Vous êtes sur la page 1sur 16

CONTENTS

PART I - GENERAL INFORMATION


PART I DESCRIPTION OF THE PROJECT
PART Ill EXPECTED PROJECT WASTE HANDELING AND DISPOSAL
PART lV - WASTE MANAGEMENT GOALS
PART lV - PROPOSAL FOR MINIMAZATION, REUSE WASTE ON SITE
PART VI - ASSIGNEMENT OF RESPOSIBILITIES THE TEAM
PART VII- COMUNICATION ,TRAINING, AND THE MOTOVATION PLAN
PART VIII - COLCLUSION AND CALCULATIONS REASULTS

PART I - GENERAL INFORMATION


PROJECT NAME.
NBK HEADQUARTER PROJECT
ADRESS/LOCATION OF DEVELOPMENT
Kuwait
Kuwait City - Sharq
Al Shuhada Street
Plot between Arraya Building and Al Hamra Tower

OWNER
CONSTRUCTION MANAGER
CONSULTANT
GENERAL CONTRACTOR (GC)
SUBCONTRACTORS (SUBS)

NATIONAL BANK OF KUWAIT (NBK)


PROAJACS
SSH INT. ENGINEERING (SSHI) / N+P / BURO HAPPOLD (BH)
AHMADIAH TRADING AND CONTRACTIN CO.
BADR AL MULLA & BROS. CO. ENGINEERING GROUP, KUWAIT
AL HAMRA
CHINA STATE CONSTRUCTION ENGINEERING CORP
BEIJING JANGO CURTAIN WALL CO. LT
FIBREX CONSTRUCTION GROUP
THYSSEN KRUPP ELEVATORS

CWM COORDINATOR :
TELEPHONE:

ACTC / ARCHITECT, LEED COORDINATOR : AMMAR YAHIA


+965 97410495

PART I DESCRIPTION OF THE PROJECT


Project Description:
The National Bank of Kuwait Headquarters is new 300 meter tall steel structure. The main tower will be
complemented by two additional structures; a bank branch and museum. The project is aiming for
LEED Gold certification. The project is divided into several phases. The first phase will involve
2

preparing the site for the construction of the new tower. The following phases will involve the
construction of all three structures. Though the potential environmental impacts of the later phases
must be considered, the first phase is considered to be the most disruptive to the environment.
Generally Construction waste will arise on a Project mainly from: (Excavation/ Demolition /Unavoidable
construction work/Material surpluses/Damaged materials)
The work generally will consist of The construction of 5.970 m 2 of.
Construction Estimated time will take :
3.5 years
The main waste categories as of its material types and streams are as follow:
1-Construction Targeted Recyclables (Packaging/metals/plastics/and glass)
2-Construction Reinforcements Steel Rebars
3-Construction Hardcore Waste ABCs
4-Construction Non- recyclables
5-Construction Workforce trash and waste
6-Construction Hazardous Waste
7-Construction Job Site offices waste (Paper/metals/plastics/glass/Kitchen&general waste)
Site Description

The project site is located in the Sharq district of Kuwait City, Kuwait. The site is bound to the north
by Al-Hilali Street and to the East by Jaber Al-Mubarak Street. The surrounding area is highly
urbanized with several skyscrapers in proximity to the site. The site was previously cleared and
prepped for another construction project that did not follow through.

PART Ill EXPECTED PROJECT WASTE HANDELING AND DISPOSAL


Surpluses On the course of the project it's estimated that the following waste/material surpluses will
arise:
Description of construction material
Excavated Soil /Land clearing

LEED Caculation
No
3

Diversion from landfil


No/Landfill

Concrete
Steel Rebars.
Structural metal/steel.
Plaster board/gypsum.
Wood
Asphalt.
Paving.
GRC
Glass.
Plastics
Packaging
Office paper
Organic Waste/Kitchen
Mixed Construction Waste

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Yes
Yes
Yes

Hazardous waste material


Paint & Coating
Adhesives & Sealants
Varnish
Oils

Yes/Recycled
Yes/Salvaged
Yes/Recycled
Yes/Recycled
Yes/Recycled
Yes/Recycled
Yes/Recycled
Yes/Recycled
Yes/Recycled
Yes/Recycled
Yes/Recycled
Yes/ Recycled
No/ Municipal waste company
No/ Landfill

(Verified in Rev02)

Estimated tipping fees


Material type
quantity ton.
volume.
Container/Truck vol trips. Value/KD
Concrete
4,400 tons
1760 m3
20 m3
260 KD520
Steel Rebars.
1,200 tons
2,856 m3
22 m3
130 ACTC
Structural metal china state
8.1 tons
19.3 m3
22 m3
3
KD45
Metal Jangho
5 tons
11.9 m3
22 m3
2
KD30
Metal BMB
3.6 tons
8.56 m3
22 m3
1
KD15
GRC
73.75 tons
29.5 m3
20 m3
3
ACTC
Glass jangho
8 tons
16 m3
22 m3
2
KD30
Plastics
5.3 tons
15.9 m3
22 m3
3
KD45
Packaging jangho/BMB
9.5 tons
45.2 m3
22 m3
6
KD90
Mixed Construction waste
675 tons
550 m3
20 m3
160 ACTC
Organic/kitchen waste
1.2 tons
6 m3
KD50/Month
Office waste paper
Rev02
Hazardous Waste
Rev02
Expected Project Waste, Disposal, and Handling Table
The following charts identify waste materials expected on this project, their disposal method, and
handling procedures:
Material
Land clearing debris

Estimated Quantity
-

Disposal Method
Excavation hole was an
existing condition when
ACTC start duties.
4

Handling Procedure
Keep separated in designated
areas on site. Reuse in site
landfilling, and to Landfill.

Material

Estimated Quantity

Clean dimensional wood


and palette wood

Plywood, Squares

Disposal Method
Reuse at NBK Site, Land
filling, cut and fill works
Reuse at NBK Site, landfill

Reuse at NBK Site, landfill

Concrete Casting
Concrete Masonry Units

4,400 TONS

Reuse at NBK site


Recycle at EPIC

Metals

16.7 TONS

GRC

73.75 TONS

Salvaged Sold
Recycle at
MRC Metal recycling Co.
Recycle at
EPIC

Paint

REV 2

Insulation
Flooring
Carpet and pad

REV 2
REV 2
BP5

Glass

8 TONS

Plastics

5.3 TONS

Cardboard

9 TONS JANGO

Handling Procedure

Keep separated in designated


areas on site to be returned to
ACTC stored for future
projects. Place in Clean
Wood container. Other to
lanfill
Keep separated in designated
areas on site. Place in
Trash container.
Keep separated in designated
area , hardcore
storage/handling area .
Keep separated in designated
areas on site. Place in
Metals container.
Keep scraps separate for
recycling stack on pallets in
provided on site. All scrap
drywall will be taken back by
contractor to drywall supplier
Keep separated in designated
areas on site

Reuse or recycle at
Environmental Depot; Cost
= $0.21/lb latex, $0.37/lb oil
Reuse, landfill
Reuse, landfill
Reuse or recycle with
carpet manufacturer
Keep separated in designated
Recycle at
areas on site. Place in
MRC Metal recycling Co.
Glass/Plastic /Meta/
(MRF)
Cardboard containers
Keep separated in designated
Polyethylene pipes to be
areas on site. Place in
returned
Glass/Plastic /Meta/
Recycle at
Cardboard containers
MRC Metal recycling Co.
Glass/Plastic /Meta/
Cardboard containers
Recycle at
Keep separated in designated
areas on site. Place in
MRC Metal recycling Co.
Glass/Plastic bottles/Metal
Cans/Mixed Paper/
Cardboard container

Material
Office paper

Estimated Quantity
#

Disposal Method
Recycled at
MRC Metal recycling Co.

Handling Procedure
Keep separated in designated
areas on site. Place in
Glass/Plastic bottles/Metal
Cans/Mixed Paper/
Cardboard container

TOTAL

PART lV - WASTE MANAGEMENT GOAL

Waste Management Goals:


This project will recycle or salvage for reuse a minimum of 75% by weight of the waste generated
on-site.
6

Waste reduction will be achieved through building design, and reuse and recycling efforts will be
maintained throughout the construction process.
After assuring the full coverage of all wasting types in terms a separate and weighed collection,
and with all possible supporting tools (Containers/weighing tools/ site personnel/and awareness)
,then Waste Calculation results will be under a continuous verification every month to reach
more compliance with the LEED goal of maximum diverting from land fill, all non-recyclables will
be more worked out more and more to explore ways of reusing, salvaging, or recycling.

Evaluation Plan:
Ahamdiah Contracting Co. as the GC developed, Signage addressing the recycling on site , it
will be more developed to incorporate progress to date for achieving the projects waste
recycling goal of 75% or more by weight of the total project waste stream.
Waste General Foreman has a Construction Forms as a waste log, to record every waste
diversion from site, in terms of its weight, every material type has a separate form for logging.
All will be compiled together in the end of the month for Waste calculation results.

PART lV - PROPOSAL FOR MINIMAZATION, REUSE WASTE ON SITE


Waste Prevention Planning: (to be monthly updated)
1. The remaining concrete every casting event, is being used from concrete pump, to cast a
containment concrete bunds all around excavation shoring to control most of potential pollution
sources on site such as dewatering pumps, oil and fuel drums, control oil leak to discharge to
the top soil, and a service area
2. Glass panels, Paving, tiles is procured following the bases of modularity in construction
7

3. Polyethylene pipes longs, are being chosen to minimize the cutting to the most possible, all
remaining cutting will be weighed and returned to the supplier.
4. Steel rebars where considered in design so to assure the lowest waste estimates.
5. All wooden members used in excavation will be used future projects of ACTC so it will be
returned to stores.
6. All segregated materials containers will be expected to be reused again in construction,
specially steel reinforcements cuttings.
7. In the first phases of the project land clearing are being used in land filling , as a p art of the cut
and fill works, for the land grading to stabilize site slopes, required for LEED ESC Plan.
o metal cans
The Construction Waste Reduction Plan is already implemented and executed as follows and
as on the chart:
o Salvageable materials will be diverted from disposal where feasible.
o There will be a designated area on the construction site reserved for a row of
dumpsters each specifically labeled for respective materials to be received.
o Before proceeding with any removal of construction materials from the
construction site, Recycling Coordinators will inspect containers for compliance .
o Wood cutting will occur in centralized locations to maximize reuse and make
collection easier.
o Hazardous waste will be managed by a licensed hazardous waste vendor.
ACTC will conduct a pre-award meeting for subcontractors. Subcontractors under consideration
will be required to attend the meeting to review project goals and requirements with the project
team. Attendance will be a prerequisite for award of subcontracts. A sign-off will be required by
subcontractors attending the meeting that the project goals are understood. This document will
be an attachment to every subcontract. Copies of the attachment will be posted prominently at
the jobsite.

PART VI - ASSIGNEMENT OF RESPOSIBILITIES THE TEAM


Major team
LEED Coordinator (Sr,Architect)
Senior Foremen
4 Site workmanships
Supportive team
Tower Crane driver
Tower Crane indicator
House keeping team
8

Safety team
Concrete foreman
Truck driver 1 concrete
Truck driver 2 mixed waste
Store keeper
Movable crane driver
Pop cat Driver
Attached site conference Site personnel signatures for LEED waste management plan introduction
and highlight on waste segregation.

PART VII- COMUNICATION ,TRAINING, AND THE MOTOVATION PLAN


Communication & Education Plan:
ACTC (General Contractor) will conduct an on-site pre-construction meeting with subcontractors.
Attendance will be required for the subcontractors key field personnel. The purpose of the meeting is to
reinforce to subcontractors key field employees the commitments made by their companies with regard
to the project goals and requirements.
Waste prevention and recycling activities will be discussed at the beginning of each weekly
subcontractor coordination meeting to reinforce project goals and communicate progress to date.
Once a subcontractor comes on site, the recycling coordinator will present himself with a copy of
the NBK Construction Waste Management Plan and will provide a tour of the recycling areas.
The subcontractor will be expected to make sure all their crews comply with the Waste
Management Plan.
9

All recycling containers are clearly labeled. Containers are located in close proximity to excavation
hole in which recyclables/salvageable materials will be placed.
Lists of acceptable/unacceptable materials will be posted throughout the site.
All subcontractors will be informed in writing of the importance of non-contamination with other
materials or trash.
Recycling coordinator and his team shall inspect the containers on a weekly basis to insure that no
contamination is occurring and precautions shall also be taken to deter any contamination by the
public.
A jobsite Graphics boards, will be mounted for acceptable and non-acceptable items for
recycling, and also in a ways of (Does and Donts)
A jobsite Graphics boards, will be mounted for Hazardous waste Storage areas, and all
safety requirements for any ignitable materials.

Recycling containers are clearly labeled to assure separate collection

Site board addressing the recycling plan

Motivation Plan:
The project team will develop and publish a project mission statement that can be distributed to
the subcontractors, attached to subcontracts, and posted at the jobsite.

PART VIII - COLCLUSION AND CALCULATIONS REASULTS


Name of landfill for disposal of non-recyclable waste:
o Transfer Stations: Tanzifico Company for organic/kitchen waste
o Landfills (ultimate disposal location): Kuwait Municipality (more info in Rev02)
Landfill tipping fee:

MRC Tipping Fees

KD15 / truck Only for Targeted recyclables MRC Company


KD 4/ truck Only for Hardcore recycling EPIC Company
KD 50/ Month Organic/Kitchen Waste Handled by Tanzifco

= KD255
10

EPIC Tipping Fees


= KD520
Tanzifco Tipping Fees = KD2100
Waste Disposal Contractors/Vendor.
Land clearing
Landfill / Kuwait Municipality
Steel Rebars
Sold to third party
Concrete. In
EPIC
Concrete Blocks EPIC
GRC
EPIC
Asphalt
EPIC
Paving
EPIC
Metals
MRC
Packaging
MRC
Plastics
MRC
Paper
MRC
Municipal waste TANZIFICO
Mixed construction waste Landfill / Kuwait Municipality
Hazardous Waste
Authorized hazardous Vendor

Estimate of waste for landfill disposal:

6,389.45 tons

Recycling Calculation:
If all construction waste was disposed in landfill: 6,389.45 tons
Total of recycled construction waste (diverted from land landfill) : 5,713.25 tons
Percent of Recycling (Diversion from Landfill) = 89.42 %

NBK HQ Construction Waste Diversion Summary

Diversion/Recycling Hauler
or Location

Diversion/Recycling
Quaintly

Units
(tons)

Concrete *0

EPIC

4400

tons

GRC

EPIC

73.75

tons

Paving

EPIC

tons

Flooring

EPIC

tons

Asphalt

EPIC

tons

SOLD TO THIRD PARTY

1200

tons

Diversion/Recycling
Materials Description

Steel Rebars

11

Structural Steel/Metals

MRC

16.7

tons

Glass

MRC

tons

Plastics

MRC

5.3

tons

Packaging / Paper *1

MRC

9.5

tons

Hazardous Waste *2

Authorized Haz Vendor (Rev02)

tons

Total Construction Waste Diverted

*0
*1

5,713.25 tons

Landfill
Materials Description

Landfill
or Location

Hauler

Genera Construction Waste*3

Kuwait Municipality/ Landfills

Municipal/Kitchen Waste *4

Tanzifico Company

Hazardous Waste

Authorized Haz Vendor (Rev02)

Landfill
Quantity
675

tons

46.1 + #

tons

tons

Total Estimate Construction Waste sent to landfill

676.2

tons

Total Estimate of all Construction Waste

6,389.45 tons

Percentage of Construction Waste Diverted from Landfill

89.42 %

All Estimates/calculations is based on the construction period of 3.5 years

The derived waste value is only as from the construction field only as per feedback from subcontractors BMB/Jangho , Still
Office Paper is under more verification and study for next month plan, offices waste plan.

*2 Hazardous waste as (Sealants, paint, coating, and adhesives) including the two grades of hazardous if toxic or ignitable;
all have been planned to be handled by authorized haz vendor, handling procedures will include separate methods for solid,
and liquids waste, in addition to the proper ways of storage as instructed in the all materials data of each material. More
information and numbers/values at Rev02
*3

Estimates of General construction waste, is only representing those materials which came out of construction field
building components , an estimate of 16 tons / month, Basis of estimating is to give logic values, that will turned to exact at
following months #

*4

The counted number of organic/municipal waste is based yet only on site workforce personnel as 300 in day, 100 night, as
100 gram/person/day gives in total 40 kg/day and 1.2 tons/month and finally gives 46.1 tons in the 3.5 years, taking in
consideration that values for office staffs as personal trash or kitchen waste needs to be added. In rev02 #

12

NBK HQ Waste Diversion Summary

Diversion/Recycling
Hauler or Location

Diversion/Recycling
Quantity

Units
(tons)

Concrete *

EPIC

4400

tons

GRC

EPIC

73.75

tons

Paving

EPIC

tons

Flooring

EPIC

tons

Asphalt

EPIC

tons

SOLD TO THIRD PARTY

1200

tons

Structural Steel/Metals

MRC

16.7

tons

Glass

MRC

tons

Plastics

MRC

5.3

tons

Packaging / Paper

MRC

9.5

tons

Hazardous Waste

Authorized Haz Vendor (Rev02)

tons

Diversion/Recycling
Materials Description

Steel Rebars

Total Construction Waste Diverted

5,713.25 tons

Landfill
Materials Description

Landfill
or Location

Hauler

Genera Construction Waste

Kuwait Municipality/ Landfills

Municipal/Kitchen Waste

Tanzifico Company

Hazardous Waste

Authorized Haz Vendor (Rev02)

Landfill
Quantity

Units
(tons)

675

tons

46.1 + #

tons

tons

Total Estimate Construction Waste sent to landfill

676.2

Total Estimate of all Construction Waste

6,389.45 tons

Percentage of Construction Waste Diverted from Landfill

89.42 %

tons

**

All Estimates/calculations is based on the construction period of a 3.5 years .

** The table always under development in terms of perusing more to the exact numbers than the logic
numbers, and this will happen from covering (weighing) all the categories of waste, recyclables vs nonrecyclables. Especially the general construction waste, and the offices waste. More will be in Rev01.

13

14

CWM CHECK LIST


RECYCLING OPERATIONS
Action ***

Who

Choose bins/collection methods

__________________________

When

Order bins - oversee deliver


Site bins/collection sites for
optimum convenience
Sort or process wood
Sort or process metal
Sort or process cardboard
Sort or process drywall
Sort or process CSWD mandatory
items (material)
Sort or process

(material)

Schedule material pickups/dropoffs


Protect Materials from Contamination
Document material pickups/dropoffs
***

Depending on the service option chosen, these may be the responsibility of either the field personnel, the hauler,
a full-service recycling contractor, or the subcontractors.
COMMUNICATION PLAN - Except for mandatory items (*), check other items intended to be used.
Action

Who

When

Completed

Complete Construction Waste Mgmt. Plan*

Hold Orientation/Kick-off Meeting*

Update & Progress in Weekly Job-Site Meetings*

Encourage Just-In-Time Deliveries

Post Targeted Materials (Signage)

Distribute Tip Sheets for Job-Site Personnel

Post Goals/Progress (Signage)

MOTIVATION PLAN - Except for mandatory items (*), check other items intended to be used.
Action

Who

When

Use formal agreements committing

Completed

Subs to program

Require Mis-Sorters to Re-Sort Bin

Provide Stickers, T-Shirts, or Hats

Public Recognition of Participating Subs

Letters of Recognition

Awards Luncheon


15

EVALUATION PLAN - Except for mandatory items (*), check other items intended to be used.
Action

Who

When

Completed

Perform Short Form Waste Audit

Perform Full Waste Audit

Perform Mid-Course Assessment

Perform Monthly Cost and Materials Tracking*

Perform Final Evaluation*

16