BADAJ STEEL STRUCTURES

JOORO AREA, ASA DAM ROAD ILORIN,KWARA STATE


08036896541

email ; babstunne2009@yahoo.com

Dear sir,
QUOTATION FOR FABRICATION AND ERECTION OF 42MTR LENGTH X 27MTR
SPAN
( INDUCTION )

A* materials
Material Description
Amount

Quantity Required

Unit Price

{1} Holding down bolt/nut


[25mm dia x 750mm b/nut]
900
57,600

64 nos

{2} Base Plate


[1200 x 2400 x 16mm plate]
70,000

1 sheets

{3} Stanchions /Rafters /Haunches


[356 x 171 x 51kg/m UB ]
110,000
880,000

8 Lengths

[254 x 146 x 43kg/m UB ]


70,000
1,540,000

22 Lengths

{4} Tie beams/Upper Roof


[IPE 200 AA 17.95kg/m ]
36,000
432,000

12 Lengths

{5} Tie beam Connection plate


[1200 x 2400 x 10mm plate]
40,000
20,000
{6} Tie beam Connection b/nut

0.5 sheet

70,000

[16mm dia x 60mm b/nut/washer]


3,840

64 nos

60

{7} Rafter Connection plate


[1200 x 2400 x 16mm plate]
105,000

1.5 sheets

70,000

{8} Rafter Connection b/nut


[20mm dia x 60mm b/nut/washer]
110
26,400
Lateral bracers
[70 x 70 x 8mm L iron ]
8,500
374,000

240 nos
{9}
44 Lengths

{10} Purlin cleat


[ 130 x 50 x 4mm x 180 L Cleat]
280
58,240

208 nos

{11} Purlin bolt/nut


[12mm dia x 40mm b/nut/washer]
25
20,800

832 nos

{14} Purlin
[150 x 50 x 1.5mm Z purlin ]
4,500
927,000

206 Lengths

{15} Gable girder/Hanger


[2/75 x 75 x 6mm L iron ]
5,800
208,800

36 Lengths

[2/50 x 50 x 6mm L iron ]


4,500
193,500

43 Lengths

[1200 x 2400 x 6mm plate ]


18,500
37,000

2 sheets

[IPA 200 AA 17.95kg/m ]


36,000
72,000

2 Lengths

{16} Cladding frame


[ 60 x 60 x 5mm L iron ]
3,900
148,200

38 Lengths

[ 50 x 50 x 5mm L iron ]
3,400
81,600

24 Lengths

[ 50 x 50 x 4mm L iron ]
2,800
84,000

30 lengths

[ 40 x 40 x 4mm L iron ]
2,200
105,600

48 Lengths

{17} Anti-sag rod


[12mm rod]
1,200
30

22 Lengths
26,400

[12mm dia x 50mm b/nut ]


10,080

336 nos

{18} Gulter plate


[1200 x 2400 x 2.5mm plate]
7,400
281,200

38 sheets

{19} Drainage pipe


[ 114.3mm dia x 2mm thick CHS ]
110,000

20 Lengths
SUB - TOTAL A

5,873,260

B * Provision for consumable materials


{1} Oxygen gas
6,800

12 bottles
81,600

{2} Acetylene gas


16,500

49,500

{3} Electrode
1,500

54,000

3 bottles
36 packets

5,500

{4}Redoxide paint
3,200

38 gallons
121,600

{ 5} Bitumen paint
4,150

10 gallons
41,500

{5} Thinner
1,800

23,400

13 gallons

{7} Diesel for generator


---110,000

LSP
SUB

TOTAL

481,600

C * transportation
{1} Transportation of materials to SITE
200,000

D* labour
{1] Labour for fabrication
=1,050,000
{2} Labour for erection
= 825,500
SUB - TOTAL D
=

1,875,500

SUMMARY
A * Materials
5,873,260
B * Consumables Materials
481,600

=
=

C * Transportation

200,000
D * Labour
1,875,500
ONE SHED

=
=

8,430,360

Eight million, four hundred and thirty thousand ,


three hundred and sixty naira only.

Yours faithfully,

Tunde Olabode