ENERGY AUDIT REPORT

OF
E BUILDING

EXECUTIVE SUMMARY
We have carried out the field work for DETAILED ENERGY AUDIT, during the month of
July14. We carried out very; very elaborate measurements for the various areas of the
Vishwakarma Institute of Information Technology, E-building. We analyzed very critical the
effectiveness of ENERGY Consumption, in each area.
ENERGY AUDIT TEAM:1.
2.
3.
4.

Rahul Santosh Divekar


Amol Somnath Shirsat
Parag Suresh Palsokar
Akshay Mohan Dolas

1.0 GENERAL BUILDING LOAD DETAILS:


1.1 GENERAL PLANT DETAILS
No. of classrooms 21
No. of labs

19

No of Store rooms 06
Central library

01

Staff Room

06

1.2 GENERAL BUILDING LOAD DETAILS:


a.
b.
c.
d.
e.
f.
g.
h.

Computers
Tube lights
Fans
Printers
Projectors
Scanner
Water cooler
Laptops

114 Nos.
307 Nos.
181 Nos.
13 Nos.
13 Nos.
07 Nos.
03 Nos.
35 Nos.

300W
20W
60W
200W
200W
200W
1.5TR
200W

1.3 MAJOR ENERGY CONSUMPTION EQUIPMENT


a.
b.
c.
d.

Computers
Water coolers
Tube lights
Fans

1.4 MAJOR INPUTS, QUANTITY AND COSTS.


a.
b.
c.

During Lecture Session.


During Practical Session.
Water coolers are running continuously.

2.0 ENERGY AND UTILITY SYSTEM DESCRIPTION:2.1 LIST OF UTILITIES:a. Electrical Consumptions as mentioned for the items enlisted in tables below.
3.0BRIEF DESCRIPTION OF EACH UTILITY:3.1 ELECTRICITY
3.2 Maximum Demand Charges based on the consumption of one month during session
period throughout the year.
4.0 ENERGY EFFICIENCY IN UTILITY AND PROCESS SYSTEMS.
4.1 Specific Energy consumption: Cannot be predicted due to non- predicted occupancy.
4.4 Lighting system: Illumination level in passages and lighting in bath rooms of few
rooms is measured and observed to be more than the requirement.

Energy Audit Worksheets


For Ground floor
No.

Equipment

Tube lights

Quantity

Rating

Working

Total (KW-

hours

hr)

22

20

3.52

(classroom
2

)
Fan

18

60

8.64

Tube lights

16

20

12

3.84

(Corridor)
4

Bulbs

04

100

3.2

Computers

08

300

19.2

CFL

15

20

2.4

ATM

01

1000

Printer

02

200

0.8

AC

03

8792.5

211.02

10

VCR Engine

01

3500

01

3.5

11

Petrol

01

7500

01

7.5

12

Engine
Two stage

01

5968

01

5.968

01

2000

01

01

373

01

0.373

air
13

compresso
Pneumatic
Trainer

14

Discharge
measure

15

Wind

01

373

01

0.373

16

tunnel
Vel

01

373

01

0.373

distribution
17

Motor

02

5595

08

89.52

18

Motor

01

373

08

2.984

Total

373.211

Rating

Working

Total (KW-

hours

hr)

21

20

08

3.36

For First floor


No.

Equipment

Tube lights

Quantity

(classroom
2

)
Fan

14

60

08

6.72

Tube lights

16

20

12

3.84

(Corridor)
4

Computers

12

300

08

28.8

Printer

05

200

02

Scanner

02

200

01

0.4

Total

45.12

For second floor


No.

Equipment

Tube lights

Quantity

Rating

Working

Total (KW-

hours

hr)

40

20

6.4

(classroom
2

)
Fan

37

60

17.76

Tube lights

13

20

12

3.12

(Corridor)
4

Laptop

04

200

6.4

Computers

14

300

33.6

CFL

12

20

1.92

Projector

03

200

2.4

Printer

02

200

0.8

Scanner

01

200

0.4

10

Water

01

5275.5

42.204

Total

115.004

cooler

For Third floor


No.

Equipment

Tube lights

Quantity

Rating

Working

Total (KW-

hours

hr)

75

20

12

(classroom
2

)
Fan

55

60

26.4

Tube lights

20

12

2.16

(Corridor)
4

Laptop

15

200

12

Computers

300

10.5

Projector

05

200

Motor

02

1119

4.476

01

746

1.492

02

746

2.984

01

1492

2.984

(M1)1.5 HP
8

Motor
(M2)1 HP

Motor
(M3)1 HP

10

Motor
(M4)2 HP

11

Generator

02

750

12

Water

01

5275.5

42.204

Total

124.2

cooler

For Fourth floor


No.

Equipment

Tube lights

Quantity

Rating

Working

Total (KW-

hours

hr)

68

20

10.88

(total)
2

Fan

57

60

27.36

Laptop

16

200

25.6

Computers

73

300

175.2

Projector

05

200

Printer

04

200

1.6

Scanner

04

200

0.8

Water

01

5275.5

42.204

Total

287.644

cooler

Total consumption of the building per day is 945.179 KW-hr

Tubelight; 0.06
Fans; 0.11
Motor & Generator; 0.19
Scanner; 0.01
Projector; 0.03
Water cooler; 0.16

Computers; 0.34
Printers; 0.03
Laptops; 0.07

Fig. Pie Diagram for Energy Consumption by different utilities


5.0 Energy Analysis
Total energy consumption per day

= 945.179 Kw-hr

Total energy consumption by tube lights per day

= 49.12 Kw-hr

Total energy consumption by fans per day

= 86.88 kW-hr

On replacing electronic tube lights with CFL we assume 15% energy is saved and by installing
capacitor in fan ,
Total energy consumption by fan

= 57.92 kW-hr

Total energy consumption by CFL per day

= 41.752 Kw-hr

Energy saved per day

= 36.328 kW-hr

As per MSEB light tariff if we consider charge per kW-hr to be Rs. 7.65
Then savings in electricity bill would be

= Rs 277.91 per day


= Rs 8337.276 per month

Assuming installation charges for CFLs

= Rs 170 x 280 CFLs


= Rs 47600

Assuming installation charges for capacitor

= Rs 20 x 181 capacitors
= Rs 3620

Total installation cost

= Rs 51220

Simple payback period would be

= 51220/ 8337.276
= 6.14 months

6.0 Recommendations
1.
2.
3.
4.

Total load on building is about 946 Kw-hr per day.


Maximum load is related to lighting. High load energy consumption units are few in
number.
For lighting tube light fittings are of electronic type (20W) if we replace them with energy
efficient CFL energy consumption reduces by about 15%.
Investment required to replace tube lights with CFLs = Rs 51220.
This amount would be recovered in period of 6 months, which implies henceforth the
saving of Rs 8337.276 is our profit.