Vous êtes sur la page 1sur 3

Pre-Commissioning for Generator System

CLIENT:
MEP CONTRACTOR:
EQUIPMENT NO.:

TIME:

LOCATION/BUILDING:

DATE:

Equipment Details
Type:

Engine Manufacturer:

Genset Manufacturer:

Alternator Manufacturer:

Model No:

Nominal KVA:

Serial Number:

System Readiness Checklist


Description

Condition (Ok/No)

Reading

Lubricating Oil System Check


Lubrication Oil Level
Base Frame properly fixed
Cooling Water System
Radiator Water Level
Fuel Oil Pumping/Circulation System
Fuel Day Tank/Fuel Oil Level
Fuel Storage Tank/Fuel Oil Level
Anti-Vibration mounting is effective
Vee Belt Condition
Air Cleaner/Filter Condition
Meters/Gauges
Control Panel
Electrical Connections
MCB's & Indication Lamps Function Check
Selector Switches/Meters Function Check
Inside Canopy Temp. Rise Limit Test
Engine Exhaust System Installation and Condition
Body Earthing of Alternator and Panel Done
Anti-Condensate heater for Alternator has been provided
Rectifiers/Charges
Battery Condition and Installation
Electrolyte Level
Supply Voltage and Phase Seuence Check

Functional Test

Status

Functional Test

Auto Paralleling

Lamp Test Button

Emergency Stop

Selector Switches

Status

REMARKS :

PERFORMED BY:

SIGN
Name
DATE

WITNESSED BY:
Shimizu Corp. India

APPROVED BY:

ELECTRICAL FUNCTION TEST - GENERATOR SET


CLIENT:
PROJECT:
MEP CONTRACTOR:
PANEL NO./NAME

Ref. No:

LOCATION/SYSTEM:

Date:

Equipment Details
Type:

Engine Manufacturer:

Genset Manufacturer:

Alternator Manufacturer:

Model No:

Nominal KVA:

Serial Number:

Result
Type of Test

YES

NO

RESULT

Battery Test.
-Perform 6 cranks in 5 second duration.
Gen-set must be able to start on the 7th cranks.
AMF board Function Test.
- Gen-set to start automatically upon main power failure &
stop automaticcaly when main supply resume.
- Auto change over switch to function after gen-set start
with timer delay. Change back after power supply resume.
Noise Level Check.
- DOE requirement of minimum 80dBA at 1m from external
wall, louvre or door.
Check condition by using Noise level meter.
Spec

Instrumentation Test.
1).

Engine oil pressure.

2).

Radiator water temperature.

3).

RPM at no load.

Test
Relay Test Button
Remote/Local Switch
REMARKS :

Status

Performed by
SIGN.
NAME
DATE

Actual

Functional
Lamp Test Button
IP Protection

WITNESSED BY MEP:
Shimizu Corp.

Status

APPROVED BY:
Nipro India

Commissioning for Generator System


CLIENT:
MEP CONTRACTOR:
EQUIPMENT NO.:

TIME:

LOCATION/BUILDING:

DATE:

Test Information
Duration of Test: 12 Hours (Readings taken every hour)
Hour Run Meter, from:

to:

Time
Item
Oil Pressure
Oil Temperatue
Coolant Temperature
Load (kw)
Voltage (V)
Current (A) (R)
Current (A) (Y)
Current (A) (B)
Power Factor
Frequency
Battery Charge Rate
Room Temperature
Transfer Switches and Control Buttons

Description

Condition (Ok/No)

Remarks

a) Manual transfer switch (MTS) for changeover of supply is tested and is working.
b) Automatic transfer switch (ATS) for changeover of supply is tested and is working.
c) All alarm and monitoring points for generator system on generator control panel are tested and are working
d) Remote start/stop buttons on the generator control panel and generator duplicate control panel are tested and are
working

REMARKS :

PERFORMED BY:
SIGN
Name
DATE

WITNESSED BY:
Shimizu Corp.

APPROVED BY: