The Use of Composite Materials
to Improve the Wear Life in SAG
Mill Feed End Liners
Craig Faulkner
Bradken, Australia
Contents
Introduction
SAG Mill - FE Liner Optimisation and Design
Summary
Conclusion
Introduction
Cadia Valley Operations (CVO) consists of two
distinct processing plants
Cadia Hill - Low Grade Plant
Ridgeway - High Grade Plant
Underground
16,300 tpd @ 2.4g/t Au and 0.8% Cu
Annual Production:
35,000 t Cu
290,000 oz Au
Ridgeway Operation
Semi-Augeounous Grinding
Liner life
Combat excessive wear
Reduce reline times per annum
Improve profitability
10
11
12
13
Processing Details
Tonnes
@
Installation
Tonnes
@
Removal
Period
Tonnes
Date
Installed
Date
Removed
Days
in
Service
Tonnes
p/day
27,061,534
29,184,335
2,122,801
13/03/2007
24/07/2007
133
15,961
Trial
Composite
ID @ 475mm
MID @ 1030mm
395
395
260
265
135
130
1.015
0.977
64
61
Behind
CrMo
ID @ 475mm
MID @ 1030mm
395
395
140
95
255
300
1.917
2.256
120
141
14
15
16
17
Part No.
BK53212A
Material
Chrome-moly
Installed
Life
Life
Removed (Days) (Months)
24/07/2007 13/11/2007
112
3.7
Installed
Tonnes
Removed
Tonnes
Period
Tonnes
Tonnes
per Day
29,184,335
30,973,378
1,789,043
15,974
18
New
Worn
Kg's
%
mm
mm
mm
1974
1420
554
28%
395
150
245
136.94
2.19
19
Part No.
BK53212B
Material
Installed
Life
Life
Removed (Days) (Months)
189
6.2
Installed
Tonnes
Removed
Tonnes
Period
Tonnes
Tonnes
per Day
30,973,378
33,958,726
2,985,348
15,795
20
New
Worn
Kg's
%
mm
mm
mm
1940
1361
579
30%
395
226
169
56.61
0.89
21
3500000
400
3000000
2500000
300
250
2000000
200
1500000
150
Tonnes Milled
Liner Thickness
350
1000000
100
500000
50
0
0
0
189
112
Days in Service
CrMo
WI Composite
CrMo - Tonnes
WI Composite - Tonnes
22
Summary
Results
REVISION 2
Liner Description
Feed End
Middle Liner
Composite Outer Liner
Quantity
Per Set
Liner Mass
Per Set (kg's)
Change-out Time
Per Set (Hours)
Wear Life
(Months)
Annualised
Change-out Time (Hours)
16
32
24,000
44,880
68,880
4.53
9.07
3.8
3.8
14.3
28.6
43
Quantity
Per Set
Liner Mass
Per Set (kg's)
Change-out Time
Per Set (Hours)
Wear Life
(Months)
Annualised
Change-out Time (Hours)
16
32
10,816
62,080
72,896
4.53
9.07
42.7
6
1.3
18.1
19
23
Conclusion
24
Conclusion
The use of the composite materials on the feed end outer liners in the
Ridgeway SAG mill has provided a viable solution to reduce the overall
relines per annum and increase mill availability.
This fully integrated approach offers significant opportunity for
improvements in milling environments with the flexibility in solving
operational / scheduling issues beyond the usual option of increasing
liner mass.
The
The Use of Composite Materials to
Improve the Wear Life in SAG Mill
Feed End Liners
25
Acknowledgements
Bradken
Newcrest Mining Cadia Valley Operations
THANK YOU
Notice:
The Design and Technical information as detailed in this document is the exclusive property of the Bradken Pty. Ltd. and its related
entities. It is issued on the strict condition that except with our written permission it must not be reproduced, copied or communicated to
any third party nor be used for any purpose other than that stated in the particular enquiry or contract with which it is issued.
26