Walsall DSDA Access Project BAFFB Sep 2011

Appendix 3.8A
Risk Register

Darlaston SDA Access Project (BAFFB Scheme)

Risk Register Ver 6.0

Implications of Risk

Impact of Risk
(on the project)
Score 1 - 4

Inherent Risk
Likelihood
(of risk occurring)
Score 1 - 6

Last amended: 04/09/11

Proximity
TOTAL
Score

Prep
(P)

Short
(ST)

Med
(MT)

Action
Impact of Risk
(on the project)
Score 1 - 4

Long
(LT)

Residual Risk
Likelihood
(of risk occurring)
Score 1 - 6

TOTAL
Score

Risk Owner
Employer (E)
or
Contractor (C)

Risk Ref.

Risk Factor

A1.

Scheme Development Risks

A1 - 1

Objections from British Waterways leading to Public Inquiry

Delay to programme and probable increase


in costs

15

Regular liaison with objectors throughout design process

9E

A1 - 2

British Waterways insist on canal closure

Delay to programme resulting from phased


construction or increase in costs resulting
from more intense construction programme

15

Early liaison with British Waterways and their stakeholders

12 E

A1 - 3

Objections from English Heritage leading to Public Inquiry

Delay to programme and probable increase


in costs

Consult directly prior to submission of business case.

6E

A1 - 4

Objections from Highways Agency leading to Public Inquiry

Delay to programme and probable increase


in costs

Regular liaison with objector throughout design process

6E

A1 - 5

Objections from English Nature leading to Public Inquiry

Delay to programme and probable increase


in costs

Consult directly prior to submission of business case.

6E

A1 - 6

Objections from Network Rail leading to Public Inquiry

Delay to programme and probable increase


in costs

Regular liaison with objector throughout design process

6E

A1 - 7

Objections from Environment Agency leading to Public Inquiry

Delay to programme and probable increase


in costs

Regular liaison with objector throughout design process

6E

A1 - 8

Objection from Severn Trent Water leading to Public Enquiry

Delay to programme and probable increase


in costs

Consult directly prior to submission of business case.

6E

A1 - 9

Objections from pressure groups e.g. Friends of the Earth


leading to changes in design

Delay to programme and negative public


perception of scheme

If objections arise, engage through agreed consultation


mechanisms.

5E

A1 - 10

Scheme doesn't attract regional support in forthcoming RFA2


process RISK CLOSED

Delay to programme and probable increase


in costs or scheme fails

Submit robust RFA application & champion scheme

6E

A1 - 11

Objections from people who have relatives buried near to site


of aqueduct on Bentley Mill Way leading to need for
environmental treatments e.g. acoustic or visual barriers

Delay to programme and probable increase


in costs

Liaise with Bereavement Services to minimise potential


objections

3E

A1 - 12

Requirement for variable demand modelling to be undertaken


RISK CLOSED

Delay to programme and increase in cost

12

Assess need for VDM prior to business case submission


and agree results with DfT

9E

A2.

Implementation of Infrastructure Improvements

A2 - 1

Part 1 claims actual costs significantly exceed estimates

Increasing costs on fixed funding approval

Early negotiation with land/property owners and provision


of a contingency budget

3E

A2 - 1A

Land compensation costs significantly exceed estimates

Increasing costs on fixed funding approval

Early negotiation with land/property owners and provision


of a contingency budget

3E

A2 - 2

Noise insulation actual costs significantly exceed estimates

Increasing costs on fixed funding approval

Provision of a contingency budget

4E

A2 - 3

Statutory undertakers diversion costs unacceptably high

Uneconomic costs resulting in scheme


failure

Consult with statutory undertakers in line with


communications plan

6E

A2 - 3A

Statutory undertakers C4 cost estimates significantly exceed


C3 cost estimates

Increasing costs on fixed funding approval

Liaise with statutory undertakers and early commission of


C4 estimates

4E

A2 - 4

Significantly uncharted services found

Delay to programme and probable increase


in costs

Availability of contingency budget.

8E

A2 - 5

Contaminated land found in unexpected locations

Delay to programme and probable increase


in costs

Robust programme of site investigation and ongoing


liaison with Environment Agency

5E

A2 - 6

Excavation reveals contaminate levels are higher than


assumed resulting in higher disposal costs

Increasing costs on fixed funding approval

Conduct site investigation early on in design process

9E

A2 - 7

Unexpected very high contaminants found


(high/toxic/dangerous)

Delay to programme, design changes and


probable increase in costs

Conduct early site investigation

9E

Status
Sep-11

Closed

Closed

X
Proximity codes: P = preparation period 0 - 3 years
ST = opening year to 5 years after opening
MT = years 5 to 15 after opening
LT = more than 15 years after opening

Status codes: C = closed


= no change
= worse
= better

Darlaston SDA Access Project (BAFFB Scheme)

Risk Register Ver 6.0

Impact of Risk
(on the project)
Score 1 - 4

Inherent Risk
Likelihood
(of risk occurring)
Score 1 - 6

Last amended: 04/09/11

Proximity
TOTAL
Score

Prep
(P)

Short
(ST)

Action

Med
(MT)

Impact of Risk
(on the project)
Score 1 - 4

Long
(LT)

Residual Risk
Likelihood
(of risk occurring)
Score 1 - 6

TOTAL
Score

Risk Owner
Employer (E)
or
Contractor (C)

Risk Ref.

Risk Factor

Implications of Risk

A2 - 8

Potential remedial works to aqueduct to enable British


Waterways co-operation. (Potential for cost share with British
Waterways.)

Delay to programme and probable increase


in costs

Transfer risk to contractor

6E

A2 - 9

Contaminated ground water enters works from former IMI


copper works site

Delay to programme and probable increase


in costs

Transfer risk to IMI site owners

8E

A2 - 10

Unforeseen archaeological / environment / ecological


conditions impact on the scheme e.g. live ordnance from the
Second World War

Delay to programme and probable increase


in costs

Identify possible 'extraordinary' scenarios and ensure


procedures to be followed are documented

4E

A2 - 11

Unforeseen mineshafts found

Delay to programme and probable increase


in costs

Carry out searches in the design process and carry out


site investigations

8E

A2 - 12

Risk of River Tame flooding during construction

Delay to programme, design changes and


probable increase in costs

Transfer risk to contractor - Erect flood defences - Liaise


with Environment Agency

3C

A2 - 13

Existing grade II listed aqueduct affected by construction of


new (adjacent) aqueduct RISK CLOSED

Delay to programme, design changes and


probable increase in costs

15

Early involvement of British Waterways and Council


heritage teams

15 E

A2 - 14

Canal integrity breached leading to serious flooding. Included in


A2 - 8

Delay to programme, design changes and


probable increase in costs

Transfer risk to Contractor

6C

A2 - 15

Underpinning of existing aqueduct foundations required RISK


CLOSED

Delay to programme, design changes and


probable increase in costs

18

Site investigation in first instance. Possible transfer of risk


to contractor

15 E

A2 - 16

Lowering of existing carriageway undermines existing aqueduct


due to contractor operations

Delay to programme, design changes and


probable increase in costs

18

Site investigation in first instance. Possible transfer of risk


to contractor

18 C

A2 - 17

Performance of statutory undertakers e.g. time overruns

Delay to programme and probable increase


in costs

18

Transfer risk to statutory undertakers through contract

15 E

A2 - 17A

Management of statutory undertakers e.g. time overruns

Delay to programme and probable increase


in costs

12

Contractor to develop risk action plan

12 C

A2 - 18

Condition of existing carriageway at tie-ins requires


reconstruction work to be undertaken

Delay to programme and probable increase


in costs

Assess carriageway condition prior to scheme


commencement - Identify maintenance resources

5C

A2 - 19

Failure of railway track possession dates

Delay to programme and probable increase


in costs

15

Transfer risk to Network Rail & their contractors who will


construct rail bridge.

15 E

A2 - 20

Performance of Network Rail construction programme e.g. time


overrun

Delay to programme and probable increase


in costs

Transfer risk to Network Rail & their contractors who will


construct rail bridge.

6E

A2 - 21

Exceptional inclement weather during construction period

Delay to scheme and rise in costs

12

Dynamic programming of works on site

12 C

A2 - 22

Highways works in neighbouring local authority area during


construction

Diversions leading to traffic congestion and


delay with possible impact on programme
and costs

15

Liaison with neighbouring authorities and agreement re


programme

12 C

A2 - 23

Highways Agency works on strategic network during


construction

Diversions leading to traffic congestion and


delay with possible impact on programme
and costs

15

Liaison with Highways Agency and agreement re


programme

12 C

A2 - 24

Land development in vicinity of highway improvements

Changes to vehicular and pedestrian


flows/patterns with capacity and safety
implications

Liaison with Planning Department and Traffic Manager re


any possible development works

9E

A2 - 25

Additional Traffic management

Increased costs on fixed funding approval

Liaison with Traffic Management section and early


quantification of TM cost

2C

A2 - 26

Design development / design growth

Delay to scheme and rise in costs

Communications Plan to keep stakeholders informed and


minimise chance of surprise changes

8E

A3.

Operator, Third Party & User Responses / Impacts

A3 - 1

Land-use developments on which BCR are based are not


realised

Scheme benefits not realised

Obtain funding commitment to scheme from key


developers prior to scheme start.

15 E

Status
Sep-11

Closed

Closed

Proximity codes: P = preparation period 0 - 3 years


ST = opening year to 5 years after opening
MT = years 5 to 15 after opening
LT = more than 15 years after opening

Status codes: C = closed


= no change
= worse
= better

Darlaston SDA Access Project (BAFFB Scheme)

Risk Register Ver 6.0

Impact of Risk
(on the project)
Score 1 - 4

Inherent Risk
Likelihood
(of risk occurring)
Score 1 - 6

Last amended: 04/09/11

Proximity
TOTAL
Score

Prep
(P)

Short
(ST)

Action

Risk Ref.

Risk Factor

Implications of Risk

Med
(MT)

A3 - 2

Failure to obtain funding

Increasing costs on fixed funding approval

12

A3 - 3

Traffic generation less than anticipated

Reduced scheme benefits

A3 - 4

Traffic generation greater than anticipated

Infrastructure unable to cope with actual


demand leading to localised congestion

A4.

Highway Operations

A4 - 1

Maintenance costs for new/improved infrastructure are greater


than anticipated

Financial implications for Walsall Council's


annual maintenance budget

B1.

Project Management

B1 - 1

Loss of political support resulting from significant blight notice


RISK CLOSED

Scheme fails

B1 - 2

Project Board members' lack of clarity over roles and


responsibilities. (Quantification included in B1 - 6.)

Key decision-making process undermined


and possible delay to programme

B1 - 3

Poor leadership provided by Project Board. (Quantification


included in B1 - 6.)

Key decision-making process undermined


and possible delay to programme

B1 - 4

Political influences on design. (Quantification included in B1 6.)

Scheme health and safety compromised

B1 - 5

Unrealistic programming of scheme delivery RISK CLOSED

B1 - 6

Impact of Risk
(on the project)
Score 1 - 4

Long
(LT)

Residual Risk
Likelihood
(of risk occurring)
Score 1 - 6

TOTAL
Score

Risk Owner
Employer (E)
or
Contractor (C)

Status
Sep-11

Early Contractor Involvement.

15 E

Commitment of regeneration stakeholders to scheme;


robust traffic modelling

6E

Robust traffic modelling; ongoing engagement of key


stakeholders in developing business case

9E

Early dialogue with maintenance team and input to detailed


design

4E

Ongoing communication with affected land owners & local


members - Negotiation of land/property sales.

16 E

Clear terms of reference

8E

Training for Project Board members

8E

15

Training for Project Board members

12 E

Delay to programme

ECI in project planning

4E

Change in internal political support leads to design changes

Scheme fails

Ongoing communication with members in line with


communication plan

6E

B1 - 7

Staff changes

Lack of team continuity and threat to


programme

12

Effective document control and project management


procedures in place, including arrangements for 'handover'

12 E

B2.

Scheme Approval and Funding

B2 - 1

DfT refuse programme entry RISK CLOSED

Scheme fails

12

Regular liaison with DFT

16 E

B2 - 2

DfT refuse conditional approval RISK CLOSED

Scheme fails

Regular liaison with DFT

8E

B2 - 3

DfT refuse full approval

Scheme fails

Regular liaison with DFT

8E

B2 - 4

Economic/financial climate leads to DfT deferring scheme


approval

Delay to programme and probable increase


in costs

Accept outside of control of Walsall MBC

6E

B2 - 4A

Employer delays construction start date

Increasing costs on fixed funding approval

Continuity of Project Team and sufficient advance


programming of work streams

9E

B2 - 5

Rising cost of land / property when completing acquisitions


following confirmation of CPO or at negotiation stage.
(Quantification included in B2 - 8.)

Increasing costs on fixed funding approval

Accelerate negotiation with landowners

2E

B2 - 6

Adverse impact of tax regimes e.g. land fill tax

Increasing costs

Accept outside of control of Walsall MBC

4E

B2 - 7

Land not being acquired by negotiation. Sufficient time


available within current programme

CPO Public Inquiry required

12

Develop CPO in tandem - Maximise resources in


negotiation terms

12 E

B2 - 8

Land cannot be acquired by negotiation at reasonable


budgeted cost

Cost increase. Without CPO, scheme fails

12

Develop CPO in tandem - Maximise resources in


negotiation terms

12 E

Closed

Closed

Closed

Closed

Proximity codes: P = preparation period 0 - 3 years


ST = opening year to 5 years after opening
MT = years 5 to 15 after opening
LT = more than 15 years after opening

Status codes: C = closed


= no change
= worse
= better

Darlaston SDA Access Project (BAFFB Scheme)

Risk Register Ver 6.0

Impact of Risk
(on the project)
Score 1 - 4

Inherent Risk
Likelihood
(of risk occurring)
Score 1 - 6

Last amended: 04/09/11

Proximity
TOTAL
Score

Prep
(P)

Short
(ST)

Med
(MT)

Action
Impact of Risk
(on the project)
Score 1 - 4

Long
(LT)

Residual Risk
Likelihood
(of risk occurring)
Score 1 - 6

TOTAL
Score

Risk Owner
Employer (E)
or
Contractor (C)

Risk Ref.

Risk Factor

Implications of Risk

B2 - 9

Planning Application refused or Certificate of Lawfulness not


obtained

Scheme fails

Early planning authority involvement

8E

B2 - 10

Additional time required for CPO Public Inquiry

Delay to programme

Accept outside of control of Walsall MBC

6E

B2 - 11

Additional time required for Planning Public Inquiry

Delay to programme

Accept outside of control of Walsall MBC

8E

B2 - 12

Statutory orders being approved delayed

Scheme fails

Accept outside of control of Walsall MBC

8E

B2 - 13

Change of Government transport policy RISK CLOSED

Weakened policy case for scheme or policy


no longer supports scheme

Accept outside of control of Walsall MBC

6E

B2 - 14

British Waterways restrict access and apply onerous conditions


on construction of the Bentley Road South canal bridge RISK
CLOSED

Change to programme and probable


increase in costs

12

Regular liaison with BW throughout design process.

9E

B2 - 15

Environment Agency refuse drainage outfalls to River Tame

Additional cost of pumping systems and


long-term maintenance

Early involvement of Environment Agency in design


process.

2E

B2 - 16

Failure to secure Council commitment to fund the 'local


contribution' RISK CLOSED

Scheme fails

Seek early Cabinet approval of local contribution and


ensure Capital Programme 3-year budget planning takes
account of scheme

12 E

B2 - 17

Inflation rates exceed estimates

Escalation of scheme costs

Ongoing monitoring of inflation rates and forecasting of


impact on scheme costs

6E

B2 - 18

Forced property purchase under CPO rules leads to more


property being acquired than forecast

Escalation of scheme costs

Early negotiation of land/property acquisition

8E

B2 - 19

Unforeseen Environment Agency management plan


requirements

Escalation of scheme costs

Early involvement of Environment Agency in design


process.

9E

B2 - 20

Unforeseen flora and fauna (e.g. Japanese Knotweed)

Escalation of scheme costs

Additional surveys to identify early

6E

B2 - 21

Discovery of unforeseen protected species

Delay to programme and probable increase


in costs

Subsequent stages of EIA analysis will address

6E

B2 - 22

Secretary of State rejects scheme

Scheme fails

Ensure robust procedures in place to deal with statutory


order applications

8E

B2 - 23

Inflation included in base estimate incorrect

Escalation of scheme costs

12

Included within QRA so if risk materialises funds are


available

9E

B3.

Procurement and Delivery

B3 - 1

Economic conditions elevate the cost of construction


significantly

Increasing costs on fixed funding approval

Transfer risk to contractor agreeing a fixed contract cost

4C

B3 - 2

Difficulty in engaging a contractor to construct the scheme


RISK CLOSED

Delay to programme and probable increase


in costs

Appointment of Framework Contractor - ECI in design


process.

4E

B3 - 3

Changes in national or EU procurement policy leading to new


procurement approach RISK CLOSED

Delay to programme and probable increase


in costs

Accept outside of control of Walsall MBC, but procurement


timetable to be accelerated

2E

B3 - 4

Unrealistic programming of scheme procurement RISK


CLOSED

Delay to programme and probable increase


in costs

Realistic planning in conjunction with framework


contractor.

2E

B3 - 5

Additional management of contractual disagreements

Delay to programme and probable increase


in costs

Minimise threat of disagreements through ECI

5E

B3 - 6

Standards change during/after design completed RISK


CLOSED

Delay to programme and probable increase


in costs

Awareness of any proposed changes and any open


consultations

6E

Status
Sep-11

Closed

Closed

Closed

Closed

Closed

Closed

Proximity codes: P = preparation period 0 - 3 years


ST = opening year to 5 years after opening
MT = years 5 to 15 after opening
LT = more than 15 years after opening

Closed

Status codes: C = closed


= no change
= worse
= better

Darlaston SDA Access Project (BAFFB Scheme)

Risk Register Ver 6.0

Impact of Risk
(on the project)
Score 1 - 4

Inherent Risk
Likelihood
(of risk occurring)
Score 1 - 6

Last amended: 04/09/11

Proximity
TOTAL
Score

Prep
(P)

Short
(ST)

Med
(MT)

Action
Impact of Risk
(on the project)
Score 1 - 4

TOTAL
Score

Risk Owner
Employer (E)
or
Contractor (C)

Risk Ref.

Risk Factor

Implications of Risk

B3 - 7

Changes in legislation

Delay to programme and probable increase


in costs

Awareness of any proposed changes and any open


consultations

6E

B4.

Contractor Construction Risks

B4 - 1

Abnormal weather during earthworks (non-exceptional event)

Works temporarily halted - delay incurred


and cost increase

Accept beyond control of contractor, but risk management


plan to be developed in case risk materialises

9C

B4 - 2

Water/ground pollution from run off from excavations, diesel


spillage, etc.

Delay to programme and increase in costs

Make contractor aware of risk. Contractor to develop risk


action plan

9C

B4 - 3

Control of transport and site vehicle traffic

Potential for accidents and delay

Make contractor aware of risk. Contractor to develop risk


action plan

6C

B4 - 4

Physical security of site during construction, Direct Protester


Action or vandalism

Delay to programme and increase in costs

10

Make contractor aware of risk. Contractor to develop risk


action plan

10 C

B4 - 5

Site security and storage of materials, especially hazardous


materials

Potential for accidents and delay

Make contractor aware of risk. Contractor to develop risk


action plan

9C

B4 - 6

Potential nuisance for local people such as noise, dust on


roads

Additional time to deal with complaints

10

Make contractor aware of risk. Contractor to develop risk


action plan

10 C

B4 - 7

Failure to meet stakeholder access requirements

Additional time to deal with complaints and


increased costs

Make contractor aware of risk. Contractor to develop risk


action plan

8C

B4 - 8

Interface with third parties e.g. British Waterways and Network


Rail

Additional time to deal with complaints and


increased costs

Make contractor aware of risk. Contractor to develop risk


action plan

8C

B4 - 10

HSE Requirements new regulations

Additional training, delay and cost

12

Make contractor aware of risk. Contractor to develop risk


action plan

12 C

B4 - 11

Delays to programme due to non-performance of supplier or


sub-contractor failure

Delay to programme and increase in costs

12

Make contractor aware of risk. Contractor to develop risk


action plan

12 C

B4 - 12

Lack of local resources, materials or suitable skilled workforce

Resources, materials or labour to be


sourced from outside area at greater cost

12

Make contractor aware of risk. Contractor to develop risk


action plan

12 C

B4 - 13

Protection and access to neighbouring buildings, structures


and other material assets, and adjacent developments

Delay to programme and increase in costs

Make contractor aware of risk. Contractor to develop risk


action plan

9C

B4 - 14

Waste management / disposal by licensed carriers to licensed


tips

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

9C

B4 - 15

Different construction start date within the year from tender


assumption (caused by changes to Contractor's programme
due to circumstances within his control)

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

9C

B4 - 16

Visual impact / nuisance from site compounds. (Quantification


included in B4 - 6.)

Additional cost to be borne by contractor

10

Make contractor aware of risk. Contractor to develop risk


action plan

10 C

B4 - 17

Planting season not achieved as per programme

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

6C

B4 - 18

Remedial works during construction

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

8C

B4 - 18A

Remedial works after construction

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

8C

B4 - 18B

Disallowed costs

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

8C

B4 - 19

Design Issues regarding temporary works

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

4C

Proximity codes: P = preparation period 0 - 3 years


ST = opening year to 5 years after opening
MT = years 5 to 15 after opening
LT = more than 15 years after opening

Long
(LT)

Residual Risk
Likelihood
(of risk occurring)
Score 1 - 6

Status
Sep-11

Status codes: C = closed


= no change
= worse
= better

Darlaston SDA Access Project (BAFFB Scheme)

Risk Register Ver 6.0

Impact of Risk
(on the project)
Score 1 - 4

Inherent Risk
Likelihood
(of risk occurring)
Score 1 - 6

Last amended: 04/09/11

Proximity
TOTAL
Score

Prep
(P)

Short
(ST)

Med
(MT)

Action
Impact of Risk
(on the project)
Score 1 - 4

TOTAL
Score

Risk Owner
Employer (E)
or
Contractor (C)

Risk Ref.

Risk Factor

Implications of Risk

B4 - 20

Ground Conditions unforeseen RISK CLOSED

Additional cost to be borne by contractor

12

Make contractor aware of risk. Contractor to develop risk


action plan

12 C

B4 - 21

Additional GI required

Delay to programme and increase in costs

Make contractor aware of risk. Contractor to develop risk


action plan

9C

B4 - 22

Groundwater over and above allowed in target

Delay to programme and increase in costs

Make contractor aware of risk. Contractor to develop risk


action plan

9C

B4 - 23

Use of partially complete works causing damage

Remedial works required. Cost escalation.

12

Make contractor aware of risk. Contractor to develop risk


action plan

12 C

B4 - 24

Phasing of sections of the works in order to reduce impact on


traffic and local business

Delay to programme and increase in costs

Make contractor aware of risk. Contractor to develop risk


action plan

4C

B4 - 25

Temporary configuration of traffic signals to suit method of


working

Delay to programme and increase in costs

Make contractor aware of risk. Contractor to develop risk


action plan

4C

B4 - 26

Additional pedestrian traffic management

Delay to programme and increase in costs

Make contractor aware of risk. Contractor to develop risk


action plan

4C

B4 - 27

Excavated material not suitable for inclusion in works (e.g.


backfill of drainage trenches)

Delay to programme and increase in costs

Make contractor aware of risk. Contractor to develop risk


action plan

8C

B4 - 28

Selection of excavated material not practical due to space


constraints

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

3C

B4 - 29

Temporary surfacing to widened areas of carriageway to


facilitate phasing and traffic management proposals

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

3C

B4 - 30

Piling increased costs / delays due to obstructions and piling


design changes

Additional cost to be borne by contractor

12

Make contractor aware of risk. Contractor to develop risk


action plan

12 C

B4 - 31

Unforeseen ground conditions - formation does not achieve


design CBR (strength / stability of the sub-grade) Soft
spots/soft areas at formation

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

8C

B4 - 32

Quantities incorrect

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

4C

B4 - 33

Pricing and rates incorrect

Additional cost to be borne by contractor

Make contractor aware of risk. Contractor to develop risk


action plan

4C

Proximity codes: P = preparation period 0 - 3 years


ST = opening year to 5 years after opening
MT = years 5 to 15 after opening
LT = more than 15 years after opening

Long
(LT)

Residual Risk
Likelihood
(of risk occurring)
Score 1 - 6

Status
Sep-11

Closed

Status codes: C = closed


= no change
= worse
= better