Académique Documents
Professionnel Documents
Culture Documents
Eng
________________________________________________________________________________________
Personal Information
Name: Mostafa M.Mansour
Email: mostafa.mansour1983@hotmail.com,
Mobile: 00971552971313
Languages: English, Arabic
Nationality: Egyptian
Address: Dubai, UAE
Objective
Willing to work with any reputed organization, where I can be able to achieve and build up carrier by
Showing the professionalism and dare to take challenge in any stressed condition in the field of electrical
Engineering design, projects, power system studies, planning, research, evaluate, testing and
Commissioning for power plant, Transmission and distribution substations.
________________________________________________________________________________________________
Key qualifications
Senior Design, Testing, Commissioning, Site supervision and maintenance electrical engineer for
132, 66, 22, 11 kV Substations in accordance to IEC, IEEE, ISO Std.
Total Experience: 10 years
Educational Qualification
1- Degree:
Higher Studies Specialized Diploma (Master Part 1 )
Scope:
Power System Protection and circuit breaker
Education Authority: Ain shams University ( Cairo,Egypt)
Year: 2005 - 2007
2- Degree :
Bachelor of Engineering Science
Scope:
Power System And Electrical Machines
Education Authority: Helwan University( cairo ,Egypt)
Year: 2000-2005
________________________________________________________________________________________________
Experience
1. Preparing specification, study, design documents and reports related to electrical and power system.
2. Design review for contractor submittals such as design Concept, design philosophy, layouts
drawings, and calculations, shop drawings, FAT, SAT reports, material and other related documents
to confirm compatibility with Specification and standard requirements.
3. Prepare erection check list , method of statement , clearance certificates as per ISO
4. Site supervision, quality and progress monitoring
5. Witness for Factory and site testing activities.
6. Project management control and monitoring project for scope, schedule and quality with high
Knowledge with PMP code V4. All monthly progress meeting, progress and quality control reports.
Coordinating with consultant and contractors for technical and contractual matters.
Page 1 of 6
___________________________________________________________________________________
Work Scope
Design, Commissioning and Maintenance
1. Protection: protection schemes, components, primary and secondary tests.
Busbar, transformers and feeders protection schemes such as Differential, REF,
,Distance schemes, OC, EF, Interlocking circuits, inter tripping schemes.
Component Tests : CT,VT , Relays and auxiliary components
2. Transformers: Power/ Earthing/AUX. Transformers, shunt /series Reactors
3. Switchgears : 132,66,22 and 11KV ( GIS, Vacuum, Metal Clad and conventional )
4. SCMS
5. Cables : 220 ,132,22,11 and 0.4 KV
6. Capacitor banks (fixed, switchable) power tests, protection, interlock and control circuits
(Automatic & manual) and design calculation .
7. Standby Diesel Engine ( testing )
8. Lightning Protection and earthing design calculation, execution and testing works.
9. LVAC Distribution systems. ( testing ,erection and design ).
Employment Record:
1-
Company: Dubai Electricity and Water Authority(DEWA) - UAE (10/2009 till date )
Job title: substation commissioning sr. engineer (Transmission Commissioning Dept.)
Experience period: 4.5 years
Work Scope: SAT, FAT witnessing , Erection and management activities for DUBAI NETWORK
UAE, Accordance to IEC, IEEE, BS and DEWA specification for 400/132/11 Power substations for:
Power transformers 132/12 KV , AVR , SHX reactors and earting transformer ( Testing, design
and Control scheme )
132 KV GIS switchgear ( components testing , design and interlocks schemes )
11 KV switchgear : ( components testing , design and interlocks schemes )
Protection: CT, VT, AUX relays ,trip relay ( components testing , calculation ,AC/DC schemes)
SCMS ( testing )
Power cables ( 132kv , 11 KV and 0.4 KV erection , ampcity calculations and testing )
Capacitor Banks and series reactors ( Testing and Control scheme )
Earthing Mesh tests .
Page 2 of 6
Site management and control for scope, schedule and quality control.
Fire Fighting system.( testing and erection )
Reviewing test plan
Prepare method of statements
Prepare SAT formats , FAT plan , test PLAN , erection checklists , DDCMS , specification
reviewing.
______________________________________________________________________
2- Company: Dubai Electricity and Water Authority (DEWA) - UAE (5/2008 10/2009)
Job title: Protection Commissioning Engineer.( Protection Department )
Experience period: 1.5 year months.
Work Scope: scheme review for old/ new DEWA protection philosophy, FAT and SAT witnessing
with accordance to DEWA Specification ,IEC61850 /103/102/101, standard for 400/132/11
Power substations.
11 kv (protection schemes and protection relays(IED), CT, VT AUX and trip relays)
132 kv (protection schemes and protection relays (IED), CT ,VT AUX and trip relays )
Fault Recorder.
DC and AC systems (Battery Charger-NiCa Battery).
Capacitor Banks and reactors (Control and protection systems).
Site management and control for scope, schedule and quality control.
3- Company: Egyptian Electricity Transmission Company (EETC) Egypt (2/2006
4/2008).
Job title: Protection, Testing And Maintenance Engineer ( Protection Sector ,Cairo Zone )
Experience period: 2.5 years
Work Scope: Testing, commissioning and maintenance engineers for 66/11KV substations
Work include, not limited, the following:
Commissioning and testing for protection and control schemes for new
Substations which include component test (relay, CT, VT and auxiliary
components), scheme test, final settings and load test.
Responsible for (40 ) 66/22/11KV substations as team leader for all
Commissioning, testing and troubleshooting activities (also designing for new
Extensions) for line feeders, transformers, outgoing feeders, low voltage system,
DC system, control schemes.
fault record analysis
prepare protection setting calculations
erection , testing and design 20 units of 11 kv Capacitor banks
charge to perform training to new protection engineers
________________________________________________________________________________________
_____________________________________________________________________________________________
Page 4 of 6
___________________________________________________________________
Projects Samples
Project achieved.
MDCC , INVZ , CPITI ,PILT (SIEMENS), Design, site supervision and Commissioning(
DEWA)
TELECOM, LSCT (ETA), Design, site supervision and Commissioning( DEWA)
ETMR , MSJA, JAFZA ( HYUNDAI), Design, site supervision and Commissioning( DEWA)
Project in progress.
Capabilities
Personal achievement:
DEWA Special acting award 2013
-
3 awards through suggestion scheme for cost saving and optimization of DUBAI network.
Exceed expectations in annual appraisal 2010 ,2012 and 2013.
Charge of issuing approvals to consultants and contractors in substations for transformers and
protection components at transmission commissioning department.( Approvals Committee )
- Knowledge sharing scheme award for performing 16 presentation between 2011 to 4/2014 .
Page 5 of 6
- nominated to transmission power division award for 1st half in 2014 . ( waiting the committee decision
)
________________________________________________________________________________________________
Computer Skill
o interfacing software for different types of IEDs
o Microsoft project
o Microsoft Visio drawing program.
o Very Good skills for MS Office (Word, Excel, Power point, Access)
o Very Good skills about the Internet search engine.
o Excellent for hardware and software troubleshooting for PCs
________________________________________________________________________________________________
Personal Data
Date of birth : 25TH , June , 1983
Marital Status : single
Driving License : Egypt ,UAE licenses
Page 6 of 6