Dear sir,
QUOTATION FOR FABRICATION AND ERECTION OF 42MTR LENGTH X 27MTR
SPAN
( INDUCTION )
A* materials
Material Description
Amount
Quantity Required
Unit Price
64 nos
1 sheets
8 Lengths
22 Lengths
12 Lengths
0.5 sheet
70,000
64 nos
60
1.5 sheets
70,000
240 nos
{9}
44 Lengths
208 nos
832 nos
{14} Purlin
[150 x 50 x 1.5mm Z purlin ]
4,500
927,000
206 Lengths
36 Lengths
43 Lengths
2 sheets
2 Lengths
38 Lengths
[ 50 x 50 x 5mm L iron ]
3,400
81,600
24 Lengths
[ 50 x 50 x 4mm L iron ]
2,800
84,000
30 lengths
[ 40 x 40 x 4mm L iron ]
2,200
105,600
48 Lengths
22 Lengths
26,400
336 nos
38 sheets
20 Lengths
SUB - TOTAL A
5,873,260
12 bottles
81,600
49,500
{3} Electrode
1,500
54,000
3 bottles
36 packets
5,500
{4}Redoxide paint
3,200
38 gallons
121,600
{ 5} Bitumen paint
4,150
10 gallons
41,500
{5} Thinner
1,800
23,400
13 gallons
LSP
SUB
TOTAL
481,600
C * transportation
{1} Transportation of materials to SITE
200,000
D* labour
{1] Labour for fabrication
=1,050,000
{2} Labour for erection
= 825,500
SUB - TOTAL D
=
1,875,500
SUMMARY
A * Materials
5,873,260
B * Consumables Materials
481,600
=
=
C * Transportation
200,000
D * Labour
1,875,500
ONE SHED
=
=
8,430,360
Yours faithfully,