Vous êtes sur la page 1sur 32

RULES FOR BUILDING AND CLASSING

STEEL VESSELS
2007
NOTICES AND
GENERAL INFORMATION

American Bureau of Shipping


Incorporated by Act of Legislature of
the State of New York 1862

Copyright 2006
American Bureau of Shipping
ABS Plaza
16855 Northchase Drive
Houston, TX 77060 USA

This Page Intentionally Left Blank

part
Notices and General Information
CONTENTS
Introduction....................................................................................................1
TABLE 1 Applicable Editions of Booklets Comprising 2007 Rules..................4
TABLE 2 Division and Numbering of Rules .....................................................4

Change Notice (2007) ....................................................................................5


TABLE 3 Summary of Changes from the 2006 Rules .....................................5

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

iii

This Page Intentionally Left Blank

Notices and General Information


Introduction
1.

The year 2007 edition of the Rules for Building and Classing Steel Vessels is a complete
reprint of the 2006 edition, consisting of the eleven (11) booklets as shown in Table 1. In this
regard, we would bring the following to the users attention:
a)

The purpose of the generic title ABS Rules for Materials and Welding of PART 2 is
to emphasize the common applicability of the requirements to ABS-classed vessels,
other marine structures and their associated machinery, and thereby make PART 2
more readily a common PART of various ABS Rules and Guides, as appropriate.

b)

The purpose of the generic title ABS Rules for Survey After Construction Part 7 is
to reflect the expanded contents of PART 7, as a result of including consolidated
requirements for Surveys After Construction applicable to all types and sizes of
vessels, barges and specific shipboard arrangements/systems, etc., as specified in
Part 7, Chapter 1, Section 1.

2.

The numbering system applied in the Rules is shown in Table 2.

3.

The primary changes from the 2006 edition of the Rules are identified and listed in Table 3.
The effective date of the indicated Rule Changes is 1 January 2007, unless specifically
indicated otherwise.

4.

The effective date of each technical change since 1993 is shown in parenthesis at the end of
the subsection/paragraph titles within the text of each Part. Unless a particular date and
month are shown, the years in parentheses refer to the following effective dates:
(2000) and after
(1999)
(1998)
(1997)

1 January 2000 (and subsequent years)


12 May 1999
13 May 1998
19 May 1997

(1996)
(1995)
(1994)
(1993)

9 May 1996
15 May 1995
9 May 1994
11 May 1993

5.

Until the next edition of the Rules for Building and Classing Steel Vessels is published, Rule
Change Notices and/or Corrigenda, as necessary, will be published on the ABS website
www. eagle.org only, and will be available free for downloading. It is not intended to
publish hard copies of future Rule Change Notices and/or Corrigenda to existing Rules or
Guides. The consolidated edition of the Rules for Building and Classing Steel Vessels, which
includes Rule Change Notices and/or Corrigenda using different colors for easy recognition
will be published on the ABS website only when RCN and/or Corrigenda are issued.

6.

The listing of CLASSIFICATION SYMBOLS AND NOTATIONS is available from the ABS
website www.eagle.org/rules/downloads.html for download.

7.

In association with the introduction of the Common Structural Rules for Double Hull Oil
Tankers and Bulk Carriers, respectively, on 1 April 2006, Part 5 of the Rules for Building and
Classing Steel Vessels, 2007 is divided into three Sub-parts, 5A, 5B and 5C. The contents and
application of each Part are as follows:
Contents
Part 5A:

Common Structural Rules for Double Hull Oil Tankers (*See note below)

Part 5B:

Common Structural Rules for Bulk Carriers (*See note below)

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part 5C:

* Note:

This Part is divided into two separate booklets as follows:


Chapters 1 to 6:

Tankers not covered by Part 5A, Bulk


Carriers not covered by Part 5B and
Container Carriers

Chapters 7 to 10:

Passenger Vessels, Liquefied Gas Carriers,


Chemical Carriers and Vessels Intended to
Carry Vehicles.

In view of the effective date (1 July of each year) of the updated Common Structural Rules, the
2007 editions of Part 5A and Part 5B will be published in April 2007. Until the effective date
of the 2007 editions, the following 2006 editions are applicable:
Part 5

Specific Vessel Types (Chapter 1), 2006


Common Structural Rules for Double Hull Oil Tankers
[including Corrigenda No. 1 and No. 2 (1 April 2006) and Rule Change Notice No. 1
(September 2006)]

Part 5

Specific Vessel Types (Chapters 3 and 4), 2006


Common Structural Rules for Bulk Carriers
[including Corrigenda No. 1 (May 2006)]

Application Oil Tankers


The structural requirements in Part 5A of the Rules are applicable for double hull oil
tankers of 150 m in length and upward, with structural arrangements as specified in
Part 5A, Section 2.
For oil tankers with structural arrangements not covered by Part 5A, the requirements
in Part 5C, Chapters 1 or 2, are to be complied with.
Application Bulk Carriers
The structural requirements in Part 5B of the Rules are applicable for single side skin
and double side skin bulk carriers of 90m in length and upward, with structural
arrangements as specified in Part 5B, Chapter 1, Section 1.
For vessels intended to carry ore or bulk cargoes, other than the single side skin or
double side skin bulk carriers of 90 m in length and upward with structural
arrangements as specified in Part 5B, Chapter 1, Section 1, the requirements in Part
5C Chapters 3 or 4 are to be complied with.
Application Onboard Systems for Oil Tankers and Bulk Carriers
The onboard systems for all tankers are to comply with the requirements of Part 5C,
Chapter 1, Section 7, and for all bulk carriers are to comply with the requirements of
Part 5C, Chapter 3, Section 7 of the Rules.
The following flow chart indicates the application of the Rules and typical Class Notations for
tanker and bulk carrier vessels, of which arrangements and scantlings are in full compliance
with the Rules:

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Vessels Intended to Carry Oil in Bulk

Vessels Intended to Carry Ore or Bulk Cargoes

L 150 m?

L 90 m?

Yes

No

Arrangement and
layout comply with
5A-1-2/3.1.2 and
5A-1-2/Fig 2.3.1?

Yes

Yes

Arrangement and
layout comply with
5B-1-1/1.1.2?

No

Yes

Part 5A, Chapter 1:


Common Structural Rules for
Double Hull Oil Tankers
and
Part 5C, Chapter 1, Section 7

Part 5B, Chapters 1 through 13:


Common Structural Rules for
Bulk Carriers
and
Part 5C, Chapter 3, Section 7

A1 Oil Carrier, CSR, SafeShip-CM

A1 Bulk Carrier, CSR, SafeShip-CM

plus
appropriate notations for oil carriers

plus
appropriate notations for bulk carriers

Part 5C, Chapter 1


(L 150 m)

Part 5C, Chapter 3


(L 150 m)
Or

A1 Oil Carrier, SH, SHCM

A1 Bulk Carrier, SH, SHCM

plus
appropriate notations for oil carriers

plus
appropriate notations for bulk carriers

Part 5C, Chapter 2


(L < 150 m)

Part 5C, Chapter 4


(L < 150 m)

A1 Oil Carrier

A1 Bulk Carrier

plus
appropriate notations for oil carriers

plus
appropriate notations for bulk carriers

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

TABLE 1
Applicable Editions of Booklets Comprising 2007 Rules
Notices and General Information
Part 1:
Conditions of Classification
Part 2:
Rules for Materials and Welding
Rules for Testing and Certification of Materials
Rules for Welding and Fabrication
Part 3:
Hull Construction and Equipment
Part 4:
Vessel Systems and Machinery
Part 5:
Specific Vessel Types
(Part 5A)
Chapter 1
Common Structural Rules for Double
(Booklet 1)
Hull Oil Tankers
Specific Vessel Types
Part 5:
Chapter 3 & 4
Common Structural Rules for Bulk
(Part 5B)
Carriers
(Booklet 2)
Part 5C:
Specific Vessel Types
(Booklet 3)
Chapter 1 & 2
Oil Carrier
Chapter 3 & 4
Bulk Carrier
Chapter 5 & 6
Container Carrier
Part 5C:
Specific Vessel Types
(Booklet 4)
Chapter 7
Passenger Carrier
Chapter 8
Liquefied Gas Carrier
Chapter 9
Chemical Carrier
Chapter 10
Vehicle Carrier
Part 6:
Optional Items and Systems
Chapter 1
Strengthening for Navigation in Ice
Chapter 2
Refrigerated Cargo Vessels
Part 7:
Rules for Surveys After Construction

2007
2007
2007

2007
2007
1 April 2006
(on and after
1 July 2007)
1 April 2006
(on and after
1 July 2007)
2007

2007

2007

2007

TABLE 2
Division and Numbering of Rules
Division
Part
Chapter
Section
Subsection (see Note 1)
Paragraph (see Note 1)
Subparagraph
Item
Subitem
Appendix
Note:
1

Number
Part 1
Part 1, Chapter 1
Section 1-1-1
1-1-1/1
1-1-1/1.1
1-1-1/1.1.1
1-1-1/1.1.1(a)
1-1-1/1.1.1(a)i)
Appendix 1-1-A1 or Appendix 1-A1-1

An odd number (1, 3, 5, etc.) numbering system is used for the Rules. The purpose is to permit future insertions of
even-numbered paragraphs (2, 4, 6, etc.) of text and to avoid the necessity of having to renumber the existing text and
associated cross-references, as applicable, within the Rules and associated process instructions, check sheets, etc.
ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Change Notice (2007)


TABLE 3
Summary of Changes from the 2006 Rules
EFFECTIVE DATE 1 April 2006
Part/Para. No.
Title/Subject
PART 1
Conditions of Classification

Status/Remarks

1-1-3/21 (New)

Common Structural Rules for


Tankers and Bulk Carriers

To provide a new notation for tankers or bulk carriers complying with


the Common Structural Rules. (Incorporates Notice No. 3)

1-1-3/23

SafeHull Criteria

To indicate that the SafeHull criteria are applicable to vessels whose


designs are not within the scope of the Common Structural Rules.
(Incorporates Notice No. 3)

1-1-4/3.3.2

Date of Contract for Construction

To require the hull numbers of all vessels included in the contract to


be indicated on the form, Application of Request for Classification.
(Incorporates Notice No. 3)

1-1-4/3.3.3

Sister Vessels and Optional Vessels

To define a series of sister vessels. (Incorporates Notice No. 3)

1-1-4/7.5

Other Rules

To apply SHR notation only to container carriers.


(Incorporates Notice No. 3)

EFFECTIVE DATE 1 July 2006


Part/Para. No.
Title/Subject
PART 1
Conditions of Classification
1-1-2/13

Alternative Procedures for Certain


Types of Vessels

Status/Remarks
To align the requirements with IACS PR1A (Rev. 6).
(Incorporates Notice No. 4)

EFFECTIVE DATE 1 January 2007


(based on the date of purchase order of the materials)
Part/Para. No.
Title/Subject
PART 2
Rules for Materials and Welding

Status/Remarks

2-1-1/17

Steel Plates and Wide Flats with


Specified Minimum Through
Thickness Properties (Z Quality)

To clarify that ASTM A 770 is not to be primarily used for reduction


of area, ultrasonic testing and marking.

2-1-1/17.11

Ultrasonic Inspection

To clarify the frequency to be used for this type of ultrasonic testing.

2-1-2/9.7

Elongation Deduction for Material


Under 7.9 mm (0.313 in.) Thick

To remove a conflict with the application of 2-1-2/Table 3 and


2-1-3/Table 3.

2-2-1/1
(New)

General Requirements

To maintain consistency with IACS UR W29.

2-2-1/3
(New)

Materials for Anchors

To maintain consistency with IACS UR W29.

2-2-1/5
(New)

Manufacture of Anchors

To maintain consistency with IACS UR W29.

2-2-1/Figure 1
(New)

Allowable Lateral Movement of


Shank

To maintain consistency with IACS UR W29.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

2-2-1/7

Testing and Certification

To maintain consistency with IACS UR W29.

2-2-1/Table 1
(New)

Applicable Test Programs for Each


Product Form

To maintain consistency with IACS UR W29.

2-2-1/Table 2
(New)

Product Test Requirements for


Program A and B

To maintain consistency with IACS UR W29.

2-2-1/Table 3
(New)

General NDE for Ordinary and SHP


Anchors

To maintain consistency with IACS UR W29.

2-2-1/Table 4
(New)

General NDE For SHP Anchors For


Restricted Service with 4 Times the
Holding Power of Ordinary Anchors

To maintain consistency with IACS UR W29.

2-2-1/Table 5
(New)

Extended NDE for Ordinary and All


SHP Anchors

To maintain consistency with IACS UR W29.

2-2-1/11
(New)

Certification

To maintain consistency with IACS UR W29.

2-2-1/13
(New)

Painting

To maintain consistency with IACS UR W29.

2-3-1/1.1

General

To clarify that the Surveyor does not necessarily carry out tests and
inspections, but does need to verify that materials are tested and
inspected.

2-A4/11

Renewal of Approval

To clarify the responsibilities for review of data and issuing of the


new certificate for renewal of steel mill approval.

2-A4/Table 1

Tests for Rolled Products


Manufacturer Approval

To clarify the intent of the requirements.

2-4-3/Figure 5

Guided Bend Test for Root Bend and


Face Bend (Plate or Pipe)

To allow bend test specimens to be machined down to 3/8 inch as per


AWS D1.1, AWS B4.0 and ASME Section IX.

2-A2-1/27

Licensee Approvals

To clarify the requirements in line with IACS UR W17 paragraph 2.3.

EFFECTIVE DATE 1 January 2006


(based on the contract date for new construction between builder and Owner)
Part/Para. No.
Title/Subject
PART 4
Vessel Systems and Machinery

Status/Remarks

4-2-1/7.1.2vii)

<No Title>

To withdraw the requirement, in line with IACS withdrawal of UR


M66 and M67. (Incorporates Notice No. 1.)

4-2-1/7.2.1

General

To withdraw the requirement for testing, in line with IACS


withdrawal of UR M66 and M67. (Incorporates Notice No. 1.)

Appendix
4-2-1A3

Type Testing Procedure for


Crankcase Explosion Relief Valves

To withdraw the Appendix, in line with IACS withdrawal of UR


M66 and M67. (Incorporates Notice No. 1.)

Appendix
4-2-1A4

Type Testing Procedure for


Crankcase Oil Mist Detection/
Monitoring and Alarm Arrangements

To withdraw the Appendix, in line with IACS withdrawal of UR


M66 and M67. (Incorporates Notice No. 1.)

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

EFFECTIVE DATE 1 March 2006


(based on the contract date for new construction between builder and Owner)
Part/Para. No.
Title/Subject
PART 4
Vessel Systems and Machinery

Status/Remarks

4-6-2/5.9.1(a)

General

To withdraw the requirement for testing, in line with ABS reservation


against IACS UR P2.11 (Rev.2/Nov 2001). (Incorporates Notice No. 2.)

4-6-2/5.9.2

Testing of Mechanical Joints

To withdraw the requirement for testing, in line with ABS reservation


against IACS UR P2.11 (Rev.2/Nov 2001). (Incorporates Notice No. 2.)

4-6-2/Table 12

Testing Requirements for Mechanical


Joints

To remove the references to the withdrawn 4-6-2/5.9.2, in line with


ABS reservation against IACS UR P2.11 (Rev.2/Nov 2001).
(Incorporates Notice No. 2.)

EFFECTIVE DATE 1 July 2006


(based on the contract date for new construction between builder and Owner)
Part/Para. No.
Title/Subject
PART 3
Hull Construction and Equipment

Status/Remarks

3-2-1/3.3.1

General

To align the requirements with IACS UR S11 (Rev. 5) and to clarify


its application to partially filled water ballast tanks.
(Incorporates Notice No. 4)

3-2-1/3.3.3

Ballast Tanks in Ballast Loaded


Conditions

To align the requirements with IACS UR S11 (Rev. 5) and to clarify


its application to partially filled water ballast tanks.
(Incorporates Notice No. 4)

3-2-1/3.3.5
(New)

Sequential Ballast Water Exchange

To align the requirements with IACS UR S11 (Rev. 5) and to clarify


its application to partially filled water ballast tanks.
(Incorporates Notice No. 4)

PART 4

Vessel Systems and Machinery

4-2-3/5.1

Rotors and Blades

To incorporate the requirements of IACS UR M68.


(Incorporates Notice No. 4.)

4-2-4/1.5.5

Calculations and Analyses

To correct cross reference and align requirement with 4-2-4/5.3.4.


(Incorporates Notice No. 4.)

4-2-4/5.3.4

Vibration

To incorporate the requirements of IACS UR M68.


(Incorporates Notice No. 4.)

4-3-1/5.9.1

General

To incorporate the requirements of IACS UR M68.


(Incorporates Notice No. 4.)

4-3-1/5.9.6

Vibration

To incorporate the requirements of IACS UR M68.


(Incorporates Notice No. 4.)

4-3-2/1.1

Application

To incorporate the requirements of IACS UR M68.2.


(Incorporates Notice No. 4.)

4-3-2/Table 3

Maximum Values of U to be Used in


Shaft Alignment Calculations

To incorporate the requirements of IACS UR M68.


(Incorporates Notice No. 4.)

4-3-2/7.5

Torsional Vibrations

To incorporate the requirements of IACS UR M68.2.


(Incorporates Notice No. 4.)

4-3-2/Table 4

Allowable Torsional Vibratory Stress

To incorporate the requirements of IACS UR M68.2.


(Incorporates Notice No. 4.)

4-5-1/7

Shop Inspection and Testing

To provide test requirements as contained in the specified standards.


(Incorporates Notice No. 4.)

4-6-4/17.5
(New)

Class Notation POT

To clarify the criterion for the POT class notation.


(Incorporates Notice No. 4.)

4-8-3/3.11.1(b)

Shafting

To provide a more appropriate reference to gear shaft systems.


(Incorporates Notice No. 4.)

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

EFFECTIVE DATE 1 July 2006


(based on the keel laying date or similar stage of construction)
Part/Para. No.
Title/Subject
PART 5
Specific Vessel Types

Status/Remarks

5-3-A5a/1.1

Application

To align the requirements with IACS UR S17 (Rev. 7).


(Incorporates Notice No. 4.)

5-3-A5a/3.1

Floodable Holds

To align the requirements with IACS UR S17 (Rev. 7).


(Incorporates Notice No. 4.)

5-3-A5a/5.1

Stress Calculation

To align the requirements with IACS UR S17 (Rev. 7).


(Incorporates Notice No. 4.)

5-3-A5b/1.1

Application

To align the requirements with IACS UR S18 (Rev. 7).


(Incorporates Notice No. 4.)

5-3-A5c/1.1

Application

To align the requirements with IACS UR S20 (Rev. 7).


(Incorporates Notice No. 4.)

EFFECTIVE DATE 1 January 2007


(based on the contract date for new construction between builder and Owner)
Part/Para. No.
Title/Subject
PART 3
Hull Construction and Equipment

Status/Remarks

3-2-9/3.9

Chain Lockers

To provide clarification regarding bulkheads between chain lockers


and bulkheads forming a common boundary between chain lockers,
per IACS UR L4.

3-2-14/19.1

Strength

To reflect design review practice and to prevent harmful vibration in


slender foil sections.

3-2-17/1.5.2

<No Title>

To provide alternative arrangements for stanchions where brackets at


every third stanchion would interrupt safe traffic.

3-2-17/Figure 1
(New)

Guardrail Stanchion

To provide alternative arrangements for stanchions where brackets at


every third stanchion would interrupt safe traffic.

PART 4

Vessel Systems and Machinery

4-2-1/5.9

Crankshafts

To incorporate the requirements of IACS UR M53 (Rev. 1).

4-2-1/7.1.2vii)

<No Title>

To incorporate the requirements of IACS UR M66 (Rev. 1).

4-2-1/7.2.1

General

To incorporate the requirements of IACS UR M67 (Rev. 1).

4-2-1/7.5.1(a)

<No Title>

To incorporate the requirements of IACS UR M3 (Rev. 5) to allow for


supplying the electrical load in steps.

4-2-1/7.5.1(c)

<No Title>

To incorporate the requirements of IACS UR M3 (Rev. 5) to allow for


supplying the electrical load in steps.

4-2-1/13.11.1

Application

To incorporate the intent of the statement in IACS UR M21,


Omission or simplification of the type test may be considered for
engines of well known type.

4-2-1/Table 1

Required Material and


Nondestructive Tests of Diesel
Engine Parts

For consistency with regard to gray and nodular iron castings.

Appendix
4-2-1A2
(New)

Definition of Stress Concentration


Factors in Crankshaft Fillets

To incorporate the requirements of IACS UR M53 (Rev. 1).

Appendix
4-2-1A3
(New)

Stress Concentration Factors and


Stress Distribution at the Edge of Oil
Drillings

To incorporate the requirements of IACS UR M53 (Rev. 1).

Appendix
4-2-1A5

Type Testing Procedure for


Crankcase Explosion Relief Valves

To incorporate the requirements of IACS UR M66 (Rev. 1).

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

Appendix
4-2-1A6

Type Testing Procedure for


Crankcase Oil Mist Detection and
Alarm Equipment

To incorporate the requirements of IACS UR M67 (Rev. 1).

4-2-3/1.5.1

Gas Turbine Construction

To clarify the drawings and data required ABS review/approval of gas


turbines.

4-2-3/1.5.2

Gas Turbine Systems and


Appurtenances

To clarify the drawings and data required ABS review/approval of gas


turbines.

4-2-3/1.5.3

Data

To clarify the drawings and data required ABS review/approval of gas


turbines.

4-2-3/1.5.5

Calculations and Analyses

To clarify the drawings and data required ABS review/approval of gas


turbines.

4-2-3/5.9
(New)

Casing

To provide requirements for containment in the case of gas turbine


blade or blade attachment failure.

4-2-3/9

Piping and Electrical Systems for Gas


Turbines

To provide references to requirements for electric or hydraulic starting


of gas turbines.

4-2-3/11.3

Intake and Exhaust

To clarify the requirement for gas turbine exhaust outlets.

Appendix
4-2-3A1
(New)

Plans and Data for Gas Turbines

To clarify the drawings and data required ABS review/approval of gas


turbines.

4-3-4/1.1

Application

To provide specific requirements for azimuthal thrusters.

4-3-5/5.11
(New)

Steering Systems

To provide specific requirements for azimuthal thrusters.

4-3-5/5.13
(New)

Access for Inspection

To facilitate internal inspection at surveys after construction without


disassembling thruster units.

4-4-1/1.11.3

Pressure Vessels Included in Selfcontained Equipment

To clarify the definition of small pressure vessels.

4-4-1A1/Table 1

Joint Efficiencies for Welded Joints

To incorporate revisions to ASME VIII Division 1, UW-12(d).

4-6-2/Table 3

Corrosion Allowance c for Steel


Pipes

To incorporate the requirements of IACS UR P1.2 (Rev. 5).

4-6-2/Table 5B

Minimum Wall Thickness for


Austenitic Stainless Steel Pipes

To incorporate the requirements of IACS UR P1.2 (Rev. 5).

4-6-3/3

Plans and Data to be Submitted

To incorporate the requirements of IACS UR P4 (Rev. 3).

4-6-3/5.7

Temperature

To allow the use of polyethylene, polypropylene and polybutylene


pipes.

4-6-3/5.17

Marking

To add a date of production to the marking for the purpose of


traceability.

4-6-3/9

Manufacturing of Plastic Pipes

To clarify acceptance of a manufacturers quality system and the


involvement of the Surveyor during testing.

4-6-3/19
(New)

Testing by Manufacturer General

To provide requirements for testing by manufacturer.

4-6-3/Table 2
(New)

Standards for Plastic Pipes Typical


Requirements for All Systems

To provide a list of applicable Standards that may be used in testing


rigid pipes, pipe joints and fittings, based on IACS UR P4.7 and IACS
Recommendation 86.

4-6-3/Table 3
(New)

Standards for Plastic Pipes


Additional Requirements Depending
on Service and/or Location of Piping

To provide a list of applicable Standards that may be used in testing


rigid pipes, pipe joints and fittings, based on IACS UR P4.7 and IACS
Recommendation 86.

4-6-4/ 9.3.5(b)i)

<No Title>

To provide technical details regarding the construction of corrosion


resistant flame screens.

4-7-3/3.1.2

Distribution Piping and Nozzles

To incorporate the requirements of IACS UR P1.2 and P1.Table 5.

4-7-3/Table 2

Minimum Steel Pipe Wall Thickness


for CO2 Medium Distribution Piping

To incorporate the requirements of IACS UR P1.2 and P1.Table 5.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

4-8-2/7.7.1(e)

Minimum Conductor Sizes

To align the requirements with the Second Edition of IEC 60092-376


Electrical Installations in Ships Cables for control and
instrumentation circuits 150/250 V (300 V).

4-8-3/3.13.2(c)

Variation from Rated Voltage


Transient

To align the requirements with IACS UR E13.

4-8-3/11.3.1

Impeller and its Housing

To align the requirements with IACS UR F29 (Rev. 5).

4-8-3/11.3.3

Acceptable Combination of Materials

To align the requirements with IACS UR F29 (Rev. 5).

4-8-3/11.5

Type Test

To align the requirements with IACS UR F29 (Rev. 5).

4-8-3/Table 4

Limits of Temperature Rise for Air


Cooled Rotating Machines

To clarify the requirements for temperature rise for rotating machines


installed outside of machinery spaces.

4-8-4/1.9

Services to Operable Under a Fire


Condition

To align the requirements with IACS UR E15.

4-8-4/1.11

High Fire Risk Areas

To align the requirements with IACS UR E15.

4-8-4/21.17.2

Services Necessary Under a Fire


Condition

To align the requirements with IACS UR E15.

4-8-4/Figure 1
(New)

Cables within High Fire Risk Areas

To align the requirements with IACS UR E15.

4-8-5/5.3
(New)

System Design

To incorporate requirements to address new designs for electric


propulsion systems.

4-8-5/5.17.9

Semiconductor Converters for


Propulsion

To update and clarify the requirements.

4-9-3/13.13

Propulsion Auxiliaries

To align the requirement with SVR 4-6-4/5.5.5(c), which only


requires manual operation of the machinery space bilge system valves.

4-9-7/13.5

Type Approval Program

To clarify the requirement with regard to prototype testing for


evaluations vs. Unit Certification.

PART 5

Specific Vessel Types

5-1-7/25.41.5(b)

Instrumentation

To align the requirements with UR F20 (Rev. 5)

5-3-1/7.3

Arrangements

To align the requirements with UR S28 (Rev. 2) and to avoid any


hindrance to hatch cover operation.

5-4-1/7.3

Arrangements

To align the requirements with UR S28 (Rev. 2) and to avoid any


hindrance to hatch cover operation.

5-5-2/Figure 1

Nominal Design Corrosion Values


(NDCV)

The NDCV for the side shell plating in dry space is decreased because
the plating is always adjacent to a dry space. The NDCV for tight
flats forming recesses or steps except 2nd deck is decreased because
these tanks in container carriers are usually either full or empty.

5-5-2/Table 1

Nominal Design Corrosion Values


(NDCV)

The NDCV for the side shell plating in dry space is decreased because
the plating is always adjacent to a dry space. The NDCV for tight
flats forming recesses or steps except 2nd deck is decreased because
these tanks in container carriers are usually either full or empty.

5-5-3/Table 1A

Combined Load Cases for Yielding


and Buckling Strength Formulation

To adjust the Dominant Load Parameters for Load Cases1-2, 3-4 and
7-10 to reflect the vessels seakeeping characteristics in extreme sea
conditions.

5-5-3/Table 1B
(New)

Combined Load Cases for Fatigue


Strength Formulation

The existing 5-5-3/Table 1 is renumbered and is used for fatigue


strength formulation only.

5-5-3/Table 2

Design Pressure for Local and


Supporting Members

To clarify the roll and pitch amplitudes used in the Rules.

5-5-3/11.3

Nominal Bowflare Slamming

To include the effects of the bowflare angles close to the waterline on


the slamming pressure distribution.

5-5-4/11.5

Bottom and Inner Bottom


Longitudinals

To adjust the prescriptive upper stress limit based on direct yielding


and buckling assessment.

10

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

5-5-4/11.17

Bottom Tank Boundary Girders

To adjust the prescriptive upper stress limit based on direct yielding


and buckling assessment.

5-5-4/13.1

Side Shell Plating

To adjust the prescriptive upper stress limit based on direct yielding


and buckling assessment.

5-5-4/23.1

Tank Bulkhead Plating

To adjust the prescriptive upper stress limit based on direct yielding


and buckling assessment.

5-5-/3.5

Plating

To control secondary and tertiary stresses in way of plate panels


adjacent to knuckle and cruciform connections.

5-5-5/5.5.1

Beam-Column Buckling State Limits


and Ultimate Strength

To account for boundary restraints other than simply supported.

5-5-5/5.9.1

Buckling Criteria

To allow more accurate estimation of stress components fL, fb and fLT.

5-5-5/11
(New)

Critical Areas

To require certain critical areas to be evaluated using very fine mesh


fatigue models.

5-5-5/Figure 1
(New)

Critical Areas

To require certain critical areas to be evaluated using very fine mesh


fatigue models.

5-5-6/23.3.1

Side Shell Plating

To consider relatively lower hull girder stresses on the forebody


region.

5-5-A1/7.5.1

Definitions

To withdraw change accounting for warping stress fd1wi, fd1wj based on


satisfactory service experience.

5-8-1/3.30.3
(New)

<No Title>

To align the Rules with amendments to the International Code for the
Construction and Equipment of Ships Carrying Liquefied Gasses in
Bulk (IGC Code) per IMO Res. MSC.32(63), Res. MSC.59(67) and
Res. MSC.177(79).

5-8-2/3.3

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-3/8.1

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-4/2.4.2

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-4/2.4.4

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-4/11.2

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-8/2.3

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-8/2.4

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-8/2.9

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-8/2.16

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-8/2.17

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-8/2.18
(New)

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-10/1.2

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-10/1.3

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-10/1.4

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

11

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

5-8-10/2 (ABS)
(New)

Cargo Pumps

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-15/1.1

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-15/1.2

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-15/1.3

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-15/1.5
(New)

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-17/20.3.1

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-8-17/20.14

<No Title>

To align the Rules with amendments to the IGC Code per IMO Res.
MSC.32(63), Res. MSC.59(67) and Res. MSC.177(79).

5-9-1/11.3

Hull Structure in Way of Tanks

To reduce the minimum thickness for above deck structures.

5-9-1/1

Application

To align the Rules with amendments to the International Code for the
Construction and Equipment of Ships Carrying Chemical Cargoes in
Bulk (IBC Code) per IMO Resolution MSC.176(79).

5-9-1/2

Hazards

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.3
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.13
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.14
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.15

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.16

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.21.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.22A

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.22B

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.23

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.26
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.28
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.30
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.31
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.34

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/3.35

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

12

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

5-9-1/5.1.2
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/5.1.3.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/5.1.4

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/5.2.1.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/5.2.1.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/5.2.1.4

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/5.2.1.5

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/5.3.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/5.4

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/5.5

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-1/5.6

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-2/1.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-2/3.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-2/8.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-3/1

Cargo Segregation

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-3/2.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-3/2.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-3/2.3 (IMO)

Interpretation of 5-9-3/2.3

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-3/7.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-4/1.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-4/1.4

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-4/1.1.1 (ABS)

PV Valve Setting

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-4/1.1.2 (ABS)

Scantling Head

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-4/1.3.1 (ABS)

PV Valve Setting

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-5/1.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-5/1.4

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

13

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

5-9-5/1.5

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-5/1.6.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-5/2.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-5/2.3.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-5/2.3.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-5/2.4.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-5/3.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-5/4.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-5/5.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-5/7.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-6/1.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-6/1.2
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-6/1.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-6/1.4
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-6/1.5
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-6/2
(Deleted)

Special Requirements for Materials

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-6/2 (IMO)
(Deleted)

Interpretation of 5-9-6/2.2. and


5-9-6/2.4

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-8/1.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-8/1.4

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-8/1.5

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-8/1.6

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-8/2 (IMO)

Interpretation of Section 5-9-8


Proposal for Venting Arrangements
on Board Chemical Tankers

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-8/3.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-8/3.5

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-8/5.1.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

14

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

5-9-9/1.3.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-9/1 (IMO)

Amendments to SOLAS

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-10/1.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-10/1.2.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-10/1.4

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-10/1.6

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-10/2
(Deleted)

Hazardous Locations and Types of


Equipment and Wiring

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-11/1

Application

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-11/2.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-11/2.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-11/3.15

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-12/Note

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-14/2.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-14/2.3.4

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-14/2.4

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-14/3
(New)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/1

General

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/3.11

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/3.15

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/4.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/5

Hydrogen Peroxide Solutions

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/8
(Title only)

Propylene Oxide and Mixtures of


Ethylene Oxide/Propylene Oxide
with an Ethylene Oxide Content of
Not More Than 30% by Mass

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/8.14.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/8.22.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/8.22.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

15

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

5-9-15/8.25

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/8.25.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/10
(Title only)

Sulphur (Molten)

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/10.7

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/11.5

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/14
(Title only)

Cargoes with a Vapor Pressure Greater


than 0.1013 MPa Absolute at 37.8C

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/16.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-15/20
(Title only)

Alkyl (C7-C9) Nitrates, All Isomers

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-16/2.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-16/2.6

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-16/3.3

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-16/6.4

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-16/2.7
(Deleted)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-16/2.8
(Deleted)

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-16/7
(Deleted)

Additional Operational Requirements

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

Section 5-9-17

Summary of Minimum Requirements

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

Section 5-9-18

List of Chemicals to Which the Code


Does Not Apply

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

Section 5-9-19
(New)

Index of Products Carried in Bulk

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-20/3.2

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

5-9-20/6.1

<No Title>

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

Section 5-9-21
(New)

Criteria for Assigning Carriage


Requirements for Products
Subject to the IBC Code

To align the Rules with amendments to the IBC Code per IMO
Resolution MSC.176(79).

PART 6

Optional Items and Systems

6-2-3/5.7

Areas Exposed to Low Temperatures

16

To clarify the application of 6-2-3/5.7.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

EFFECTIVE DATE 1 August 2007


(based on the contract date for new construction between builder and Owner)
Part/Para. No.
Title/Subject
PART 4
Vessel Systems and Machinery

Status/Remarks

4-6-4/17.1

General

To align the requirements with MARPOL 73/78, as amended, Annex I,


Regulation [13A] Fuel Oil Tank Protection.
(Incorporates Notice No. 4.)

4-6-4/17.3

Protective Location of Tanks

To align the requirements with MARPOL 73/78, as amended, Annex I,


Regulation [13A] Fuel Oil Tank Protection.
(Incorporates Notice No. 4.)

EFFECTIVE DATE 1 January 2007


(based on the keel laying date or similar stage of construction)
Part/Para. No.
Title/Subject
PART 3
Hull Construction and Equipment

Status/Remarks

3-2-7/4

Deck Fittings

To align the requirements with IACS UR A2 (Rev. 2).

3-2-7/Figure 1
(New)

Application of Design Loads

To align the requirements with IACS UR A2 (Rev. 2).

3-5-1/15

Bollard, Fairlead and Chocks

To align the requirements with IACS UR A2 (Rev. 2).

PART 4

Vessel Systems and Machinery

4-6-2/9.17

Accessibility of Valves

To incorporate the requirements of SOLAS Reg. II-1/48.3.

4-6-4/3.1.2

Definitions

To align the requirements with SOLAS Reg. II-1/17.9.2.1.

4-6-4/3.13

Basic Principles

To align the requirements with SOLAS Reg. II-1/17.9.2.1.

4-6-4/3.3.3
(New)

Overboard Gravity Discharges from


Spaces below the Freeboard Deck on
Vessels Subject to SOLAS
Requirements

To align the requirements with SOLAS Reg. II-1/17.9.2.1.

4-6-4/3.3.4

Scupper and Discharges below the


Freeboard Deck Shell Penetration

To align the requirements with SOLAS Reg. II-1/17.9.2.1.

4-6-4/3.9.1

General

To align the requirements with SOLAS Reg. II-1/17.9.2.1.

PART 5

Specific Vessel Types

5-1-7/1.9.1v)
(New)

<No Title>

To align the requirements with IMO Resolution MSC.179(79) to


require compliance with IEC 60092-502 (1999).

5-1-7/1.9.1vi)
(New)

<No Title>

To align the requirements with IMO Resolution MSC.179(79) to


require compliance with IEC 60092-502 (1999).

5-1-7/31.1

Application

To align the requirements with IMO Resolution MSC.179(79) to


require compliance with IEC 60092-502 (1999).

5-3-7/3.3

Vessels Carrying Low Fire Risk Cargo

To align the requirements with SOLAS Reg. II-2/10.7.1.4.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

17

Notices and General Information

Part 7 Rules for Survey After Construction


The reference date which is indicated in the parentheses following the title of the requirement in this Part is
the date that the requirement becomes effective [e.g. 7-1-1/3 Definitions (1 July 2006) is to apply for vessels
undergoing survey on or after 1 July 2006].
EFFECTIVE DATE 1 July 2006
Part/Para. No.
Title/Subject
PART 7
Rules for Survey After Construction

Status/Remarks

7-1-1/3

Definitions

To align the requirements with IACS UR Z7 (Rev. 12) and UR Z10.1


(Rev. 12), UR Z10.2 (Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4
(Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-1-1/7.5

Prompt and Thorough Repairs

To align the requirements with IACS UR Z7 (Rev. 12) and UR Z10.1


(Rev. 12), UR Z10.2 (Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4
(Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-1-1/21
(New)

Vessels Utilized in Support of


Military Operations

To account for the differing operational schedule of vessels used in


support of military operations or non-commercial service.
(Incorporates Notice No. 4.)

7-2-1/3

Intermediate Surveys

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-2-1/5.5

Unusual Cases

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-2-1/7

Continuous Surveys

To align the requirements with IACS UR Z6 (Rev. 5).


(Incorporates Notice No. 4.)

7-2-1/13.3

Extensions

To reflect current ABS survey practice. (Incorporates Notice No. 4.)

7-3-1/1

General

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-1/5.1

<No Title>

To align the requirements with IACS UR Z7 (Rev. 11).


(Incorporates Notice No. 4.)

7-3-1/5.3

<No Title>

To align the requirements with IACS UR Z7 (Rev. 11).


(Incorporates Notice No. 4.)

7-3-1/7.1

<No Title>

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-1/9.3

<No Title>

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/1.1.2(d)

<No Title>

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/1.1.6

Load Line

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/1.1.9

Suspect Areas

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/1.1.10
(New)

Ballast Tanks and Combined


Cargo/Ballast Tanks

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/1.1.11

Helicopter Deck

To align the requirements with IACS UR Z1 revised due to


replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)

7-3-2/1.7.1

Weather Decks, Hatch Covers and


Coamings

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/1.7.2(a)iii)

Thickness Measurement

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/1.7.2(b)iii)

Thickness Measurement

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

18

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-3-2/1.7.2(b)iv)
(New)

<No Title>

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/1.7.3(a)ii)

Close-up Survey

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/1.7.3(a)iv)

Thickness Measurement

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/1.7.3(b)ii)

Close-up Survey

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/1.7.3(b)iii)

Thickness Measurement

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/1.13.5

Tankers ESP Ballast Tanks and


Combined Cargo/Ballast Tanks

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.3


(Rev. 7) and UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/1.13.6

Chemical Carriers and Chemical


Tank Barges

To align the requirements with IACS UR Z1 revised due to


replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)

7-3-2/1.13.7(b)iv)

Instrumentation and Safety Systems

To align the requirements with IACS UR Z16.


(Incorporates Notice No. 4.)

7-3-2/1.13.7(b)vi)

Cargo Handling Piping and


Machinery

To align the requirements with IACS UR Z1 revised due to


replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)

7-3-2/1.13.7(b)ix)

Ventilating System

To align the requirements with IACS UR Z16.


(Incorporates Notice No. 4.)

7-3-2/1.13.7(b)x)

Spaces in Cargo Areas

To align the requirements with IACS UR Z16.


(Incorporates Notice No. 4.)

7-3-2/1.13.8
(New)

Access to Bow on Tankers

To align the requirements with IACS UR Z1 revised due to


replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)

7-3-2/1.13.9
(New)

Emergency Towing Arrangements

To align the requirements with IACS UR Z1 revised due to


replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)

7-3-2/1.15.1

Weather Decks, Hatch Covers and


Coamings

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/1.15.2

Cargo Holds

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/1.19.1

Weather Decks, Hatch Covers and


Coamings

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/1.19.2(a)ii)

Thickness Measurement

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/1.19.2(b)ii)

Thickness Measurement

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/3.1

All Vessels

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/3.1.1

Ballast Tanks

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/3.1.5
(New)

Survey Planning Meeting

To align the requirements with IACS UR Z7 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/3.7.1

Overall Survey Requirements

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/3.7.2

Close-up Survey Requirements

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/3.7.3

Thickness Measurement
Requirements

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

19

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-3-2/3.7.4
(New)

Tank Testing Requirements

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/3.7.5

Drydocking Requirements

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/3.9.1

Overall Survey Requirements

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/3.9.2

Close-up Survey Requirements

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/3.9.3

Thickness Measurement
Requirements

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/3.9.4
(New)

Tank Testing Requirements

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/3.9.5

Drydocking Requirements

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/3.9.6

Survey Planning

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/3.15

Tankers Non ESP

To align the requirements with IACS UR Z16.


(Incorporates Notice No. 4.)

7-3-2/3.17.1

Piping Systems on Weather Decks

To provide more specific requirements for cargo tank venting system


examination. (Incorporates Notice No. 4.)

7-3-2/3.17.2

Overall Survey Requirements

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/3.17.3

Close-up Survey Requirements

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/3.17.4

Thickness Measurement
Requirements

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/3.17.5
(New)

Tank Testing Requirements

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/3.17.6

Drydocking Requirements

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/3.18.1

Piping Systems on Weather Decks

To provide more specific requirements for cargo tank venting system


examination. (Incorporates Notice No. 4.)

7-3-2/3.18.2

Overall Survey Requirements

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/3.18.3

Close-up Survey Requirements

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/3.18.4

Thickness Measurement
Requirements

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/3.18.5
(New)

Tank Testing Requirements

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/3.18.6

Drydocking Requirements

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/3.19.1

Overall Survey Requirements

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/3.19.2

Close-up Survey Requirements

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/3.19.3

Thickness Measurement
Requirements

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/3.19.4
(New)

Tank Testing Requirements

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/3.19.5

Drydocking Requirements

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

20

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-3-2/3.23
(New)

Chemical Carriers ESP

To align the requirements with IACS UR Z10.3 (Rev. 7).


7-3-2/3.23.1: To provide more specific requirements for cargo tank
venting system examination. (Incorporates Notice No. 4.)

7-3-2/5.1

All Vessels

To align the requirements with IACS UR Z7 (Rev. 11).


(Incorporates Notice No. 4.)

7-3-2/5.1.6

Overall Survey Requirements

To align the requirements with IACS UR Z7 (Rev. 11).


(Incorporates Notice No. 4.)

7-3-2/5.1.7

Protection of Other Openings

To align the requirements with IACS UR Z7 (Rev. 11).


(Incorporates Notice No. 4.)

7-3-2/5.1.8

Thickness Measurement
Requirements

To align the requirements with IACS UR Z7 (Rev. 11).


(Incorporates Notice No. 4.)

7-3-2/5.1.10

Hatch Covers and Coamings

To align the requirements with IACS UR Z7 (Rev. 11).


(Incorporates Notice No. 4.)

7-3-2/5.1.14(a)iii)

Special Periodical Survey No. 3 (10 <


Age 15 Years)

To align the requirements with IACS UR Z7 (Rev. 11).


(Incorporates Notice No. 4.)

7-3-2/5.1.16
(New)

Bilge and Ballast Piping

To align the requirements with IACS UR Z7 (Rev. 11).


(Incorporates Notice No. 4.)

7-3-2/5.1.17
(New)

Survey Planning Meeting

To align the requirements with IACS UR Z7 (Rev. 11).


(Incorporates Notice No. 4.)

7-3-2/5.7.1
(New)

General

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/5.7.2

Overall Survey Requirements

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/5.7.3

Close-up Survey Requirements

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/5.7.4

Thickness Measurement
Requirements

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/5.7.6

Drydocking Requirements

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/5.7.7
(New)

Survey Planning

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-3-2/5.11

Liquefied Gas Carriers

To align the requirements with IACS UR Z16.


(Incorporates Notice No. 4.)

7-3-2/5.13.1

General

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/5.13.2

Overall Survey Requirements

To provide more specific requirements for cargo tank venting system


examination. (Incorporates Notice No. 4.)

7-3-2/5.13.3

Close-up Survey Requirements

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/5.13.4

Thickness Measurement
Requirements

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/5.13.5

Extent of Tank Testing

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/5.13.6

Drydocking Requirements

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/5.13.7
(New)

Survey Planning

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-3-2/5.14.1
(New)

General

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.14.2

Overall Survey Requirements

To provide more specific requirements for cargo tank venting system


examination. (Incorporates Notice No. 4.)

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

21

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-3-2/5.14.3

Close-up Survey Requirements

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.14.4

Thickness Measurement
Requirements

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.14.5

Extent of Tank Testing

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.14.6
(New)

Drydocking Requirements

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.14.7
(New)

Survey Planning

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.15.1
(New)

General

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.15.2

Overall Survey Requirements

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.15.3

Close-up Survey Requirements

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.15.4

Thickness Measurement
Requirements

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.15.5

Tank Testing Requirements

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.15.6
(New)

Drydocking Requirements

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.15.7

Survey Planning

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/5.19.1
(New)

General

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/5.19.2

Overall Survey Requirements

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/5.19.3

Close-up Survey Requirements

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/5.19.4

Thickness Measurement
Requirements

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/5.19.6

Drydocking Requirements

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/5.19.7
(New)

Survey Planning

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-3-2/5.21
(New)

Chemical Carriers ESP

To align the requirements with IACS UR Z10.3 (Rev. 7).


7-3-2/5.21.2 provides more specific requirements for cargo tank
venting system examination. (Incorporates Notice No. 4.)

7-3-2/9.1.1

<No Title>

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

7-3-2/9.1.3

<No Title>

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

7-3-2/9.5
(New)

Access to Structures

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 3). (Incorporates Notice No. 4.)

7-3-2/10
(New)

Preparations for Surveys of ESDC


Vessels

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/11.5.1

<No Title>

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

22

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-3-2/11.5.5

<No Title>

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

7-3-2/13.5

Reporting

To align the requirements with IACS UR Z7.1 (Rev. 2) and UR Z10.1


(Rev. 12), UR Z10.2 (Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4
(Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/15

Reporting and Evaluation of Surveys


of ESP Vessels

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/15.1.2

<No Title>

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-3-2/15.3

Reporting

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-6-2/1.1.9(i)

Remote Controls

To align the requirements with IACS UR Z1 revised due to


replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)

7-6-2/1.1.9(n)
(New)

Fire Extinguishing Systems

To align the requirements with IACS UR Z1 revised due to


replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)

7-6-2/1.1.9(o)
(New)

Fire Fighting Systems

To align the requirements with IACS UR Z1 revised due to


replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)

7-6-2/1.1.10

Helicopter Operations

To align the requirements with IACS UR Z1 revised due to


replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)

7-6-2/1.3.5

Gas Detection

To align the requirements with IACS UR Z1 revised due to


replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)

7-6-2/1.3.6

Cargo Pump Room Protection

To align the requirements with IACS UR Z1 revised due to


replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)

7-6-2/3.1.1(n)

Operational Testing

To align the requirements with IACS UR Z18 (Rev. 1).


(Incorporates Notice No. 4.)

7-6-2/3.5.1

Overall Survey Requirements

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-11-3/1

All Systems

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-3/1.1

Pressure Boundaries

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-3/1.2
(New)

Viewports

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-3/1.3

Life Support Systems

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-3/1.5

Ballasting, Floatation and Buoyancy


Systems

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-3/1.7

Communications Systems

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-3/1.9

Electrical Systems

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-3/1.11

Emergency Arrangements

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-3/1.13

Propulsion

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-3/1.15

Corrosion Control Systems

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-3/1.17

Instrumentation

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-3/1.19

Special Items

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-4/1.3

Valves in Pressure Boundaries

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-4/1.5

Ballasting and Deballasting Systems

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-4/1.7

Life Support Systems

To clarify the Rule requirements. (Incorporates Notice No. 4.)

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

23

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-11-4/1.8
(New)

Viewports

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-4/1.9

Gauges and Monitoring Instruments

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-4/1.10
(New)

Electrical Systems

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-4/1.11

Pressure Hull

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-11-4/1.12
(New)

Machinery

To clarify the Rule requirements. (Incorporates Notice No. 4.)

7-A-4/33.3

Evaluation of Longitudinal Strength

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

7-A-5/1

Application

To align the requirements with ABS survey practice.

Appendix 7-A-6

Report on Thickness Measurement of


Bulk Carriers Non Double Skin and
General Dry Cargo Vessels

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev 1). (Incorporates Notice No. 4.)

Appendix 7-A-7

Report on Thickness Measurement of


Oil Carriers Non Double Hull,
Ore/Oil Ships Non Double Hull and
Chemical Carriers, etc.

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

7-A-8/3.5.2(b)

Corrosion

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

7-A-8/Figure 1

Technical Assessment and the Survey


Planning Process

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

7-A-9/1

General

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev 1). (Incorporates Notice No. 4.)

7-A-9/5

Result of the Survey

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

7-A-9/Report 1

Condition Evaluation Report

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

7-A-9/Report 1

Tank/Hold Protection

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

7-A-9/Report 2

Condition Evaluation Report

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

7-A-9/Report 2

Tank/Hold Protection

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

Appendix 7-A-13

Report on Thickness Measurement of


Oil Carriers Double Hull

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

Appendix 7-A-15

Report on Thickness Measurement of


Bulk Carriers Double Skin

To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2


(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5
(Rev. 1). (Incorporates Notice No. 4.)

24

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-A-16/Table 1

Thickness Measurement
Requirements at Special Periodical
Surveys for Vessels without ESP and
ESDC Notations Vessels Under 90
meters (295 feet) in Length;
Passenger Vessels and High Speed
Craft Under 61 meters (200 feet) in
Length

To align the requirements with IACS UR Z7 (Rev. 11).


(Incorporates Notice No. 4.)

7-A-16/Table 6

Thickness Measurement
Requirements at Special Periodical
Surveys Bulk Carriers Non
Double Skin ESP and Bulk Carrier
Features of Combination Carriers
Non Double Skin ESP

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-A-16/Table 7

Minimum Requirements for CLOSEUP Examination at Special Periodical


Surveys Bulk Carriers Non
Double Skin ESP and Bulk Carrier
Features of Combination Carriers
Non Double Skin ESP

To align the requirements with IACS UR Z10.2 (Rev. 17).


(Incorporates Notice No. 4.)

7-A-16/Table 8

Thickness Measurement
Requirements at Special Periodical
Surveys Tankers ESP (Oil Carriers
and Oil Carrier Features of
Combination Carriers Non-Double
Hull) and Oil/Fuel Oil Tank Barges
Non Double Hull and Chemical Tank
Barges 122 meters (400 feet) and
over in Length

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-A-16/Table 9

Minimum Requirements for CLOSEUP Examination at Special Periodical


Surveys Tankers ESP (Oil Carriers
and Oil Carrier Features of
Combination Carriers Non-Double
Hull) and Oil/Fuel Oil Tank Barges
Non Double Hull and Chemical Tank
Barges 122 meters (400 feet) and
over in Length

To align the requirements with IACS UR Z10.1 (Rev. 12).


(Incorporates Notice No. 4.)

7-A-16/Table 10

Thickness Measurement
Requirements at Special Periodical
Surveys Tankers ESP (Oil Carriers
and Oil Carrier Features of
Combination Carriers Double Hull)
and Oil/Fuel Oil Tank Barges
Double Hull 122 meters (400 feet)
and over in Length

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-A-16/Table 11

Minimum Requirements for CLOSEUP Examination at Special Periodical


Surveys Tankers ESP (Oil Carriers
and Oil Carrier Features of
Combination Carriers Double Hull)
and Oil/Fuel Oil Tank Barges
Double Hull 122 meters (400 feet)
and over in Length

To align the requirements with IACS UR Z10.4 (Rev. 2).


(Incorporates Notice No. 4.)

7-A-16/Table 12

Thickness Measurement
Requirements at Special Periodical
Surveys General Dry Cargo Vessels
(ESDC)

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

25

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-A-16/Table 13

Minimum Requirements for CLOSEUP Examination at Special Periodical


Surveys General Dry Cargo Vessels
(ESDC)

To align the requirements with IACS UR Z7.1 (Rev. 2).


(Incorporates Notice No. 4.)

7-A-16/Table 14

Thickness Measurement
Requirements at Special Periodical
Surveys Bulk Carriers Double
Skin ESP and Bulk Carrier Features
of Combination Carriers Double
Skin ESP

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-A-16/Table 15

Minimum Requirements for CLOSEUP Examination at Special Periodical


Surveys Bulk Carriers Double
Skin ESP and Bulk Carrier Features
of Combination Carriers Double
Skin ESP

To align the requirements with IACS UR Z10.5 (Rev. 1).


(Incorporates Notice No. 4.)

7-A-16/Table 16
(New)

Thickness Measurement
Requirements at Special Periodical
Surveys Chemical Carriers ESP

To align the requirements with IACS UR Z10.3 (Rev. 7).


(Incorporates Notice No. 4.)

7-A-16/Table 17
(New)

Minimum Requirements for CLOSEUP Examination at Special Periodical


Surveys Bulk Carriers Chemical
Carriers ESP

To align the requirements with IACS UR Z10.3 (Rev. 7).


(Incorporates Notice No. 4.)

EFFECTIVE DATE 1 January 2007


Part/Para. No.
Title/Subject
PART 7
Rules for Survey After Construction

Status/Remarks

7-2-1/17.1.1

Multiple Boilers

To align the requirements with IACS UR Z18 (Rev. 1).

7-2-1/17.1.2

Single Boiler

To align the requirements with IACS UR Z18 (Rev. 1).

7-2-1/17.3

Fire-tube Boilers for Propulsion

To align the requirements with IACS UR Z18 (Rev. 1).

7-2-1/17.5

Auxiliary Boilers

To align the requirements with IACS UR Z18 (Rev. 1).

7-3-1/9.9

<No Title>

To align the requirements with IACS UR Z10.1 (Rev. 13), UR Z10.2


(Rev. 20), UR Z10.3 (Rev. 8), UR Z10.4 (Rev. 3) and UR Z10.5 (Rev. 3).

7-3-1/11

Thickness Measurements and Closeup Surveys

To align the requirements with IACS UR Z10.1 (Rev. 13), UR Z10.2


(Rev. 20), UR Z10.3 (Rev. 8), UR Z10.4 (Rev. 3) and UR Z10.5 (Rev. 3).

7-3-2/1.1.2(e)

<No Title>

To provide specific requirements for self-unloaders.

7-3-2/1.7.4
(New)

Bulk Carriers Subject to SOLAS


XII/12 and XII/13

To align the requirements with IACS UR Z10.2 (Rev. 19).

7-3-2/
1.13.7(b)xv)

Electrical Equipment

To align the requirements with IACS UR Z16 (Rev. 1).

7-3-2/1.19.3
(New)

Bulk Carriers Subject to SOLAS


XII/12 and XII/13

To align the requirements with IACS UR Z10.5 (Rev. 3).

7-3-2/3.5.2

Deck Cargo Barges

To reflect ABS experience.

7-3-2/3.5.3

Dry Cargo Barges

To reflect ABS experience.

7-3-2/5.1.7(c)
(New)

Watertight Bulkheads

To provide specific requirements for testing watertight doors.

7-3-2/5.7.9
(New)

Bulk Carriers Subject to SOLAS


XII/12 and XII/13

To align the requirements with IACS UR Z10.2 (Rev. 19).

7-3-2/5.11.1(h)
(New)

Cargo Pump Towers

To provide specific requirements for cargo pump towers.

26

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-3-2/5.19.8
(New)

Bulk Carriers Subject to SOLAS


XII/12 and XII/13

To align the requirements with IACS UR Z10.5 (Rev. 3).

7-3-2/9.3.2

<No Title>

To align the requirements with IACS UR Z10.1 (Rev. 13), UR Z10.2


(Rev. 20), UR Z10.3 (Rev. 8), UR Z10.4 (Rev. 3) and UR Z10.5 (Rev. 3).

7-3-2/Figure 1

<No Title>

To align the requirements with IACS UR Z10.1 (Rev. 13), UR Z10.2


(Rev. 20), UR Z10.3 (Rev. 8), UR Z10.4 (Rev. 3) and UR Z10.5 (Rev. 3).

7-3-2/9.5.3
(New)

Bulk Carriers Non Double Skin


ESP and Bulk Carrier Features of
Combination Carriers Non Double
Skin ESP

To align the requirements with IACS UR Z10.2 (Rev. 20).

7-3-2/13.1

General

To align the requirements with IACS UR Z7.1 (Rev. 3), UR Z10.1


(Rev. 13), UR Z10.2 (Rev. 20), UR Z10.3 (Rev. 8), UR Z10.4
(Rev. 3) and UR Z10.5 (Rev. 3).

7-6-2/1.1.7

Boilers, Pressure Vessels and


Thermal Fluid Heaters

To align the requirements with IACS UR Z18 (Rev. 1).

7-6-2/1.1.6
(New)

Propulsion Thrusters

To provide requirements that propulsion thrusters are to be surveyed in


accordance with the applicable requirements for thrusters and dynamic
positioning systems.

7-6-2/3.1.1(q)

Propulsion Thrusters

To provide requirements that propulsion thrusters are to be surveyed in


accordance with the applicable requirements for thrusters and dynamic
positioning systems.

7-6-2/3.1.1(s)
(New)

Arrangements for Flammable Fluids

To provide specific requirements for examination of the arrangements


for storage, distribution and utilization of flammable fluids to promote
fire and explosion prevention.

7-7.1/3

Boiler Mountings and Safety Valves

To align the requirements with IACS UR Z18 (Rev. 1).

7-7-1/5

Waste Heat Boilers

To align the requirements with IACS UR Z18 (Rev. 1).

7-7-1/7
(New)

Record Review

To align the requirements with IACS UR Z18 (Rev. 1).

7-7-1/11

Survey Extensions

To align the requirements with IACS UR Z18 (Rev. 1).

7-7-1/13
(New)

Annual Examination

To align the requirements with IACS UR Z18 (Rev. 1).

7-6-2/1.3.1

All Thrusters

To provide survey requirements for propulsion and dynamic positioning


thrusters not currently covered by the Rules.

7-6-2/1.3.2
(New)

Water-jet Type Thrusters

To provide survey requirements for propulsion and dynamic positioning


thrusters not currently covered by the Rules.

7-6-2/1.3.3
(New)

Cycloidal Propellers

To provide survey requirements for propulsion and dynamic positioning


thrusters not currently covered by the Rules.

7-9-6/3.3
(New)

First Drydocking Survey After


Delivery

To specify that examination of the gear train through an inspection


port is acceptable and NDT may only be required when considered
necessary by the Surveyor.

7-9-11/1.1

Annual Surveys

To clarify and provide more specific requirements.

7-9-11/1.3
(New)

Special Periodical Surveys

To provide requirements for the examination and pressure testing of


recovered oil storage tanks at Special Periodical Survey.

7-9-11/1.5

Survey after Each Oil Recovery


Operation

To require examination of hull, machinery and equipment after each oil


recovery operation.

Section 7-9-19
(New)

Tailshaft Condition Monitoring

To relocate the requirements for Tailshaft Condition Monitoring to a


new Section.

7-11-3/11.1

<No Title>

To provide requirements for operation in waters with a sea-bed depth


greater than 105% of the rated depth of the unit.

7-11-3/11.3

<No Title>

To require the dive site report to be provided to the pilot prior to the
first dive only.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

27

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-11-3/11.5

<No Title>

To provide requirements for protection of the pilot stand from the


passenger spaces.

7-11-3/11.7

<No Title>

To require both a fixed bilge system and a bilge alarm, for consistency
with Subsection 12/11 of the Underwater Rules

7-11-3/11.11

<No Title>

To require that surface and underwater maneuvering systems are to be


as per the approved arrangement.

7-11-3/11.13

<No Title>

To require that navigation and position equipment are to be as per the


approved arrangement and to provide for the use of analog depth
gauges.

7-11-3/11.17

<No Title>

To clarify the requirement.

7-A-11/17.12
(New)

Cladding on Taper

To clarify the application of cladding in way of the taper.

7-A-11/Figure 7

Weld Procedure Test Specimens for


Shafts with Built-up Welded Stainless
Steel Liner

To clarify the requirement for hardness readings.

28

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2007

Vous aimerez peut-être aussi