Académique Documents
Professionnel Documents
Culture Documents
This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of
the examination. It shows the basis on which Examiners were instructed to award marks. It does not
indicate the details of the discussions that took place at an Examiners meeting before marking began,
which would have considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner
Report for Teachers.
Cambridge will not enter into discussions about these mark schemes.
Cambridge is publishing the mark schemes for the May/June 2013 series for most IGCSE, GCE
Advanced Level and Advanced Subsidiary Level components and some Ordinary Level components.
Page 2
Mark Scheme
IGCSE May/June 2013
Syllabus
0417
Centre Number
06_0417_21_MS v3.doc
Header
Centre No left, file name right aligned
1 mark
Title
Data entry 100% accurate, centre aligned
26 pt, sans-serif, bold & underlined
1 mark
1 mark
Paper
21
Subtitle
Data entry 100% accurate, 18 pt sans-serif 1 mark
The
UK
the largest wind energy
Italic,
bold,
righthas
aligned
1 mark
1 mark
1 mark
1 mark Cambridge International Examinations 2013
Page 3
Mark Scheme
IGCSE May/June 2013
Syllabus
0417
Paper
21
Centre Number
v3.doc
Name
06_0417_21_MS
Sea
Capacity
Thanet
North Sea
300
Gunfleet Sands
North Sea
172
Inner Dowsing
North Sea
120
Lynn
North Sea
97
Kentish Flats
North Sea
90
DB extract
Inserted in correct place within column width 1 mark
Europe is currently
UK, Operational,
North Seathe leader in offshore
1 mark
wind>=90
power generating 1951.5 MW1 mark
of
Capacity
Descending
order ofHowever
Capacity China is the fastest
1 mark
green power.
Fields
Name, Sea,
Capacity
mark
growing
market
and init order
is predicted 1that
No noise impact
1 mark
2 marks
The
wind at sea is steadier, more
1 mark
consistent
1 mark and not blocked by obstacles
such
as mountains, trees and buildings,
1 mark
1 markbetter output and more consistent
giving
higher
25/10/2011
1 mark
Page 4
Mark Scheme
IGCSE May/June 2013
Centre Number
v3.doc
Syllabus
0417
Paper
21
06_0417_21_MS
Page 5
Mark Scheme
IGCSE May/June 2013
Syllabus
0417
Paper
21
Centre Number
06_0417_21_MS v3.doc
ID
BE06
BE02
BE07
BE04
BE05
DK02
DK05
Germany
Germany
Germany
Ireland
Netherlands
Netherlands
Norway
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United Kingdom
DE01
DE09
DE10
IE01
NL02
NL01
NR01
UK04
UK10
UK14
UK07
UK11
UK09
UK06
UK08
UK02
UK03
UK05
UK01
UK19
UK21
Walney
Total turbines in operation
1 mark
Name
Number Distance
Operational
Capacity
Belwind
66
46.0
Yes
330
Bligh Bank
55
42.0
Yes
165
C-power II
60
27.0
Yes
216
Eldepasco
36
37.0
Yes
216
Thornton Bank
6
27.0
Yes
30
3
records
added,
100%
accurate
3
marks
Horns Rev 1
80
17.0
Yes
160
Sorted by Country, then by Name
1 mark
Horns Rev 2
91
31.7
Yes
209
Specified fields in correct order
1 mark
and labels all fully visible
1 mark Yes
AlphaData
Ventus
12
56.0
60
Landscape,
1
page
wide
1
mark
Emden
1
0.3
Yes
5
Hooksiel
1
0.4
Yes
5
Arklow Bank
7
10.0
Yes
25
Egmond aan Zee
36
10.0
Yes
108
Princess Amalia
60
23.0
Yes
120
Hywind
1
10.5
Yes
2
Barrow
30
10.0
Yes
90
Beatricee Demonstration
2
23.0
Yes
10
Blyth
2
1.0
Yes
4
Burbo Bank
25
6.4
Yes
90
Search
Gunfleet Sands
48Sea = North
7.0 Sea or Irish Sea
Yes 1 mark 172
Inner Dowsing
30Operational
5.0 = Yes
Yes 1 mark 120
Kentish Flats
30
8.5
Yes
90
Lynn
27
5.2
Yes
97
North Hoyle
30
8.0
Yes
60
Rhyl Flats
25
8.0
Yes
90
Robin Rigg
60
9.5
Yes
216
Calculated Sum of
Number 1 mark
Scroby Sands
30
2.3
Yes
60
Label 100% accurate
1300
mark
Thanet
100
11.0
Yes
51
1002
14.0
Yes
1 mark
184
Height
Sea
117.0
North Sea
117.0
North Sea
130.0
North Sea
130.0
North Sea
157.0
North Sea
110.0
North Sea
Calculated
field
114.5 100% North
Sea
Heading
accurate
Calculated field
150.0
North Sea
Formatted to 1 dp
157.0
North Sea
151.0
North Sea
129.0
Irish Sea
115.0
North Sea
99.0
North Sea
106.2
North Sea
120.0
Irish Sea
170.0
North Sea
95.0
North Sea
137.0
Irish Sea
128.5
North Sea
133.5
North Sea
115.0
North Sea
133.5
North Sea
107.0
Irish Sea
133.5
Irish Sea
125.0
Irish Sea
100.0
North Sea
115.0
North Sea
137.0
Irish Sea
Turbine_Capacity
5.0
3.0
3.6
6.0
5.0
2.0
2.3
1 mark
2 marks
5.0
1 mark
5.0
5.0
3.6
3.0
2.0
2.0
3.0
5.0
2.0
3.6
3.6
4.0
3.0
3.6
2.0
3.6
3.6
2.0
3.0
3.6
Page 6
Mark Scheme
IGCSE May/June 2013
Syllabus
0417
Paper
21
Centre Number
Import 6 slides
1 mark
New slide as first slide correct layout 1 mark
Text entry correct
1 mark
Print
Handout slides 6 to page 1 mark
25/10/2011
1 mark
1 mark
Master slide
Correct image placed top right no distortion
Thick 3 pt horizontal line across slide below image
Text Renewable Energy, 72 pt, serif, left, above line, no wrap
Centre No, Cand No, Name, 10 pt, serif, bottom right
Auto slide
no, bottom
left
Cambridge
International
Examinations
2013
All items created and appear on all slides with no overlap
1 mark
1 mark
1 mark
1 mark
1 mark
1 mark
Page 7
Mark Scheme
IGCSE May/June 2013
Syllabus
0417
Centre Number
1 mark
1 mark
1 mark
Print
Single slide
1 mark
Paper
21
Page 8
Mark Scheme
IGCSE May/June 2013
Syllabus
0417
Paper
21
Centre Number
Step 2 & 3 Contact details and distribution list
Database structure
Correct field names and data types
Distance and Height formatted
to 1 dp
Operational as yes/no on report
Boolean/logical set in design
1 mark
1 mark
1 mark
1 mark
1 mark
1 mark
1 mark
1 mark
1 mark
Page 9
Mark Scheme
IGCSE May/June 2013
Syllabus
0417
Paper
21
Centre Number
Step 51 Email Message
Email
To: Energy Team group
1 mark
Cc: design.h@cie.org.uk
1 mark
Subject: Offshore wind farms
1 mark
Report file attached (doc or rtf)
1 mark
Message text & personal details correct
1 mark
The annual report is attached for your information.