

(INDIAN SECTIONS)
COMPRESSION
0.101
0.00
0.00
(INDIAN SECTIONS)
COMPRESSION
0.120
0.00
0.00
(INDIAN SECTIONS)
7.1.2 BEND C
0.152
0.03
1.07
(INDIAN SECTIONS)
7.1.2 BEND C
0.289
0.00
-0.28
(INDIAN SECTIONS)
IS-7.1.1(A)
0.307
0.00
-0.20
(INDIAN SECTIONS)
7.1.2 BEND C
0.345
0.00
-0.34
(INDIAN SECTIONS)
IS-7.1.1(A)
0.275
0.00
-0.25
(INDIAN SECTIONS)
7.1.2 BEND C
0.335
0.00
-0.33
(INDIAN SECTIONS)
IS-7.1.1(A)
0.357
0.00
-0.23

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

15
0.00
14
0.00
15
2.50
11
0.00
11
0.00
11
0.00
11
0.00
11
0.00
11
0.00

Page 14 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

15

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

60 ST

TABLE

ISMB150
PASS
1.22 T

61 ST

ISMB300
PASS
0.03 C

62 ST

63 ST

64 ST

65 ST

66 ST

67 ST

68 ST

ISMB400
PASS
2.24 C
ISA75X75X10
PASS
0.11 C
ISA100X100X10
PASS
2.16 C
ISA75X75X10
PASS
0.25 C
ISA75X75X10
PASS
1.20 C
ISA75X75X10
PASS
1.21 C
ISA75X75X10
PASS
0.32 C

(INDIAN SECTIONS)
7.1.2 BEND C
0.268
0.00
-0.27
(INDIAN SECTIONS)
IS-7.1.1(A)
0.168
0.05
-1.04
(INDIAN SECTIONS)
IS-7.1.1(A)
0.205
0.18
0.52
(INDIAN SECTIONS)
IS-7.1.1(A)
0.063
-0.01
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.309
0.01
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.107
0.01
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.407
0.01
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.416
0.00
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.134
-0.01
0.00

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

11
0.00
14
2.50
15
0.00
15
0.00
7
3.91
14
0.00
7
3.91
7
3.91
14
0.00

Page 15 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

16

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

69 ST

70 ST

71 ST

72 ST

73 ST

74 ST

75 ST

76 ST

77 ST

TABLE

ISA100X100X10
PASS
2.15 C
ISA75X75X10
PASS
0.17 C
ISMB400
PASS
2.21 C
ISMB300
PASS
0.07 T
ISMB150
PASS
1.16 T
ISMB150
PASS
0.83 C
ISMB150
PASS
0.51 T
ISMB150
PASS
0.17 C
ISMB150
PASS
0.44 T

(INDIAN SECTIONS)
IS-7.1.1(A)
0.316
0.00
0.01
(INDIAN SECTIONS)
IS-7.1.1(A)
0.081
0.00
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.225
-0.18
0.78
(INDIAN SECTIONS)
7.1.2 BEND C
0.154
-0.04
1.02
(INDIAN SECTIONS)
7.1.2 BEND C
0.291
0.00
0.29
(INDIAN SECTIONS)
IS-7.1.1(A)
0.321
0.00
0.21
(INDIAN SECTIONS)
7.1.2 BEND C
0.359
0.00
0.35
(INDIAN SECTIONS)
IS-7.1.1(A)
0.276
0.00
0.26
(INDIAN SECTIONS)
7.1.2 BEND C
0.343
0.00
0.34

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

7
3.91
15
0.00
15
0.00
15
2.50
10
0.00
10
0.00
10
0.00
10
0.00
10
0.00

Page 16 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

17

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

78 ST

TABLE

ISMB150
PASS
0.87 C

79 ST

ISMB150
PASS
1.16 T

80 ST

ISMB300
PASS
0.05 T

81 ST

82 ST

83 ST

84 ST

85 ST

86 ST

ISMB400
PASS
2.33 C
ISA75X75X10
PASS
0.11 C
ISA100X100X10
PASS
2.03 C
ISA75X75X10
PASS
0.21 C
ISA75X75X10
PASS
1.12 C
ISA75X75X10
PASS
1.15 C

(INDIAN SECTIONS)
IS-7.1.1(A)
0.350
0.00
0.24
(INDIAN SECTIONS)
7.1.2 BEND C
0.290
0.00
0.28
(INDIAN SECTIONS)
7.1.2 BEND C
0.170
0.05
1.06
(INDIAN SECTIONS)
IS-7.1.1(A)
0.207
-0.17
0.52
(INDIAN SECTIONS)
IS-7.1.1(A)
0.063
0.00
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.298
0.00
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.101
-0.01
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.389
-0.01
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.388
0.01
0.00

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

10
0.00
10
0.00
15
2.50
14
0.00
14
0.00
7
3.91
15
0.00
7
3.91
7
3.91

Page 17 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

18

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

87 ST

88 ST

89 ST

90 ST

91 ST

92 ST

93 ST

94 ST

95 ST

TABLE

ISA75X75X10
PASS
0.28 C
ISA100X100X10
PASS
2.01 C
ISA75X75X10
PASS
0.15 C
ISMB400
PASS
2.30 C
ISMB300
PASS
0.35 C
ISMB150
PASS
0.51 C
ISMB150
PASS
0.29 C
ISMB150
PASS
0.15 C
ISMB150
PASS
0.09 C

(INDIAN SECTIONS)
IS-7.1.1(A)
0.115
0.01
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.287
0.00
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.061
0.01
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.228
0.18
0.80
(INDIAN SECTIONS)
IS-7.1.1(A)
0.142
0.02
1.06
(INDIAN SECTIONS)
IS-7.1.1(A)
0.224
0.01
0.17
(INDIAN SECTIONS)
IS-7.1.1(A)
0.238
0.00
0.22
(INDIAN SECTIONS)
IS-7.1.1(A)
0.255
0.00
0.25
(INDIAN SECTIONS)
IS-7.1.1(A)
0.222
0.00
0.25

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

15
0.00
7
0.00
14
3.91
14
0.00
15
0.00
15
0.00
15
0.00
15
0.00
15
0.00

Page 18 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

19

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

96 ST

TABLE

ISMB150
PASS
0.16 C

97 ST

ISMB150
PASS
0.32 C

98 ST

ISMB150
PASS
0.56 C

99 ST

102 ST

103 ST

104 ST

105 ST

106 ST

ISMB300
PASS
0.38 C
ISA75X75X10
PASS
1.08 T
ISA75X75X10
PASS
1.08 T
ISA75X75X10
PASS
0.68 T
ISA75X75X10
PASS
0.68 T
ISA50X50X6
PASS
0.31 T

(INDIAN SECTIONS)
IS-7.1.1(A)
0.240
0.00
0.23
(INDIAN SECTIONS)
IS-7.1.1(A)
0.221
0.00
0.20
(INDIAN SECTIONS)
IS-7.1.1(A)
0.209
0.00
0.16
(INDIAN SECTIONS)
IS-7.1.1(A)
0.142
-0.02
1.09
(INDIAN SECTIONS)
TENSION
0.051
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.051
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.032
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.032
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.036
0.00
0.00

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

15
0.00
15
0.00
15
0.00
14
2.00
15
0.00
14
0.00
15
0.00
14
0.00
15
0.00

Page 19 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

20

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

107 ST

TABLE

ISA50X50X6
PASS
0.32 T

108 ST

ISA50X50X6
PASS
0.14 T

109 ST

ISA50X50X6
PASS
0.14 T

110 ST

ISA50X50X6
PASS
0.12 T

111 ST

ISA50X50X6
PASS
0.12 T

112 ST

ISA50X50X6
PASS
0.35 T

113 ST

114 ST

115 ST

ISA50X50X6
PASS
0.35 T
ISA75X75X10
PASS
0.74 T
ISA75X75X10
PASS
0.74 T

(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00

SECTIONS)
0.036
0.00
SECTIONS)
0.016
0.00
SECTIONS)
0.016
0.00
SECTIONS)
0.014
0.00
SECTIONS)
0.014
0.00
SECTIONS)
0.040
0.00
SECTIONS)
0.040
0.00
SECTIONS)
0.034
0.00
SECTIONS)
0.034
0.00

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

14
0.00
15
0.00
14
0.00
14
0.00
15
0.00
14
0.00
15
0.00
14
0.00
15
0.00

Page 20 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

21

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

116 ST

117 ST

120 ST

121 ST

122 ST

123 ST

124 ST

125 ST

126 ST

TABLE

ISA75X75X10
PASS
1.18 T
ISA75X75X10
PASS
1.18 T
ISMB150
PASS
0.68 C
ISMB150
PASS
0.17 C
ISMB150
PASS
0.96 C
ISMB150
PASS
0.24 C
ISMB150
PASS
0.56 C
ISMB150
PASS
0.11 T
ISMB150
PASS
0.49 C

(INDIAN SECTIONS)
TENSION
0.055
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.055
0.00
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.529
0.00
0.54
(INDIAN SECTIONS)
IS-7.1.1(A)
0.366
0.00
-0.38
(INDIAN SECTIONS)
IS-7.1.1(A)
0.603
0.00
0.58
(INDIAN SECTIONS)
IS-7.1.1(A)
0.359
0.01
0.35
(INDIAN SECTIONS)
IS-7.1.1(A)
0.531
0.00
0.55
(INDIAN SECTIONS)
7.1.2 BEND C
0.350
0.00
-0.38
(INDIAN SECTIONS)
IS-7.1.1(A)
0.484
-0.01
0.48

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

14
0.00
15
0.00
10
2.00
7
1.33
10
2.00
10
2.00
10
2.00
7
1.33
10
2.00

Page 21 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

22

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

127 ST

TABLE

ISMB150
PASS
0.18 C

128 ST

129 ST

130 ST

131 ST

132 ST

133 ST

134 ST

135 ST

ISMB150
PASS
0.80 C
ISA100X100X10
PASS
2.45 T
ISA100X100X10
PASS
2.45 T
ISA100X100X10
PASS
0.51 T
ISA100X100X10
PASS
0.50 T
ISA75X75X10
PASS
1.74 T
ISA75X75X10
PASS
1.74 T
ISA75X75X10
PASS
0.96 T

(INDIAN SECTIONS)
IS-7.1.1(A)
0.368
0.00
-0.38
(INDIAN SECTIONS)
IS-7.1.1(A)
0.549
0.00
0.55
(INDIAN SECTIONS)
TENSION
0.084
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.084
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.018
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.017
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.081
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.081
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.045
0.00
0.00

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

7
1.33
10
2.00
15
0.00
14
0.00
10
0.00
11
0.00
14
0.00
15
0.00
15
0.00

Page 22 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

23

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

136 ST

137 ST

138 ST

139 ST

140 ST

141 ST

142 ST

143 ST

144 ST

TABLE

ISA75X75X10
PASS
0.96 T
ISA75X75X10
PASS
0.58 T
ISA75X75X10
PASS
0.58 T
ISA75X75X10
PASS
1.15 T
ISA75X75X10
PASS
1.15 T
ISA75X75X10
PASS
0.34 T
ISA75X75X10
PASS
0.34 T
ISA75X75X10
PASS
1.05 T
ISA75X75X10
PASS
1.06 T

(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00
(INDIAN
TENSION
0.00

SECTIONS)
0.045
0.00
SECTIONS)
0.027
0.00
SECTIONS)
0.027
0.00
SECTIONS)
0.054
0.00
SECTIONS)
0.054
0.00
SECTIONS)
0.016
0.00
SECTIONS)
0.016
0.00
SECTIONS)
0.049
0.00
SECTIONS)
0.050
0.00

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

14
0.00
14
0.00
15
0.00
15
0.00
14
0.00
14
0.00
15
0.00
15
0.00
14
0.00

Page 23 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

24

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

145 ST

146 ST

147 ST

148 ST

149 TB

150 TB

151 TB

152 TB

154 TB

TABLE

ISA100X100X10
PASS
0.39 T
ISA100X100X10
PASS
0.42 T
ISA100X100X10
PASS
3.18 T
ISA100X100X10
PASS
3.19 T
ISMB400
PASS
1.29 T
ISMB400
PASS
1.24 T
ISMB400
PASS
1.39 T
ISMB400
PASS
2.29 C
ISMB200
PASS
2.98 C

(INDIAN SECTIONS)
TENSION
0.013
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.014
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.109
0.00
0.00
(INDIAN SECTIONS)
TENSION
0.109
0.00
0.00
(INDIAN SECTIONS)
IS-7.1.2
0.142
-0.30
0.66
(INDIAN SECTIONS)
IS-7.1.2
0.142
0.30
0.65
(INDIAN SECTIONS)
IS-7.1.2
0.173
-0.36
-0.94
(INDIAN SECTIONS)
IS-7.1.1(A)
0.174
-0.36
0.80
(INDIAN SECTIONS)
IS-7.1.1(A)
0.184
0.03
0.39

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

8
0.00
11
0.00
14
0.00
15
0.00
14
0.30
15
0.30
14
0.30
14
0.30
11
0.19

Page 24 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

25

ALL UNITS ARE - MTON METE (UNLESS OTHERWISE Noted)


MEMBER

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

155 TB

TABLE

ISMB200
PASS
2.89 C

157 TB

ISMB200
PASS
3.00 C

158 TB

ISMB200
PASS
2.91 C

162 ST

ISMB300
PASS
2.94 C

163 ST

ISMB300
PASS
2.81 C

167 ST

ISMB300
PASS
3.62 C

168 ST

ISMB300
PASS
3.48 C

172 ST

ISMB300
PASS
3.59 C

173 ST

ISMB300
PASS
3.42 C

(INDIAN SECTIONS)
IS-7.1.1(A)
0.180
-0.03
0.37
(INDIAN SECTIONS)
IS-7.1.1(A)
0.168
-0.04
0.25
(INDIAN SECTIONS)
IS-7.1.1(A)
0.163
0.04
0.24
(INDIAN SECTIONS)
IS-7.1.1(A)
0.274
0.28
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.273
-0.28
-0.01
(INDIAN SECTIONS)
IS-7.1.1(A)
0.354
0.37
0.01
(INDIAN SECTIONS)
IS-7.1.1(A)
0.353
-0.37
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.229
0.22
0.00
(INDIAN SECTIONS)
IS-7.1.1(A)
0.232
-0.22
-0.01

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

10
0.19
11
0.38
10
0.38
11
0.30
10
0.30
11
0.30
10
0.30
11
0.30
10
0.30

Page 25 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

26

************** END OF TABULATED RESULT OF DESIGN **************

228. STEEL TAKE OFF LIST 6 12 14 TO 21 24 TO 31 33 TO 99 102 TO 117 120 TO 152 -

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 26 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

27

STEEL TAKE-OFF
-------------PROFILE

LENGTH(METE)

WEIGHT(MTON)

229. 154 155 157 158 162 163 167 168 172 173
ST ISMB300
19.82
0.912
ST ISMB200
48.00
1.158
ST ISMB150
127.00
1.900
ST ISMB400
6.60
0.406
ST ISA75X75X10
118.97
1.305
ST ISA100X100X10
44.46
0.665
ST ISA50X50X6
28.84
0.128
TB ISMB400
1.22
0.105
TB ISMB200
9.02
0.376
---------------TOTAL =
6.955

************ END OF DATA FROM INTERNAL STORAGE ************

230.
231.
232.
233.
234.
235.
236.
237.
238.
239.
240.
241.
242.
243.
244.
245.
246.
247.
248.
249.

LOAD LIST 20 TO 28
START CONCRETE DESIGN
CODE IS13920
*CODE IS456
UNIT MMS NEWTON
FC 25 MEMB 1 3 6 12 14 TO 21 24 TO 31 33 TO 99 102 TO 117 120 TO 152 154 155 157 158 160 TO 163 165 TO 168 170 TO 173 175 TO 180
FYMAIN 415 MEMB 1 3 6 12 14 TO 21 24 TO 31 33 TO 99 102 TO 117 120 TO 152 154 155 157 158 160 TO 163 165 TO 168 170 TO 173 175 TO 180
FYSEC 415 MEMB 1 3 6 12 14 TO 21 24 TO 31 33 TO 99 102 TO 117 120 TO 152 154 155 157 158 160 TO 163 165 TO 168 170 TO 173 175 TO 180
MAXMAIN 20 MEMB 1 3 6 12 14 TO 21 24 TO 31 33 TO 99 102 TO 117 120 TO 152 154 155 157 158 160 TO 163 165 TO 168 170 TO 173 175 TO 180
MAXSEC 10 MEMB 1 3 6 12 14 TO 21 24 TO 31 33 TO 99 102 TO 117 120 TO 152 154 155 157 158 160 TO 163 165 TO 168 170 TO 173 175 TO 180
MINSEC 8 MEMB 1 3 6 12 14 TO 21 24 TO 31 33 TO 99 102 TO 117 120 TO 152 154 155 157 158 160 TO 163 165 TO 168 170 TO 173 175 TO 180
MINMAIN 10 MEMB 1 3 6 12 14 TO 21 24 TO 31 33 TO 99 102 TO 117 120 TO 152 154 155 157 158 160 TO 163 165 TO 168 170 TO 173 175 TO 180
DESIGN COLUMN 1 3 160 161 165 166 170 171 175 TO 180

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 27 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

28

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


1
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

D E S I G N

R E S U L T S

Fe415 (Main)
2300.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

23 END JOINT:

900.0 mm X
1

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
270.43
Muy1 :
517.81
INTERACTION RATIO: 0.09 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
27
END JOINT:
1 Puz :
6148.23
Muz :
266.09
Muy :
507.93
IR: 0.17
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 28 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

29

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


3
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

D E S I G N

R E S U L T S

Fe415 (Main)
2300.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

24 END JOINT:

900.0 mm X
4

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
270.04
Muy1 :
517.09
INTERACTION RATIO: 0.10 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
28
END JOINT:
4 Puz :
6148.23
Muz :
266.21
Muy :
508.15
IR: 0.17
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 29 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

30

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


160
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

160

D E S I G N

R E S U L T S

Fe415 (Main)
2913.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

23 END JOINT:

900.0 mm X
59

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
268.45
Muy1 :
514.14
INTERACTION RATIO: 0.09 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
27
END JOINT:
59 Puz :
6148.23
Muz :
261.93
Muy :
500.20
IR: 0.10
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 30 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

31

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


161
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

161

D E S I G N

R E S U L T S

Fe415 (Main)
2913.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

24 END JOINT:

900.0 mm X
61

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
268.08
Muy1 :
513.45
INTERACTION RATIO: 0.09 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
28
END JOINT:
61 Puz :
6148.23
Muz :
262.26
Muy :
500.81
IR: 0.10
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 31 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

32

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


165
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

165

D E S I G N

R E S U L T S

Fe415 (Main)
2183.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

23 END JOINT:

900.0 mm X
63

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
269.46
Muy1 :
516.01
INTERACTION RATIO: 0.09 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
27
END JOINT:
63 Puz :
6148.23
Muz :
262.12
Muy :
500.56
IR: 0.10
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 32 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

33

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


166
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

166

D E S I G N

R E S U L T S

Fe415 (Main)
2183.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

24 END JOINT:

900.0 mm X
65

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
269.05
Muy1 :
515.26
INTERACTION RATIO: 0.09 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
28
END JOINT:
65 Puz :
6148.23
Muz :
262.52
Muy :
501.29
IR: 0.10
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 33 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

34

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


170
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

170

D E S I G N

R E S U L T S

Fe415 (Main)
3587.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

23 END JOINT:

900.0 mm X
67

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
268.57
Muy1 :
514.36
INTERACTION RATIO: 0.09 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
27
END JOINT:
67 Puz :
6148.23
Muz :
261.13
Muy :
498.71
IR: 0.10
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 34 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

35

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


171
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

171

D E S I G N

R E S U L T S

Fe415 (Main)
3587.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

24 END JOINT:

900.0 mm X
69

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
268.33
Muy1 :
513.91
INTERACTION RATIO: 0.09 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
28
END JOINT:
69 Puz :
6148.23
Muz :
261.57
Muy :
499.52
IR: 0.10
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 35 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

36

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


175
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

175

D E S I G N

R E S U L T S

Fe415 (Main)
2913.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

27 END JOINT:

900.0 mm X
71

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
270.56
Muy1 :
518.06
INTERACTION RATIO: 0.13 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
28
END JOINT:
71 Puz :
6148.23
Muz :
276.39
Muy :
526.95
IR: 0.15
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 36 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

37

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


176
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

176

D E S I G N

R E S U L T S

Fe415 (Main)
2913.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

28 END JOINT:

900.0 mm X
72

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
270.90
Muy1 :
518.67
INTERACTION RATIO: 0.13 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
28
END JOINT:
72 Puz :
6148.23
Muz :
271.58
Muy :
518.10
IR: 0.13
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 37 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

38

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


177
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

177

D E S I G N

R E S U L T S

Fe415 (Main)
2183.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

27 END JOINT:

900.0 mm X
73

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
269.91
Muy1 :
516.84
INTERACTION RATIO: 0.12 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
28
END JOINT:
73 Puz :
6148.23
Muz :
277.78
Muy :
529.51
IR: 0.14
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 38 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

39

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


178
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

178

D E S I G N

R E S U L T S

Fe415 (Main)
2183.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

28 END JOINT:

900.0 mm X
74

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
270.29
Muy1 :
517.54
INTERACTION RATIO: 0.12 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
28
END JOINT:
74 Puz :
6148.23
Muz :
270.97
Muy :
516.98
IR: 0.12
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 39 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

40

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


179
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

179

D E S I G N

R E S U L T S

Fe415 (Main)
3587.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

27 END JOINT:

900.0 mm X
75

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
270.21
Muy1 :
517.39
INTERACTION RATIO: 0.14 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
28
END JOINT:
75 Puz :
6148.23
Muz :
277.69
Muy :
529.33
IR: 0.15
============================================================================

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 40 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE

-- PAGE NO.

41

***Note: SOME OF THE BEAMS CONNECTED TO THE COLUMN NO.


180
ARE NOT DESIGNED. HENCE ONLY SHEAR FORCE FROM ANALYSIS
WILL BE CONSIDERED FOR SHEAR DESIGN.
============================================================================
C O L U M N
M25

N O.

LENGTH:

180

D E S I G N

R E S U L T S

Fe415 (Main)
3587.0 mm

** GUIDING LOAD CASE:

CROSS SECTION:

Fe415 (Sec.)

28 END JOINT:

900.0 mm X
76

500.0 mm

COVER: 40.0 mm

TENSION COLUMN

REQD. STEEL AREA


:
3600.00 Sq.mm.
REQD. CONCRETE AREA:
446400.00 Sq.mm.
MAIN REINFORCEMENT : Provide 32 - 12 dia. (0.80%,
3619.11 Sq.mm.)
(Equally distributed)
CONFINING REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 100 mm c/c
over a length
900.0 mm from each joint face towards
midspan as per Cl. 7.4.6 of IS-13920.
8 number overlapping hoop along with crossties
are provided along Y direction.
(Clause 7.3.2 of IS-13920)
8 number overlapping hoop along with crossties
are provided along Z direction.
(Clause 7.3.2 of IS-13920)
TIE REINFORCEMENT
: Provide 8 mm dia. rectangular ties @ 190 mm c/c
SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)
---------------------------------------------------------Puz :
6142.50
Muz1 :
270.60
Muy1 :
518.12
INTERACTION RATIO: 0.13 (as per Cl. 39.6, IS456:2000)
SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)
---------------------------------------------------------WORST LOAD CASE:
28
END JOINT:
76 Puz :
6148.23
Muz :
271.28
Muy :
517.55
IR: 0.13
============================================================================

********************END OF COLUMN DESIGN RESULTS********************

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 41 of 42

Wednesday, January 22, 2014, 06:47 PM


STAAD SPACE
250.
251.
252.
253.

-- PAGE NO.

42

*DESIGN BEAM 17
END CONCRETE DESIGN
*UNIT MET MTON
FINISH

*********** END OF THE STAAD.Pro RUN ***********


**** DATE= JAN 22,2014

TIME= 16: 7:37 ****

************************************************************
*
For questions on STAAD.Pro, please contact
*
*
Bentley Systems or Partner offices
*
*
*
*
Telephone
Web / Email
*
* USA
+1 (714) 974-2500
*
* UK
+44 (0) 808 101 9246
*
* SINGAPORE +65 6225-6158
*
* FRANCE
+33 (0) 1 55238400
*
* GERMANY
+49 0931 40468
*
* INDIA
+91 (033) 4006-2021
*
* JAPAN
+81 (03)5952-6500
http://www.ctc-g.co.jp
*
* CHINA
+86 21 6288 4040
*
* THAILAND +66 (0)2645-1018/19 partha.p@reisoftwareth.com*
*
*
* Worldwide http://selectservices.bentley.com/en-US/
*
*
*
************************************************************

D:\Staad\Pipe Bridge (Somnath PHE)\Intake Well 30m Bridge.anl

Page 42 of 42

Vous aimerez peut-être aussi