BETTER CHEAPER
REV.00
Item
1
Activity
PIC
2.
3.
Gap Analysis
L. Estrella/
Process Owners
CONSULTANT
4.
Filling-up of gap.
CNRG
5.
CONSULTANT
6.
Internal audit
CNRG
7.
CNRG
8.
Management review.
9.
Pre-qualification assessment
CNRG
Management
CONSULTANT
10.
CNRG
11.
Management review.
12.
Pre-Audit
CNRG
Management
CONSULTANT
13.
Counter-measure to pre-audit
CNRG
14.
Management review.
15.
Certification Audit.
CNRG
Management
To be
determined
2005
MAR
APRIL
MAY
JUNE
JULY
AUG
SEPT
OCT
NOV
DEC
week 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
CONSULTANT
Legend:
Target
Actual
Approved:
Approved:
Prepared:
FASTER
BETTER CHEAPER
REV.00
Item
Activity
PIC
2005
MAR
APRIL
MAY
JUNE
JULY
AUG
SEPT
OCT
NOV
DEC
week 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Identify the processes needed for the quality management system and their
application throught the organization.
Determine the sequence and interaction of the processes identified in item#1.
Core Team
5.
Determine criteria and methods needed to ensure that both the operation and
control of these processes are effective.
Ensure the availability of resources and information necessary to support the
operation and monitoring of the processes identified in item#1.
Gap Analysis
Core Team/
Process Owners
L. Estrella/
Process Owners
Consultant
6.
Filling-up of gap
7.
Pre-Audit
8.
Core Team/
Process Owners
Consultant/
CNRG
CNRG
9.
Certification Audit
TBD
10.
11.
Core Team/
Process Owners
Core Team/
Process Owners
2.
3.
4.
Core Team
Legend:
Target
Actual
Approved:
Approved:
Prepared:
FASTER
BETTER CHEAPER
REV.00
2005
MAR
APRIL
MAY
JUNE
JULY
AUG
SEPT
OCT
NOV
DEC
WW
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Item
Activity
QMS-GENERAL REQUIREMENTS FOR CERTIFICATION
PIC
Identify the processes needed for the quality management system and their
application throught the organization.
Core Team
2.
Core Team
3.
Determine criteria and methods needed to ensure that both the operation and
control of these processes are effective.
-includes procedural manual,Work Instruction,Visual Aids and
training/orientation of concerned personnel.
Core Team/
Process Owners
ISO DOCUMENTATION
3.1
3.2
Core Team
3.1.2
quality manual.
-procedural manual
Core Team
3.1.3
3.1.3.2.2.2
3.1.3.2.2.3
Management
C. Tutanes
W. Umali
3.1.3.2.3
Work Environment
3.1.3.2.3.1
Work Environment Control Procedure for
parts prep., painting room, baking oven,
polishing and assembly area and warehouse.
3.1.3.2.3.2
Process
Owners
3.1.3.2.4
G. Estingor
3.1.3.2.5
Purchasing
3.1.3.2.5.1
Mike
Purchasing Procedure
Incoming Material quality control procedure
3.1.3.2.6
Production provision
3.1.3.2.6.1
Control of production provision
3.1.3.2.6.2
Validation of processes for production provision
3.1.3.2.6.3
Identification and traceability
3.1.3.2.6.4
Customer property
3.1.3.2.6.5
Preservation of product
Process
Owners
3.1.3.2.7
W. Umali
3.1.3.2.8
Core Team
3.1.3.2.9
L. Estrella
Process
Owners
4.
L. Estrella/
Process Owners
5.
Gap Analysis
Consultant
6.
Filling-up of gap
Core Team/
Process
Owners
7.
Pre-Audit
8.
Consultant
CNRG
CNRG
9.
Certification Audit
TBD
10.
Core Team/
Process
Owners
11.
Core Team/
Process
Owners
Legend:
Target
Actual