PART 2 OF 2
TECHNICAL SPECIFICATIONS
City of Carmel
Beach Restrooms
BidSet
February25,2014
ProjectNo.09112
TABLE OF CONTENTS
SPECIFICATION GROUP
GENERAL REQUIREMENTS SUBGROUP
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 11 00 - Summary of Work
Section 01 14 00 - Work Restrictions
Section 01 26 13 - Request for Interpretation
Section 01 29 00 - Payment Procedures
Section 01 31 13 - Project Coordination
Section 01 31 19 - Project Meetings
Section 01 32 00 - Construction Progress Documentation
Section 01 33 00 - Submittal Procedures
Section 01 35 00 - Special Procedures
Section 01 41 00 - Regulatory Requirements
Section 01 42 00 - References
Section 01 43 00 - Quality Assurances
Section 01 43 39 - Mockup Requirements
Section 01 45 00 - Quality Control
Section 01 50 00 - Temporary Facilities and Controls
Section 01 56 39 - Temporary Tree and Plant Protection
Section 01 60 00 - Product Requirements
Section 01 62 00 - Product Substitution Procedures
Section 01 71 00 - Examination and Preparation
Section 01 71 23 - Field Engineering
Section 01 73 00 - Execution
Section 01 73 29 - Cutting and Patching
Section 01 74 00 - Cleaning
Section 01 74 19 - Construction Waste Management and Disposal
Section 01 76 00 - Protecting Installed Construction
Section 01 77 00 - Closeout Procedures
Section 01 78 00 - Closeout Submittals
Table of Contents
Page 2
DIVISION 27 - COMMUNICATIONS
Not Used
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
Not Used
Table of Contents
Page 3
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: The following subjects are covered in this Section:
1.
Project Name and Identification.
2.
Project Description.
3.
Applications of Contract Documents
4.
Contract Method.
5.
Work Sequence.
1.2
Project Number:
1.3
PROJECT DESCRIPTION
A.
Work of the Project includes construction 191 square foot men and women ADA restroom facility with a
vegetated roof. Site work consists of new stone retaining walls, stone trash enclosure and accessible path.
1.4
A.
Provisions of the Conditions of the Contract, Supplementary Conditions, and Division 01 - General
Requirements of the Specifications, apply to the work specified in each Section of the Specifications.
B.
Contractor is hereby specifically directed to notify and apprise all subcontractors and other parties engaged
in the Work as to Contents of the Conditions of the Contract, Supplementary Conditions, and Division 01 General Requirements.
C.
No contractual adjustment shall be due or become exigent as a result of failure to fully understand the
Conditions of the Contract, Supplementary Conditions, and Division 01 - General Requirements.
1.5
CONTRACT METHOD
A.
Perform the Work of Contract under a single lump sum contract with Owner in accordance with Conditions of
Contract.
END OF SECTION 01 11 00
Summary of Work
01 11 00 - 1
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: The following subjects are covered in this Section:
1.
Contractors Use of Owners Premises.
2.
Time Restrictions for Performing Work.
3.
Publicity Releases.
1.2
A.
Use of Site: Confine operations at the site to the areas permitted by the Contract Documents. Portions of the
site beyond areas on which work is indicated are not to be disturbed unless approved in advance in writing by
Owner.
B.
In addition to site utilization limitations and requirements shown on Drawings, and indicated by other Contract
Documents, administer allocation of available space to produce best overall efficiency in performance of total
work of project.
C.
Contractor will have use of the premises for work and storage as approved by Owner.
D.
Contractor shall no unreasonably encumber site/premises with material, equipment, debris material, or
recycling material.
E.
Schedule deliveries to minimize space and time requirements for storage of materials and equipment on Project
site.
F.
G.
H.
Promptly clean up debris dropped in the immediate area due to work, service access ways or streets under this
Contract to the satisfaction of Architect.
I.
Use the premises for work and construction operations to allow for work by other contractors, utility
companies, and Owner.
J.
Provide, locate, and protect control points. Provide, coordinate, and check dimensions and elevations as
necessary for layout work.
K.
If the areas on the premises are not sufficient, obtain and pay for use of additional work, storage, and parking
areas needed.
1.3
A.
Contractor shall follow any City of Carmel-by-the Sea time restrictions for performing work.
1.4
PUBLICITY RELEASES
A.
Do not release any information, story, photograph, plan, or drawings relating information about the project to
anyone, including press or other public communication medium without Owners written permission.
Work Restrictions
01 14 0 - 1
END OF SECTION 01 14 0
Work Restrictions
01 14 0 - 2
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: The procedures to be followed by Contractor upon discovery of any apparent
conflicts, omissions, or errors in Contract Documents or upon having any question concerning interpretation.
1.2
PROCEDURES
A.
Notification by Contractor:
1.
Submit all requests for clarification and additional interpretation in writing to Architect using the
Request for Interpretation (RFI) form provided by Architect or a similar form approved by Architect.
2.
Number RFIs sequentially. Follow RFI number with sequential alphabetical suffix as necessary for
each resubmission. For example, the first RFI would be 001. The second RFI would be 002.
The first resubmittal of RFI 002 would be 002a.
3.
Limit each RFI to one issue on one subject and to no more than five questions.
4.
Submit RFIs if one of the following conditions occur:
a.
Contractor discovers an unforeseen condition or circumstance that is not described in the
Contract Documents.
b.
Contractor discovers an apparent conflict or discrepancy between portions of the Contract
Documents that appears to be inconsistent or is not reasonably inferred from the intent of the
Contract Documents.
c.
Contractor discovers what appears to be an omission from the Contract Documents that
cannot be reasonably inferred from the intent of the Contract Documents.
5.
RFIs will not be recognized or accepted if, in the opinion of Architect, one of the following conditions
exist:
a.
Contractor submits the RFI as a request for substitution.
b.
Contractor submits the RFI as a submittal.
c.
Contractor submits the RFI under the pretense of a Contract Documents discrepancy or
omission without thorough review of the Documents.
d.
Contractor submits the RFI as a request for information that is clearly shown on Contract
Document.
e.
Contractor submits the RFI in a manner that suggest that specific portions of the Contract
Documents are assumed to be excluded or by taking an isolated portion of the Contract
Documents in part rather than whole.
f.
Contractor submits an RFI in an untimely manner without proper coordination and
scheduling of work or related trades.
g.
Contractor submits an RFI that does not conform to requirements of this Section.
h.
Contractor submits an RFI that does not conform to the above, Contractor shall pay the cost
of any review, which cost shall be deducted from the Contract Sum.
6.
Contractor shall ask for any clarification or request for interpretation immediately upon discovery.
Contractor shall submit RFIs in a reasonable time frame so as not to affect the project schedule while
allowing the full response time described below.
7.
RFI shall carry the following information:
a.
Applicable specification section, article, and paragraph numbers.
b.
Drawing number and detail references as needed.
B.
Response Time:
1.
Architect, whose decision will be final and conclusive, shall resolve such questions and issue
instructions to Contractor within a reasonable time frame. In most cases, RFIs will receive a response
within 14 calendar days. In some cases this time may need to be lengthened for complex issues, or
shortened for emergency situations, as mutually agreed by all parties.
Request for Interpretation
01 26 13 - 1
Should Contractor proceed with the work affected before receipt of a response from Architect, within
the response time described above, any portion of the work which is not done in accordance with
Architects interpretations, clarifications, instructions, or decisions is subject to removal or
replacement and Contractor shall be responsible for all resultant losses.
C.
D.
Failure to Agree: In the event of failure to agree as to the scope of Contract requirements, Contractor shall
follow procedures set forth in the disputes clause.
END OF SECTION 01 26 13
PART 1 GENERAL
1.1
SUMMARY
A.
1.2
A.
Format: Contractors standard form and automated electronic media printout will be considered for approval
upon Contractors request. .
B.
Content and Format: Utilize Schedule of Values for listing items in Application for Payment.
C.
D.
E.
F.
G.
H.
Submittal Procedure:
1.
Submit Applications for Payment to Owner at the times stipulated in the Agreement.
2.
Number: Three copies of each Application.
3.
When Owner and Contractor agree on percentages to be requested, and when agreed and signed by
them and Architect. Architect will transmit the Certificate for Payment to Owner.
Payment Procedures
01 29 00 - 1
Approval and signing of the Application for Payment by Owner and Architect is contingent upon
approval of the current status of Record Documents and submittal of updated construction schedule
1.3
PROGRESS PAYMENTS
A.
Based upon Application for Payment submitted to Architect by Contractor and Certificates for Payment issued
by Architect, Owner will make progress payments on account f the Contract Sum to Contractor as follows:
1.
Each Month: Ninety percent of the portion of the Contract Sum properly allocable to labor, materials,
and equipment incorporated in Work and 90 percent of the portion of the Contract Sum properly
allocable to materials and equipment suitably stored at the site, up to the end of month prior to date on
which the Application for Payment is submitted, less the aggregate of previous payments in each case.
2.
Upon substantial Completion: A sum sufficient to increase the total payments to 90 percent of the
Contract Sum, less such amounts as Architect shall determine for all incomplete work and unsettled
claims.
3.
At the time the Work is 50 percent complete and thereafter, if the manner of prosecution of work and
its progress are and remain satisfactory to Architect and upon Owner's acceptance, Architect may
authorize remaining partial payments to be paid in full. The full retainage may be reinstated if the
manner of prosecution of work and its progress do not remain satisfactory to Architect or for other
good and sufficient reason.
1.4
FINAL PAYMENT
A.
Final payment, constituting the entire unpaid balance of the Contract Sum, will be paid by Owner to Contractor
35 days after Substantial Completion of the Work unless otherwise stipulated in the Certificate of Substantial
Completion, provided the work has been completed, the Contract fully performed, Owner had filed Notice of
Completion, and a final Certificate of Payment has been issued by Architect.
END OF SECTION 01 29 00
Payment Procedures
01 29 00 - 2
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Description of requirements for Project coordination of the Work of the
Contract.
1.2
DESCRIPTION OF REQUIREMENTS
A.
Minimum administrative and supervisory requirements necessary for coordination of Work include, but are not
necessarily limited to, the following:
1.
Contractors Coordination.
2.
Coordination meetings.
3.
Coordination of Drawings.
4.
Coordination of Submittals
5.
Coordination of Contract Closeout.
6.
Correspondence and Notices
1.3
CONTRACTORS COORDINATION
A.
Work of the Contract includes coordination of the entire Project from beginning of construction activity
through Project close-out and warranty periods.
B.
Coordinate the Work and do not delegate responsibility for coordination to any subcontractor.
C.
D.
Coordinate all aspects of construction operations, generally, and specifically as required to provide Owner
with a complete, operable facility.
1.
Resolve any dispute over coordination, or failure to coordinate, such that resolution is consistent
with Contract Documents. When such resolution is not possible, refer to the General Conditions.
2.
Cooperate with other contractors on the Project site and with Architect so that completion of all
work can proceed with prudent speed.
a.
Furnish other contractors, whose work is fitted to this work, detail and erection drawings
giving full information regarding the fabrication and assembly of this Work.
b.
So far as possible, drawings shall indicate checked field measurements.
c.
Cooperate in timing this Work to join with the work of other contractors or Owner.
3.
Check the drawings of other contracts for interferences with this Work and promptly report to
Architect, in writing, any such interference.
4.
Submit complete information, including Drawings, descriptions, sketches, marked prints, and
similar items, as required for Architects review and coordination of drawings by others that are a
part of this Work.
E.
Coordination of mechanical and electrical work includes, but is not limited to, the following:
1.
Scheduling and sequencing of mechanical and electrical work,
2.
Sharing of access to Work spaces,
3.
Integration of Work placed into limited spaces available for mechanical and electrical installations,
4.
Protection of each trades Work by other trades,
5.
Cutting and patching,
6.
Tolerances,
7.
Compatibility as a basis of selection,
8.
Preparation of mechanical and electrical coordination drawings,
9.
Inspections,
10.
Systems commissioning,
11.
Test, and
12.
Utilization of mechanical and electrical temporary facilities.
F.
It is recognized that the Contract Documents are diagrammatic in showing certain physical relationships of the
various elements and systems and their interfacing with other elements and systems. Establishing and
coordinating these relationships is the exclusive responsibility of Contractor. Lay out and arrange all elements
to contribute to safety and efficiency while maintaining the intent of the design. If conflicts arise, notify
Architect before proceeding with installation.
G.
Immediately refer to Architect any requirement shown or specified which Contractor finds or believes:
1.
Is not equal to industry standards for achieving a first quality installation as intended;
2.
Is excessive in cost or effort to effect intended results;
3.
Is below standard for proper enforcement of guarantees/warranties required; or
4.
Is at variance with governing laws, regulations, codes, or standards.
H.
I.
Anticipate the interrelationship of subcontractors so their work is performed in a manner that minimizes
interference with general progress of the Work and conforms to the Contract Documents.
J.
Order and schedule delivery of materials in ample time to avoid delays in construction. If an item is found to
be unavailable, notify Architect immediately to permit Architects selection of suitable substitute.
K.
Do not proceed with work operations relative to any matter referred to Architect for consideration until receipt
of appropriate instructions from Architect.
Project Coordination
01 31 13 - 2
L.
As an integral step of starting each installation, recheck measurements of the Work. Advise Architect of any
discrepancies prior to installation.
M.
Take all necessary precautions and implement sequences of construction to protect adjacent work from damage
caused by movement of Project components that would not normally occur in the completed Project.
N.
Make provisions to accommodate items installed by Owner or by others under separate contracts.
O.
Compatibility:
1.
Provide products and equipment, which are compatible with other work requiring
mechanical/electrical interface including electrical connections, control devices, water drain and
piping connections. Verify voltage characteristics, fuel requirements, and other interface requirements
before ordering equipment and resolve conflicts that may arise.
2.
Make connections to controls directly attached to ducts, piping, or mechanical equipment with
flexible connections.
P.
Ensure that anchorage, blocking, joining and other detailing are provided as required.
Q.
Ensure attachment and connection devices and methods for securing work are provided as required.
R.
1.4
COORDINATION MEETINGS
A.
In addition to progress meetings specified in Section 01 31 19 - Project Meetings, hold coordination meetings
and pre-installation conferences with requisite personnel to assure coordination of the Work.
B.
Include in the progress meetings the coordination of various entities and activities. Where necessary, schedule
additional coordination meetings for coordinating the Work and resolving conflicts.
C.
In advance of installation of every major unit of work, which requires coordination and interfacing with other
work, meet at project site with installers and representatives of manufacturers and fabricators who are involved
in or affected by unit of work. Review progress of other work and preparations for particular work under
consideration.
1.5
COORDINATION OF SUBMITTALS
A.
Schedule and coordinate submittals specified in Section 01 33 00 - Submittals Procedures and Section 01 78 00
- Closeout Submittals.
B.
C.
Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and
placing in service, such equipment.
D.
Coordinate requests for substitutions to assure compatibility of space, of operating elements, and affect on
work of other sections. Substitution procedures are specified in Section 01 62 00 - Product Substitution
Procedures.
1.6
A.
Coordinate completion and cleanup of work of separate sections in preparation for for Substantial Completion.
B.
1.7
A.
Clearly identify correspondence, notices and submittals with project name, subject and detailed references to
drawings and specifications.
B.
Notify Architect two working days in advance of required inspections unless otherwise noted.
END OF SECTION 01 31 13
Project Coordination
01 31 13 - 4
PART 1 GENERAL
1.1
SUMMARY
A.
1.2
PRECONSTRUCTION CONFERENCE
A.
Prior to commencement of the Work, attend a preconstruction conference to discuss procedures to be followed
during the course of the work.
B.
The purpose of the conference is to introduce Owners, Architects, and Contractors key personnel; to review
the contract provisions, project procedures, and other items pertaining to the Project; distribute documents
including sample forms referenced in the Contract Documents; answer any questions related to construction
contract administration; and establish schedule and procedures for future meetings.
C.
D.
E.
F.
G.
Minutes: Contractor to record minutes including significant proceedings and decisions and distribute copies
within two working days to Architect, Owner, meeting participants, and those affected by decisions made at
meetings.
1.3
PROGRESS MEETINGS
A.
Schedule and administer progress meetings during course of construction of work to review the progress and
the status of the work, and to discuss any problems that may arise.
B.
Meeting Schedule: At maximum one-week intervals or more often when required by progress of the Work.
C.
D.
Make physical arrangement for meetings, prepare agenda with copies for participants, and preside at meetings.
Progress meetings shall be numbered consecutively.
E.
F.
Representatives of Contractor, subcontractors, and suppliers attending Project Meetings shall be qualified and
authorized to act on behalf of entity each represents.
G.
Minutes:
1.
Contractor to record minutes including significant proceedings and decisions and distribute copies
within two working days to Owner, Architect, meeting participants, and those affected by decisions
made at meetings. Record in the minutes significant discussions and agreements and disagreements.
2.
Identify items discussed at meetings by the meeting number and sequence in which it was raised to
action at the meeting; i.e.,
5th Progress Meeting
5th Item Discussed
3.
4.
Retain items in the minutes under unfinished Business until they are satisfactorily resolved.
If applicable, following the comments about any item include action pending statement that
specifically identifies who is responsible for following up on that item and a realistic date for the
action to be accomplished.
Action Pending: None
Date Required: N/A
5.
Attendants taking exception to anything in the meeting report shall state their objections in writing,
within five working days following the receipt of the notes including significant proceedings and
decisions.
1.4
PREINSTALLATION MEETING
A.
Conduct a preinstallation meeting at the site before each construction activity that requires coordination with
other construction or when required by an individual Specification Section.
B.
Require attendance of parties directly affecting, or affected by, or involved in the installation, and its
coordination or integration with other materials and installations that have preceded or will follow the
particular item of work or activity under consideration.
C.
Meeting Schedule: Schedule conference to assure a sufficient amount of time prior to the scheduled work or
activity under consideration so that any concerns, problems or disagreements can be resolved without delaying
the Project. Notify Architect seven days in advance of meeting date.
D.
Make physical arrangements for meeting, prepare agenda, and preside at meeting.
E.
Representatives of Contractor, subcontractors, and suppliers attending Project Meetings shall be qualified and
authorized to act on behalf of entity each represents.
F.
Suggested Agenda: Review the progress of other construction activities and preparations for the particular
activity under consideration, including requirements for:
1.
Contract Documents
2.
Options
3.
Related Change Orders
4.
Purchases
Project Meetings
01 31 19 - 3
Deliveries
Shop Drawings, Product Data and quality control Samples
Possible conflicts
Compatibility problems
Time Schedules
Weather limitations
Manufacturers recommendations
Compatibility of materials
Acceptability of substrates
Temporary facilities
Space and access limitations
Governing regulations
Safety
Inspection and testing requirements
Required performance results
Recording requirements
Protection
G.
Minutes: Contractor to record minutes including significant proceedings and decisions and distribute copies
within two days to Owner, Architect, meeting participants, and those affected by decisions made at meetings.
Record in the minutes significant discussions and agreements and disagreements.
H.
Do not proceed with the work or activity if the conference cannot be successfully concluded. Initiate whatever
actions are necessary to resolve impediments to performance of work and reconvene the conference at the
earliest feasible date.
1.5
A.
B.
C.
3.
d.
Architects consultants as appropriate
e.
Contractor
f.
Subcontractor as appropriate
g.
Suppliers as appropriate
h.
Others as appropriate
Minutes: Architect will record minutes including significant proceedings and decisions and distribute
copies within two working days to Owner, Contractor, meeting participants, and those affected by
decisions made at meetings.
1.6
CONTRACTOR MEETINGS
A.
This Section does not limit meetings among Contractor, subcontractors, and others, as Contractor deems
necessary.
END OF SECTION 01 31 19
Project Meetings
01 31 19 - 5
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Procedures for submitting the following construction progress documentation
submittals.
1.
Construction Progress Schedule.
2.
Submittal Schedule.
3.
Daily Construction Reports.
4.
Construction Photographs.
1.2
GENERAL REQUIREMENTS
A.
Construction progress documentation submittals are not Contract Documents and do not become Contract
Documents by virtue of their submission, review, and stamping by Architect.
1.3
SUBMISSION REQUIREMENTS
A.
B.
Submittal received from sources other than Contractor will be returned without action.
C.
Submit complete submittals for each portion of the work; submit components of the work interrelated as a
system at the same time.
D.
Transmit each construction progress documentation submittal with Architect accepted form containing the
following information.
1.
Date.
2.
Project name.
3.
Architects Project Number.
4.
Architects name.
5.
Contractors name.
6.
Signature of transmitter.
7.
Any other pertinent information.
1.4
CONTRACTORS RESPONSIBILITIES
A.
B.
Prepare and distribute additional sets of reviewed submittals to subcontractors, manufacturers, fabricators,
suppliers, erectors, installers, and others as required for performance of the Work. Instruct parties to promptly
report inability to comply with requirements.
C.
Maintain one set of each construction progress documentation submittal at the project site, available for
reference.
1.5
A.
Submit initial Construction Progress Schedule within 14 calendar days of the Notice to Proceed.
B.
Type of Schedule: Horizontal bar chart with separate line of each major portion of Work or section of Work,
identifying first work day of each week.
C.
Schedule Development:
1.
Show complete sequence of construction by activity, identifying Work of separate stages and other
logically grouped activities. Indicate the early and late start, early and late finish, float dates, and
duration.
2.
Indicate estimated percentage of completion for each item of Work at each submission.
3.
Coordinate Contractors construction schedule with list of subcontracts, submittal schedule, progress
reports, payment requests and other schedules.
4.
Indicate completion in advance of the date established for Substantial Completion. Indicate
Substantial Completion on the schedule to allow time for Architects procedures necessary for
certification of Substantial Completion.
5.
Secure time commitments for performing critical elements of the Work from parties involved.
Coordinate each element on the schedule with other construction activities; include minor elements
involved in the sequence of the Work. Show each activity in proper sequence. Indicate graphically
sequences necessary for completion of related portions of the Work.
D.
Submittal Schedule: Submit separate schedule of submittal dates for shop drawings, product data, and samples,
including dates reviewed submittals will be required from Architect. For each submittal allow at least 14
calendar days, excluding delivery time to and from Contractor, for review by Architect for each submittal or
resubmittal.
E.
Delays:
1.
Requests for delay must be submitted with Application for Payment.
2.
Request for evaluation of delay will then be evaluated each month, and a decision rendered monthly,
so that extensions of time, if any, will be granted on a monthly basis.
3.
If Contractor fails to identify this information in any given month, or if the request is denied and not
protested, Contractor will be deemed to have accepted the schedule as is, with no delays, extensions
of time and no possibilities of future evaluation.
F.
Submission:
1.
Submit two signed copies of initial Construction Progress Schedule.
2.
Submit a signed copy revised Construction Progress Schedule with each Application for Payment.
3.
Identify in writing any delays that impacted the critical path, and quantify the impact of that delay
with appropriate back up.
4.
If Contractors Construction Progress Schedule submission is incomplete or late, Contractors
progress payment will be withheld until the schedule is corrected and received.
G.
Distribution: Following response to the initial submittal, print and distribute copies to Architect, Owner,
subcontractors, and other parties required to comply with scheduled dates. Post copies in the Project meeting
room and temporary field office.
1.
When revisions are made, distribute to the same parties and post in the same locations. Delete parties
from distribution when they have completed their assigned portion of the Work and are no longer
involved in construction activities.
1.6
SUBMITTAL SCHEDULE
A.
Submit a comprehensive and complete Submittal Schedule within 14 calendar days of the Notice to Proceed.
B.
Schedule Requirements/Development:
1.
Identify on the schedule all of the submittal items required by the Contract Documents.
2.
For each submittal item on the schedule, indicate the following.
a.
The specification section number.
b.
A place for the final submittal number.
Construction Progress Documentation
01 32 00 - 2
c.
d.
e.
f.
3.
4.
5.
6.
7.
C.
Submission: Submit two copies of the Submittal Schedule after it is completed and each time it is updated by
Contractor.
D.
Receipt of the Submittal Schedule by Architect will be a precondition of the receipt of the first progress
payment. Architect will review the Submittal Schedule to determine its completeness and compatibility with
the Construction Progress Schedule.
E.
Distribution: Following response to initial submittal, print and distributed copies to Architect, Owner,
subcontractors, and other parties required to comply with submittal dates indicated. Post copies in the Project
meeting room and field office.
1.
When revisions are made, distribute to the same parties and post in the same locations. Delete parties
from distribution when they have completed their assigned portion of the Work and are no longer
involved in construction activities.
F.
Schedule Updating:
1.
At progress meetings, submit a detailed, updated and accurate schedule of anticipated submittals
remaining for review by Architect.
2.
Revise the schedule every two weeks or more frequently if necessary, after each meeting or activity
where revisions have been recognized or made. Include all submittals required during the next 90
days of construction. Issue the updated schedule concurrently with minutes of each progress meeting.
1.7
A.
Prepare a daily construction report, recording the following information concerning events at the site:
1.
List of subcontractors at the site.
2.
Approximate count of personnel at the site.
3.
High and low temperatures, general weather conditions.
4.
Accidents and unusual events.
5.
Meetings and significant decisions.
6.
Stoppages, delays, shortages, losses.
7.
Meter readings and similar recordings.
8.
Emergency procedures.
9.
Orders and requests of governing authorities.
10.
Change Orders received, implemented.
11.
Services connected, disconnected.
12.
Equipment or system tests and start-ups.
13.
Partial completions, occupancies.
14.
Substantial Completions authorized.
B.
Submit for information two copies of each daily construction report to Architect at weekly intervals.
1.8
CONSTRUCTION PHOTOGRAPHS
A.
Camera Type: Use digital type camera with 640 by 480 minimum resolution and capable of providing both
prints and electronic version of required photographs.
B.
Exterior Photographs: Starting with site as existing, prior to any work of this Contract, and at
biweeklyintervals until completion of installation of all windows, window wall and exterior doors, and at
monthly intervals thereafter until completion of the total work, provide in three different exterior exposures per
interval from Architect-selected ground level or adjacent building locations.
C.
Interior (Artificial Light Supplemented) Photographs: Starting with formwork for first suspended slab
construction and proceed at monthly intervals until start of interior painting, and at bimonthly intervals
thereafter until completion of total work, provide two different exposures per interval from Architect selected
locations.
D.
E.
Submittal: Submit electronic version and two prints, color, glossy; 8 by 10 inch size; mounted on 8-1/2 by 11
inch soft card acid-free archival stock, with left edge binding margin for three hole punch.
F.
END OF SECTION 01 32 00
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Procedures for submitting the following types of submittals.
1.
Product Data.
2.
Shop Drawings.
3.
Samples.
4.
Manufacturers Instructions.
5.
Manufacturers Field Reports.
B.
1.2
GENERAL REQUIREMENTS
A.
Submittals are not Contract Documents and do not become Contract Documents by virtue of their submission,
review, and stamping by Architect.
B.
Product Data and Samples for proposed substitutions shall be submitted to University's Representative in
accordance with Section 01 62 00 - Product Substitution Procedures.
C.
Contractor shall be responsible for obtaining such copies of Product Data, Shop Drawings, Samples, and
other submittals as it may require for its own use.
1.3
SUBMISSION REQUIREMENTS
A.
Make submittal promptly in accordance with the Submittal Schedule and in such sequence as to cause no delay
in the Work or in the work of any separate contractor.
B.
C.
Failure on the part of Contractor to indicate approval on submittal prior to submission to Architect will result in
submittal being returned to Contractor without being acted upon.
D.
No delays in construction occasioned by Contractors failure to submit material for approval in accordance
with the Submittal Schedule will be excused.
E.
F.
Number and type of copies to be submitted, distributed, and returned will be as stated in this Section, unless
otherwise specified in technical Sections.
G.
Submittal of information not required as a submittal, or covering work for which the submittal has been
returned as approved or approved as noted, will be returned without review.
H.
Approval of a separate material, product, or component does not imply approval of assembly in which the item
functions.
Submittal Procedures
01 33 00 - 1
I.
J.
Submittal received from sources other than Contractor will be returned without action.
K.
Submit complete submittals for each portion of the work; submit components of the work interrelated as a
system at the same time.
L.
When submittal acceptability is dependent on conditions, items, or materials included in separate subsequent
submittals, the submittal will be returned without review.
M.
Transmittal:
1.
Transmit each submittal with Architect accepted form containing the following information.
a.
Date of submission and dates of any previous submissions.
b.
Project name and number.
c.
Architects Project Number.
d.
The names of:
1)
Contractor
2)
Architect
3)
Subcontractor, as applicable
4)
Supplier, as applicable
5)
Manufacturer, as applicable
e.
Identification of system, product and material, as applicable.
f.
Applicable Specification Section, Article, and Paragraph numbers.
g.
Drawing number and detail references, as applicable.
h.
Quantity and type of submittals.
i.
Listing of documents and components that comprise the submittal.
j.
Date submittal is requested back from Architect.
k.
Distribution record (for both transmittal and submittals).
l.
Notice of any deviations from the Contract Documents contained in the submittal. Supply
on separate sheets of Contractors letterhead.
m.
Contractors certification that the information complies with Contract Document
requirements.
n.
Signature of transmitter.
o.
Any other pertinent information.
2.
Number submittals sequentially. Marked revised or resubmitted submittals with original number and
sequential alphabetic suffix. For example, the first submittal would be 001. The second submittal
would be 002. The first resubmittal of 002 would be 002a.
3.
Incomplete transmittal forms are unacceptable and the entire submittal will be returned to Contractor
without review at Architects discretion.
N.
Submittal Identification: Place a permanent label or title block on each document or component of each
submittal for identification. Mark each copy of each submittal identically. Include the following information in
label or title block.
1.
Submittal number.
2.
Project name.
3.
Project number.
4.
Contractors name.
5.
Subcontractors name, as applicable
6.
Suppliers name, as applicable
7.
Manufacturers name, as applicable
8.
Completely identify Samples with manufacturers name and model number, material name and
source, or similar information.
9.
Provide space for Contractors and Architects review stamps.
Submittal Procedures
01 33 00 - 2
O.
Resubmittals:
1.
If a submittal is returned for correction or is not satisfactory and is disapproved by Architect, resubmit
the corrected material in the same quantity, including reproducibles, as specified for the original
submittals.
2.
Make resubmittal within 14 calendar days after receipt by Contractor of the disapproved material.
3.
If the same document is used for resubmittal, clear identify revised portions of the document by
clouding.
4.
Keep each resubmittal intact and do not add new drawings, materials, or information outside the
scope of the original submittal, except to answer Architects comments.
1.4
CONTRACTORS RESPONSIBILITIES
A.
It shall be the responsibility of Contractor to obtain Architects approval of required submittals prior to
initiating work represented.
B.
Maintain a log of submittals showing the submittal number, the name of the Subcontractor making the
submittal (where applicable), date submitted, date received, and action by Architect. Submit current copy of
submittal log each month with Application for Payment.
C.
D.
E.
Apply Contractors stamp to each document and component of each submittal certifying that review,
verification of Products required, field dimensions, adjacent construction Work, and coordination of
information, is in accordance with the requirements of Work and Contract Documents. Contractors stamp
must be approved by Architect prior to the first submittal. Contractor shall stamp all submittals with submittal
number and date. Contractor to wet sign first page of bound sets of submittals. The person signing the stamp
shall be one designated in writing by Contractor as having that authority. Signature shall be in original ink.
Stamped signature is not acceptable.
F.
Notify Architect in writing, at the time of submission, of deviations in submittals from the requirements of the
Contract Documents. Contractors responsibility for deviations in submittals shall not be relieved by
Architects review of the submittals, unless Architect gives written acceptance of specific deviations clearly
identified by Contractor by clouding and the words CONTRACT DEVIATION and SUBSTITUTION in
bold face print. When submittal is revised for resubmission, identify changes made since previous submittal.
G.
Contractors responsibility for errors and omissions in the submittals shall not be relieved by Architects review.
H.
Contractor shall be responsible for the accuracy of the submittals and for the proper fitting, verification of
dimension, construction of the work, furnishing of materials, and work required by the Contract Documents but
not indicated on the submittals.
Submittal Procedures
01 33 00 - 3
I.
Submission of Shop Drawings, Product Data, or other submittals in either original submission or when
resubmitted with corrections, constitutes evidence that Contractor has checked all information, thereon, and
that it accepts and is willing to perform the work as shown, in a workmanlike manner, and in accordance with
the best standard practice.
J.
Do not submit Shop Drawings, Product Data, or Samples for products that have not been specified unless such
products have been formally reviewed as a substitute in accordance with Section 01 62 00 - Product
Substitution Procedures.
K.
Do not allow copies of submittals without Architects stamp indicating approval by Architect to be used in
connection with the Work. Do not permit submittals marked Rejected or Revise and Resubmit to be used
at the Project site, or elsewhere where work is in progress.
L.
Do not proceed with fabrication or installation of materials, products or systems until final approved submittals
are in the possession of the fabricator or installer as appropriate.
M.
Prepare and distribute additional sets of reviewed submittals to subcontractors, manufacturers, fabricators,
suppliers, erectors, installers, and others as required for performance of the Work. Instruct parties to promptly
report inability to comply with requirements or potential conflicts.
N.
Maintain one set of each submittal at the project site, available for reference.
O.
Maintain one set of reviewed submittals for Record Documents as described in Section 01 78 00 Closeout
Submittals.
1.5
ARCHITECTS RESPONSIBILITIES
A.
Architect will review submittals with reasonable promptness and in accordance with the Submittal Schedule.
B.
Architect will only review submittals for general conformance to the design concept and Contract Documents.
C.
D.
Submittal Procedures
01 33 00 - 4
E.
Architects review is only for items to be furnished by the submitting subcontractor or supplier and does not
constitute approval of any assemblage of which the submitted item is a component nor approval of construction
sequence or method.
F.
Architect will return without actions submittals not requested or required by Contract Documents or Architect.
G.
Architects Actions:
1.
Where action and return is required, Architect will review Contractors submittals, apply Architects
action stamp and indicate action, sign, and date.
2.
The terms of Architects action stamp have the following meaning:
a.
APPROVED -- indicates that Architect takes no specific exception to the information
contained in the submittal; Contractor may proceed with that portion of the Work described
in the submittal -- subject to compliance with all applicable requirements of the Contract
Documents.
b.
APPROVED AS NOTED -- indicates that Architect approves the submittal for general
design conformance with the specific exceptions noted; Contractor may proceed with that
portion of the Work provided that the notations made by Architect are incorporated in the
work -- and subject to compliance with all applicable requirements of the Contract
Documents.
c.
REVISE AND RESUBMIT -- indicates that Architect has noted nonconforming work on
the submittal, and/or desires clarification on some aspects of the submittal; the Contractor
must make revisions and resubmit. Contractor may not proceed with the work described in
the submittal.
d.
REJECTED -- indicates that Architect believes the submittal contains significant error or
nonconformance and is, therefore, rejected. A new submittal is required. Contractor may
not proceed with that portion of the Work described by the submittal.
3.
Where a submittal does not require Architects action, the submittal will be returned, marked Action
Not Required or Not Reviewed.
H.
Architect will retain one copy of each submittal for Architects file and one copy for each major consultant who
has reviewed the submittal, unless otherwise noted.
I.
When appropriate Architect will return submittals to Contractor for distribution, or for resubmission.
1.6
SUBMITTALS
A.
Product Data:
1.
Product Data includes standard preprinted information on materials, products, equipment, and
systems; not specially-prepared for this Project, other than the designation of selections from among
available choices printed therein.
2.
Product Data permits Architect to determine which materials, products, and systems will be accepted
in the project.
3.
Where Product Data must be specially prepared because standard printed data is not suitable for use,
submit as Shop Drawings.
4.
Preparation:
a.
Collect required data into one coordinated submittal for each unit of work, element of
construction or system.
b.
Mark the manufacturers brochures and catalog data to clearly indicate the items to be
included as a part of the work. Product Data submitted with multiple items and no clear
indication as to which item is to be used in the work will be returned to Contractor without
being reviewed.
c.
Mark all submittals indicating item, options, and finishes proposed, and referencing
technical Specification Section and paragraph covering the work in question.
d.
Use same equipment, fixture, or item reference used in the Contract Documents.
Submittal Procedures
01 33 00 - 5
e.
5.
B.
Shop Drawings:
1.
Shop Drawings facilitate integration, coordination, and progress of the Work.
2.
Shop Drawings include fabrication, erection, and installation drawings, setting diagrams, schedules,
patterns, templates, and similar drawings.
3.
Shop Drawings include specially-prepared technical data for this Project, including drawings,
diagrams, performance curves, data sheets, schedules, templates, patterns, reports, calculations,
instructions, measurements and similar information not in standard printed form for general
application to a range of similar projects. Shop Drawings shall be prepared by Contractor or through
Contractor by way of a subcontractor, manufacturer, supplier, distributor, or other lower tier
contractor, to illustrate a portion of the work.
4.
Submit shop drawings when specified and to illustrate every custom fabricated item or assembly.
5.
Preparation:
a.
Provide newly prepared information with graphic information at accurate scale, except as
otherwise noted. Do not reproduce Contract Documents and do not copy standard
information as basis of Shop Drawings. Standard information prepared without specific
reference to the project is not considered Shop Drawings.
b.
Include plans, sections, and details complete with information for making connections with
other work and any other information necessary to adequately describe the unit of Work.
c.
Identify materials, products, and finishes and, where applicable, use specification section
numbers as reference.
d.
Identify details by reference to Contract Drawings drawing and detail, schedule, or room
numbers shown or specified.
e.
Use same equipment, fixture, or item reference used in the Contract Documents.
f.
Identify applicable standards.
g.
Identify coordination requirements.
Submittal Procedures
01 33 00 - 6
h.
6.
C.
Dimension drawings, except diagrams and schematic drawings, and indicate which are based
on field measurement. Prepare dimensioned drawings to scale.
i.
Identify deviations from the Contract Documents by clouding and the words CONTRACT
DEVIATION in boldface type or lettering.
j.
Shop Drawings shall be not less than 8-1/2 by 11 inches nor more than 30 by 42 inches,
unless approved in advance by Architect.
k.
Where coordination requirements necessitate scope of Shop Drawing to include more than
one item, label Shop Drawing with specification section number of dominant trade involved.
Dominant shall be defined as greatest quantity, greatest cost, or principal detail subject of
drawing, whichever may be appropriate.
l.
Draw Shop Drawings at large scale, fully detailed and with all materials and stock or
purchased components fully identified.
Submission:
a.
For Shop Drawings presented on sheets larger than 11 inches by 17 inches two opaque
reproductions of each required shop drawing prepared for this project. Shop drawings can
be no larger than Typical Contract Drawings without prior of approval of Architect.
1)
Transmit reproducibles rolled in mailing tubes. Do not fold reproducibles.
2)
Bind Shop Drawings in sets.
3)
Include on each drawing the drawing title, number, date, and revision numbers and
dates, in addition to the information required in the paragraph entitled Submittals
Identification.
4)
Each drawing shall have clear space of approximately 4 by 10 inches to receive
review stamps.
5)
One copy of reviewed Shop Drawings will be returned to Contractor.
b.
For shop drawings presented on sheets 8-1/2 inches by 14 inches or less, conform to the
format and quantity requirements for Product Data.
Samples:
1.
Samples include both fabricated and unfabricated physical examples of products, materials, products
equipment, fixtures, devices, assemblies, or workmanship, physically identical to a portion of the
Work, illustrating a portion of the Work or establishing standards for evaluating the appearance of the
finished Work or both or (where indicated) for more detailed testing and analysis. Mock-ups are a
special form of samples, which are too large or otherwise inconvenient for handling in specified
manner for transmittal of sample submittals.
2.
Review of Samples shall permit Architect to physically verify conformance of materials, products,
fixtures, devices, assemblies, or workmanship with Contract Documents either by inspection or
testing, and to select textures, colors, or other characteristics as stipulated in the Contract Documents.
a.
Review of Samples will be only for characteristics or uses named in such review and shall
not be taken to change or modify any contract requirement except as specifically authorized
or requested by Architect.
b.
Samples shall set standards for items or characteristics of which Samples are representative.
3.
After a sample has been accepted, no change in brand, manufacturer, or quality will be permitted
unless satisfactory written evidence is presented to, and accepted by, Architect that the manufacturer
cannot make scheduled delivery of the accepted material, or that the material delivered has been
rejected and substitution of suitable materials is an urgent necessity.
4.
Refer to technical Specification Sections for additional requirements of samples, if any, which are
intended for examinations or testing for other characteristics.
5.
Format and Quantity of Samples:
a.
Furnish samples in the sizes below, unless otherwise specified or unless the manufacturer has
prepackaged samples of approximately the same size as specified:
1)
Sample of equipment or device: Full size.
2)
Sample of materials less than 2 by 3 inches: Attach to an 8-1/2 by 11 inch sheet.
3)
Sample of materials exceeding 8-1/2 by 11 inches: Cut down to 8-1/2 by 11 inches
as appropriate to indicate color, texture, and material variations.
Submittal Procedures
01 33 00 - 7
4)
6.
7.
8.
9.
D.
Sample of linear devices or materials, such as, conduit and handrails: 10-inch
length or length to be supplied, if less than 10 inches.
5)
Sample of non-solid materials, such as, sand and paint: Pint.
6)
Color selection samples: 2 inches by 4 inches.
7)
Sample panel: 4 feet by 4 feet.
8)
Sample installation: 100 square feet.
9)
Sizes of samples shall be of their respective standard unit, insofar as possible or
practical, unless otherwise noted.
10)
Refer to Section 09 91 00 Painting for paint color sample requirements
b.
Samples showing range of variation: Where variations are unavoidable due to the nature of
the materials, submit sets of samples of not less than three units showing the extremes and
middle of the range.
c.
Where Samples are for selecting of color, pattern, texture, or similar characteristics from a
range of standard choices, submit a full set of choices for the material or product.
d.
Quantity, unless otherwise specified:
1)
Submit three samples, or three sets of samples showing range of variation, of each
required item. One approved sample or set of samples will be retained by Architect
and two will be returned to Contractor.
2)
Submit one sample panel. Include components listed in technical Specification
Section or as directed.
3)
Submit one sample installation, where directed.
4)
Submit one sample of non-solid materials.
e.
Mount, display, or package samples in the manner specified to facilitate review of qualities
indicated.
f.
Identify each Sample with information required by the paragraph entitled Submittal
Identification. Also, include information with each Sample to show generic description,
source or product name and manufacturer, limitations, and compliance with standards.
g.
Refer to technical Specification Sections for requirements for Samples that illustrate
workmanship, fabrication techniques, details of assembly, connections, operation, and
similar construction characteristics.
Requirements for Mock-Ups and Field Samples:
a.
Mock-ups and similar field samples specified in technical Specifications Sections are
recognized as a special type of Sample. Comply with requirements for samples to greatest
extent possible, and process transmittal forms to provide a record of activity.
b.
Erect at site in locations acceptable to Architect.
c.
Construct each mock-up or field sample; include all items required in the finish work.
d.
Mock-ups or field samples shall remain in place until the work it represents has been
completed and accepted by Architect.
e.
Note and preserve the notation of the area constituting the sample installation but remove the
notation at the final clean up of the Project.
Quality Control Set of Samples:
a.
Maintain returned final set of Samples at project site, properly protected and in suitable
condition and available for quality control comparisons by Architect and others.
b.
Quality control set shall serve as the basis for comparison for following work, and shall
establish the standard of color, pattern, texture, workmanship, and other qualities as
applicable when in conformance with the requirements of the Contract Documents.
Reusable Samples: Returned Samples that are intended or permitted to be incorporated in the Work
are so indicated in other Specification Sections.
Incorporated Samples must be undamaged at the time of use and in complete conformance with all
requirements of the Contract Documents.
Manufacturers Instructions:
1.
When specified in technical Specification Sections, submit manufacturers printed instructions for
delivery, storage, assembly, installation, start-up, adjusting, and finishing, to Architect for delivery to
Owner in quantities specified for Product Data.
Submittal Procedures
01 33 00 - 8
E.
Indicate special procedures, perimeter conditions requiring special attention, and special
environmental criteria required for application or installation.
Identify conflicts between manufacturers instructions and Contract Documents.
Installation of the items will not be allowed to proceed until the information is received. Failure to
furnish the information can be cause for rejection of the material.
END OF SECTION 01 33 00
Submittal Procedures
01 33 00 - 9
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: The requirements for the following subjects are covered in this Section.
1.
Construction Procedures Plan.
2.
Contractors Site Safety and Health Plan.
3.
Environmental Protection Plan.
4.
Disposal Operations.
5.
Cultural Resources.
1.2
A.
Within 15 days of award of contract, submit to Architect a proposed Construction Procedures Plan
demonstrating how the provisions of this section and of all other requirements of the Contract Documents
are to be implemented so as to provide the minimum possible disturbance to residents from noise, traffic,
and vibration to adjacent structures. The plan must be approved before work is started, and shall include,
but not be limited to, the following:
1.
Sequence of operations.
2.
Environmental Protection Plan as described in this Section.
3.
Noise Control: Refer to Section 01 50 00 Temporary Facilities and Controls for noise control
requirements.
4.
Dust Control: Refer to Section 01500 Temporary Facilities and Controls for dust control
requirements.
5.
Smoke/odor control plan.
6.
Site Plan showing public protection such as pedestrian covered walkways, barriers, flagman locations,
truck access, and similar items.
7.
Waste, debris, and rubbish removal procedures.
8.
Trucking plan describing traffic routes and procedures for transporting debris.
9.
Street cleanup plan.
10.
MSDS Safety Data Sheets for any chemicals proposed to be used.
11.
Utility shut off and capping plan.
12.
Vibration control plan.
B.
Refer to other specification sections for specific requirements concerning some of the items that are noted to
be included in the Construction Procedures Plan.
1.3
A.
Contractor shall be the Controlling Employer, throughout the duration of the construction of the Project. As
the Controlling Employer, Contractor is responsible for the following:
1.
All site safety and health conditions at the Project;
2.
Correcting any and all hazards which may endanger any persons health or safety while rightfully
working on the Project;
3.
Initiating, maintaining, and supervising all safety programs in connection with the Work;
4.
Conducting daily safety inspections of the site to ensure that its subcontractors and any other
employees working on the Project, whether working directly for Contractor or Owner, are not in
violation of any CAL/OSHA regulations;
5.
Providing written notice demanding immediate correction of any safety violation to each and every
subcontractor or employee, whether working directly for Contractor or Owner, working on the Project
who is either responsible for exposing employees to the hazard, creating the hazard, or correcting the
hazard; and
Special Procedures
01 35 00 - 1
Notifying and complying with all applicable laws, ordinances, rules, regulations and orders of any
public authority bearing on the safety of persons rightfully on the Project.
B.
Contractor shall develop and keep on the project site at all times a Site Safety and Health Plan (SSHP) that
fulfills the requirements set forth in the California Code of Regulations (CCR) Title 8 Section 3203 Injury and
Illness Prevention Program (Cal/OSHA General Industry Standard) and CCR Tile 8 Section 1509 (Cal/OSHA
Construction Safety Orders).
C.
The SSHP shall address all site-specific topics pertinent to maintaining a safe and healthy work environment
which may include, but is not limited to: safety organization and responsibilities; meetings and inspections;
emergency and evacuation plans; hazardous material spill response; incident investigation, reporting and record
keeping; training; first aid; hazard communication; housekeeping; noise; personal protective equipment; fire
prevention and protection; confined space entry; electrical safety and lockout/tagout; welding, torch cutting and
hot work permitting; hand and portable power tools; cranes, heavy equipment, forklifts and motor vehicles;
ladders, scaffolds and elevated platforms; guarding of floor and wall openings; fall protection; excavation and
trenching; pressurized cylinders; material handling and storage; ventilation; personal hygiene, sanitation and
chemical toilets.
D.
The SSHP shall include an MSDS for each product used at the work site.
E.
The SSHP shall describe measures that Contractor will implement to ensure the safety of people and visitors
who are in adjacent occupied building spaces, on public thoroughfares, or who are otherwise in close proximity
to the construction activities. The SSHP shall also address security measures that will be used to prevent
unauthorized entry to the site.
F.
Contractor shall ensure that all Subcontractors, vendors, visitors or others entering or working at the project site
comply with applicable SSHP provisions.
G.
Contractor shall comply with Title 87 of the California Fire Code for fire safety during construction, alteration
or demolition of a building
1.4
A.
During the progress of the work, keep the premises occupied in a neat and clean condition and protect the
environment both on site and off site, throughout and upon completion of the construction project.
B.
Develop an Environmental Protection Plan in detail and submit to Architect within 30 days from the date of
commencement specified in the Notice to Proceed. Distribute the approved plan to all employees and to all
subcontractors and their employees. The Environmental Protection Plan shall include, but not be limited to, the
following items:
1.
Copies of required permits and procedures agreed upon with City, County, and other regulatory
agencies having jurisdiction.
2.
Proposed sanitary landfill site.
3.
Other proposed disposal sites.
4.
Noise Controls: Refer to Section 01 50 00 - Temporary Facilities and Controls for noise control
requirements.
5.
Dust Controls: Refer to Section 01 50 00 - Temporary Facilities and Controls for dust control
requirements.
6.
Erosion Controls: Refer to Section 01 50 00 - Temporary Facilities and Controls for erosion control
requirements.
7.
Copies of any agreements with public or private landowners regarding equipment, materials storage,
borrow sites, fill sites, or disposal sites. Any such agreement made by Contractor shall be invalid if its
execution causes violation of local or regional grading or land use regulations.
Special Procedures
01 35 00 - 2
C.
Requirements: All operations shall comply with all federal, state and local regulations pertaining to water, air,
solid waste and noise pollution.
D.
Definitions of Contaminants:
1.
Sediment: Soil and other debris that have been eroded and transported by runoff water.
2.
Solid Waste: Rubbish, debris, garbage and other discarded solid materials resulting from construction
activities, including a variety of combustible and non-combustible wastes, such as ashes, waste
materials that result from construction or maintenance and repair work, leaves and tree trimmings.
3.
Chemical Waste: Includes petroleum products, bituminous materials, salts, acids, alkalis, herbicides,
pesticides, disinfectants, organic chemicals and inorganic wastes. Some of the above may be
classified as hazardous.
4.
Sanitary Wastes:
a.
Sewage: Domestic sanitary sewage.
b.
Garbage: Refuse and scraps resulting from preparation, cooking, dispensing and
consumption of food
5.
Hazardous Materials: Except as otherwise specified, in the event Contractor encounters on the site
material reasonably believed to be asbestos, polychlorinated biphenyl (PCB), or other hazardous
materials which have not been rendered harmless, Contractor shall immediately stop Work in the area
affected and report the condition to Owner in writing. The Work in the affected area shall not
thereafter be resumed except by written agreement of Owner and Contractor if in fact the material is
asbestos, PCB, or other hazardous materials and has not been rendered harmless. The Work in the
affected area shall be resumed in the absence of asbestos, PCB, or other hazardous materials, or when
such materials have been rendered harmless.
E.
3.
and debris from construction equipment on public streets. Sweep clean turning areas and
pavement entrances as necessary.
Water Resources: Investigate and comply with all applicable federal, state and local regulations
concerning the discharge (directly or indirectly) of pollutants to the underground and natural waters.
Perform all work under this Contract in such a manner that any adverse environmental impacts are
reduced to a level that is acceptable to Architect and regulatory agencies. Refer to Section 02300 Earthwork, paragraph on control of water for dewatering water disposal requirements.
a.
Oily Substances: At all times, special measures shall be taken to prevent oily or other
hazardous substances from entering the ground, drainage areas or local bodies of water in
such quantities as to affect normal use, aesthetics or produce a measurable impact upon the
area. Any soil or water that is contaminated with oily substances due to Contractors
operations shall be disposed of in accordance with applicable regulations.
1.5
DISPOSAL OPERATIONS
A.
The following requirements are in addition to requirement specified in Section 01 74 19 Construction Waste
Management and Disposal.
B.
Solid Waste Management: Supply solid waste transfer containers. Daily remove all debris such as spent air
filters, oil cartridges, cans, bottles, combustibles and litter. Take care to prevent trash and papers from blowing
onto adjacent property. Encourage personnel to use refuse containers. Convey contents to a sanitary landfill.
C.
Washing of concrete containers where wastewater may reach adjacent property, storm drains or natural
watercourses will not be permitted. Remove any excess concrete to the sanitary landfill.
D.
Chemical Waste and Hazardous Materials Management: Furnish containers for storage of spent chemicals
used during construction operations. Dispose of chemicals and hazardous materials in accordance with
applicable regulations.
E.
Garbage: Store garbage in covered containers; pick up daily and dispose of in a sanitary landfill.
F.
Dispose of vegetation, weeds, rubble, and other materials removed by the clearing, stripping and grubbing
operations off site at a suitable disposal site in accordance with applicable regulations.
G.
Excavated Materials:
1.
Native soil complying with the requirements of Division 31 may be used for backfill, fill and
embankments as allowed by that section.
2.
Spoil Material: Remove all material, which is excavated in excess of that, required for backfill, and
such excavated material, which is unsuitable for backfill, from the site.
a.
Excess suitable backfill material shall be hauled off site. No additional compensation will be
paid to the Contractor for such off haul. Include all such costs in the lump sum prices bid for
the project.
b.
Unsuitable backfill material will be disposed of off site in accordance with applicable
regulations, in a disposal site indicated in the Environmental Protection Plan. Remove
rubbish and materials unsuitable for backfill immediately following excavation. Remove
material in excess of that required for backfill immediately following backfill operations.
H.
Rubbish shall consist of all materials not classified as suitable materials or rubble and shall include shrubbery,
trees, timber, trash, and garbage.
1.6
CULTURAL RESOURCES
A.
The project does not pass through any known archaeological sites. However, it is conceivable that unrecorded
archaeological sites could be discovered during construction.
Special Procedures
01 35 00 - 4
B.
In the event that artifacts, human remains, or other cultural resources are discovered during subsurface
excavations at locations of the Work, Contractor shall protect the discovered items, cease work for a distance of
35 feet radius in the area, notify Architect and comply with applicable law.
C.
Owner may retain an Archaeologist to monitor and recover data and artifacts during period work has ceased.
D.
All items found which are considered to have archaeological significance are the property of Owner.
END OF SECTION 01 35 00
Special Procedures
01 35 00 - 5
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: This Section sets forth certain codes, standards, and relevant requirements applicable
to the work required under this Contract.
1.2
A.
Perform the Work in accordance with Applicable Code Requirements and applicable requirements of all other
regulatory agencies listed on Drawing No. G1.0.
B.
Unless otherwise specified, specific references to codes, regulations, standards, manufacturers instruction, or
requirements of regulatory agencies, when used to specify requirements for materials or design elements, shall
mean the latest edition of each in effect on the date of Contract Documents or date of the Change Order or
Field Order, as applicable, except where a specific date is established by codes.
1.3
A.
Contractor shall maintain codes and regulatory requirement publications, as indicated in the individual
Specification Sections, of the appropriate publication date, on the Site during construction.
1.4
CONFLICTS
A.
1.5
QUALITY CONTROL
A.
Conflicts: If a conflict exists between referenced regulatory requirements, comply with more stringent
establishing requirement, unless otherwise directed by Architect.
END OF SECTION 01 41 00
Regulatory Requirements
01 41 00 - 1
SECTION 01 42 00 - REFERENCES
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: The requirements for abbreviations, definitions, reference standards, and symbols.
1.2
ABBREVIATIONS
A.
B.
1.3
DEFINITIONS
A.
The following terms, when used on the Drawings or in the Specifications, shall have the following meanings:
TERM
MEANING
As directed
As directed by Architect
As required
As selected
As selected by Architect
By others
Equal
Furnish
Install
Owner-furnished,
Contractor-installed
Project
Project site
References
01 42 00 - 2
Provide
Shown
Specified
Submit
Submit to Architect
1.4
REFERENCE STANDARDS
A.
For products or workmanship specified by association, trade, or other consensus standard, comply with
requirements of the standard, except when requirements that are more rigid are specified or are required by
applicable codes.
B.
Applicable standards of the construction industry have the same force and effect (and are made a part of the
Contract documents by reference) as if copied directly into the Contract documents, or as if published
copies were bound herewith.
C.
Unless otherwise specified, specific references to referenced standard, when used to specify requirements for
materials or design elements, shall mean the latest edition in effect on the date of Contract Documents or date
of the Change Order or Field Order, as applicable, except where a specific date is established code.
D.
E.
When specified reference standards conflict with Contract Documents, request clarification from the
Architect before proceeding.
F.
Neither the contractual relationships, duties, nor responsibilities of the parties in Contract nor those of
Architect shall be altered from the Contract Documents by mention or inference otherwise in any reference
document.
1.5
SYMBOLS
A.
END OF SECTION 01 42 00
References
01 42 00 - 3
PART 1 GENERAL
1.1
SUMMARY
A.
B.
C.
1.2
LABELING
A.
Attach label from agency approved by authority having jurisdiction for products, assemblies, and systems
required to be labeled by applicable code.
B.
Label Information: Include manufacturer's or fabricator's identification, approved agency identification, and
the following information, as applicable, on each label.
1.
Model number.
2.
Serial number.
3.
Performance characteristics.
1.3
A.
When specified in individual specification sections, require material or product suppliers or manufacturers
to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation,
quality of workmanship.
B.
C.
D.
Representatives shall submit written report to Architect listing observations and recommendations.
E.
Representatives to report observations and site decisions or instructions given to applicators or installers
that are supplemental or contrary to suppliers and manufacturers' written instructions.
END OF SECTION 01 43 00
Quality Assurance
01 43 00 - 1
PART 1 GENERAL
1.1
SUMMARY
A.
B.
1.2
DEFINITIONS
A.
Mockups: Full-size, physical example assemblies to illustrate finishes and materials. Mockups are used to
verify selections made under Sample submittals, to demonstrate aesthetic effects and, where indicated,
qualities of materials and execution, and to review construction, coordination, testing, or operation; they are
not Samples. Mockups establish the standard by which the Work will be judged.
1.3
QUALITY ASSURANCE
A.
Mockups: Before installing portions of the Work requiring mockups, build mockups for each form of
construction and finish required to comply with the following requirements, using materials indicated for
the completed Work:
1.
Construct mockups required by this section out of sequence with respect to normal construction
sequence and obtain approval by Architect before commencing the work represented by the mock-up.
2.
Construct mockups at the building site in locations and of sizes indicated or, if not indicated, as
directed by Architect.
3.
Notify Architect seven days in advance of dates and times when mockups will be constructed.
4.
Use products, materials, finishes, fabrication methods, details, anchorage systems, and construction
methods identical with those required for the Work. Use supervisor who will be involved in actual
construction.
5.
Simulate fabrication and installation, as nearly as feasible, the actual fabrication and installation in the
completed structure.
6.
Correct work installed within a mock-up, which is not acceptable to Architects at no additional cost
to Owner. Correct subsequent installations elsewhere in the project, which are not in accordance with
an approved mock-up at no additional cost to Owner.
7.
Demonstrate the proposed range of aesthetic effects and workmanship.
8.
Obtain Architects approval of mockups before starting work, fabrication, or construction.
9.
Maintain mockups during construction in clean and an undisturbed condition as a standard for
judging the completed Work.
10.
Each item of work within a mock-up must be approved by Architect before commencing work
represented by a mock-up.
11.
Architect's approval of a mock-up will not relieve Contractor of the responsibility for any deviation
from the requirements of the Contract Documents unless Contractor has specifically informed
Architect in writing of such deviation at the time of the review and Architect has given written
approval of the specific deviation.
Mockup Requirements
01 43 39 - 1
END OF SECTION 01 43 39
Mockup Requirements
01 43 39 - 2
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: The requirements for the following quality control subjects are covered in this
Section.
1.
Control of Installation.
2.
Tolerances.
3.
Testing and Inspection Laboratory Services.
4.
Contractors Responsibilities.
5.
Additional Testing and Inspections.
6.
Testing and Inspection Reports.
7.
Job Conditions.
8.
Repair and Protection.
B.
C.
1.2
CONTROL OF INSTALLATIONS
A.
Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship,
to produce Work of specified quality.
B.
C.
Should manufacturers' instructions conflict with Contract Documents, request clarification from {Architect
before proceeding.
D.
Comply with specified standards as minimum quality for the Work except where more stringent tolerances,
codes, or specified requirements indicate higher standards or more precise workmanship.
E.
F.
Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G.
Secure Products in place with positive anchorage devices designed and sized to withstand stresses,
vibration, physical distortion, or disfigurement.
H.
Multiple Tests and Inspections: Certain portions of the Work will be tested and inspected at various stages,
sometimes off the site, between their inception and final positioning in the completed work. Nothing in any
prior approval or satisfactory test result shall govern if at any subsequent time the Work or portion thereof, is
found not to conform to the Contract Documents.
I.
If Architect is to observe tests, inspections, or make acceptances required by the Contract Documents, Architect
will do so promptly and, where practical, at the normal place of testing.
J.
Tests or inspections conducted pursuant to the Contract Documents shall be made promptly to avoid
unreasonable delay in the Work.
Quality Control
01 45 00 - 1
1.3
TOLERANCES
A.
Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not
permit tolerances to accumulate.
B.
Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract
Documents, request clarification from Architect before proceeding.
C.
1.4
A.
B.
Contractors Testing Laboratory: Testing laboratory retained and paid for by Contractor to perform testing
services required by the Contract documents. Contractors Testing Laboratory shall be an Independent
organization other than Owners Testing Agency, acceptable to Architect. It may be a commercial testing
organization, the testing laboratory of a trade association, the certified laboratory of a supplier, the contractors
own forces, or other organization. Contractors Testing Laboratory shall have performed testing of the type
specified for at least five years.
C.
D.
E.
1.5
CONTRACTORS RESPONSIBILITIES
A.
Cooperate with testing and inspection personnel and provide access to the Work, including off-site
manufacturers and fabricators operations.
Quality Control
01 45 00 - 2
B.
Provide required quantities material samples of materials proposed to be used which require testing. Samples
will be selected and taken by representative of Owners Testing Agency.
C.
Submit to Owners Testing Agency the preliminary design mixes proposed to be used for concrete and other
materials that require review by Owners Agency.
D.
E.
F.
When tests or inspections are not performed after such notice, Contractor shall reimburse Owners Testing
Agency for the cost of personnel and travel expenses incurred.
G.
Pay for additional samples and tests required for Contractors use.
H.
Contractor shall be responsible for the premium costs for required inspections of materials being fabricated
more than 75 miles from the Project Site. These costs shall include additional travel time as well as per diem
and travel expenses.
1.6
A.
If initial tests or inspections made by Owners Testing Agency or Owners Geotechnical Engineer reveal that
any portion of the Work does not comply with the Contract Documents, or if Architect determines that any
portion of the Work requires additional testing or inspection, perform additional testing and inspections as
directed.
B.
If such additional tests or inspections establish that such portion of the Work complies with Contract
Documents, all costs of such additional testing will be paid for by Owner.
C.
If such additional tests or inspections establish that such portion of the Work fails to comply with the Contract
Documents, all costs of such additional tests and inspections, and all other costs resulting from such failure,
including compensation for Architect shall be deducted from Contract Sum.
1.7
A.
After each inspection and test, promptly submit copies of reports which include:
1.
Date issued,
2.
Project name,
3.
Architects Project Number,
4.
Architects name,
5.
Name of Inspector from inspection or testing agency,
6.
Date and time of sampling or inspection,
7.
Identification of product and specification section,
8.
Type of inspection or test,
9.
Date of test,
10.
Results of tests,
11.
Conformance with Contract Documents,
12.
Whether original test or re-test.
Quality Control
01 45 00 - 3
B.
Distribution of Reports: Distribute copies of all reports, indicating observations and results of tests and
indicating compliance or noncompliance with the Contract Documents, as follows.
1.
Architect: One copy.
2.
Owner: Three copies.
3.
Architects Consultants, as appropriate: One copy each.
4.
Local Jurisdiction where applicable.
5.
Those affected by the report: One copy each.
6.
The number of copies for Contractor and Supplier being tested will be determined upon
commencement of the Contract.
1.8
JOB CONDITIONS
A.
When Contractors methods of operation result in excessive test and inspection costs to Owner and if after
warning, costs remain excessive; Contractor shall defray costs attributable to their methods of operation.
B.
Scheduling:
1.
Make tests and inspections conducted pursuant to the Contract Documents promptly to avoid
unreasonable delay in the Work.
2.
Notify Architect and Owners Testing Agency 24 hours prior to expected time for operations requiring
inspection and testing services.
3.
Make tests, inspections, and approvals of portions of the Work required by the Contract Documents or
by applicable code requirements at appropriate times. Except as otherwise provided, arrange for such
tests, inspections, and approvals with the Contractors Testing Laboratory. Give Architect written
notice within 7 calendar days of when and where tests and inspections are to be made.
4.
Cooperate with testing program as necessary to avoid delays. When material or work is not ready at
times scheduled for tests and inspections, be responsible for costs of additional tests and inspections
occasioned by delays.
5.
Premium time fees for testing performed after regular working hours or on Saturday, Sunday, or on
legal holidays shall be reimbursed by Contractor except when testing is required for Owner-requested
overtime work.
C.
Completed Work: Should Architect require tests and inspections for work completed before final acceptance of
entire work, furnish necessary facilities, labor, and materials to uncover or remove work in question to extent
necessary.
1.
If such work is found defective due to fault of Contractor, Contractor shall defray expense of removal,
tests, and inspections, and satisfactory reconstruction. Time extension may not be granted.
2.
If such work is found to conform to requirements of the Contract, Contractor shall be reimbursed by
Owner for facilities, labor, and materials required for removal, and costs of satisfactory reconstruction
in accordance with the Contract for amounts for extra work and time extension.
1.9
A.
Upon completion of testing, inspecting, sample-taking, and similar services performed on the work, repair
damaged work and restore substrates and finishes to eliminate deficiencies, including deficiencies in the visual
qualities of exposed finishes.
B.
Protect work exposed by or for quality control services activities, and protect repair work.
C.
Repair and protection is Contractors responsibility, regardless of the assignment of responsibility for testing,
inspecting, or similar services.
Quality Control
01 45 00 - 4
END OF SECTION 01 45 00
Quality Control
01 45 00 - 5
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Providing, maintaining, and removing of facilities and controls required to
execute work of this Project efficiently and successfully including, but not necessarily limited to, the
following:
1.
Temporary Utilities:
a.
Temporary Electricity.
b.
Temporary Water.
c.
Temporary Lighting.
2.
Equipment.
3.
Temporary Fire Protection.
4.
Construction Facilities:
a.
Field Offices and Sheds.
b.
Sanitation Facilities.
c.
Construction Staging Area.
5.
Temporary Construction:
a.
Access Provisions.
b.
Site Barriers.
6.
Construction Aids:
a.
Debris Box.
7.
Vehicular Access and Parking:
a.
Parking Areas.
8.
Temporary Controls:
a.
Storm Water Pollution Control.
b.
Moisture Control.
c.
Dust Control.
d.
Noise Control.
e.
Sewer Sediment Control.
f.
Water Control
g.
Erosion Control.
h.
Pollution Control
i.
Pest Control.
j.
Rodent Control.
9.
Temporary Signage:
a.
Project Identification Sign.
b.
Project Informational Sign.
10.
Removal of Utilities, Facilities and Controls.
B.
1.2
REFERENCE STANDARDS
A.
1.3
SUBMITTALS
A.
1.4
QUALITY ASSURANCE
A.
Structural Engineer: Where required for engineering temporary facilities or aiding in construction, employ
Structural Engineer licensed in State of California, other than Structural Engineer of Record.
B.
C.
1.5
SITE CONDITIONS
A.
General: Establish and initiate use of each temporary facility at time first reasonably required for proper
performance of the Work. Terminate use and remove facilities at earliest reasonable time, when no longer
needed or when permanent facilities have, with authorized use, replaced the need.
B.
Conditions of Use:
1.
Install, operate, maintain, and protect temporary facilities in a manner and at locations, which will be
safe, non-hazardous, sanitary, protective of persons and property, and free of deleterious effects.
2.
Remove and replace any components of temporary facilities that are not suitable for intended use.
3.
Temporary facilities of any nature exposed to public view to present a neat, clean attractive
appearance.
C.
PART 2 PRODUCTS
2.1
MATERIALS
A.
Provide those materials incidental to providing construction facilities and executing controls.
B.
Used materials for protection enclosures are acceptable if approved by Architect and if adequate for required
purposes, otherwise new materials will be required.
C.
PART 3 EXECUTION
3.1
PREPARATION
A.
Ensure temporary facility and control requirements have been reviewed, approved, and ready for installation
prior to beginning work.
3.2
TEMPORARY UTILITIES
A.
General:
1.
Provide and maintain temporary utilities of any nature required for construction or temporary
occupancy until completion of the Work. Include arrangements for and payment of charges for
temporary or permanent piping footage required for installation of utilities by utility companies.
2.
Materials may be new or used, but shall be adequate for the required purposes. Their use and
methods of installation shall not create unsafe conditions or violate requirements of Applicable Code
Requirements.
3.
Provide any new utility services to site, connection to utility sources and distribution of utilities for
any purpose.
4.
Provide utility reduction items such as transformers and reducing valves, connections to utility
sources, and distribution of utilities.
5.
Comply with applicable requirements specified in Division 22 Plumbing and Division 26 Electrical.
6.
Maintain and operate systems to provide continuous service.
7.
Modify and extend systems as required.
8.
Removal and Reconditioning: Remove temporary utilities installed as a requirement of the Contract
Documents. Restore utilities to their original condition at the completion of the Work.
9.
Inspections: Unscheduled site inspections will be made to ensure maintenance of equipment and
compliance with Specifications.
B.
Temporary Electricity:
1.
Temporary power in not available from PG&E. Provide portable engine generator capable of
providing the required electricity to the construction site. Verify location with the construction
management team and owner prior to locating generator in field.
2.
Provide a sound attenuation enclosure around generator to maintain noise levels of 45-72 dB(A).
C.
Temporary Water:
1.
Arrange and payfor temporary water from utility source as needed for site construction.
2.
Provide all equipment including metering, connections, and other materials necessary for the
extending of the utility lines to where they will be used.
3.
Install piping with taps located so that water is available throughout the Project site by the use of
hoses. Protect piping and fittings against freezing.
4.
Provide water for human consumption in accordance with regulatory requirements for potable water.
D.
Temporary Lighting:
1.
Provide and maintain electrical lighting for construction operations, and areas accessible to the
public when natural light is not adequate for work, to achieve a minimum lighting level of 25-foot
candles on walking and working services.
2.
Provide and maintain electrical lighting to exterior staging and storing areas after dark for security
purposes.
3.
Provide branch wiring from power source to distribution boxes with lighting conductors, pigtails,
and lamps as required.
4.
Maintain lighting and provide routine repairs.
3.3
EQUIPMENT
A.
Internal combustion engine-powered air compressors, hoists, pumps and similar devices shall be so located
that the exhausts discharge well away from combustible materials and occupied areas of hospital. When
required to pipe exhaust outside the structure, piping material and clearances shall be in accordance with
NFPA 37.
B.
Internal combustion equipment shall be shut down and allowed to cool to ambient temperatures prior to
refueling.
C.
Equipment shall not be serviced or repaired within structures under construction, alteration or demolition.
D.
Fuel for internal combustion equipment shall not be stored within structures under construction, alteration,
or demolition.
3.4
A.
Develop and supervise an overall fire prevention and fire protection program. Eliminate unnecessary fire
hazards wherever possible.
B.
Flammable Materials:
1.
Trash, debris, lumber or other materials considered to be flammable or hazardous are not to be stored
or allowed to accumulate in quantities that endanger life or property.
2.
Containers used for the temporary storage of combustible waste must be of solid metal, such as steel,
or made of material approved by the State Fire Marshal.
3.
Assign a qualified person with authority to maintain fire protection equipment, institute prevention
measures, and direct the prompt removal of combustible and waste material.
4.
Flammable and Combustible Liquids:
a.
Storage of flammable and combustible liquids shall be in accordance with NFPA 30,
except as modified by this Section.
b.
Storage of Class I and II liquids shall not exceed 60 gallons within 50 feet of the structure
under construction, alteration, or demolition.
c.
Storage areas shall be kept free of weeds, debris and combustible materials not necessary
to the storage.
d.
Open flames and smoking shall not be permitted in flammable and combustible liquids
storage areas. Such storage areas shall be appropriately posted as NO SMOKING
areas.
e.
Class I and II liquids shall be kept in approved safety containers.
f.
Means shall be provided to dispose of leakage and spills promptly and safely.
g.
Class I liquids shall only be dispensed where there are no open flames or other sources of
ignition within the possible path of vapor travel.
C.
4.
Fire Extinguishers:
a.
Comply with applicable recommendations of NFPA 10 for each area of each construction
activity when combustible materials, flammable liquids, and similar exposures to possible
fires are present.
b.
Provide and maintain at least one portable ABC multi-purpose dry chemical fire
extinguishers with a minimum rating of 4A-60BC throughout the area under construction
and in field offices, storage sheds and other temporary structures used for construction.
Use fire protection equipment only for fighting fires.
D.
3.5
CONSTRUCTION FACILITIES
A.
B.
Sanitary Facilities:
1.
Existing sanitary facilities located at site may be used during construction period. Make sure
sanitary facilities are used for their intended purposes and do not allow them to be used for other
purposes such as dumping debris, cleaning paint brushes or similar activities.
2.
Service, clean, and maintain facilities and enclosure.
C.
3.6
TEMPORARY CONSTRUCTION
A.
Site Barriers:
1.
Submittal: Submit site plan detailing location of temporary fencing, and submit product data when
applicable.
2.
Provide barriers to prevent unauthorized entry to construction areas and to protect the Work, existing
facilities, persons, and adjacent properties from damage and injury from demolition and construction
operations.
3.
Provide barriers required by authorities having jurisdiction for public rights-of-ways and for public
access to existing buildings.
4.
Provide barrier in locations as indicated on Drawings.
5.
Provide barrier not less than 7 feet high with privacy screen fabric. Provide venting holes as
necessary to keep fences from falling down or being damaged during wind events.
6.
Construction: Meet requirements of The City of Carmel-by-the-Sea Public Works director.
Temporary Facilities and Controls
01 50 00 - 5
10.
11.
Install adequate safety devices (signs, flashers, reflectors, and barriers) as the fence is being
constructed. Do not wait until after fence is completed to install safety devices.
Provide vehicular and pedestrian gates complete with locking devices where required.
Maintenance:
a.
Maintain barriers during entire construction period.
b.
Provide continues maintenance of barricade free from debris, bushes, and planting.
c.
Repair immediately damage to barricades which compromises the sites integrity or
security.
d.
Maintain barricades in a clean and neat and in a graffiti free condition.
Relocate barriers as required by progress of the Work.
Delineators, cones, and caution tape are unacceptable barricades.
3.7
CONSTRUCTION AIDS
A.
General:
1.
Materials and installation may be new or used, suitable for the intended purpose, and in
conformance with applicable regulatory requirement.
2.
Completely remove construction aids when no longer required.
3.
Clean and repair damages caused by installation or use of construction aids.
4.
Restore permanent facilities used for temporary purposes to condition acceptable to Owner.
5.
Accumulations of unnecessary combustible forms or formed lumber shall be prohibited.
Combustible forms or formed lumber shall be brought onto the project only when needed.
Combustible forms or formed lumber shall be removed from the project as soon as stripping is
complete. Those portions of the structure where combustible forms are present shall not be used
for the storage of other combustible building materials.
6.
During forming and stripping operations, portable fire extinguishers or charged hose lines shall be
provided to protect adequately the additional combustible loading.
B.
Debris Box:
1.
Location of debris box shall be determined at Pre-Construction Meeting.
2.
Remove rubbish, waste materials and debris daily.
3.
Comply with all pertinent requirements of governmental agencies having jurisdiction.
3.8
A.
Parking: This paragraph covers requirements for construction personnel parking. Construction personnel
includes Contractors personnel and employees, Subcontractors and their employees, suppliers, vendors and
visitors.
1.
Contractor shall arrange for and pay for off-site parking for construction personnel.
3.9
TEMPORARY CONTROLS
A.
B.
Moisture Control:
1.
Perform pumping, trenching, damming, and under draining necessary to keep site free from puddling
and running water during construction.
2.
Provide water barriers as required to protect site from soil erosion.
3.
Dispose of water in manner acceptable to local regulations, taking care to insure that no existing
water disposal facilities are impeded, clogged, damaged or interfered with in any way.
C.
Dust Control:
1.
Execute Work by methods to minimize raising dust from construction operations.
2.
Employ positive measures to prevent air-borne dust from dispersing into atmosphere.
a.
Wet down unpaved areas, to eliminate dust formation, a minimum of twice a day to reduce
particulate matter. When wind velocity exceeds 15 mph, site shall be watered down more
frequently.
b.
Store all volatile liquids, including fuels or solvents in closed containers.
c.
No open burning of debris, lumber, or other scrap will be permitted.
d.
Properly maintain equipment to reduce gaseous pollutant emissions.
3.
Use means necessary to control dust on and near the Work, and on and near off-site areas, if such
dust is caused by Contractors operations during performance of the Work, or if resulting from the
condition in which Contractor leaves the site.
4.
Do not use water if it results in hazardous or objectionable condition, such as, flooding or
pollution.
5.
Cover stockpiles of soil, sand, and other loose materials.
6.
Cover trucks hauling soil, debris, sand, or other loose materials.
7.
Sweep project area streets at least once daily.
8.
Completely cover debris, when transported, to contain dust during transport through patient care
areas.
D.
Noise Control:
1.
Provide methods, means, and facilities to minimize noise produced by construction operations.
2.
Maximum Noise Levels: The following applies to areas within 1,000 feet of any residence,
Business, Adjacent Buildings or Other Populated Area.
a.
Noise levels for trenchers, pavers, graders, and trucks shall not exceed 90 dBA at 50 feet as
measured under the noisiest operating conditions.
b.
For all other equipment, noise levels shall not exceed 85 dBA at 50 feet.
3.
Equipment:
a.
Keep noise from job equipment to a minimum by use of adequate mufflers and other
appropriate means.
b.
Air compressors should be of a quiet type such as a whisperized compressor.
Compressor hoods shall-be closed while equipment is in operation.
c.
Forklifts should be electrically powered rather than gasoline or diesel powered.
d.
Obtain special permission to use jackhammers. Equip jackhammers with exhaust mufflers
and steel muffling sleeves. Provide portable noise barriers around jack hammering,
construct barriers of 3/4 inch plywood lined with 1 inch thick acoustical fiberglass on work
side.
e.
Minimize use of impact wrenches for bolting torsion control bolts to connect steel structural
frames.
f.
Pre-cut metal decking off site to reduce on site sawing.
4.
Operations: Keep noisy equipment as far as possible from noise-sensitive site boundaries. Machines
should not be left idling. Use electric power in lieu of internal combustion engine power wherever
possible. Maintain equipment properly to reduce noise from excessive vibration, faulty mufflers, or
other sources. All engines shall have properly functioning mufflers.
5.
Scheduling:
a.
Schedule noisy operations so as to minimize their duration at any given location, and to
minimize disruption to the adjoining users.
b.
Notify Owner and Architect in advance of performing work creating unusual noise and
schedule such work at times mutually agreeable.
c.
Coordinate timing of noisy operations with Owner.
6.
Do not play radios, tape recorders, televisions, and other similar items at construction site.
E.
F.
Water Control:
1.
Control fill, grading, and ditching to direct surface drainage to proper runoff away for excavations,
pits, tunnels, and other construction areas.
2.
Dispose of drainage water in manner to prevent flooding, erosion, or other damage to any portion of
the site or adjoining areas.
3.
Obtain and pay for any discharge permits required.
G.
Erosion Control:
1.
Plan and execute construction by methods to control surface drainage from cuts and fills, from
borrow and waste disposal areas, prevent erosion and sedimentation.
2.
Minimize surface area of bare soil exposed at one time.
3.
Periodically inspect earthwork to detect evidence of erosion and sedimentation; promptly apply
corrective measures.
4.
Selectively place constructed fills and waste areas to eliminate surface silts or clays that will erode.
5.
Provide temporary measures including berms, dikes, and drains, and other devices to prevent water
flow.
6.
Discharge construction runoff into small drainages at frequent intervals to avoid build-up of large
potentially erosive flows.
7.
Prevent runoff from flowing over unprotected slopes.
8.
Keep disturbed areas to the minimum necessary for construction.
9.
Keep runoff away from disturbed areas during construction.
10.
Direct flows over vegetated areas prior to discharge into public storm drainage systems.
11.
Trap sediment before it leaves the site, using such techniques as check dams, sediment ponds, or
siltation fences.
12.
Remove and dispose of all project construction-generated siltation that occurs in offsite retention
ponds.
13.
Stabilize disturbed areas as quickly as possible.
H.
Pollution Control:
1.
Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from
discharge of noxious, toxic substances, and pollutants produced by construction operations.
2.
Comply with pollution and environmental control requirements of authorities having jurisdiction.
I.
Pest Control: Provide methods, means, and facilities to prevent pests and insects from damaging the Work
and entering facility.
J.
Rodent Control: Provide methods, means, and facilities to prevent rodents from accessing or invading
premises.
3.10
TEMPORARY SIGNAGE
A.
Ensure Project Identification signs are complete and in place within 30 days after date fixed by
Notice to Proceed.
B.
3.11
A.
Upon completion of any portion of the Work, promptly remove temporary facilities generated by that portion
of the Work, including surplus materials, equipment, and machinery if so directed by Architect.
B.
Remove temporary materials and equipment when their use is no longer required.
C.
Remove temporary above grade or buried utilities, equipment, facilities, materials, prior to Substantial
Completion.
D.
Clean and repair damage caused by installation, use, and removal of temporary work.
E.
Restore permanent facilities used during construction to original condition. Restore permanent facilities used
during construction to specified condition.
F.
Prior to final inspection, remove temporary lamps and install new lamps.
G.
Dispose of all debris resulting from removal and reconditioning operations in accordance with requirements of
Section 01 74 19 Construction Waste Management and Disposal.
END OF SECTION 01 50 00
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Protection and welfare of all existing trees within the Contract Limits which are
noted to remain, including construction of temporary barricades and trimming and repair of such trees as
necessary.
1.2
REFERENCE STANDARDS
A.
1.3
QUALITY ASSURANCE
A.
General Responsibility: Contractor shall be directly responsible for protection and welfare of all existing trees
within the Contract Limits that are noted to remain. This responsibility shall continue throughout the full
construction period until the entire Project is completed and accepted by Owner.
B.
Qualifications of Workmen: Provide at least one person approved by Architect who shall be present at all times
during tree protection and trimming operations, who shall be thoroughly familiar with the type of work
involved, and who shall direct all protection and trimming work.
PART 2 PRODUCTS
2.1
MATERIALS
A.
Temporary Tree Barricades: Unless otherwise specifically approved by Architect use only new and solid
lumber of Utility grade or better to construct temporary barricades around trees noted to remain.
B.
Pruning Paint: Use only a pruning paint specially formulated for horticultural application to cut or damaged
plant tissue and approved by Architect for use on this Work.
PART 3 EXECUTION
3.1
A.
Prior to performing any work of this Contract, Contractor shall carefully inspect the trees to be protected and,
in cooperation with Architect, shall formulate an effective plan for tree protection throughout the construction
period.
B.
Cooperate with Architect to assure coordination of all tree protection and trimming work with similar work
performed by Owner.
3.2
A.
In company with Architect, ascertain the limbs that need to be trimmed to provide adequate clearance for
passage of vehicles or clearance as required for new structure. Clearly, mark limb to designate the approved
point of cutting.
B.
Where trimming or significant branch removal is necessary, the work will be performed by professional tree
surgeons.
C.
Where large branches must be removed, additional pruning shall be performed to restore the overall character
of the tree as directed by Architect.
D.
E.
Cut evenly, using proper tools and skilled workers to achieve neat severance with the least possible damage to
the tree.
F.
Promptly coat the cut area with the approved pruning paint in strict accordance with the manufacturers
recommendations.
3.3
A.
Perform excavation within drip lines of trees only where absolutely necessary. Coordinate this work with
Architect
B.
Where trenching for utilities is required within drip lines, perform tunneling under and around roots by hand
digging. Do not cut main lateral roots and tap roots. Smaller roots (2 inches in diameter and less) that interfere
with installation of new work may be cut.
C.
Where excavation for new construction is required within drip line of trees, employ hand excavation to
minimize damage to root systems. Relocate roots in backfill areas wherever possible. If large main lateral
roots are encountered, expose beyond excavation limits as required to bend and relocate without breaking.
D.
Do not allow exposed roots to dry out before permanent backfill is placed. Provide temporary earth cover, or
pack roots with wet peat moss or 4 layers of wet untreated burlap and temporarily supported and protected
from damage until permanently relocated and covered with backfill.
E.
Thin branching structures in accordance with National Arborists Association Pruning Standards and Practices
to balance loss to root system caused by damage or cutting of root system. Do not thin more than 30 percent of
existing branching structure.
3.4
PROTECTION OF TREES
A.
Contractor acknowledges that it is familiar with Owners policies for the protection of trees and agrees to take
reasonable precautions to protect trees not subject to trimming or removal from damage which might be caused
during work. Refer to the Municipal Code of the City of Carmel-by-the-Sea Chapter 12.28.
B.
Water and fertilize trees and other vegetation, which are to remain within the Contract Limits as required to
maintain their health during the course of construction operations.
C.
Damage to root system from flooding, excessive wetting and drying resulting from de-watering and
other operations.
3.5
A.
Promptly repair trees damaged by construction operations in a manner acceptable to Architect. Repair of tree
damage shall be done by a qualified tree surgeon. Repair of damaged trees shall be done without any
additional cost to Owner.
B.
Compensation for Planting Loss: Any tree or shrub to remain, which is damaged or destroyed due to
Contractors negligence or failure to provide adequate protection shall be compensated for in accordance with
following schedule of values, using tree caliper method (greatest trunk diameter measured 30 inches above
ground):
1.
For trees or shrubs with diameters up to and including 6 inches, the actual cost of replacement with
item similar in species, size, and shape, including:
a.
Actual cost of item boxed out of ground.
b.
Transportation or delivery of boxed item to site.
c.
Planting and staking.
d.
Maintenance in watering, fertilizing, pruning, pest control, and other care to bring
replacement to same general condition of original item.
2.
For trunks over 6 inches in diameter, refer to ISA Guide for establishing value for compensation for
plant loss.
END OF SECTION 01 56 39
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: The requirements for product bans, basic products, product delivery, and product
storage and handling, installation, and protection.
1.2
PRODUCT BANS
A.
Asbestos:
1.
Owner forbids any manufactured building materials, products, components of building materials,
or building systems containing asbestos in any amount to be incorporated into the Work and
Owners facilities or property. If asbestos-containing materials are required to match existing
conditions/materials and cannot be substituted with non-asbestos-containing materials, then
Contractor shall submit documentation to Owner and request and obtain written permission prior
to installing the asbestos-containing materials, including any manufacturer specifications,
MSDS(s), and/or any other relevant and Owner requested information, and indicating the material
and asbestos content and locations where the material is to be placed and/or installed within the
Work or Owner building.
2.
Contractor shall be responsible for all costs associated with removal, disposal, and replacement of
materials installed by Contractor or Subcontractors and found to be in violation of this requirement.
Contractor shall indemnify Owner for all costs related to regulatory agency citations or litigation and
court ordered settlements arising from asbestos exposure lawsuits where the source of asbestos is
directly attributed to products installed by Contractor or Subcontractors.
B.
Lead-Containing Paints and Surface Coatings: All paints, finishes, and protective coatings, including coatings
designed for industrial use or highway applications, applied to Owners facilities or property shall be lead-free.
Contractor shall be responsible for all costs associated with removal, disposal, and replacement of materials
installed by Contractor or Subcontractors and found to be in violation of this requirement.
C.
Urea-Formaldehyde Products: All construction products including, but not limited to, thermal insulation,
particle board, press board, and plywood shall be free of urea-formaldehyde. Contractor shall be responsible
for all costs associated with removal, disposal, and replacement of materials installed by Contractor and found
to be in violation of this requirement.
1.3
A.
Incorporate into the Work products, material and equipment that are:
1.
New, unless otherwise specified,
2.
In compliance with specified requirements,
3.
In a condition acceptable to Architect,
4.
Undamaged and unused at time of installation
5.
Complete with accessories, trim, finish, safety provisions and other devices and details needed for a
complete installation,
6.
Suitable for the intended use, and
7.
Match existing adjacent material as required.
B.
Where available, provide standard products of types which have been produced and used previously and
successfully on other projects and in similar applications.
Product Requirements
01 60 00 - 1
C.
Do not use any product, materials or equipment for purposes other than that for which designated or specified.
Do not use products, materials or equipment removed from existing premises, except as specifically permitted
by Contract Documents.
D.
Definitions:
1.
Products are purchased items for incorporation into the work.
2.
Materials are products that must be substantially worked, mixed, fabricated, processed, or applied.
3.
Equipment is defined as products with operational parts.
4.
Definitions in this paragraph are not intended to negate the meaning of other terms such as
specialties, systems, structure, finishes, accessories, furnishings, special construction,
and similar terms, which are self-explanatory or have recognized meanings in the construction
industry.
5.
Products, materials and equipment do not include machinery and equipment used for preparation,
fabrication, conveying and erection of Work.
E.
To the greatest extent possible for each unit of work, provide products, materials, or equipment of a generic
kind from a single source. For example, provide toilet accessories from a single manufacturer unless otherwise
specified.
F.
G.
Where more than one choice is available, select an option that is compatible with other products and materials
already selected.
H.
Labels:
1.
Except as otherwise indicated, do not allow conspicuous labels advertising any manufacturer or trade
name on products in occupied spaces or on exterior of building.
2.
Locate required labels and stamps on a concealed surface or, where required for observation after
installation, on an accessible surface that, in occupied spaces, is not conspicuous.
3.
Provide permanent nameplate on each item of service-connected or power-operated equipment.
Indicate manufacturer, product name, model number, serial number, capacity, speed, ratings, and
similar essential operating data. Locate nameplates on an easily accessed surface that, in occupied
areas, is not conspicuous.
4.
Products, materials and equipment, for which testing laboratories standards have been established
and their label service is available, shall bear the appropriate Label.
5.
Architect reserves the right to review and request the removal or redesign of the manufacturers trade
marks and names on items of materials and equipment which will be exposed to view in the complete
Work. Such removal or redesign shall be at no increase in Contract Sum.
I.
Fire Rated Work: Materials and equipment, for which Underwriters Laboratories, Intertek Testing Services,
National Fire Protection Association, or other Standards have been established and their label service is
available, shall bear appropriate label.
J.
K.
Provide standard products of types that have been produced and used previously and successfully on other
projects and in similar applications.
L.
Where additional amounts of a product, by nature of its application, are likely to be needed by Owner at a later
date for maintenance and repair or replacement work, furnish standard, domestically produced product which is
likely to be available to Owner at such later date.
M.
When specified in individual Sections, provide and deliver extra stock of products, materials, or equipment, to
locations designated by Architect.
Product Requirements
01 60 00 - 2
N.
Remove rejected items immediately from the Work and replace with items of quality specified. Failure to
remove rejected materials and equipment shall not relieve Contractor from responsibility for quality and
character of items used nor from any other obligation imposed upon him by Contract.
1.4
A.
B.
C.
D.
Provide equipment and personnel to transport and handle products by methods to prevent soiling, disfiguration,
or damage.
E.
Deliver manufactured products in the manufacturers original unbroken containers or packaging, with
identifying labels intact and legible. Labels to show manufacturers name, brand, and grade seal or model
number.
F.
Require supplier to package products in boxes or crates for protection during shipment, handling, and storage.
Protect sensitive products against exposure to elements and moisture.
G.
Protect sensitive equipment and finishes against impact, abrasion, and other damage.
H.
Clearly mark partial deliveries of component parts of equipment to identify equipment and contents to permit
easy accumulation of parts and to facilitate assembly.
I.
J.
Provide equipment and personnel to immediately transfer delivered products to designated holding area at time
of delivery.
K.
Promptly remove damaged or defective products from the site, and replace at no increase in Contract Sum.
1.5
A.
Store and handle products, materials, and equipment in accordance with manufacturers instructions.
B.
Store products, materials and equipment with seals and labels intact and legible.
C.
Arrange storage to facilitate easy access for maintenance of stored items and for inspection.
D.
Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials to
Project Area.
Product Requirements
01 60 00 - 3
E.
Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.
F.
Provide additional protection during handling to prevent marring and otherwise damaging products, packaging,
and surrounding surfaces.
G.
Handle product by methods to avoid bending or overstressing. Lift large and heavy components only at
designated lift points.
H.
Store sensitive products and materials in weather tight, climate controlled, enclosures in an environment
favorable to product.
I.
Enclosed Storage:
1.
Store product, materials, and equipment in accordance with the manufacturers instructions, with seals
and labels intact and legible.
2.
Store products subject to damage by the elements in weathertight enclosures.
3.
Maintain temperature and humidity within the ranges specified by the manufacturers.
4.
Provide humidity control and ventilation for sensitive products as required by manufacturers
instructions.
5.
Store unpacked and loose products on shelves, in bins, or in neat groups of like items.
J.
Exterior Storage:
1.
Store fabricated products above the ground on sloped blocking or skids to prevent soiling and
staining.
2.
Cover products subject to discoloration and deterioration from exposure to the elements with
impervious sheet coverings; provide adequate ventilation to avoid condensation.
3.
Store loose granular material in a well-drained area on solid surfaces to prevent mixing with foreign
matter.
4.
Provide surface drainage to prevent erosion and ponding of water.
5.
Prevent mixing of refuse or chemically injurious materials or liquids.
K.
No storage of equipment, materials, and toolboxes outside the construction barrier will be permitted.
L.
Store paints or any other combustible materials in the properly rated storage lockers.
M.
Provide bonded off-site storage and protection when site does not permit on-site storage or protection.
N.
Maintenance of Storage: Periodically inspect stored products on a scheduled basis and verify that:
1.
Stored facilities comply with manufacturers product storage requirements.
2.
Manufacturer required environmental conditions are maintained continually.
3.
Products and materials are undamaged.
4.
Products and materials are maintained in acceptable condition.
5.
Surfaces of products exposed to the elements are not adversely affected; that any weathering of
finishes is acceptable under requirements of Contract Documents.
6.
Products and materials are free from damage or deterioration.
O.
Promptly remove damaged or defective products from the site, and replace at no increase in Contract Sum.
Product Requirements
01 60 00 - 4
PART 3 EXECUTION
3.1
INSTALLATION
A.
Comply with manufacturer's instructions and recommendations for installation of products in applications
indicated. Accurately locate and secure each product.
3.2
PROTECTION
A.
Prevent damage to products, materials, equipment, finishes, and other installed work.
B.
Use whatever protective materials or methods are necessary to prevent damage to products, materials,
equipment finishes, and other installed work from traffic, construction operations, and weather. Remove
protection when no longer required.
C.
Maintain temperature and humidity conditions in interior spaces for the Work in accordance with
manufacturers' instructions for the products, materials, equipment finishes, and other installed work being
protected.
D.
Protect the various products, materials, equipment, finishes, and other installed work provided by the
several trades from other operations or work in an appropriate manner to ensure they are in satisfactory
condition at the Date of Substantial Completion. Final responsibility for protection rests with Contractor.
END OF SECTION 01 60 00
Product Requirements
01 60 00 - 5
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: Procedures for making substitutions, procedures for their proposal, and criteria for
their acceptance or rejection.
1.2
DEFINITIONS
A.
The term product includes materials, systems, and equipment. Products shall be new, undamaged, of the
types specified, and furnished in ample quantities to facilitate proper execution of the work.
B.
An equal product is any material, product, thing, or service that is in all respects equal to the item specified,
including, but not limited to, size, quality, guarantees, and materials. The final determination of whether or not
a proposed product is equal to the specified product rests with Architect.
C.
A substitution is any material, product, thing, or service, which may or may not be equal, as determined by
Architect, in all respects to the specified item but which is proposed by Contractor to be used in lieu of the
specified item.
1.3
QUALITY ASSURANCE
A.
Architects Compensation:
1.
Except as limited by provisions of Owner-Architect or Owner-Contractor Agreements, Contractor
shall reimburse Owner for compensation paid to Architect for evaluation of substitution proposals
made during construction, whether or not substitution is accepted by Owner.
2.
Refer to Request for Substitution form at the end of this Section.
B.
1.4
CONTRACTORS OPTIONS
A.
For items specified by only reference standards of trade, industry, or governmental organization, select any
item meeting standards, by any manufacturer. Any item not in compliance with referenced standards will be
considered a substitution.
B.
For items specified by naming several products by manufacturers trade name or model designation, select any
product and manufacturer named. Any item, which bears different trade name or model designation, will be
considered a substitution. Where any one product is specified, but other manufacturers are listed as acceptable,
their products will be considered a substitution.
C.
For items specified by naming one or more products, but indicating the option of selecting equivalent products
by stating or equal after specified product, submit request as required for substitution for any product not
specifically named.
2.
3.
An equal will qualify as such where item proposed conforms to descriptive, performance or
proprietary requirements of the specifications and locational, dimensional and visual requirements
shown on the drawings.
An equal will qualify as such where item proposed conforms with performance criteria specified,
meets dimensional and visual requirements shown on drawings and, in Architects opinion, does not
unreasonably alter other work of this contract, separate contract work, or occasion extra expense or
additional contract time.
In determining approved equals or approved alternates, Architects judgment will be final.
D.
An item that does not conform to descriptive, performance, visual, dimensional or proprietary requirements
specified or shown will be considered a substitution.
E.
F.
For products specified by naming only one product and manufacturer, without the qualifying phrase or equal
or or approved equal there is no option, and no substitution will be allowed. Such is the case with products,
materials, equipment or systems which are specified for the purpose of matching a specific function or
economy of maintenance of other products, materials, equipment or systems already in use in existing portions
of Owners installations. Where matching with an existing item is required, the final decision whether a
product proposed matches the item satisfactorily is Architects judgment.
G.
Except as otherwise indicated, where Specifications include the statement ...as selected from manufacturers
standard colors, patterns, textures... or words of similar effect, the selection of manufacturer and basic product
(complying with Specifications) is the Contractors option, and the selection of color, pattern, and texture shall
be Architects selection.
1.5
LIST OF PRODUCTS
A.
Not later than 15 days after the receipt of the Notice to Proceed, provide a list to Architect showing the names
of manufacturers proposed to be used for each of the products identified in the Specifications, including
substitutions and where applicable, the name of the installer. Tabulate products by Specification section
number and title, article number, and paragraph letter.
B.
Architect will reply, in writing, to Contractor stating whether Architect, after due investigation, has reasonable
objection to any such proposal. If adequate data on any proposed manufacturer or installer is not available,
Architect may state that action will be deferred until Contractor provides further data.
C.
Up to and until 35 days after the date of the Notice to Proceed, Architect will consider Contractors formal
requests for substitutions in place of the specified items under the conditions set forth in this Section, assuming
the item was listed in paragraph A above. No requests will be considered after 35 days after the Notice to
Proceed except as specified in this Section.
D.
The 35 day submittal period does not excuse Contractor from completing the Work within the Contract Time.
1.6
A.
Substitutions which are equal in quality, utility, and appearance to those specified may be accepted, subject to
following provisions:
1.
Substitutions are accepted by Architect in writing.
2.
Proposed substitutions where included on list of products described above.
3.
Submission by Contractor of supporting data as required by this section.
5.
6.
7.
8.
Proposed substitutions must meet all manufacturing and testing criteria, performance and durability
tests while maintaining the same aesthetic character with regard to color, reflectivity, pattern, texture
and finish.
Proposed substitutions comply with specific performances indicated and specified, and which are
recommended by the manufacturer (in published product literature or by individual certification) for
application indicated.
Proposed substitution have been produced in accordance with prescriptive requirements, using
specified ingredients and components, and complying with specified requirements for fabricating,
finishing, testing, and similar operations in manufacturing process.
Contractor is responsible for the effect of a substitution on related work in the Project.
Contractor is responsible for paying additional costs generated by a substitution, including the costs of
Architects additional services.
B.
C.
D.
Do not purchase or install proposed substitution without written acceptance from Architect. By acceptance of
proposed substitution Contractor is not relieved from responsibility for the proper execution of the Work and
any other requirements specified in Contract Documents.
E.
The burden of proving that the proposed substitution is equal to the specified product is upon Contractor and
such proof shall include sufficient factual and comparative data and information necessary to establish that the
requested substitution is equal in quality, utility, structural strength, mechanical and technical performance,
finish, arrangement of plan, repair and maintenance, compatibility with other existing or specified items, and
any other relevant data.
F.
Source Limitation: To the greatest extent possible for each unit of work, provide products, materials, or
equipment of a generic kind from a single source. For example, provide toilet accessories from a single
manufacturer unless otherwise specified.
G.
Compatibility of Options: Where more than one choice is available as options for Contractors selection of
a product or material, select an option, which is compatible with other products and materials already
selected. Total compatibility among options is not assured by limitations within contract documents, but
must be provided by the Contractor. Compatibility is a basic general requirement of product/material
selections. Furnish interchangeable components from same manufacturer, for similar components.
H.
Standard Products: Where available, provide standard products of types that have been produced and used
previously and successfully on other projects and in similar applications.
Product Substitution Procedures
01 62 00 - 3
I.
If Architect, in reviewing the list of materials and equipment, requires revisions or corrections to be made to
previously accepted shop drawings and supplemental data to be resubmitted, Contractor shall promptly do so.
If any proposed material is judged by Architect to be unacceptable, the specified item shall be provided; further
submissions will not be allowed, unless directed by Architect.
J.
Physical samples may be required. If tests for the determination of quality and utility are required by Architect,
they shall be made by a testing laboratory, with acceptance of the test procedure first given by Architect, and at
the expense of Contractor.
K.
In reviewing the data submitted in support of substitutes, Architect will use for purposes of comparison all the
characteristics of the specified item as they appear in the manufacturers published data even though all the
characteristics of the specified item may not have been particularly mentioned in the specification. If more
than two submissions of data are required the cost of reviewing these additional submissions shall be charged
directly against Contractor and Owner will withhold the funds necessary to cover these costs.
L.
Architect will be the judge of the acceptability of proposed substitutions, and his determination will be final.
M.
Only one request for substitution for each product will be considered. If a substitution is rejected, provide the
product originally specified.
1.7
A.
Submit separate request for each substitution. Document each request with complete data substantiating
compliance of proposed substitution with requirements of Contract Documents.
B.
Identify product by Specifications section name and number, article numbers and paragraph letters. Provide
manufacturers name and address, trade name of product, and model or catalog number. List subcontractors,
fabricators, and suppliers as appropriate.
C.
Requests for substitutions will only be considered if Contractor submits the following supporting data:
1.
Complete technical data including drawings, performance specifications, samples, and test reports of
the article proposed for substitution.
2.
List similar projects using product, dates of installation, and names of Architect and Owner.
3.
Submit statement that the proposed substitution is in full compliance with the requirements of
Contract Documents and Applicable Code Requirements.
4.
Itemized comparison of proposed substitution with specified product, listing variations, and reference
to Specifications section name and number, article numbers and paragraph letters.
5.
Quality and performance comparison between proposed substitution and the specified product.
6.
List availability of maintenance services and replacement materials.
7.
List of Subcontractors, if any, that may be affected by the substitution.
8.
State effect of substitution on construction schedule, and changes required in other work or products.
9.
Any additional information required by Architect.
D.
If the proposed substitution requires that portions of the Work be redesigned or removed in order to
accommodate the substituted item, submit design and engineering calculations prepared by a properly licensed
design professional.
E.
Where agencies such as Division of Facilities Development of the Office of Statewide Health Planning and
Development, State Fire Marshal, International Conference of Building Officials, or local bureau of Building
Inspection, exercise jurisdiction over use of specific material or method, Contractor shall submit certification of
their approval of proposed substitution.
1.8
SUBMITTAL PROCEDURES
A.
B.
Architect will review Contractors requests for substitutions with reasonable promptness.
C.
For accepted products, submit shop drawings, product data, and samples under provisions of Section 01330
Submittal Procedures.
1.9
ARCHITECTS REVIEW
A.
Architect, acting as Owners designated agent for design of this project, shall be the sole judge of whether
Contractors proposed substitution is equal and shall make his judgment in accordance with following criteria:
1.
Whether substitution proposed conforms with description or performance specified;
2.
Whether substitution proposed is equal in quality;
3.
Whether substitution proposed is comparable in appearance and artistic effect where these are
considerations;
4.
Whether substitution proposed affords comparable operation, maintenance, and performance;
5.
Whether substitution proposed will provide equal longevity and service under conditions of climate
and usage;
6.
Whether substitution proposed will fit into space allocated or operate from mechanical or electrical
services provided without necessitating changes in details and construction of related work;
7.
Whether substitution is otherwise in Owners interest, offering advantages in cost and time.
B.
Architect may reject any substitutions not proposed in the manner and within the time prescribed in this
section.
1.10
A.
No substitutions of materials, products, or equipment will be considered after the time described in the above
paragraphs unless the specified material cannot be delivered or incorporated into the work in the time allowed
due to conditions beyond the control of Contractor.
B.
Reimburse Owners cost for additional services required by Architect to review and process those substitutions
submitted after the time specified.
C.
Written requests for substitutions shall include reasons for the request, proof that delivery is impossible,
complete description and data of the proposed substitute necessary for a complete evaluation of costs, delivery
time, and other necessary information.
D.
Costs of delays, which could have been avoided by the timely submission of requests for substitutions, shall be
borne by Contractor.
1.11
A.
Acceptance of substitutions shall not relieve Contractor from responsibility for complying with requirements of
Contract Documents.
B.
Contractor shall be responsible for changes in other parts of the work occasioned by his substitutions and shall
bear their expense.
END OF SECTION 01 62 00
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: The following subjects are covered in this Section:
1.
Examination.
2.
Preparation/
3.
Existing utility lines.
4.
Protection of adjacent construction.
5.
Buried conditions.
1.2
EXAMINATION
A.
Data in these Specifications and on Drawings are as accurate as possible, but are not guaranteed.
B.
Specifications and Drawings show existing structures, waste lines, hot and cold water lines, gas, electrical,
mechanical, chilled water, and other utilities which are known to Owner and are as accurate as possible but
not guaranteed. Verify locations, levels, dimensions and features that may affect the Work. Existing
installations shall be kept in service where possible. No allowance will be made in Contractors behalf for
extra expense resulting from failure or neglect in determining conditions under which Work is to be
performed, or in Contractors interpretation of information provided.
C.
D.
Report unsatisfactory conditions that are detrimental to proper and timely installation of work in writing to
Architect.
E.
Do not proceed with work until unsatisfactory conditions have been corrected and accepted by installer. Start
of work will signify compliance with the above requirements and acceptance of previously placed
construction or substrates as being in satisfactory condition to achieve proper installations and first quality
workmanship as intended under these specifications.
F.
No allowance will be made in Contractors behalf for any extra expense resulting from failure or neglect in
determining the conditions under which Work is to be performed, or in Contractors interpretation of the
information provided.
G.
1.3
PREPARATION
A.
B.
C.
D.
Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying new
material or substance in contact or bond
1.4
A.
Be responsible for disposition necessary for existing above-grade utilities and for utilities either known or
visible by site inspection. Disposition shall include rerouting lines to be continued in service.
B.
Undocumented Utilities: If any undocumented utilities are encountered, request directions from Architect
before proceeding with Work.
1.5
A.
Drawings show, as applicable, existing above and below grade structures, drainage lines, storm drains, sewers,
water, gas, electrical, hot water, and other utilities that are known to Owner.
B.
Adequately and continuously, protect adjacent construction from damage by the Work of this Contract. Repair
and replace in an approved manner as directed by Architect at no cost to Owner any damage to existing and
installed construction.
C.
Take precautions at all times to protect property affected in any way by the Work; guard against or eliminate
hazardous conditions.
D.
Provide suitable temporary and removable protective materials and methods are necessary to avoid damage or
deterioration to existing adjacent construction due to traffic, construction operations, , from action of the
elements, from carelessness of Contractor's employees or subcontractors and their employees, from vandalism,
and from any other cause until completion and Owner's acceptance of the Work. Control activity in immediate
work area to prevent damage.
E.
Damage: If any existing structure or utility is damaged, take appropriate action to ensure safety of persons and
property. Report such incidents to Architect immediately.
F.
If settlement of adjacent structures occurs due to vibration from Contractors equipment, Contractor must cease
operations at Owners request and use equipment that does not cause the settlement.
G.
1.6
BURIED CONDITIONS
A.
At no change in Contract Sum, remove known existing construction of any nature below-grade wherever it
occurs within immediate area of new construction, new paving, and new planted areas.
If previously undocumented underground water, gas, electric, or other utility lines, drain lines, sewers, tunnels,
vaults, wells, or other construction are encountered by excavation, dispose of such items according to following
conditions:
1.
Upon encountering any utility line, drain line, sewer, or utility tunnel, verify active or inactive status
of item.
a.
If inactive, remove that portion within excavated area.
2.
If any undocumented structures are encountered, request directions from Architect before proceeding
with Work.
END OF SECTION 01 71 00
PART 1 GENERAL
1.1
SUMMARY
A.
1.2
SUBMITTALS
A.
Civil engineer's or land surveyor's qualifications including at least name, address, telephone, and license
number.
B.
Certification signed by the civil engineer or land surveyor that the elevations and locations of the Work are in
conformance with Contract Documents.
1.3
QUALITY ASSURANCE
A.
Contractor is solely responsible for the complete, timely and accurate layout of the work including, but not
necessarily limited to, horizontal and vertical control and dimensional coordination as necessary to construct
the Work in accordance with Contract Documents.
B.
Contractor agrees to cooperate with Architect, if necessary, to accommodate any discovered variations or
deviations from Contract Documents so that the progress of the Work is not adversely affected.
C.
Ensure dimensional coordination of Work laid out with existing work and work to be subsequently constructed.
D.
Civil Engineer or Land Surveyor: Registered or licensed in the state in which project is located and acceptable
to Architect.
PART 3 EXECUTION
3.1
CONSTRUCTION LAYOUT
A.
Preparation: Verify locations of survey control points prior to starting work. Promptly notify Architect of any
discrepancies discovered.
B.
C.
Project Layout:
1.
Provide all construction survey work required for accurate location of the Work. Provide services of a
civil engineer or land surveyor to do required construction survey work.
2.
Establish a minimum of two permanent benchmarks on site, referenced to established control points.
3.
Record locations, with horizontal and vertical data, on Project Record Documents.
Field Engineering
01 71 23 - 1
6.
7.
8.
9.
10.
Layout necessary lines for various parts of the Work as shown or dimensioned on Drawings, or as
directed by Architect from established base lines and benchmarks.
Establish elevations, lines, and levels, locate and lay out by instrumentation and similar appropriate
means:
a.
Identify, stake, and flag existing known above and below grade utilities.
b.
Site improvements, including pavements; stakes for grading, fill and topsoil placement; and
utility locations, slopes, and invert elevations.
c.
Grid or axis for structures.
d.
Building foundation, column locations, and ground floor elevations.
e.
Interior partitioning including spaces, chases, and openings allotted to pipes, ducts, conduits,
and similar items.
f.
Controlling lines and levels required by mechanical and electrical work.
Check structural steel framework for plumbness and establish on steel frame the required reference
points, bench marks and basic grid lines from which work of other sections is to be laid out.
Coordinate tolerances of various materials.
Verify layouts as Work proceeds to ensure compliance with required lines, levels, and tolerances.
Preserve permanent reference points throughout construction operations.
After laying out the Work, inform workers and subcontractors accordingly.
Lay out the mechanical and electrical work in conformity with Drawings, coordination drawings and
other shop drawings, product data and similar requirements, so that the entire mechanical plant will
perform as an integrated system properly interfaced with electrical work and other work.
Replace control points, which have been lost or destroyed, at no increase in the Contract Sum. Base
replacements on original survey control.
D.
Contractor shall verify the inverts or flow lines of all existing utility structures adjacent to the site or to be
connected to, including but not limited to stubs, drainage channels, laterals, catch basins, junction boxes,
manholes and gutters.
E.
Records:
1.
Maintain a complete, accurate log of control and survey work as it progresses.
2.
On completion of foundation walls and major site improvements, including underground site utilities,
prepare a certified survey showing dimensions, locations, angles, and elevations of construction.
F.
Verification of Layout: Architect at its discretion, may arrange to have Contractor's grades, measurements, or
levels checked and verified by an independent licensed surveyor. If layout is found to be outside of allowable
tolerances, pay cost of checking or verification.
END OF SECTION 01 71 23
Field Engineering
01 71 23 - 2
SECTION 01 73 00 - EXECUTION
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: The following subjects are covered in this section.
1.
Erection/Installation/Application of the Work.
2.
Conversation and Salvage.
3.
Damage and Restoration.
4.
Structural Integrity.
PART 3 EXECUTION
3.1
A.
Perform work with craftsmen well experienced and competent in their particular trade.
B.
Manufacturers Instructions: Where installations include manufactured products, comply with the
manufacturers applicable instructions and recommendations for installation, to the extent that these
instructions and recommendations are more explicit or more stringent than requirements are indicated in the
Contract Documents.
C.
Install work during weather conditions and project conditions, which will ensure best possible results.
D.
Be responsible for seeing that anchorage, blocking, joining and other detailing is provided as required.
E.
Provide attachments, connections, fastenings, and insert device and methods for securing work. Secure work
true to line, level, and within recognized industry tolerances. Drawings show only special conditions to assist
Contractor; they do not illustrate every such detail.
F.
Install work allowing for expansion, contraction, shrinkage, and building movement as necessary to prevent
cracks, buckling, and warping of completed work.
G.
Install finished work with smooth, clean, uniform appearance without waves, distortions, holes, marks, cracks,
stains, or discoloration. Provide exposed work with uniform, close fitting, neat, and well scribed joints.
Arrange joints in exposed work to obtain best visual effect. Refer questionable visual effect choices to
Architect for final decision.
H.
Install finish work with no exposed unsightly anchors or fastenings and no hazardous, unsafe, or unfinished
protrusions, offset, burrs, raw edges, or sharp corners.
I.
No work defective in construction or quality or deficient in any requirement of Drawings and Specifications
will be acceptable in consequence of Owners or Architects failure to discover or to point out defects or
deficiencies during construction; nor will the presence of Inspectors on the work relieve Contractor from
responsibility for securing the quality and progress of work as required by the Contract. Defective work
revealed within the time required by guarantees shall be replaced by work conforming to the intent of the
Contract. No payment, whether partial or final, shall be construed as an acceptance of defective work or
improper materials.
Execution
01 73 00 - 1
J.
Waive common practice and common usage as construction criteria whenever Contract Documents or
codes, ordinances, or similar items require greater quantity or better quality than common practice or common
usage would require.
K.
If at any time before commencement of work, or during progress thereof, Contractors methods, equipment, or
appliances are inefficient or inappropriate for securing the quality of work or rate of progress intended by the
Contract Documents, Owner may order Contractor to improve their quality or increase their efficiency. This
will not relieve Contractor or his sureties from their obligations to secure the quality of work and rate of
progress specified in the Contract.
L.
Provide holes, slots, cutouts, blocking, screeds, nailers, chases and similar preparation as the work progresses,
as required to receive or pass subsequent work without damage to previously completed work.
M.
Make exterior work tight against direct or indirect entry of water into concealed or interior spaces of the
building. Seal joints or penetrations below grade or behind exterior trim and other conditions where water
might enter the structure, in same manner as for exposed exterior work.
N.
O.
P.
Isolation: Provide between ferrous and non-ferrous or dissimilar metal components to protect the work against
electrolysis, as follows:
1.
For architectural work, provide cork fillers, asphaltic coatings, neoprene gaskets, or similar separation
as necessary; and use stainless steel fastenings only where interconnecting dissimilar parts.
2.
For mechanical and electrical work, provide dielectric unions or similar separation. In particular,
provide isolation as necessary between exterior underground systems and interior above-grade
systems where they meet dissimilar metals.
Q.
Remove and replace all work that does not comply with Contract Documents. Repair or replace any Work or
property damaged by these operations at no increase in Contract sum.
3.2
A.
3.3
A.
Restore or replace as specified or directed by Architect damage to adjacent existing facilities including any
landscaping, paving, roads and sidewalks damaged as a result of the performance of this work at no
additional cost to Owner.
B.
Execution
01 73 00 - 2
C.
Restoration shall be equal to the Structural qualities or performance capacities of the restoration to be equal
of the original work.
D.
E.
Remove and replace work not properly restored or where not capable of being restored as intended under
these Specifications as directed by at Architect at no added expense to Owner.
F.
Additional time required to secure replacements and to make repairs will not be considered to justify an
extension in the Contract Time of Completion.
3.4
STRUCTURAL INTEGRITY
A.
Be responsible for and particularly supervise each operation and work that may affect structural integrity of
various building elements, both permanent and temporary.
B.
Include structural connections and fastenings as shown or required for complete fabrication and installation
of the Work.
END OF SECTION 01 73 00
Execution
01 73 00 - 3
PART 1 GENERAL
1.1
SUMMARY
A.
B.
1.2
DEFINITION
A.
Cutting and patching is defined to include, but is not necessarily limited to, demolition and repair of
nominally completed and previously existing work in order to accommodate coordination of Work, installation
of Work, uncovering Work for access or inspection, and to obtain samples for testing or similar purposes. It is
defined to include integral cutting and patching during manufacturing, fabricating, erecting, and installation
processes for individual units of Work.
1.3
PERFORMANCE REQUIREMENTS
A.
Do not reduce performance capacities, nor alter the physical and aesthetic characteristics of the Work as
determined by Architect, due to performance of cutting and patching.
B.
Unless specifically designated otherwise, patch existing work cut, altered, or revised to accommodate new
work to duplicate undisturbed adjacent finishes, colors, textures, and profiles; finish new work in existing
portion to match adjacent work unless noted otherwise. Where there is dispute whether duplication is
successful or has been achieved to reasonable degree, Architects judgment shall be final.
C.
D.
Achieve security, strength, protection where exposed to weather, and preserve continuity of existing fire ratings
with new patch.
E.
F.
G.
Visual Requirements: Do not cut and patch construction exposed on the exterior, in a manner that would, in
Architects opinion, result in lessening the buildings aesthetic qualities. Do not cut and patch work in a
manner that would result in substantial visual evidence of cut and patch work. Remove and replace Work cut
and patched in a visually unsatisfactory manner.
H.
Where feasible, inspect and test patched areas to demonstrate integrity of installation.
I.
1.4
ADMINISTRATIVE REQUIREMENTS
A.
Coordination:
1.
Coordinate procedures and resolve potential conflicts before proceeding.
2.
Coordinate layout of the work and resolve potential conflicts before proceeding with the work.
B.
Scheduling:
1.
Schedule cutting and patching to precede construction and be completed without delay.
1.5
SUBMITTALS
A.
Product Data and Shop Drawings: Submit for approval materials, methods, or systems different from existing
work to be matched.
B.
1.6
A.
Deliver materials in original packages, containers, or bundles with seals unbroken and labels intact until time of
use.
B.
1.7
SITE CONDITIONS
A.
PART 2 PRODUCTS
2.1
A.
General Requirements:
1.
Use materials for patching that are identical to existing materials appearance, quality, and
performance.
2.
If identical materials or products are not available, or cannot be used, use materials and products that
match existing adjacent and similar surfaces to the fullest extent possible with regard to visual
effect and physical characteristics.
3.
Use materials for patching that will result in equalor-better performance characteristics.
B.
PART 3 EXECUTION
3.1
GENERAL REQUIREMENTS
A.
If any hazardous materials are encountered, notify Architect immediately and obtain instructions for safe
handling and removal.
B.
Execute work by methods to avoid damage to other Work, and which will provide appropriate surfaces to
receive patching and finishing.
C.
Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest
feasible time and complete without delay.
D.
Perform work in accordance with manufacturers recommendations, deviating only where advisable to achieve
good match and with Architects approval.
E.
Restore work remaining in place that is damaged or defaced during this Contract to the condition existing at
time of award of the Contract.
3.2
EXAMINATION
A.
Before Cutting Operations: Examine surfaces to be cut and patched and conditions under which work is be
performed. If unsafe or otherwise unsatisfactory conditions are encountered, take corrective action before
proceeding with the work.
B.
3.3
PREPARATION
A.
Lay out cutting work at job site, and coordinate with related work for which cutting is required.
B.
C.
Temporary Supports: Provide temporary shoring, bracing, and supports as required to maintain structural
integrity of affected portion of Work.
D.
Protection: Protect existing construction during cutting and patching to prevent damage.
3.4
CUTTING
A.
Cut existing construction using methods least likely to damage elements to be retained or adjoining Work.
Where possible review proposed procedures with the original installer; comply with the original installers
recommendations.
B.
C.
In general, where cutting is required use hand or small power tools designed for sawing or grinding, not
hammering and chopping. Cut holes and slots neatly to size required with minimum disturbance of adjacent
surfaces. Temporarily cover openings when not in use.
D.
3.5
PATCHING
A.
B.
Restore work that has been cut or removed. Restore work with new products to provide completed Work in
accordance with requirements of Contract Documents.
C.
Execute fitting and adjustment of products to provide finished installation to comply with specified tolerances,
finishes.
D.
Perform work in accordance with manufacturers recommendations, deviating only where advisable to achieve
good match.
E.
Patch with durable seams that are as invisible as possible. Comply with specified tolerances.
F.
Where feasible, inspect and test patched areas to demonstrate integrity of the installation.
G.
Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a
manner that will eliminate evidence of patching and refinishing.
3.6
CLEANING
A.
Thoroughly clean areas and spaces where cutting and patching is performed.
B.
Remove debris in accordance with requirements of Section 01 74 19 Construction Waste Management and
Disposal.
END OF SECTION 01 73 29
SECTION 01 74 00 - CLEANING
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: The requirements for progress and final cleaning of project and removal of waste,
debris, and rubbish.
1.2
GENERAL REQUIREMENTS
A.
Compliance: Comply with regulations of authorities having jurisdiction and safety standards for cleaning. .
1.3
SUBMITTALS
A.
PART 2 PRODUCTS
2.1
CLEANING MATERIALS
A.
Use materials which will not create hazards to health or property, and which will not damage surfaces.
B.
Use only materials and methods as recommended by manufacturer of material or surface being cleaned.
C.
PART 3 EXECUTION
3.1
PROGRESS CLEANING
A.
Develop a program that addresses construction site cleanup and control of construction debris.
B.
During construction period keep premises and public properties under Contractors control free from
accumulations of waste materials, debris, and rubbish, caused by operations. Maintain the site in a clean and
orderly condition. Clean newly installed Work as frequently as necessary through remainder of construction
period.
C.
Clean and perform maintenance on installed work as frequently as necessary through remainder of the
construction period. Adjust and lubricate operable components to ensure operability without damaging
effects.
D.
Clean areas and spaces where work is performed and used for access to work. Remove paint, mortar, oils,
putty and items of similar nature.
1.
Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or
remote spaces, prior to enclosing space.
2.
Thoroughly clean spaces where work has been performed.
3.
Completely remove paint, mortar, , and materials of similar nature.
4.
Thoroughly clean piping, conduit, and similar items, before painting or other finishing is applied.
5.
Remove combustible materials such as paper and cardboard daily.
6.
Prevent accumulations of wastes that create hazardous conditions
7.
Remove debris daily.
Cleaning
01 74 00 - 1
E.
Remove all dirt, gravel, rubbish, refuse, and green waste from sidewalks, street pavement, and storm drains
adjoining the project site. During wet weather, avoid driving vehicles off paved areas and other outdoor work.
F.
Ensure adequate workers, cleaning materials, and equipment are always available.
G.
Make adequate provisions to prevent dust and debris from being carried, blown, or otherwise transported
outside the immediate area of operation.
H.
Remove combustible materials such as paper and cardboard daily. Prevent accumulations of wastes that create
hazardous conditions.
I.
Provide on-site containers for collection of waste materials, debris, and rubbish. Provide a collection can at
each location used as an eating area. Pick up all garbage daily.
J.
Handle materials in a controlled manner with as few handlings as possible; do not drop or throw materials from
heights.
K.
Schedule cleaning operations so that dust and other contaminants resulting from cleaning process will not fall
on wet, newly painted surfaces.
L.
Paved Areas: Clean (broom clean) debris and soil from paved sidewalks, roadways and parking areas
immediately following completion of earthwork activities.
M.
Dust Controls: Refer to Section 01 50 00 - Temporary Facilities and Controls for dust control requirements.
N.
3.2
FINAL CLEANING
A.
Employ professional cleaners for final cleaning. Cleaning company must be approved by Owner prior to
starting work.
B.
At completion of work, remove lingering debris and sweep area clean prior to final cleaning.
C.
D.
Clean the entire construction area and adjacent areas affected by the performance of Work under this Contract.
E.
Clean each surface or unit of work to the condition expected in a normal, commercial buildings cleaning and
maintenance program.
F.
Comply with requirements of material and product manufacturer and with requirements for cleaning contained
in other Sections of the Specifications. Where other Sections are more specific or demanding, they shall
govern.
G.
Complete final cleaning before requesting inspection for Certification of Substantial Completion.
H.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Clean transparent materials, including mirrors and window/door glass, to a polished condition,
removing substances that are noticeable as vision-obscuring materials. Replace chipped or broken
glass and other damaged transparent materials.
Clean and polish exposed hard and glossy surfaces.
Remove paint splatters, spots, stains, and foreign matter from hardware or other factory finished
surfaces or surfaces not to be painted.
Wipe surfaces of equipment clean. Remove excess lubrication and other substances.
Clean plumbing fixtures to a sanitary condition, free of stains including those resulting from water
exposure.
Clean light fixtures and lamps so as to function with full efficiency. Replace burned out electric
lamps.
Remove waste, debris, and foreign matter from roofs, gutters, downspouts, and drainage systems.
Clean debris from new and existing drainage systems.
Clean concrete floors in non-occupied spaces broom clean.
Sweep clean and wash down all exterior pavement surfaces; remove stains, spills and foreign
substances including grease and oil deposited on pavement by Contractors vehicles.
Clean project site, including landscape developed areas, of litter and foreign matter. Rake grounds
that are neither planted nor paved, to a smooth, even-textured surface.
I.
Removal of Protection: Except as otherwise indicated or requested by Architect, remove temporary protection
devices and facilities, which were installed during course of the work to protect previously, completed work
during remainder of construction period.
J.
Pest Control: Engage an experienced exterminator to make a final inspection, and rid the project of rodents,
insects, and other pests.
K.
Maintain cleaning until Substantial Completion. Owner will assume responsibility for cleaning after
Substantial Completion.
L.
Where extra materials of value remain, dispose of these to Owners best advantage as directed.
3.3
A.
The following requirements are in addition to requirement specified in Section 01 74 29 Construction Waste
Management and Disposal.
B.
Remove waste, debris, rubbish and surplus materials daily from the project site.
C.
D.
Remove waste materials, debris and rubbish from site and legally dispose of at legal public or private dumping
areas off Owners property. Do not bury or burn waste materials at the site. Do not discharge volatile, harmful
or dangerous materials into drainage systems.
E.
Place covers over debris boxes between periods when they are being filled.
F.
Refer to Section 01 35 00 Special Procedures for additional requirements for disposal operations.
3.4
A.
If any surface, material or equipment has been damaged, touch up and repair exposed areas; such repair to be
approved by Architect.
END OF SECTION 01 74 00
Cleaning
01 74 00 - 3
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Administrative and procedural requirements for the following:
1.
Salvaging nonhazardous demolition and construction waste.
2.
Recycling nonhazardous demolition and construction waste.
3.
Disposing of nonhazardous demolition and construction waste.
1.2
DEFINITIONS
A.
Construction Waste: Building and site improvement materials and other solid waste resulting from
construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
B.
Demolition Waste: Building and site improvement materials resulting from demolition or selective
demolition operations.
C.
Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or
deposit in landfill or incinerator acceptable to authorities having jurisdiction.
D.
Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.
E.
Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.
F.
Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the
Work.
1.3
PLAN REQUIREMENTS
A.
Intent:
1.
2.
3.
Divert demolition, construction, and land clearing debris from landfill disposal.
Redirect recyclable material back to manufacturing process.
Generate cost savings or increase minimal additional cost to Project for waste disposal.
1.4
SUBMITTALS
A.
Demolition and Construction Waste Management Plan: Submit three copies of plan within 7 calendar days
of date established for the Notice to Proceed.
B.
Waste Reduction Progress Reports: Prior to Substantial Completion, submit three copies of report. Include
separate reports for demolition and construction waste. Include the following information:
1.
Material category.
2.
Generation point of waste.
3.
Total quantity of waste in tons.
4.
Quantity of waste salvaged, both estimated and actual in tons.
5.
Quantity of waste recycled, both estimated and actual in tons.
6.
Total quantity of waste recovered (salvaged plus recycled) in tons.
7.
Total quantity of waste recovered (salvaged plus recycled) as a percentage of total waste.
C.
Waste Reduction Calculations: Before request for Substantial Completion, submit 3 copies of calculated
end-of-Project rates for salvage, recycling, and disposal as a percentage of total waste generated by the
Work.
D.
Records of Donations: Indicate receipt and acceptance of salvageable waste donated to individuals and
organizations. Indicate whether organization is tax exempt.
E.
Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by
recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and
invoices.
F.
Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and
incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
G.
Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering
refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed
according to EPA regulations. Include name and address of technician and date refrigerant was recovered.
1.5
A.
Develop plan consisting of waste identification and waste reduction work plan. Include separate sections in
plan for demolition and construction waste. Indicate quantities by weight or volume, but use same units of
measure throughout waste management plan.
B.
Plan to describe methods and procedures for implementation and monitoring compliance including the
following:
1.
Transportation company hauling construction waste to waste processing facilities.
2.
Recycling and adaptive reuse processing facilities and waste type each facility will accept.
3.
Demolition and construction waste materials anticipated for recycling and adaptive reuse.
4.
On site sorting and site storage methods.
C.
Implement demolition and construction waste management plan at start of demolition and construction.
D.
Review demolition and construction waste management plan at pre-construction meeting and progress
meeting specified in Section 01 31 19 - Project Meetings.
E.
Waste Identification: Indicate anticipated types and quantities of demolition, site-clearing, and
construction waste generated by the Work. Include estimated quantities and assumptions for estimates.
F.
Distribute approved demolition and construction waste management plan to subcontractors and others
affected by Plan Requirements.
G.
Oversee implementation, instruct demolition and construction personnel for plan compliance, and document
plan results.
H.
1.6
A.
Use source separation method or co-mingling method suitable to sorting and processing method of selected
recycling center. Dispose non-recyclable trash separately into landfill.
B.
Source Separation Method: Recyclable materials separated from trash and sorted into separate bins or
containers, identified by waste type, prior to transportation to recycling center.
C.
Co-Mingling Method: Recyclable materials separated from trash and placed in unsorted bins or container
for sorting at recycling center.
D.
1.7
QUALITY ASSURANCE
A.
Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction.
B.
Waste Management Conference: Conduct conference at Project site. Review methods and procedures
related to waste management including, but not limited to, the following:
1.
Review and discuss waste management plan including responsibilities of Waste Management
Coordinator.
2.
Review requirements for documenting quantities of each type of waste and its disposition.
3.
Review and finalize procedures for materials separation and verify availability of containers and
bins needed to avoid delays.
4.
Review procedures for periodic waste collection and transportation to recycling and disposal
facilities.
5.
Review waste management requirements for each trade.
PART 3 EXECUTION
3.1
A.
Implement waste management plan as approved by Architect. Provide handling, containers, storage,
signage, transportation, and other items as required to implement waste management plan during the entire
duration of the Contract.
1.
Comply with Section 01 50 00- Temporary Facilities and Controls for governing temporary
facilities and controls for operation, termination, and removal requirements.
B.
Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as
appropriate for the Work occurring at Project site.
Construction Waste Management and Disposal
01 74 19 - 3
Distribute waste management plan to everyone concerned within 3 days of submittal return.
Distribute waste management plan to entities when they first begin work on-site. Review plan
procedures and locations established for salvage, recycling, and disposal.
C.
Site Access and Temporary Controls: Conduct waste management operations to ensure minimum
interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1.
Designate and label specific areas on Project site necessary for separating materials that are to be
salvaged, recycled, reused, donated, and sold.
2.
Comply with Section 01 50 00- Temporary Facilities and Controls for controlling dust and dirt,
environmental protection, and noise control.
D.
Collect demolition and construction waste materials in marked bins or containers and arrange for
transportation to recycling centers or adaptive salvage and reuse processing facilities.
E.
Location for storing demolition and construction waste and recycling material will be designated by Owner.
F.
Store demolition and construction waste materials to prevent environmental pollution, fire hazards, hazards
to persons and property, and contamination of stored materials.
3.2
A.
Maintain recycling and reuse storage and collection area in orderly arrangement with materials separated to
eliminate co-mingling of materials required to be delivered separately to waste processing facility.
B.
Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable
waste by type at Project site to the maximum extent practical.
1.
Provide appropriately marked containers or bins for controlling recyclable waste until they are
removed from Project site. Include list of acceptable and unacceptable materials at each container
and bin.
a.
Inspect containers and bins for contamination and remove contaminated materials if
found.
2.
Stockpile processed materials on-site without intermixing with other materials. Place, grade, and
shape stockpiles to drain surface water. Cover to prevent windblown dust.
3.
Cover construction waste materials subject to disintegration, evaporation, settling, or runoff to
prevent polluting air, water, and soil.
4.
Stockpile materials away from construction area. Do not store within drip line of remaining trees.
5.
Store components off the ground and protect from the weather.
6.
Remove recyclable waste off Owners property and transport to recycling receiver or processor.
3.3
A.
Concrete: Remove reinforcement and other metals from concrete and sort with other metals.
1.
Pulverize concrete to maximum 4-inch (100-mm) size.
3.4
A.
Packaging:
1.
Cardboard and Boxes: Break down packaging into flat sheets. Bundle and store in a dry location.
2.
Polystyrene Packaging: Separate and bag materials.
3.
Pallets: As much as possible, require deliveries using pallets to remove pallets from Project site.
For pallets that remain on-site, break down pallets into component wood pieces and comply with
requirements for recycling wood.
4.
Crates: Break down crates into component wood pieces and comply with requirements for
recycling wood.
B.
Site-Clearing Wastes: Chip brush, branches, and trees off site or on-site location designated by AOC.
Construction Waste Management and Disposal
01 74 19 - 4
C.
Wood Materials:
1.
Clean Cut-Offs of Lumber: Grind or chip into small pieces.
2.
Clean Sawdust: Bag sawdust that does not contain painted or treated wood.
3.5
DISPOSAL OF WASTE
A.
Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from
Project site and deliver to legally dispose of them in a landfill, incinerator, or other legal disposal facility.
Obtain receipt for deliveries.
1.
Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate
on-site.
2.
Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B.
C.
Disposal: Transport waste materials off Owner's property and legally dispose of them.
END OF SECTION 01 74 19
PART 1 GENERAL
1.1
SUMMARY
A.
PART 3 EXECUTION
3.1
A.
Protect all installed construction until completion and Owner's acceptance of the Work.
B.
C.
D.
Provide suitable temporary and removable protective materials and methods are necessary to avoid damage or
deterioration to installed products, materials, equipment, finishes, and other installed construction due to
traffic, construction operations, from action of the elements, from carelessness of Contractor's employees or
subcontractors and their employees, from vandalism, and from any other cause until completion and Owner's
acceptance of the Work.
E.
F.
Provide protective coverings at walls, projections, corners, jambs, sills, and soffits of openings in and
adjacent to traffic areas.
G.
Protect finished floors and other surfaces from traffic from dirt, wear, and damage:
1.
Secure heavy sheet goods or similar protective materials in place, in areas subject to foot traffic.
2.
Lay planking or similar rigid materials in place, in areas subject to movement of heavy objects.
3.
Lay planking or similar rigid materials in place in areas where storage of products will occur.
H.
I.
Restrict traffic of any kind across planted lawn and landscape areas.
J.
Protect all exterior work, including existing asphalt paving and landscaping and building.
K.
Care shall be exercised to prevent damage to adjacent facilities including walks, curbs, and gutters; where
equipment will pass over these obstructions suitable planking shall be placed, and damaged facilities, due to
Contractors operations, shall be removed and replaced at Contractors expense.
L.
Contractor shall be responsible for overloading of any part or parts of structures beyond their safe
calculated carrying capacities by placing of materials, equipment, tools, machinery or any other item
thereon. No loads shall be placed on floors or roofs before they have attained their permanent and safe
strength.
M.
All existing improvements and facilities shall be protected from damage of any type resulting from the
operations, equipment or workers of Contractor during the course of construction.
N.
Where existing utilities are damaged or disrupted on account of any act, omission, neglect or misconduct by
Contractor in the manner or method of executing the work, or due to non-execution of work, such damage
shall be immediately repaired to maintain operation regardless of the time of occurrence.
O.
Provide temporary construction necessary for protection of the building and its parts. Close in buildings as
soon as possible as protection from the weather and vandalism. Protect existing buildings and controlled
temperature areas from damage.
P.
Protect doors and frames and hardware from mechanical damage and damage to finishes.
Q.
R.
All damaged work shall be replaced, repaired and restored to its original condition without additional cost
to Owner.
S.
T.
END OF SECTION 01 76 00
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: Procedures for the following subjects are covered in this section.
1.
Substantial Completion.
2.
Final acceptance.
3.
Closeout submittals.
4.
Final adjustment of accounts.
5.
Final Application for Payment.
1.2
GENERAL
A.
Comply with requirements stated in the General Conditions and in Specification Sections for administrative
procedures in closing out the Work.
B.
Where the requirements in this or other sections of the Specifications are more specific or more demanding,
they shall take precedence over the more general and less demanding requirements of the General Conditions.
C.
Definition: Project closeout is the term used to describe certain collective project requirements, indicating
completion of the Work, that are to be fulfilled near the end of the Contract Time in preparation for the final
acceptance and occupancy of the Work by Owner, as well as final payment to Contractor and normal
termination of the Contract.
1.3
SUBSTANTIAL COMPLETION
A.
Contractors Notice of Substantial Completion: When the Work, in the opinion of Contractor, is substantially
complete, submit the following to Architect.
1.
A written notice that the Work or a designated portion thereof, is substantially complete.
2.
A detailed and comprehensive list of items to be completed or corrected.
3.
Certification that the equipment has been tested and is operational and Owners maintenance
personnel have received the specified instruction/training.
B.
Architects Review:
1.
Within a reasonable time after receipt of Contractors Notice of Substantial Completion; Architect will
review the list of items to be complete and corrected and review the work to determine whether or not
the Work, or designated portion thereof, is ready for Substantial Completion Inspection.
2.
Should Architect determine that the Work is not ready for Substantial Completion Inspection Architect
will notify the Contractor in writing. Architect will return Contractors list of items to be completed
and corrected noting items that must be completed and corrected prior to commencement of the
Substantial Completion Inspection.
3.
Contractor is to promptly complete and correct the items noted and listed by Architect. When the
items noted and listed are completed and corrected submit another Contractors Notice of Substantial
Completion. Include the list of items to be completed and corrected noting on the list the date along
with Contractors Superintendent or Project Managers initials for each item that was completed or
corrected.
4.
Architect will again review Contractors Notice of Substantial Completion and the Work to determine
whether or not the Work or a designated portion thereof, is ready for Substantial Completion
Inspection.
Closeout Procedures
01 77 00 - 1
C.
D.
1.4
FINAL ACCEPTANCE
A.
When Contractor considers the Work is complete, submit written certification that:
1.
Contract Documents have been reviewed.
2.
Work has been inspected for compliance with Contract Documents.
3.
Work has been completed in accordance with Contract Documents, and lists of deficiencies attached
to Certificate of Substantial Completion have been corrected.
4.
Equipment and systems have been tested, adjusted, and balanced, and are fully operational.
5.
Operation of systems has been demonstrated to Owners personnel.
6.
Work is completed and ready for final inspection.
B.
Architect will make an inspection to verify the status of completion with reasonable promptness after receipt of
such certification.
C.
D.
When Architect finds that the Work is acceptable under the Contract Documents, he shall request Contractor to
make closeout submittals.
1.5
CLOSEOUT SUBMITTALS
A.
In addition to the closeout submittals required by Section 01 78 00 Closeout Submittals provide the
following:
1.
Evidence of compliance with requirements of governing authorities.
2.
Evidence of Payment and Release of Liens: In accordance with the General Conditions.
3.
Consent of Surety to Final Payment.
4.
Certificate of Insurance for Products and Completed Operations: In accordance with the General
Conditions.
1.6
A.
B.
3.
4.
5.
b.
Deductions for uncorrected Work.
c.
Other adjustments.
Total Contract Sum, as adjusted.
Previous payments.
Sum remaining due.
C.
Architect will prepare a final Change Order, reflecting approved adjustments to the Contract Sum which were
not previously made by Change Orders.
1.7
A.
Submit the final Application for Payment in accordance with procedures and requirements stated in the General
Conditions.
B.
Architect will not sign the final Certificate for Payment until all of the work required by Contract Documents
has been completed and all closeout submittals have been submitted and approved.
END OF SECTION 01 77 00
Closeout Procedures
01 77 00 - 3
PART 1 GENERAL
1.1
SUMMARY
A.
Included in this Section: Procedures for submitting the following types of closeout submittals:
1.
Operation and Maintenance Manuals.
2.
Guarantees/Warranties and Maintenance Contracts.
3.
Project Record Documents.
4.
Spare Parts and Maintenance Materials.
1.2
GENERAL
A.
Comply with requirements stated in General Conditions and in Specification Sections for administrative
procedures in closeout submittals.
B.
Where the requirements in this or other sections of the Specifications are more specific or more demanding,
they shall take precedence over the more general and demanding requirements of the General Conditions.
1.3
A.
Format:
1.
Operation and maintenance data to consist of written text and drawings prepared in the form of on
instructional manual and submitted in binders.
2.
Binders: Commercial quality, 8-1/2 by 11 inch three-ring binders with hardback, cleanable, plastic
covers, 2 inch maximum ring size. When multiple binders are used, correlate data into related
consistent groupings.
3.
Cover: Identify each binder with typed or printed title OPERATION AND MAINTENANCE
DATA; Project title; and subject matter of contents.
4.
Contents: Arrange content under section numbers and sequence of Table of Contents of this Project
Manual.
5.
Tabs: Provide tabs for each separate product and system, with typed description of product and major
component parts of equipment.
6.
Text: Preprinted data or original typewritten data on 8-1/2 by 11 inch, 20 pound paper.
7.
Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to size
of text pages.
B.
Contents:
1.
Title Page: Provide title page similar to Project Manual Title Page including project name and
location, date, Owners name and address, Contractors name and address, and Architects name,
address, and project number.
2.
Table of Contents: List each product and system included in the manual. If more than one binder is
required, indicate what is included in each binder.
3.
Project Directory: Provide a directory listing all entities involved in the Project including Owner and
their consultants, Architect and their consultants, and Contractor and their subcontractors and material
suppliers. For each listing, include firm name, address, telephone number, and responsible principal.
4.
Requested Information: For each product, material, item of equipment and system provide the
following:
a.
Name, address, telephone number, and responsible principal for material supplier,
manufacturer, and subcontractor as appropriate, identifying the area of responsibility for
each.
b.
Name, address and telephone number of local source of maintenance products and materials,
space parts and replacements.
Closeout Submittals
01 78 00 - 1
c.
5.
6.
7.
Name, address and telephone number of approved maintenance contractor or service agency
closest to project, as appropriate.
d.
Identify each product, material, and item of equipment by manufacturers name, trade name,
and model number.
e.
Product information as described below.
f.
Instructions for care and maintenance of materials and finishes as described below.
g.
Instructions for operation and maintenance of equipment and systems as described below.
h.
Description of operating procedures as described below.
i.
Copies of applicable performance tests.
j.
Copies of applicable warranty, guaranty, and maintenance contracts.
Product Information: Include as a minimum the following:
a.
Product data for all products, materials and items of equipment. Include only those sheets
that are pertinent to the specific product. Annotate each sheet to:
1)
Clearly identify the specific product or part installed.
2)
Clearly identify the data applicable to the installation.
3)
Delete references to inapplicable information.
b.
Supplement product data with drawings as necessary.
1)
Coordinate drawings with information on Project Record Documents to assure
correct illustration of completed installation.
2)
Do not use Project Record Documents as maintenance drawings.
c.
Written text as required supplementing product data for the particular installation for all
mechanical, electrical, plumbing, heating, air conditioning, security, hardware, and
communication systems.
1)
Organize in a consistent format under separate headings for different procedures.
2)
Provide a logical sequence of instructions for each procedure.
d.
Information required for re-ordering special manufactured products.
Instructions for Care and Maintenance of Materials and Finishes: Include as a minimum the
following:
a.
Manufacturers recommendation for types of cleaning agents and methods.
b.
Cautions against cleaning agents and methods that are detrimental to the product.
c.
Recommended schedule for cleaning and maintenance.
d.
For moisture protection and weather exposed products, also include recommendations for
inspections, maintenance and repair.
Instructions for Operation and Maintenance of Equipment and System: Include the following
information for each item of equipment and system as appropriate.
a.
Description equipment or system and component parts.
1)
Function, normal operating characteristics, and limiting conditions.
2)
Performance curves, engineering data and tests.
3)
Complete nomenclature and commercial number of all replaceable parts.
b.
Operating Procedures: Describe, in detail, the procedures and directions required to
properly and safely operate the equipment and system. Include as a minimum the following:
1)
Start-up, break-in, route and normal operating instructions and sequences.
2)
Regulation, control, stopping, shutdown, and emergency instructions.
3)
Operation, calibration and adjustment of controls.
4)
Summer and winter operating instructions.
5)
Special operating instructions.
6)
Manufacturers printed operating instructions.
c.
Maintenance Procedures: Describe, in detail, the procedures and materials required to
properly maintain the appearance, usefulness and operation of equipment and systems.
Include as a minimum the following.
1)
Routine operations.
2)
Guide to trouble-shooting.
3)
Disassembly, repair and reassembly.
4)
Alignment, adjusting and checking.
5)
Schedule for recommended service, lubrication and preventative maintenance.
Closeout Submittals
01 78 00 - 2
d.
C.
Submittals:
1.
Submit two copies of preliminary draft or proposed formats and outlines of contents before start of
Work. Architect will review draft and return one copy with comments.
2.
For equipment, or component parts of equipment put into service during construction and operated by
Owner, submit documents within 10 days after acceptance.
3.
Submit one copy of completed volumes in final form 15 days prior to final inspection. Copy will be
returned after final inspection, with comments. No final inspection will be made until the required
data has been submitted and found to be satisfactory.
4.
Submit six copies of revised volumes of data in final form within 10 days after final inspection.
1.4
A.
Responsibility: General Conditions covers Contractors responsibility to remedy defects due to faulty
workmanship and materials that shall appear within one year from the date of project acceptance.
B.
Form of Guarantees/Warranties:
1.
Submit guarantee/warranty typed on Contractors letterhead, in a form acceptable to Owner, when
required by Specification Section.
2.
Make warranties/guarantees out in the name of Owner, not Contractor or material supplier.
C.
Form of Submittal:
1.
Bind guarantees, warranties, and maintenance contracts into binders.
2.
Binders: Commercial quality, 8-1/2 by 11 inch three-ring binders with hardback, cleanable, plastic
covers, 2 inch maximum ring size. When multiple binders are used, correlate data into related
consistent groupings.
3.
Cover: Identify each binder with typed or printed title GUARANTEES/WARRANTIES AND
MAINTENANCE CONTRACTS, Project title, and identify subject matter of contents.
4.
Contents: Arrange content under section numbers and sequence of Table of Contents of this Project
Manual.
5.
Tabs: Provide tabs for each separate section. Include all documents (guarantees/warranties and
maintenance agreements) related to that section of work behind the tab.
Closeout Submittals
01 78 00 - 3
D.
Preparation of Submittal:
1.
Contents:
a.
Title Page: Provide title page similar to Project Manual Title Page including project name
and location, date, Owners name and address, Contractors name and address, and
Architects name, address, and project number.
b.
Table of Contents: List each product and system included in the manual. If more than one
binder is required, indicate what is included in each binder.
2.
Compile the guarantees/warranties and maintenance contracts specified in respective sections of the
Specification.
3.
Review documents for compliance with the Contract Documents. Verify that documents are in proper
form, contain full information, and are notarized.
4.
For each guarantee/warranty and maintenance contract include the following:
a.
Name, address, telephone number, and responsible principal of material supplier,
manufacturer, and subcontractor as appropriate.
b.
Beginning date and duration.
c.
Proper procedure in case of failure.
d.
Instances that might affect guarantees/warranty and maintenance contract.
5.
Obtain guarantees/warranties, executed in duplicate by responsible Subcontractors, suppliers, and
manufacturers, within 10 days after completion of the applicable item or work. Except for items put
into use with Owners permission, leave date of beginning of time of guarantee/warranty until the
Date of Final Completion is determined.
6.
Where there is no specific guarantee/warranty specified, but one is typically provided by the product
manufacturer for the product specified, provide Owner with the manufacturers standard
guarantee/warranty.
7.
Co-execute submittals when required.
E.
Submittal:
1.
Submit two complete sets of guarantees/warranties and maintenance contracts.
2.
Provide additional copies of guarantees/warranties and maintenance contracts for inclusion in
Operations and Maintenance Manual.
F.
Time of Submittals:
1.
For equipment or component parts of equipment put into service during construction with Owners
permission, submit documents within 10 days after acceptance.
2.
Make other submittals within ten days after Date of Substantial Completion, prior to final inspection.
3.
For items of Work when acceptance is delayed beyond Date of Substantial Completion, submit within
ten days after acceptance, listing the date of Final Completion as the beginning of the warranty period.
1.5
A.
Closeout Submittals
01 78 00 - 4
Owner will, at beginning of Project and at no cost, provide Contractor with a set of Contract
Documents to use for recording the As-Built conditions of the Work.
Store Record Documents in Contractors Field Office apart from documents used for construction.
Provide files, racks, and secure storage for Record Documents.
Label and file Record Documents in accordance with Section number listings in Table of Contents of
this Project Manual. Label each document PROJECT RECORD in neat, large, printed letters.
Maintain Record Documents in a clean, dry and legible condition. Do not use Record Documents for
construction purposes.
Ensure that each major subcontractor maintains their set of Record Documents currently and that the
documents are in good condition and reflect as-built condition of the Work.
Keep Record Documents up to date during entire progress of the Work, a condition required for
processing monthly progress payments.
Keep Record Documents available all times for inspection by Architect.
Recording:
1.
Record information on a set of Contract Drawings, and in a copy of a Project Manual. Contractor and
each major subcontractor shall each maintain their own sets.
2.
Record information carefully and neatly with block lettering by a competent drafter, familiar with the
trade involved, using methods acceptable to Architect.
3.
Record sufficient information so Work concealed in the building may be located with reasonable ease
and accuracy. Accomplish by dimensioning or by stating the relationship to spaces in the building
near which the Work was installed. Architect decision on what constitutes sufficient information will
be final.
4.
Recording:
a.
Record information concurrently with the construction process.
b.
Give particular attention to work that would be difficult to measure and record at a later date.
c.
Do not conceal any work until required information is recorded.
d.
Completely, accurately, and legibly record actual locations and arrangements of all
installations differing from Contract Drawings, or if shown only diagrammatically on the
Contract Drawings, or if left to Contractors option.
e.
Use additional copies of prints, if necessary, to insure legible recording of data.
f.
Refer to the document that authorized the change. Where no dated instrument generated the
change, note the date the change was made in the field.
g.
Call attention to the entry by drawing a cloud around the area affected.
h.
In case of overlapping changes, use different colors for each change.
5.
Contract Drawings and Shop Drawings: Legibly mark each item to record actual construction,
including:
a.
Location of significant Work concealed inside the building, locations of which are changed
by Contractor from those shown on the Drawings.
b.
Location of item, not necessarily concealed, which vary from locations shown on the
drawings.
c.
Measured depths of elements of foundation in relation to finish first floor datum.
d.
Measured horizontal and vertical locations of underground utilities and appurtenances
referenced to permanent surface improvements.
e.
Measured locations of internal utilities and appurtenances concealed in construction,
referenced to visible and accessible features of construction.
f.
Record changes in size location, and other features of installation shown on the Drawings.
g.
Reflected ceiling plan with log list of junction boxes and valve numbers, functions, and
locations, keyed to numbered access panels identified on the plan.
h.
Actual numbering of each electrical circuit.
i.
Field changes of dimension and detail.
j.
Changes made by Change Orders and other modifications to the Contract.
k.
Details not on original Contract Drawings.
l.
References to related shop drawings and Modifications.
Closeout Submittals
01 78 00 - 5
7.
8.
9.
10.
Specifications and Addenda: Legibly mark each item to record actual construction, including:
a.
Manufacturer, trade name, catalog number, and supplier of each product, material and item
of equipment actually installed, particularly optional items and substitute items.
b.
Changes made by Addenda, Change Orders, Field Orders, Clarifications and Interpretations
made by Letters of Instruction, and other modifications to the Contract.
Other Documents: Maintain manufacturers certifications, inspection certifications, field test records,
and items required by individual Specifications sections.
Prior to submitting each request for payment, secure approval from Architect of the current status of
Record Documents.
Obtain Architects Approval of Record Drawings prior to ceiling close-up.
Periodic payments or portions thereof to Contractor may be withheld until Architect verifies that all
as-built information to date has been properly recorded on Record Documents.
C.
D.
E.
Submittal:
1.
Submit complete set of Project Record Documents to Architect 10 days after final inspection.
2.
Make any required changes and promptly deliver final Project Record Documents to Architect.
3.
Accompany submittal with transmittal letter as specified in Section 01 33 00 Submittal Procedures.
1.6
A.
Furnish spare parts, maintenance, and extra products in quantities specified in individual Specification
Sections.
B.
Deliver spare parts and maintenance materials to Project site and place in location as directed by Owner; obtain
receipt prior to final payments.
Closeout Submittals
01 78 00 - 6
END OF SECTION 01 78 00
Closeout Submittals
01 78 00 - 7
PART 1 GENERAL
1.1
SUMMARY
A.
This section references subsurface geotechnical (soil) investigation prepared for Owner's purposes and made
available to Contractor for his information.
1.2
DEFINITIONS
A.
Geotechnical Engineer: When referred to in Contract Documents for this Project, the Geotechnical
Engineer is the person or testing agency named above as having made the subsurface geotechnical
investigation.
1.3
SUBSURFACE INVESTIGATION
A.
B.
C.
Author: Beacon Geotechnical, Inc., P.O. Box 4814, Paso Robles, California 93447
D.
E.
1.4
A.
The authors or surveyors are responsible for accuracy of site data; Owner does not guarantee their accuracy nor
their adequacy, nor that data is representative of all conditions Contractor may encounter at the site.
B.
Contractor shall assume responsibility for results of acting on conclusions he draws from these data; if he
chooses not to accept such responsibility, he shall employ his own experts to determine additional information
and he shall be responsible for results of acting on conclusions from information obtained on his own initiative.
1.5
QUALITY ASSURANCE
A.
Based on recommendations contained in the investigative report, a foundation system, with assumed design
bearing pressures as engineered, shown, and noted, has been assumed as being uniform and appropriate to
satisfy construction conditions at the Project Site.
1.
These assumptions must be professionally and expertly verified and corroborated by Geotechnical
Engineer or Owner's testing and inspection agency, as indicated, when excavation has been
opened.
2.
Should opened excavation indicate that actual soil conditions are variable, erratic, or contrary to
assumed conditions, notify Architect for instruction before proceeding with foundation Work.
Geotechnical Investigation
02 32 00 - 1
September 9, 2013
F-100853
Prepared For
City of Carmel by the Sea
By
Beacon Geotechnical, Inc.
P.O. Box 4814
Paso Robles, California 93447
September 9, 2013
F-100853
Subject:
Respectfully submitted,
Beacon Geotechnical, Inc.
Greg McKay
Project Manager
Copies:
Nicholas A. McClure
Geotechnical Engineer
F-100853
September 9, 2013
Contents
1 INTRODUCTION .......................................................................................2
1.1
7
8
9
Description................................................................................................. 2
Purpose ..................................................................................................... 2
2.2
SITE SETTING..........................................................................................3
3.1
Location..................................................................................................... 3
3.2
4.2
Groundwater .............................................................................................. 3
5.2
Liquefaction ............................................................................................... 4
5.3
Landslide Hazards....................................................................................... 4
5.4
6.2
6.3
Slope Construction...................................................................................... 7
6.4
6.5
6.6
6.7
6.8
6.9
F-100853
September 9, 2013
1. INTRODUCTION
This report presents results of a Geotechnical Engineering Study performed for
the proposed restroom structure to be located in the City of Carmel by the Sea,
California.
1.1
Description
1.1.1.
1.1.2.
1.1.3.
SCOPE OF WORK
2.1
The purpose of the geotechnical investigation that led to this report was to
evaluate the soil conditions of the site with respect to the proposed
development. These conditions include surface and subsurface soil types,
expansion potential, settlement potential, bearing capacity, and presence or
absence of subsurface water. The scope of our work included:
Reconnaissance of the site.
Drilling, sampling and logging of two (2) borings to investigate soils and
groundwater conditions.
Laboratory testing of soil samples obtained from subsurface exploration to
determine their physical and engineering properties.
Geotechnical analysis of the data obtained.
Consultation with owner representatives and design professionals.
Preparation of this report.
2.2
F-100853
September 9, 2013
SITE SETTING
3.1
3.2
4.1
Soil Conditions
4.1.1
4.1.2
4.1.3
4.2
Groundwater
4.2.1
SEISMIC HAZARDS
Nearby Faults
5.1.1
5.1.2
The site does not lie within an Earthquake Fault Zone identified on a
State of California Earthquake Fault Zone Map.
Faults closest to the site, which would most affect the proposed
project:
Nearby Active Faults
Magnitude MW
5.6
7.5
7.2
7.3
61.0
8.0
F-100853
5.2
September 9, 2013
Liquefaction
5.3
Landslide Hazards
5.3.1
5.4
Based on the quality and conditions of the in-place soils and the
absence of groundwater in our boring explorations, it is our opinion
that the potential for liquefaction and/or lateral spreading is low at this
site.
The site topography and exposed soils types indicate that the potential
for landslides is minimal at this site. Furthermore, no evidence of
previous landslides was observed at the site.
The following estimated ground motion parameters have been established using
the methods outlined in the 2010 California Building Code with reference to the
acceleration contour maps provided by the U.S. Geological Survey (USGS) and
the National Seismic Hazard Mapping Project (NSHMP). These ground motion
parameters represent the Maximum Considered Earthquake (MCE) spectral
response of seismic events experiencing 5 percent damped acceleration and
having a 2 percent probability of exceedance within a 50 year period.
2010 California Building Code Seismic Parameters
Parameter
Seismic Design Category
Site Class
Short Period Spectral Acceleration, Ss
1-second period spectral acceleration, S1
Short period site coefficient, Fa
1-second period site coefficient, Fv
Adjusted short period spectral acceleration, Sms
Adjusted 1-second period spectral acceleration, Sm1
Short period design spectral acceleration, SDS
1-second period design spectral acceleration, SD1
Value
D
D
1.659
0.711
1.000
1.500
1.659
1.067
1.106
0.711
F-100853
September 9, 2013
General Grading
6.1.1
6.1.2
6.1.3
6.1.4
6.1.5
6.1.6
6.1.7
6.1.8
6.1.9
F-100853
September 9, 2013
6.2.1
6.2.2
Due to the presence of low density soils and a cut/fill situation at the
proposed bearing depth, overexcavation and recompaction of soils in
the building area (including covered deck areas) will be necessary to
decrease the potential for differential settlement and to provide more
uniform bearing conditions. Soils should be overexcavated to a depth
of two (2) feet below the bottom of footings, three (3) feet below
existing grade, or 75% of the deepest fill thickness, whichever is
greater. The over-excavation should extend to a distance of five (5)
feet beyond the building perimeter. The resulting surface should be
scarified to a depth of one (1) foot, moisture conditioned and
recompacted to a minimum of 90% of maximum dry density. The
intent of these recommendations is to provide a minimum of two (2)
feet of compacted soils below the bottom of all footings, and
recompact the loose topsoil.
Alternatively, the footings may be excavated to bear a minimum of one
(1) foot into the underlying light brown A2 soil material encountered at
a depth of four (4) feet below existing grade in our borings. To achieve
uniform bearing conditions, the footings will likely need to be
deepened in areas. A representative of this firm should be notified to
monitor footing excavations. Prior to excavating footings, the slab
areas should be overexcavated to a depth of one (1) foot below
existing or finish grade whichever is deeper. The resulting surface
should be scarified an additional one (1) foot, moisture conditioned
and recompacted to a minimum of 90% of maximum dry density.
6
F-100853
6.2.3
6.2.4
6.2.5
6.2.6
6.2.7
6.3
September 9, 2013
Slope Construction
6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
All hillside grading and construction of fill slopes should conform to the
minimum standards listed in Chapter 18 of the California Building
Code. It is recommended that a representative of this firm review the
grading plans prior to grading and site development.
Fill slopes should be keyed and benched into firm natural ground when
the existing slope to receive fill is 10:1, horizontal to vertical, or
steeper. The keys should be tilted into the slope, should be a minimum
of one equipment width wide, and should extend a minimum of three
(3) feet deep at the outside edge.
Fill slopes should be overfilled, compacted and cut back to planned
configurations. This will yield better compaction on the slope faces
than other methods.
Lined drainage swales and down drains should be provided at the tops
of all cut and fill slopes to divert drainage away from the slope faces.
Cut and fill slopes should not be constructed steeper than 2:1
(horizontal to vertical). Setbacks of structures from slopes should be
maintained as per the C.B.C.
F-100853
6.4
Utility Trenches
6.4.1
6.4.2
6.5
September 9, 2013
6.5.1
F-100853
September 9, 2013
Slabs on Grade
6.6.1
6.6.2
6.6.3
6.6.4
6.6.5
6.7
6.7.1
6.7.2
6.7.3
6.8
6.8.1
6.8.2
6.8.3
F-100853
6.9
September 9, 2013
6.9.1
6.9.2
6.9.3
6.9.4
6.9.5
0.001H 0.004H
0.01H 0.04H
10
F-100853
6.9.6
6.9.7
6.9.8
6.9.9
September 9, 2013
The lateral earth pressure to be resisted by the retaining walls or
similar structures should include the loads from any structures or
temporary loads that influence the wall design.
A back drain or an equivalent system of backfill drainage should be
incorporated into the retaining wall design. Backfill immediately behind
the retaining structure should be a free-draining granular material.
Alternatively, the back of the wall could be lined with a geodrain
system.
Compaction on the uphill side of the wall within a horizontal distance
equal to one wall height should be performed by hand-operated or
other lightweight compaction equipment. This is intended to reduce
potential locked-in lateral pressures caused by compaction with
heavy grading equipment.
Water should not be allowed to pond near the top of the wall. To
accomplish this, the final backfill site grade should be such that all
water is diverted away from the retaining wall.
REFERENCES CITED
Society
(CGS),
ADDITIONAL SERVICES
Review of the building and grading plans during the design phase of the
project.
Observation and testing during site preparation, grading, placing of
engineered fill, and foundation construction.
Consultation as required during construction.
PROJECT LIMITATIONS AND UNIFORMITY OF CONDITIONS
The analysis and recommendations submitted in this report are based in
part upon the data obtained from the borings drilled on site. The nature
and extent of variations between and beyond the borings may not become
evident until construction. If variations then appear evident, it may be
necessary to re-evaluate the recommendations of this report.
11
F-100853
9.2
9.3
9.4
9.5
9.6
9.7
September 9, 2013
END OF TEXT
Appendices
12
APPENDIX A
Vicinity Map
Site Plan
Quaternary Fault Map
Investigation Parameters
Unified Soil Classification Table
Boring Logs
SITE
PROJECT #: F-100853
PROJECT #: F-100853
SITE
PROJECT #: F-100853
QUATERNARY FAULT MAP
INVESTIGATION PARAMETERS
The borings were drilled to a maximum depth of fifteen (15) feet below the
existing ground surface to observe the soil profile and to obtain samples for
laboratory analysis. The borings were drilled on September 2, 2013 using a
mobile drill rig and/or hand auguring equipment. The approximate locations
of the borings were determined in the field by pacing and sighting, and are
shown on the Site Plan in this Appendix.
Blow counts were obtained within the test borings with Undisturbed Ring
Sampler hand sampling equipment. The blow counts were obtained by
dropping the sampler with a 10 pound hammer dropping eighteen (18)
inches in accordance with ASTM D 3550.
Bulk samples of the soils encountered were gathered from the auger
cuttings.
The final logs of borings represent our interpretation of the contents of the
field logs and the results of laboratory testing performed on the samples
obtained during the subsurface investigation. The final logs are included in
this Appendix.
aJ:a'ilN ~t"~.t'cl;ll[t.\$
f{~%1"~.\II~
l:m~,~~!fiH IRJN~
~1~4;P1r4S
CLEAN SIOO)S
<ft.ANES
~M'IDF!HU
>U~~
~!.TSANDI1A"t.3
!J!Q1J[t:)i I.!J\IJJi<"il:}
FAT ClAY
CH
Sill.TSAND OJ.A'm
UWII)~
~f!TIAAI\ON m=Sh\MCII:
~M~!U!P!J
~i!Mi
MiNllli'l.Wi"
\'llilllf~
'lll~'l
!ml'il'
!i'~>a:r'
~-
,.w
14
~A~
to- '
~-<iii
~JW
41!
1!11.'!1
1lil<'IIJ
Wfi:ll
l~It~
~~
r.fi.~
~~
\!iiitlllll'l"
R\!11
~r~mli!l'~
"'
w
il'lm
~-1&
1~ -u
L~-u
QOU
~Of'~IWMI~~~filli!OOl.'tmN~IIl!IKII6CJ!II.l'Jfi
~ni!l).)mwl'~~~ilmW!mGW~~~~
~~-~
F-100853
LOG OF BORING
for:
Scenic Road
BORING NO. 1
Voids
Moisture
Description
USCS
-2%
Light Brown Silty Sand
23
-2%
10
28
-1%
20
25
30
35
40
45
50
GROUNDWATER
Time
Depth
SM
Beacon
Soil ID
A1
-3%
Med Dense
15
F-100853
SAMPLE TYPE
SPT=Standard Penetration Test (uncorrected value, N/corrected value, N)
SM
SM
A2
A3
10
LOG OF BORING
for:
Scenic Road
F-100853
BORING NO. 2
Voids
Moisture
Description
USCS
-2%
Med Dense
5
Total Depth @ 6.0
10
15
20
25
30
35
40
45
50
GROUNDWATER
Time
Depth
SM
Beacon
Soil ID
A1
SAMPLE TYPE
SPT=Standard Penetration Test (uncorrected value, N/corrected value, N)
SM
A2
APPENDIX B
Laboratory Testing Parameters
Laboratory Results
Bench & Keyway Detail
Transition Lot Detail
Deepened Footing Detail
2010 CBC -- Table 1704.7
LABORATORY PARAMETERS
Samples were reviewed along with field logs to determine which would be
analyzed further. Those chosen for laboratory analysis were considered
representative of soils that would be exposed and/or used during grading,
and those deemed to be within the influence of the proposed structure. Test
results are presented in this Appendix.
LABORATORY RESULTS
Boring
Depth
USCS
Max.
Density
(pcf)
Opt.
Moisture
(%)
E.I.
Material A1
1@0-4
SM
112.6
11.3
Material A2
1@5-10
SM
115.1
11.0
Material A3
1@11-15
SM
113.8
10.9
(Typical)
NOT TO SCALE
Addi l io~al
Maxi~~m
Slope; 2: 1
Exisllng slopo -
--.._
Tee of Slope
PROJECT #: F-100853
--------- ---
---
---
,.-
.-.--..-
---------
OVEREXCAVATE AND
REGRADE
UNWEATH<=RED BEDROCK
-- --------
COMPACTED FILL
TOPSO I L,
----
COLLUVIUM AND
--
W E ATHERED . - . -
--------
---------
3'
OVEREXCAVATE ANC
REGRADE
UNWEATHE RED BEDROCK
BEDROCK..-
PROJECT #: F-100853
PROJECT #: F-100853
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of cementitious crystalline waterproofing additive (admixture)
system as noted, completed with related accessories.
1.2
REFERENCE STANDARDS
A.
B.
ASTM International
1.
ASTM C39/C39M - Standard Test Method for Compressive Strength of Cylindrical Concrete
Specimens.
2.
ASTM C309 - Standard Specification for Liquid Membrane-Forming Compounds for Curing
Concrete.
3.
ASTM E329 Standard Specification for Agencies Engaged in Construction Inspection, Testing,
or Special Inspection.
C.
NSF International:
1.
NSF Standard 61 - Drinking Water System Components.
D.
1.3
SYSTEM DESCRIPTION
A.
Cementitious Crystalline Additive (Admixture): Mix of Portland cement, fine treated silica sand and active
proprietary chemicals which when mixed with fresh concrete causes a catalytic reaction which generates a
non-soluble crystalline formation of dendritic fibers within the pores and capillary tracts of concrete. This
process shall cause concrete to become permanently sealed against the penetration of water or liquids and
shall protect the concrete from deterioration due to harsh environmental conditions.
1.4
A.
Testing Requirements: Crystalline waterproofing system shall be tested in accordance with the following
standards and conditions, and the testing results shall meet or exceed the performance requirements as
specified herein
B.
C.
D.
Permeability: Independent testing shall be performed according to CRD-C4. Treated concrete samples shall
be pressure tested to 150 psi (350 foot head of water) or 1.05 MPa (106 m head of water). The treated
samples shall exhibit no measurable leakage
Crystalline Waterproofing Additive
03 05 16 - 1
E.
Chemical Resistance: Independent testing shall be performed to determine "Sulfuric Acid Resistance of
Concrete Specimens". Treated concrete samples (dosage rates of 3, 5 and 7 percent) shall be tested against
untreated control samples. All samples shall be immersed in sulfuric acid and weighed daily until a control
sample reaches a weight loss of 50 percent or over. On final weighing the percentage weight loss of the
treated samples shall test significantly lower than the control samples.
F.
Compressive Strength: Independent testing shall be performed according to ASTM C39. Concrete samples
containing the crystalline waterproofing additive shall be tested against untreated control sample. At 28
days, the treated samples shall exhibit a minimum of 10 percent increase in compressive strength over the
control sample.
G.
Potable Water Approval: Independent testing shall be performed according to NSF Standard 61, and
approval for use of waterproofing material on structures holding potable water shall be evidenced by NSF
certification
1.5
ADMINISTRATIVE REQUIREMENTS
A.
B.
Required Conferences:
1.
Contractor-Applicator-Manufacturer Review: Contractor and his applicator shall review Architects
drawings and specifications with agent of crystalline waterproofing additive manufacturer and obtain
their agreement that selected systems are proper, compatible, and adequate for application shown and
that conditions and details do not conflict with manufacturers recommendations.
2.
Preinstallation Meeting:
a.
Contractor shall arrange conference to review crystalline waterproofing additive work after
review of submittals and prior to delivering cast-in-place concrete to site.
b.
Conference to be attended by Architect, Owners representative, Contractor, and
Contractors applicator, agents of accepted manufacturers, and other installers whose work
may be affected by quality of waterproofing.
c.
Participants shall have had at least one weeks advance notice of meeting date and time.
d.
The meeting shall be held at the job site or other location as approved by Architect.
e.
The following major considerations shall be reviewed at the conference:
1)
Review in detail the Contract specifications, surface preparation, protection of adjacent
surfaces, installation procedures, field quality control, and other related items.
2)
Review in detail job conditions, schedule, construction sequence, application
requirements, and quality of completed installation.
3)
Review in detail the means of protecting completed work during remainder of
construction period.
4)
Record discussions of conference and any conflict, incompatibility, or inadequacy, and
furnish a copy of record to each participant.
f.
[Contractor] shall produce meeting notes that record discussions of conference and any
conflict, incompatibility, or inadequacy and they will indicate that the applicator of
waterproofing has reviewed and accepted the substrates for waterproofing.
g.
Distribute meeting notes to all attendees prior to installation of cast-in-place concrete with
crystalline waterproofing additive c.
C.
1.6
SUBMITTALS
A.
Product Data.
B.
C.
Test Reports: Submit, for acceptance, complete test reports from approved independent testing
laboratories certifying that waterproofing system conforms to performance characteristics and testing
requirements specified herein.
D.
1.7
QUALITY ASSURANCE
A.
Manufacturers Qualifications: Manufacturers shall have no less than 10 years experience in manufacturing
the crystalline waterproofing additive for the required work. Manufacturer must be capable of providing
field service representation during construction phase. Manufacturers that cannot supply the performance
test data specified herein will not be considered for use on this project.
B.
1.8
A.
Deliver and store packaged material in original containers with seals unbroken and labels intact until time of
use. Each container shall be identified with material name, date of manufacture and lot number.
B.
PART 2 PRODUCTS
2.1
PRODUCTS
A.
2.2
MIXES
A.
B.
Additive must be added to concrete at time of batching. It is recommended that the admixture be added first to
coarse and fine aggregate and blended thoroughly for 2-3 minutes before adding cement and water. Do not add
admixture directly to wet concrete. Consult with the admixture manufacturer for methods of admixture at
ready mix plants.
C.
Blend concrete mix using normal practices to ensure formation of homogeneous mixture.
PART 3 EXECUTION
3.1
A.
B.
Moist cure concrete in accordance with ACI 308.1. Curing compounds may be used in the event that project
requirements or conditions prevent moist curing. Curing compounds shall comply with ASTM C309.
Crystalline Waterproofing Additive
03 05 16 - 3
C.
Normal backfilling procedures may be used after concrete ha s cured for at least seven days.
D.
Not all concrete is required to include waterproofing admixture. The following locations are required to include
the admixture:
1.
2.
END OF SECTION 03 05 16
PART 1 GENERAL
1.1
SUMMARY
A.
1.2
REFERENCE STANDARDS
A.
ASTM International:
1.
ASTM C979/C979M - Standard Specification for Pigments for Integrally Colored Concrete
1.3
SUBMITTALS
A.
B.
1.4
QUALITY ASSURANCE
A.
PART 2 PRODUCTS
2.1
CONCRETE MATERIALS
A.
B.
Reinforcement: Comply with Section 03 30 00 Cast-In-Place Concrete for steel reinforcement and other
requirements for reinforcement accessories.
2.2
FLOOR SEALERS
A.
Concrete Accessories
03 15 00 - 1
2.3
COLOR PIGMENT
A.
Color Pigment:
1.
Description: ASTM C979/C979M, synthetic mineral-oxide pigments or colored water-reducing
admixtures; color stable, nonfading, and resistant to lime and other alkalis.
2.
Products:
a.
Scofield CHROMIX Admixture.
b.
Davis ColorsTM Mix-Ready.
c.
Solomon Colors.
d.
Or equal.
3.
Colors:
a.
Color Pigment 1: Match Davis Colors #61078 Padre Brown at walls.
b.
Color Pigment 1: Match Davis Colors #5447 Mesa Buff at roof.
2.4
WATERSTOPS
A.
Self-Expanding Waterstops:
1.
Description: Sodium bentonite or other hydrophylic material for adhesive bonding to concrete. :
2.
Products:
a.
Below Grade Locations: Colloid Environmental Technologie Co. "Volclay WaterstopRX"; or equal.
b.
Above Grade Locations: Mitsubishi International Corporation s "Adeka Ultra Seal P201"; or equal.
PART 3 EXECUTION
3.1
FLOOR SEALERS
A.
General: Prepare, apply, and finish penetrating liquid floor treatment according to manufacturer's written
instructions.
B.
3.2
WATERSTOPS
A.
Install in construction joints and at other locations indicated, according to manufacturer's written
instructions, adhesive bonding, mechanically fastening, and firmly pressing into place. Install in longest
lengths practicable.
END OF SECTION 03 15 00
Concrete Accessories
03 15 00 - 2
PART 1 GENERAL
1.1
SUMMARY
A.
This section includes cast-in-place concrete, including reinforcement, concrete materials, mix design,
placement procedures, and finishes.
1.2
DEFINITIONS
A.
Architectural Concrete: Formed Concrete elements which are exposed to view as an exterior surface in the
completed structure.
1.3
REFERENCE STANDARDS
A.
B.
C.
ASTM International:
1.
ASTM A775/775M - Standard Specification for Epoxy Coated Steel Reinforcing Bars.
2.
ASTM A484 - Standard Specification for Low Carbon Magnetic Iron..
3.
ASTM C31/C31M - Standard Practice for Making and Curing Concrete Test Specimens in the
Field.
4.
ASTM C33 - Standard Specification for Concrete Aggregates.
5.
ASTM C39/C39M - Standard Test Method for Compressive Strength of Cylindrical Concrete
Specimens.
6.
ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete.
7.
ASTM C150 - Standard Specification for Portland Cement.
8.
ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete.
9.
ASTM C309 - Standard Specification for Liquid Membrane Forming Compounds for Curing
Concrete
10.
ASTM C494/C494M - Standard Specification for Chemical Admixtures for Concrete.
11.
ASTM C920 Standard Specification for Elastomeric Joint Sealants.
12.
ASTM E1155 Standard Specification for Determining FF Floor Flatness and FL Floor Levelness
Numbers
13.
ASTM E1745 - Standard Specification for Plastic Water Vapor Retarders Used in Contact with
Soil or Granular Fill under Concrete Slabs.
14.
ASTM E1643 Standard Practice for Selection, Design, Installation, and Inspection of Water
Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs.
D.
1.4
SUBMITTALS
A.
B.
Cast-In-Place Concrete
03 30 00 - 1
C.
D.
Shop Drawings: Include details of steel reinforcement placement, including material, grade, bar schedules,
stirrup spacing, bent bar diagrams, arrangement, and supports. Also include locations of embedded items
on shop drawings.
E.
Material certificates.
1.5
QUALITY ASSURANCE
A.
B.
Comply with ACI 301, "Specification for Structural Concrete," including the following, unless modified by
the requirements of the contract documents.
1.
General requirements, including submittals, quality assurance, acceptance of structure, and
protection of in-place concrete.
2.
Formwork and form accessories.
3.
Steel reinforcement and supports.
4.
Concrete mixtures.
5.
Handling, placing, and constructing concrete.
C.
Mockups: Before casting vertical board formed concrete, build mockups to verify selections made under
sample submittals and to demonstrate typical joints, surface finish, texture, tolerances, and standard of
workmanship. Build mockups to comply with the following requirements, using materials indicated for the
completed Work:
1.
Build mockups in the location and of the size indicated or, if not indicated, as directed by
Architect.
2.
Build mockups of typical exterior wall of cast-in-place board formed concrete as shown on
Drawings.
3.
Demonstrate curing, cleaning, and protecting of cast-in-place form liner concrete, finishes, and
contraction joints, as applicable.
4.
In presence of Architect, damage part of the exposed-face surface for each finish, color, and
texture, and demonstrate materials and techniques proposed for repair of surface blemishes to
match adjacent undamaged surfaces.
5.
Obtain Architect's approval of mockups before casting board formed concrete.
D.
PART 2 PRODUCTS
2.1
MATERIALS
A.
Form-Facing Materials:
1.
General: For formwork and other form-facing material requirements. Use materials which will
provide a true and even surface. Furnish in largest practicable sizes to minimize number of joints
and to conform to joint system shown on drawings. Provide form material of sufficient thickness
to withstand pressure of newly placed concrete without bow or deflection.
2.
Form-Facing Panels for As-Cast Concrete Finishes: Exterior-grade panels, nonabsorptive, that
will provide continuous, true, and smooth architectural concrete surfaces, one of the following:
a.
Medium-density overlay, Class 1, or better, mill-release agent treated and edge sealed,
complying with DOC PS 1.
b.
Finnish phenolic overlaid birch plywood.
3.
Plank and Board Lumber (Vertical Board Formed):
a.
No. 2 or better Hem-Fir, as indicated on Drawings.
Cast-In-Place Concrete
03 30 00 - 2
9.
10.
B.
Steel Reinforcement
1.
Reinforcing Bars: ASTM A775/A775M, Grade 60, deformed.
2.
Plain Steel Welded Wire Fabric: ASTM A884, fabricated from as-drawn steel wire into flat
sheets.
C.
Concrete Materials
1.
Portland Cement: ASTM C150, Type II.
2.
Normal Weight Aggregate: ASTM C33, uniformly graded, not exceeding 1 1/2-inch nominal
size. Combined Aggregate gradation of 3/8 inch maximum (pea gravel) shall not be used.
3.
Water: Complying with ASTM C94/C94M.
D.
Admixtures
1.
Air-Entraining Admixture: ASTM C260.
2.
Water-Reducing Admixture: ASTM C494/C494M, Type A.
3.
High Range, Water-Reducing Admixture: ASTM C494/C494M, Type F.
4.
Water-Reducing and Accelerating Admixture: ASTM C494/C494M, Type E.
5.
Water-Reducing and Retarding Admixture: ASTM C494/C494M, Type D.
E.
Curing Compound: The Cure by Sinak Corporation; conform to ASTM C309; Zero VOC
F.
G.
Accessory Products:
1.
Provide manufacturer's recommended self-adhesive plastic seam tape for seams and penetrations.
2.
Penetration boots: Provide manufacturer's recommended accessory system for sealing pipe and
conduit penetrations.
2.2
CONCRETE MIXES
A.
B.
Prepare design mixes, proportioned according to ACI 301, for normal weight concrete determined by either
laboratory trial mix or field test data bases, as follows:
Cast-In-Place Concrete
03 30 00 - 3
C.
Add air-entraining admixture at manufacturer's prescribed rate to result in concrete at point of placement
having an air content of 5.0 percent within a tolerance of plus or minus 1.5 percent for concrete exposed to
weather.
1.
Air content of trowel-finished interior concrete floors shall not exceed 3.0 percent.
D.
E.
Admixtures: Architectural concrete and concrete with a required water/cement ratio of 0.47 or lower shall
contain a high range water reducing admixture.
2.3
CONCRETE MIXING
A.
B.
Provide batch ticket for each batch discharged and used in the work, indicating project identification name
and number, date, mix type, mix time, quantity, and amount of water added. Record approximate location
of final deposit in structure.
PART 3 EXECUTION
3.1
EXAMINATION
A.
Prior to starting work, carefully inspect existing conditions and the installed work of other trades and verify
that such work is complete to the point where work of this Section may properly commence. Notify the
Architect in writing of conditions detrimental to the proper and timely completion of the work.
B.
Do not begin installation until all unsatisfactory conditions are resolved. Beginning work constitutes
acceptance of site conditions and responsibility for defective installation caused by prior observable
conditions.
3.2
FORMWORK ERECTION
A.
In addition to ACI 303.1 limits on form-facing panel deflection, limit concrete surface irregularities,
designated by ACI 347R as abrupt or gradual, as follows:
1.
Class A, 1/8 inch.
B.
Verify lines, levels, and measurement before proceeding with formwork. Align form joints.
C.
D.
Coordinate with work of other Sections in forming and setting openings, slots, recesses, chases, sleeves,
bolts, anchors, and other inserts.
E.
Cast-In-Place Concrete
03 30 00 - 4
4.
5.
Additional Tolerance Requirements: In accordance with the additional requirements of ACI 301.
Form surfaces at the joints between each panel shall be flush within a tolerance of plus or minus
1/16 inch.
Form Joint Seal for "Architectural" Concrete: Apply double face tape, not more than 1/16th inch
thick to edges of form panels holding back from form surface at least 1/16 inch; apply continuous
bead of silicone sealant for the length of the joint; tool sealant smooth and flush with adjoining
contact surfaces. Wipe off all excess sealant. Fill flush all holes and imperfections in forming
surface with sealant.
Rustication Strips: Glue or nail to form surfaces; set and fill nail holes; seal to surface of forms.
F.
G.
Seal form joints and penetrations at form ties with form joint tape or form joint sealant to prevent mortar
leaks.
H.
Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions,
before placing reinforcement. Verify that form coatings will not affect the bond of subsequent concrete
surface treatments.
I.
J.
Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain
proper alignment.
K.
3.3
INSTALLATION, GENERAL
A.
Prepare subgrade prior to placing concrete in accordance with requirements of the Geotechnical
Engineering Report, see Section 02 32 00 - Geotechnical Investigation.
B.
C.
Steel Reinforcement: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and
supporting reinforcement.
1.
Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing
concrete.
D.
Joints: Construct joints true to line with faces perpendicular to surface plane of concrete.
1.
Construction Joints: Locate and install so as not to impair strength or appearance of concrete at
locations indicated or as approved by Architect.
Cast-In-Place Concrete
03 30 00 - 5
Cast-In-Place Concrete
03 30 00 - 6
a.
Sawed Joints: Form contraction joints with power saws equipped with shatterproof
abrasive or diamond-rimmed blades. Cut 1/8-inch wide joints into concrete when cutting
action will not tear, abrade, or otherwise damage surface and before concrete develops
random contraction cracks.
E.
Tolerances: Comply with ACI 117, "Specifications for Tolerances for Concrete Construction and
Materials."
3.4
CONCRETE PLACEMENT
A.
Comply with recommendations in ACI 304R for measuring, mixing, transporting, and placing concrete.
B.
Do not add water to concrete during delivery at the project site or during placement.
C.
3.5
A.
Vertical Board Formed Finish: Produce a textured surface matching approve mockup and free of pockets,
streaks, honeycombs, and of uniform appearance, color, and texture.
B.
Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes and
defective areas repaired and patched, and fins and other projections exceeding 1/4-inch in height rubbed
down or chipped off.
1.
Apply to concrete surfaces not exposed to public view.
C.
Smooth-Formed Finish: As-cast concrete texture imparted by form-facing material, arranged in an orderly
and symmetrical manner with a minimum of seams. Repair and patch tie holes and defective areas.
Completely remove fins and other projections.
1.
Apply to concrete surfaces exposed to public view or to be covered with a coating or covering
material applied directly to concrete, such as waterproofing, damp-proofing, or painting.
2.
Do not apply rubbed finish to smooth-formed finish.
3.
Grout tie holes solid and flush with color matched mortar.
D.
E.
Form Reuse:
1.
Architect will approve reuse of forms provided they are straight, clean, free from nails, dirt, hardened
concrete, or other injurious matter and edges and surfaces are in good condition.
2.
Clean and repair any damage caused by placing, removal, or storage. Reuse of formwork with
repairs or patches which would result in adverse effects to architectural concrete finish will not be
permitted.
3.
Store formwork in manner to prevent damage or distortion.
4.
Reseal as required to achieve concrete of specified quality.
3.6
A.
General: Comply with ACI 302.1R for screeding, re-straightening, and finishing operations for concrete
surfaces. Do not wet concrete surfaces.
B.
Screed surfaces with a straightedge and strike off. Begin initial floating using bull floats or darbies to form
a uniform and open textured surface plane before excess moisture or bleedwater appears on the surface.
Cast-In-Place Concrete
03 30 00 - 7
C.
D.
Tolerance: Provide Random Traffic floor tolerances as follows, when measured in accordance with ASTM
E1155, including those floors to receive subsequent finishes.
1.
Slabs on Grade: FF 25, FL 20, over test area; FF 17, FL 15, minimum local value.
3.7
A.
Protect freshly placed concrete from premature drying, and excessive cold or hot temperatures. Comply
with ACI 306.1 for cold weather protection and follow recommendations in ACI 305R for hot weather
protection during curing.
B.
Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions
occur before and during finishing operations. Apply according to manufacturer's written instructions after
placing, screeding, and bull floating or darbying concrete, but before float finishing.
C.
Begin curing after finishing concrete, but not before free water has disappeared from concrete surface.
D.
3.8
A.
Testing Agency: Owner will engage a Qualified Independent Testing and Inspecting Agency to sample
materials, perform tests, and submit test reports during concrete placement. Tests will be performed
according to ACI 301.
B.
Continuous Field Inspection: The Independent Testing Agency shall be present at all times during the
placing of structural reinforced concrete. Work shall not proceed until all inspections are completed.
C.
D.
Concrete Sampling: Testing of composite samples of fresh concrete obtained according to ASTM C172
shall be performed according to the following requirements:
1.
Testing Frequency: One composite sample for each day's pour of each concrete mix exceeding 5
cubic yards, but less than 25 cubic yards, plus one set for each additional 100 cubic yards or
fraction thereof.
2.
Testing Frequency: At least one composite sample for each 100 cubic yards (76 cubic meters) or
fraction thereof of each concrete mix placed each day.
3.
Compression Test Specimens: ASTM C31/C31M; cast and laboratory cure one set of four
standard cylinder specimens for each composite sample.
a.
At the Contractor's expense and direction, cast and field-cure standard cylinder
specimens as may be required for the construction process. Number of specimens and
testing age shall be determined by the Contractor based on construction sequence
requirements.
Cast-In-Place Concrete
03 30 00 - 8
Compressive Strength Tests: ASTM C39/C39M; test two laboratory-cured specimens at 7 days
and two at 28 days.
a.
Test field-cured specimens at the Contractor's direction.
b.
Test two field-cured specimens at 7 days and two at 28 days.
c.
A compressive strength test shall be the average compressive strength from two
specimens obtained from same composite sample and tested at age indicated.
E.
Reinforcement Welding: All shop and field welds of reinforcing steel will be inspected. The Special
Welding Inspector will check the materials and equipment, the qualifications and ability of the welder, and
details of construction and procedure, as well as the welds themselves. The Inspector may use gamma ray,
magneflux, trepanning, ultrasonics, or any other aid to visual inspection which the Inspector may deem
necessary to determine the adequacy of the welding.
F.
No concrete shall be placed until placement of reinforcement steel has been inspected and approved.
Provide 48 hours notice to the Inspector prior to placing concrete.
END OF SECTION 03 30 00
Cast-In-Place Concrete
03 30 00 - 9
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of anchored stone veneer assemblies and related items.
B.
1.2
REFERENCE STANDARDS
A.
ASTM International:
1.
ASTM A666 - Standard Specification for Annealed or Cold-Worked Austenitic Stainless Steel
Sheet, Strip, Plate, and Flat Bar.
2.
ASTM C144 - Standard Specification for Aggregate for Masonry Mortar.
3.
ASTM C150 - Standard Specification for Portland Cement.
4.
ASTM C207 - Standard Specification for Hydrated Lime for Masonry Purposes.
5.
ASTM C270 - Standard Specification for Mortar for Unit Masonry.
B.
1.3
DESIGN REQUIREMENTS
A.
Design anchors and supports under direction of Professional Engineer, experienced in design of this work and
licensed in State of California.
B.
C.
D.
Final design shall be based on specific physical property values for stone to be used. Obtain these values from
the stone supplier.
E.
Use a minimum of four anchors per panel up to 12 square feet with two additional anchors for each additional
8 square feet.
Commented [C1]:
1.4
ADMINISTRATIVE REQUIREMENTS
A.
Pre-Installation Meeting:
1.
Contractor shall arrange meeting to be attended by Architect, Owners Representative, Contractor and
Contractors installer, and agents of manufacturers, all of whom shall have had at least one weeks
advance notice.
2.
Convene meeting minimum seven days prior to commencing work of this Section.
3.
Conference shall be held at the job site.
4.
Requirements of related work, preparation, storage and handling, materials, specification
requirements, coordination with related or adjoining work, work sequence, items requiring backing
and support, and issues that might affect proper metal support assemblies shall be discussed.
1.5
SUBMITTALS
A.
Samples:
1.
Stone: 24-inches-square; representative range each finish for preliminary review.
2.
Other Samples only as requested.
B.
1.6
QUALITY ASSURANCE
A.
Installers Qualifications: Company specializing in installing products specified in this Section with a minimum
of five years documented experience.
B.
Mock-Up:
1.
Construct a mock-up of anchor stone veneer for architects approval prior to commencement of job.
2.
Location: As directed by Architect.
3.
Size: Approximately 4 feet wide by 6 feet high.
4.
Mock-up shall simulate actual design and execution conditions.
5.
Allow Architect to view and obtain approval of mock-up before proceeding with any other
masonry installation.
6.
Approved mock-up may remain as first in place construction.
1.7
A.
Deliver stone to the site in accordance with schedule and in proper sequence with all necessary care in
handling, being maintained to avoid soiling or damaging.
B.
Unload and store stone clear off the ground on non-staining raised platform protected from weather. Cover
stone with non-staining waterproof paper, clean canvas, or polyethylene.
C.
Protect cementitious materials against exposure to moisture. Use of cementitious or other materials that have
become caked and hardened from absorption of moisture will not be permitted.
1.8
PROJECT CONDITIONS
A.
Environmental Conditions: Do not place stone when temperature is below 40 degrees Fahrenheit unless
Architect approves and Contractor provides means for preventing damage from freezing before and after
placement.
PART 2 PRODUCTS
2.1
MATERIALS
A.
Stone: Golden Granite, 5 inches thick plus or minus 1 inch and 4 to 18 inches high foor main field for exterior
walls and 18 to 36 inch boulders per site plan.
Supplier: Graniterock, Seaside CA 93955 (831) 392-3701
B.
C.
Mortar:
1.
2.
3.
4.
5.
Cement: ASTM C150, Type 1 Portland cement or ASTM C91 Type N masonry cement.
Aggregates for Mortar: ASTM C144.
Hydrated Lime: ASTM C207, Type S.
Mortar Coloring: Mineral oxide type, color as selected.
Water: Clean and potable, free from impurities detrimental to mortar and grout.
2.2
ACCESSORIES
A.
2.3
FABRICATION
A.
Provide any cutting and drilling as necessary to accommodate installation and other trades.
B.
2.4
A.
Thoroughly mix mortar ingredients in quantities needed for immediate use in accordance with ASTM C270,
Type N.
B.
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
3.2
PREPARATION
A.
Ensure stone units are clean and free from dirt or other foreign material. Do not use wire brushes or
implements that mark or damage exposed surfaces.
B.
Protection:
1.
Protect surrounding work as required against damage from stone work. Clean satisfactorily or
otherwise correct damage to surrounding work resulting from stone work.
2.
At all times, walls shall be adequately protected from droppings.
3.3
INSTALLATION
A.
Set stone accurately in accordance with the Contract Drawings and approved mockup.
B.
C.
D.
Wet absorptive stones in preparation for placement to minimize moisture suction from mortar.
E.
Select adjoining stones and place in manner to avoid extra wide and extra thin joints, or larger grouted voids
between stones.
F.
Set stone in full mortar setting bed to fully support stone over bearing surface. Provide a tooled joint as
approved by Architect.
G.
A stone, when placed in its intended position, shall remain at rest before mortar is applied around.
H.
Provide approved method of weeps immediately above horizontal flashing, above shelf angles and supports at
bottom of walls.
I.
Do not use any installation tools or methods that will mar exposed surfaces of stone.
3.4
CLEANING
A.
After completion of setting, all stone shall be thoroughly cleaned by scrubbing with fiber brushes and a mild
alkaline abrasive cleaner and clean water that contains no caustic or harsh fillers, or by the application of steam.
Upon completion, leave stone clean and free from mortar stains or traces of cleaning.
B.
Upon completion of work, remove from site surplus materials, rubbish and debris resulting from this Work.
3.5
A.
Protection of stone work during and subsequent to installation shall be the responsibility of the mason
contractor.
B.
Whenever necessary, substantial wooden covering shall be placed to protect the stone work. Nonstaining
building paper or membrane shall be used under the wood. Maintain all covering until removed to permit final
clearing of the stone work.
END OF SECTION 04 43 16
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of fabricated metal items, related accessories, and fasteners including
but not necessarily limited to the following:
1.
Miscellaneous steel shapes.
2.
Stainless steel shelves in Toilet Rooms.
3.
Galvanized insect screen between top of door and overhead concrete.
1.2
REFERENCED STANDARDS
A.
ASTM International:
1.
ASTM A123/A123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron
and Steel Products.
2.
ASTM A240/A240M - Standard Specification for Chromium and Chromium-Nickel Stainless
Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications.
3.
ASTM A283/A283M - Standard Specification for Low and Intermediate Tensile Strength Carbon
Steel Plates.
4.
ASTM A384/A384M- Standard Practice for Safeguarding Against Warpage and Distortion During
Hot-Dip Galvanizing of Steel Assemblies.
5.
ASTM A385/A385M - Standard Practice for Providing High-Quality Zinc Coatings (Hot-Dip).
6.
ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or ZincIron Alloy-Coated (Galvannealed) by the Hot-Dip Process.
B.
1.3
ADMINISTRATIVE REQUIREMENTS
A.
Coordination:
1.
Coordinate with other work supporting or adjoining miscellaneous metal and verify requirements for
cutting out, fitting, and attaching.
B.
Scheduling:
1.
Ensure timely fabrication of items to be embedded or enclosed by other work.
2.
Furnish information and assistance required for locating embedded items and be responsible for
proper location.
1.4
SUBMITTALS
A.
Product Data.
B.
Shop Drawings: Show at large scale construction of various components including profiles, sizes, methods of
joining, connection attachments, thickness of metals, reinforcing, anchorage, size and types of fasteners, and
accessories.
C.
Metal Fabrications
05 50 00 - 1
1.5
A.
B.
Deliver, store, and handle packaged materials in original containers with seals unbroken and labels intact until
time of use.
C.
Discharge materials carefully and store on clean concrete surface or raised platform in safe, dry area. Do not
dump onto ground.
D.
PART 2 PRODUCTS
2.1
METAL MATERIALS
A.
Ferrous Metals:
1.
Architectural and Miscellaneous Steel Items: ASTM A283/A283M.
2.
Galvanized Carbon Steel Sheets: ASTM A653/A653M, with G90 zinc coating.
B.
C.
D.
Plywood Backing at Stainless Shelves: Comply with requirements of Section 60 10 00 rough Carpentry.
2.2
ACCESSORIES
A.
Factory Applied Primer: Tnemec Co., Inc.s Series 27WB Typoxy; PPG Amercoats Amerlock 2; or
approved equal.
B.
2.3
A.
Preparation:
1.
Verify sizes, designs, and locations of items; do so at site whenever construction progress permits.
B.
General Requirements:
1.
Accurately fabricate decorative metal work to desired profile, design, and dimensions in accordance
with Contract Documents and reviewed Shop Drawings and finish Samples.
2.
Fabricate items from materials noted and make true to profiles shown. Obtain Architects approval of
proposed variations.
3.
Fabricate related components of same material as fabrication.
4.
Fabricate items with joints tightly fitted and secured.
5.
Miter corners and angles of frames and moldings unless otherwise noted.
6.
Grind exposed joints flush and smooth with adjacent finish surface. Make exposed joints butt
tight, flush, and hairline. Ease exposed edges to small uniform radius.
7.
Perform cutting, shearing, drilling, punching, threading, and tapping as required for items or their
adjacent work.
8.
Drill or punch holes; do not use cutting torch.
Metal Fabrications
05 50 00 - 2
C.
2.4
A.
Preparation of Surfaces:
1.
Thoroughly clean mill scale, rust, dirt, grease, and other foreign matter from ferrous metal prior to
galvanizing, hot phosphate treatment, or painting.
2.
Where hand cleaning methods are not adequate, clean in accordance with SSPC-SP1, SSPC-SP2, or
SSPC-SP7 as required.
3.
Completely eliminate burrs, rough spots, and pitting from normally exposed ferrous metal items.
B.
Galvanizing:
1.
Galvanize items after fabrication in largest sections practicable unless otherwise permitted or
recommended by ASTM A384/A384M.
2.
Where galvanizing is removed by welding or other assembly procedures, clean area of any foreign
matter by wire brushing and/or metal conditioner recommended by galvanized finish touch-up
manufacturer. Apply galvanized touch-up coating by brush or spray with a minimum coverage of 1.5
mils, dry film.
3.
Where ferrous metal item is noted to be galvanized, perform galvanizing in accordance with following
standards as applicable to item.
a.
Fabricated Items: ASTM A123/A123M.
C.
Painting:
1.
Follow paint manufacturers directions.
2.
Do not prime surfaces in direct contact with concrete or where field welding is required.
3.
Permit thorough drying before shipment.
4.
Spot paint abrasions and field connections after assembly.
D.
2.5
A.
Remove scratches, abrasions, dents, die markings, and other defects prior to finishing operations. Perform this
work in addition to finish treatment specified.
B.
Typical Finish: No. 4 directional finish with grain running in long direction of item or piece.
Metal Fabrications
05 50 00 - 3
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
3.2
PREPARATION
A.
Clean and strip primed steel items to bare metal where site welding is required.
B.
Supply steel items required to be cast into concrete or embedded in masonry with setting templates to
appropriate sections.
3.3
INSTALLATION
A.
Install items plumb and level, accurately fitted, free from distortion or defects.
B.
C.
Make provisions for erection stresses and loads. Install temporary bracing to maintain alignment, until
permanent bracing and attachments are installed.
D.
E.
Provide concrete inserts or pre-drilled expansion anchors in anchoring items into concrete.
F.
G.
Protect dissimilar metals from contact with each other or with other materials causing corrosion.
H.
Set items shown or required to be installed in sleeves with quick-setting anchor cement unless otherwise noted.
I.
Obtain approval of Architect prior to site cutting or making adjustments not scheduled.
J.
Field Touch-Up Painting: After erection, touch up welds, abrasions, and damaged finishes with prime paint
or galvanizing repair paint to match shop finishes.
K.
3.4
CLEANING
A.
Remove protective devices only when items will be safe from other construction operations or removal is
required to permit related work.
B.
C.
After erection, thoroughly clean surfaces of foreign or deleterious matter such as dirt, mud, oil, or grease that
would impair bonding of fireproofing or concrete.
END OF SECTION 05 50 00
Metal Fabrications
05 50 00 - 4
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of rough carpentry items including, but not necessarily limited to, the
following:
1.
Blocking, backing, stripping, furring, and nailers.
2.
Rough hardware.
B.
1.2
REFERENCE STANDARDS
A.
B.
C.
ASTM International:
1.
ASTM C1002 - Standard Specification for Steel Self-Piercing Tapping Screws for the Application
of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel Studs.
D.
E.
F.
1.3
SUBMITTALS
A.
Product Data.
B.
1.4
QUALITY ASSURANCE
A.
Apply label from agency approved by authority having jurisdiction to identify each preservative treated
material.
1.5
A.
Deliver and store packaged products in original containers or bundles with seals unbroken and labels intact
until time of use.
Rough Carpentry
06 10 00 - 1
Keep materials dry. Where necessary, stack materials off ground on level flat forms, fully protected from
weather.
PART 2 PRODUCTS
2.1
MATERIALS
A.
B.
C.
2.2
A.
Preservative Treatment:
1.
Lumber: Treat in accordance with AWPA C2 with 0.25 pcf retainage.
2.
Plywood: Treat in accordance with AWPA C9 with 0.25 pcf retainage.
B.
After treatment and prior to shipping, air- or kiln-dry lumber to maximum 15 percent moisture content.
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
3.2
INSTALLATION
A.
General:
1.
Split, warped, curled or otherwise defective material or careless improper workmanship will not be
accepted.
2.
Fit rough carpentry to other construction; scribe and cope as required for accurate fit.
3.
Surfaces must be level, plumb and true to lines indicated on the drawings.
Rough Carpentry
06 10 00 - 2
Securely attach carpentry work to substrate by anchoring and fastening as shown and as required
by recognized standards.
Discard units of material with defects that would lower required strength or result in unacceptable
appearance of exposed members.
B.
Provide blocking, grounds, nailers, stripping, and backing as indicated on drawings and as required to secure
other work.
C.
Where wood is cut, sawed, planed, bored, or marred after preservative treatment, apply two heavy brush coats
of same material used in treatment. Allow preservation to dry prior to erecting members.
END OF SECTION 06 10 00
Rough Carpentry
06 10 00 - 3
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of fluid-applied waterproofing systems (FAWS) as noted, complete
with related accessories.
B.
1.2
SYSTEM DESCRIPTION
A.
1.3
ADMINISTRATIVE REQUIREMENTS
A.
Coordination: Be responsible for coordinating work of this Section with related work provided under other
sections as required to avoid delays and prevent omission of related work required for correct installation.
B.
Preinstallation Meeting:
1.
Contractor shall arrange conference to review waterproofing work after review of submittals and prior
to delivering any material to site.
2.
Conference to be attended by Architect, Owners Representative, Contractor, and Contractors
installer, agents of accepted manufacturers, and other installers whose work may be affected quality of
waterproofing.
3.
Participants shall have had at least one weeks advance notice of meeting date and time.
4.
The meeting shall be held at the job site.
5.
The following major considerations shall be reviewed at the conference:
a.
Review in detail the Contract Specifications, surface preparation, protection of adjacent
surfaces, installation procedures, field quality control, and other related items.
b.
Review in detail job conditions, schedule, construction sequence, application requirements,
and quality of completed installation.
c.
Review methods for storing and handling materials.
d.
Review in detail the means of protecting completed work during remainder of construction
period.
e.
Record discussions of conference and any conflict, incompatibility, or inadequacy, and
furnish a copy of record to each participant.
6.
Contractor shall produce meeting notes that record discussions of conference and any conflict,
incompatibility, or inadequacy and they will indicate that the applicator of waterproofing has
reviewed and accepted the substrates for waterproofing.
7.
Distribute meeting notes to all attendees prior to installation of waterproofing.
1.4
SUBMITTALS
A.
Product Data.
Fluid-Applied Waterproofing
07 14 00 - 1
B.
C.
D.
Shop Drawings: Submit installation details for fluid-applied waterproofing system to show details at
reinforcing, at terminations, at expansion joints in structure, membrane at cold joints, at intersections of
horizontal and vertical surfaces, flashings at drains, and at penetrations in membrane systems.
1.
Submit for typical and non-typical conditions of Project. Manufacturers standard data sheets are not
acceptable for Shop Drawings.
2.
Indicate and identify materials to be incorporated in the work, dimensions, thickness of each material
and system, and relationships to adjacent construction.
E.
F.
Fluid-Applied Waterproofing Installers Compliance: Submit a written statement from Contractors installer
stating that:
1.
Contract Documents have been reviewed with the primary roofing material manufacturers
representative.
2.
Installer intends to comply with the Contract Documents.
3.
Roofing details do not conflict with manufacturers product/system warranty.
G.
Manufacturer's Installation Instructions: Submit special procedures and perimeter conditions requiring
special attention.
H.
Statement of Installation: Upon completion, submit written statement in form acceptable to Architect signed by
Contractor, fluid-applied waterproofing manufacturers technical representative, and installer, stating that work
was provided in compliance with the Contract Documents, and that installation methods complied with
manufacturers printed instructions and were proper and adequate for conditions of application and use.
I.
Submit copy of fluid-applied waterproofing manufacturers technical representatives field inspection reports
on the installation and water test inspection of waterproofing.
J.
Maintenance Manual: Upon completion of work, submit one copy of maintenance manual, identifying project
name, location and date, type of fluid-applied waterproofing system, and surface to which system was applied,
including sketches where necessary. Include recommendations for periodic inspections, care, and maintenance.
Identify common causes of damage with instructions for temporary patching until permanent repair can be
made.
1.5
QUALITY ASSURANCE
A.
Single Responsibility: Work shall be performed by single installer having undivided responsibility for
providing complete work, including all components and related work, and for performance and quality of
waterproofing.
B.
Manufacturer Qualifications: Submit certified evidence proving specified materials have been manufactured
by same source and successfully installed on a yearly basis for a minimum of ten years on projects of similar
extent and complexity.
1.
Manufacturer regularly and presently manufactures fluid-applied waterproofing as one of
manufacturers principal products.
Fluid-Applied Waterproofing
07 14 00 - 2
Manufacturers product submitted has been in satisfactory and efficient use on three installations
similar or equivalent to this project for three years. Submit list of installations. List shall include
name and location of project and name of owner.
C.
Installer Qualifications: Approval is required of installer, and will be based upon submission of certification
that:
1.
Installer fluid-applied waterproofing is licensed or otherwise certified by manufacturer, and certified
by the manufacturer as having the necessary expertise to install the specified system.
2.
Installer has installed a minimum of five projects using specified system and of similar scope and
complexity during the past five years.
D.
Contractor Responsibilities: Contractor is solely responsible for quality assurance and control of waterproofing
work.
E.
Manufacturer Representative:
1.
Contractor is to arrange for the manufacturers technical representative to be on the project site to
advise on every phase of work and to perform other like services.
2.
As a minimum representative shall be present for the first two workdays and of once each week
thereafter for minimum of two consecutive hours.
3.
Representative shall give preparation and installation instructions, examine substrate before
installation and examine completed installation before covering.
F.
Contractor-Applicator-Manufacturer Review: Contractor and applicator shall review Contract Documents with
representative of primary waterproofing materials manufacturer and obtain manufactures agreement that
selected systems are proper, compatible, and adequate for application shown and that conditions and details do
not conflict with manufacturers roofing and flashing warranty/guaranty.
G.
Make no deviations from Contract Documents and reviewed shop drawings without prior written approval by
Owner, Architect, and waterproofing manufacturer.
H.
Mockup: Before beginning installation, install fluid-applied waterproofing to portion of wall to demonstrate
surface preparation, crack and joint treatment, corner treatment and execution quality.
1.
If Architect determines mockup do not comply with requirements, reapply fluid-applied
waterproofing until mockup is approved.
2.
Approved mockup may become part of the completed Work if undisturbed at time of Substantial
Completion.
1.6
A.
Deliver and store packaged material in original containers with seals unbroken and labels intact until time of
use. Each container shall be identified with material name, date of manufacture and stock number, and material
data sheet.
B.
Store material in dry area out of direct sunlight. Protect materials from rain and physical damage. Storage area
temperature shall not exceed 90 degrees Fahrenheit.
1.7
SITE CONDITIONS
A.
Environmental Requirements:
1.
Do not start work when precipitation threatens or when temperature is under 40 degrees Fahrenheit.
2.
Do not start work unless surface temperatures will be between 40 and 110 degrees Fahrenheit during
installation and throughout curing period.
3.
Provide positive ventilation for areas not subject to natural ventilation throughout installation and 8
hours minimum during curing periods.
4.
Post No Smoking signs in area during and for at least eight hours following installation period.
Fluid-Applied Waterproofing
07 14 00 - 3
1.8
WARRANTY
A.
Warranty: Submit a written warranty executed by the manufacturer and installer, agreeing to repair or replace
fluid-applied waterproofing that fails in materials or workmanship within specified warranty period.
1.
Warranty Period: Twenty years from date of Final Completion.
2.
The warranty shall not deprive the Owner of other rights Owner may have under other provisions of
the Contract Documents and will be in addition to and run concurrent with other warranties made by
Contractor under requirements of the Contract Documents.
PART 2 PRODUCTS
2.1
A.
Concealed Membrane:
1.
Substrate: Concrete.
2.
Fluid-applied Materials: Membrane coating.
3.
Drainage composite with protection fabric.
2.2
MATERIALS
A.
Fluid-Applied Waterproofing:
1.
Description: Single component, liquid applied membrane with reinforcing fabric.
2.
Product: Carlisle Coatings and Waterproofing Inc.s CCW-MiraSEAL with DCH Reinforcing
Fabric; or equal.
B.
C.
Protection Course: Carlisle Coatings and Waterproofing Inc.s CCW Protection Board-V; or equal.
D.
E.
F.
Backer Rod: Extruded, closed cell flexible compressible polyethylene foam rod.
G.
Membrane Cleaner: Carlisle Coatings and Waterproofing Inc.s Carlisle Weathered Membrane Cleaner; or
equal.
Fluid-Applied Waterproofing
07 14 00 - 4
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
Do not start work until unsatisfactory conditions have been corrected. Commencement of application implies
acceptance of substrate area as suitable to accept fluid-applied waterproofing.
3.2
PREPARATION
A.
Cleaning:
1.
Thoroughly clean receiving surfaces of foreign material such as dirt, dust, free particles, oil, grease,
laitance, and other contaminants which will affect bond of the coating in accordance with fluidapplied waterproofing system.
2.
Use only cleaning materials and methods recommended by fluid-applied waterproofing system
manufacturer.
3.
Surfaces shall be vacuum cleaned or broomed.
B.
C.
Install a 1 inch face, 45 degree cant of sealant at all angle changes and inside corners including projections
through the deck, walls, curbs, bumpers, similar items.
D.
All cracks over 1/16 "inch in width and all moving cracks under 1/16 inch in width shall be saw cut to 1/4
inch minimum in width and depth. Saw cut a 1/4 by 1/4 inch kerf around drain flanges. Clean, prime and fill
saw cuts flush with sealant.
E.
All moving cracks over 1/16 inch wide and all expansion joints less than 1inch wide shall be cleaned,
primed, fitted with a backing rod and caulked with sealant. For larger joints, contact fluid=applied
waterproofing representative.
F.
G.
Apply a 6 inch wide, 45 mils thick stripe-coat of fluid-applied waterproofing centered over all sealed
cracks, hairline cracks, joints, and outside corners. Install reinforcing fabric.
H.
Apply a 45 mil thick stripe-coat of fluid-applied waterproofing over sealant cants and extending 4 inches
onto the horizontal deck. Install reinforcing fabric.
I.
All required metal shall be installed at this time. Apply a stripe coat fluid-applied waterproofing, 45 mils
thick, 6 inches wide, centered over all transitions from concrete to metal flashings and reinforce with
reinforcing fabric. Allow the stripe coat to cure a minimum of three hours or to a firm consistency.
J.
3.3
MEMBRANE COATING
A.
Apply fluid-applied waterproofing and related work in accordance with materials manufacturers
specifications for systems approved for this Project unless otherwise noted.
B.
Apply fluid-applied waterproofing in one uniform coat at the rate of one gallon minimum per 26 square feet
or as needed in order to obtain a minimum thickness of 60 wet mils, including coverage of detail work. Use
a 1/4inch notch squeegee to achieve a uniform thickness, then back roll to smooth coating
C.
Immediately install reinforcing fabric working the fabric into the wet fluid-applied waterproofing until
reinforcing fabric is saturated, avoiding trapped air, wrinkles and fish mouths. Cut and lay flat wrinkles and
fish mouths.
D.
In the event the entire surface is not completed in one day and becomes contaminated, prior to beginning
application clean an area 6 inches wide along the edge of the previously fluid-applied membrane with a
cloth wet with membrane cleaner. New work shall overlap the existing work by 6 inches.
E.
Allow the first coat of fluid-applied waterproofing to cure three hours minimum or to a firm consistency.
F.
Apply the second coat of fluid-applied waterproofing at the rate of one gallon minimum per 26 square feet
or as needed in order to obtain a minimum thickness of 60 wet mils over the first coat of fluid-applied
waterproofing. Cover the reinforcing fabric t for complete encapsulation. Fluid-applied waterproofing may
be applied wet material onto wet material with no displacement of previously applied detail coats,
previously applied coats and/or reinforcing fabric placement.
G.
3.4
A.
Owner may engage independent testing agency to verify that fluid-applied waterproofing system conforms with
manufactures specifications.
1.
Owners Testing Agency will make, examine, and test as required at least three 1 foot square cutouts
located at Architects discretion after prescribed drying period.
B.
Contractor shall:
1.
Patch cutouts to Architects satisfaction.
3.5
CLEANING
A.
Clean stains from adjacent surfaces with cleaning materials recommended by the fluid-applied waterproofing
system manufacturer.
Fluid-Applied Waterproofing
07 14 00 - 6
B.
Remove foreign matter from finished coating surfaces, masking protection, equipment, material, and debris
from roof and storage area.
3.6
PROTECTION
A.
END OF SECTION 07 14 00
Fluid-Applied Waterproofing
07 14 00 - 7
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of fluidapplied protected membrane roofing system to receive
engineered growth media and stone ballast as noted complete with related accessories.
B.
1.2
SYSTEM DESCRIPTION
A.
1.3
ADMINISTRATIVE REQUIREMENTS
A.
Coordination:
1.
Insure that the concrete finish and curing methods are in accordance with requirements of fluidapplied roofing system manufacturer for the proper installation of fluid-applied protected membrane
roofing system.
2.
Be responsible for coordinating work with installation of associated roof penetrations and
counterflashings installed by other sections as Work of this section proceeds.
3.
Be responsible for coordinating work of this Section with related work provided under other sections
as required avoiding delays and preventing omission of related work required for correct installation.
B.
Preinstallation Meeting:
1.
Contractor shall arrange conference to review fluid-applied protected membrane roofing work after
review of submittals and prior to delivering any material to site.
2.
Conference to be attended by Architect, Owners Representative, Contractor, and Contractors
installer, agents of accepted manufacturers, installers of other work in and around fluid-applied
protected membrane roofing that must precede, follow, or penetrate roofing (including Mechanical
and Electrical Installers as applicable).
3.
Participants shall have had at least one weeks advance notice of meeting date and time.
4.
Hold conference at the job site.
5.
The following major considerations shall be reviewed at the conference:
a.
Review in detail the Contract specifications, roof plans, roof decks, surface preparation,
slopes, drainage, flashing details, and other related roofing.
b.
Review in detail job conditions, schedule, construction sequence, installation requirements,
and quality of completed installation.
c.
Review methods for storing and handling materials.
d.
Review in detail the means of protecting completed work during remainder of construction
period.
e.
Discuss the acceptance of the substrate as indicated under Execution below.
6.
Contractor shall produce meeting notes that record discussions of conference and any conflict,
incompatibility, or inadequacy and they will indicate that the installer of roofing has reviewed and
accepted the substrates for roofing.
7.
Distribute meeting notes to all attendees prior to installation of fluid-applied roofing.
C.
Scheduling:
1.
All fluid-applied protected membrane roofing must be completed on each work day. Phased
construction of final fluid-applied roofing will not be permitted.
1.4
SUBMITTALS
A.
Product Data.
A.
B.
B.
Samples:
1.
Perimeter Rocks: Minimum two square feet of rocks.
2.
Other Samples only as requested.
C.
Fluid-Applied Protected Membrane Roofing Installers Compliance: Submit a written statement from
Contractors installer stating that:
1.
Contract Documents have been reviewed with the primary roofing material manufacturers
representative.
2.
Installer intends to comply with the Contract Documents.
3.
Roofing details do not conflict with manufacturers product/system warranty.
D.
Manufacturer's Installation Instructions: Submit special procedures and perimeter conditions requiring
special attention.
E.
Statement of Installation: Upon completion, submit written statement signed by Contractor and Contractors
installer, stating that fluid-applied protected membrane roofing system complied with the drawings and
specifications, and that installation methods complied with manufacturers printed instructions and were proper
and adequate for conditions of installation and performance.
F.
Submit copy of fluid-applied waterproofing manufacturers technical representatives field inspection reports
on the installation and water test inspection of waterproofing.
G.
Maintenance Manual: Upon completion of work, submit one copy of maintenance manual, identifying project
name, location and data, type of fluid-applied protected membrane roofing system, and surface to which system
was applied, including sketches where necessary. Include recommendations for periodic inspections, care, and
maintenance. Identify common causes of damage with instructions for temporary patching until permanent
repair can be made.
1.5
QUALITY ASSURANCE
A.
Single Responsibility: Work shall be performed by single installer having undivided responsibility for
providing complete work, including all components and related work, and for performance and quality of
waterproofing.
B.
Manufacturer Qualifications: Submit certified evidence proving specified materials have been manufactured
by same source and successfully installed on a yearly basis for a minimum of ten years on projects of similar
extent and complexity.
1.
Manufacturer regularly and presently manufactures fluid-applied protected membrane roofing sysrem
as one of manufacturers principal products.
Fluid-Applied Protected Membrane Roofing
07 55 56 - 2
Manufacturers product submitted has been in satisfactory and efficient use on three installations
similar or equivalent to this project for three years. Submit list of installations. List shall include
name and location of project and name of owner.
C.
Installer Qualifications: Approval is required of installer, and will be based upon submission of certification
that:
1.
Installer of fluid-applied protected membrane roofing system licensed or otherwise certified by
manufacturer, and certified by the manufacturer as having the necessary expertise to install the
specified system.
2.
Installer has installed a minimum of five projects using specified system and of similar scope and
complexity during the past five years.
D.
Contractor Responsibilities: Contractor is solely responsible for quality assurance and control of waterproofing
work.
E.
Manufacturer Representative:
1.
Contractor is to arrange for the manufacturers technical representative to be on the project site to
advise on every phase of work and to perform other like services.
2.
As a minimum representative shall be present for the first two workdays and of once each week
thereafter for minimum of two consecutive hours.
3.
Representative shall give preparation and installation instructions, examine substrate before
installation, witness flood tests, and examine completed installation before covering.
F.
Fluid-Applied Protected Membrane Roofing Installers Qualifications: Installer shall be licensed or otherwise
certified by manufacturer of fluid-applied protected membrane roofing system and be able to show evidence of
at least five years experience in successfully applying fluid-applied roofing system similar to those incurred on
this Project.
G.
H.
Make no deviations from Contract Documents without prior written approval by Architect and roofing
manufacture.
1.6
A.
Deliver and store packaged material in original containers with seals unbroken and labels intact until time of
use. Each container shall be identified with material name, date of manufacture and stock number, and material
data sheet.
B.
Store material in dry area out of direct sunlight. Protect materials from rain and physical damage. Storage area
temperature shall not exceed 90 degrees Fahrenheit.
1.7
SITE CONDITIONS
A.
Environmental Requirements:
1.
Do not start work when precipitation threatens or when temperature is under 40 degrees Fahrenheit.
2.
Do not start work unless surface temperatures will be between 40 and 110 degrees Fahrenheit during
installation and throughout curing period.
3.
Provide positive ventilation for areas not subject to natural ventilation throughout installation and 8
hours minimum during curing periods.
4.
Post No Smoking signs in area during and for at least eight hours following installation period.
1.8
WARRANTY
A.
Warranty: Submit a written warranty executed by the manufacturer and installer, agreeing to repair or replace
fluid-applied protected membrane roofing system that fails in materials or workmanship within specified
warranty period.
1.
Warranty Period: Twenty years from date of Final Completion.
2.
The warranty shall not deprive the Owner of other rights Owner may have under other provisions of
the Contract Documents and will be in addition to and run concurrent with other warranties made by
Contractor under requirements of the Contract Documents.
PART 2 PRODUCTS
2.1
A.
Description:
1.
Primer.
2.
Fluid-applied membrane system.
3.
Protection course.
4.
Root barrier.
5.
Drainage composite with protection fabric
6.
Up to 6 inches of engineered growth media.
7.
Perimeter rocks as indicated on Drawings.
Product: Carlisle Coatings and Waterproofing Inc.s Ultra Extensive Green Roof System; or
B.
equal.
2.2
MATERIALS
A.
B.
C.
Flashings:
1.
Non-Exposed Areas: Carlisle Coatings and Waterproofing Inc.s CCW-711-90 90 mil sheet
Membrane and Flashing; or equal.
2.
Exposed Areas: Carlisle Coatings and Waterproofing Inc.s Sure-Seal Fleece Black EPDM Sheet
or equal
D.
Protection Course: Carlisle Coatings and Waterproofing Inc.s CCW Protection Board-HS; or equal.
E.
Root Barrier: 16-mil tightly woven HDPE scrim with 2-mil polymeric coating on both sides specifically
formulated for use in below grade applications to resist root growth and soil bacteria.
F.
Root Barrier Cleaner: Carlisle Coatings and Waterproofing Inc.s Carlisle Weathered Membrane Cleaner;
or equal.
G.
H.
I.
Backer Rod: Extruded, closed cell flexible compressible polyethylene foam rod.
J.
K.
Perimeter Rocks: Nominal 1-1/2 2 1/2 diameter rounded water worn gravel (Grey and tan granite) which
conforms to ASTM D448, gradation size #2, applied at a minimum of 10 pounds per square foot.
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
Do not start work until unsatisfactory conditions have been corrected. Commencement of installation implies
acceptance of substrate area as suitable to accept fluid-applied protected membrane roofing system.
3.2
PREPARATION
A.
Cleaning:
1.
Thoroughly clean receiving surfaces of foreign material such as dirt, dust, free particles, oil, grease,
laitance, and other contaminants which will affect bond of the coating in accordance with fluidapplied protected membrane roofing system.
Use only cleaning materials and methods recommended by fluid-applied protected membrane roofing
system manufacturer.
Surfaces shall be vacuum cleaned or broomed.
B.
Prepare surfaces in accordance with requirements of fluid-applied protected membrane roofing system
manufacturer.
C.
Cracks: Saw cut or rout all shrinkage cracks in concrete over 1/16 inch in width, clean and fill flush with
sealant.
D.
Fill expansion, control, and construction joints to be covered with fluid-applied protected membrane roofing
system with sealant.
E.
3.3
A.
Flashing and Detail Installation: Follow fluid-applied protected membrane system applicable waterproofing
system specifications for specific surface preparation procedures, membrane positioning and adhesive
application requirements.
B.
Membrane Installation - Follow fluid-applied membrane roofing system manufacturers specifications for
specific surface preparation procedures, membrane positioning and adhesive application requirements.
1.
Apply primer to all surfaces and at the juncture of all horizontal surfaces to receive fluidapplied membrane roofing, including over flashings, at published square feet per gallon rate.
Avoid puddles. Allow primer to dry for one hour minimum or until the primer will not transfer to
touch, eight hours maximum.
2.
Heat fluid-applied membrane roofing with continuous agitation and apply at temperatures
between 330 to 375 degrees Fahrenheit.
3.
Apply heated fluid-applied membrane roofing to primed area and any pre-installed flashings at
a rate of 17.8 square feet per gallon or as required to obtain an average thickness of 90 mils.
4.
Apply reinforcing fabric and any required flashings while membrane is still warm and tacky.
Cut and trim off any wrinkles or overlap sections of the reinforcing fabric or hot the fabric
splices together with fluid-applied membrane roofing.
5.
Apply a second coat of fluid-applied membrane roofing at a rate of 12.8 square feet per gallon
or as required to obtain an average thickness of 125 mils. Total thickness of the fluid-applied
membrane roofing shall be 215 mils.
6.
Apply protection course into the last course of fluid-applied membrane roofing and splice the
protection board seams together with fluid-applied membrane roofing.
C.
Root Barrier:
1.
Sweep the surface of the membrane to remove all debris and loose or foreign material.
2.
Overlap the adjacent root barrier sheets a minimum of 4 inches in preparation for splicing.
3.
Splicing surfaces shall be clean. Remove dirt/contaminants from splice areas with root barrier
cleaner. Cleaner must be used to remove surface oxidation on the root barrier surface when the
material has been exposed to the elements for 7 days. Apply root barrier cleaner with a clean other
white rag.
D.
b.
3.
Cut the fabric along the flanged edge and remove to expose the edge of the
drainage board core and flange.
c.
Place the dimpled edge over the preceding flanged edge to join adjacent panels.
d.
Fabric on the drainage board panels extends beyond the edges of the polystyrene core to
provide an overlap to adjacent panels. When placing panels adjacent each other, overlap
fabric in the direction of water flow.
Cover drainage composite within 7 days of installation to prevent UV exposure.
E.
F.
3.4
A.
Owner may engage independent testing agency to verify that fluid-applied protected membrane roofing system
conforms to manufacturers specifications.
1.
Owners Testing Agency will make, examine, and test as required at least three one foot square
cutouts located at Architects discretion after prescribed drying period.
B.
Contractor shall:
1.
Patch cutouts to provide a watertight membrane to Architects satisfaction.
2.
Water test fluid-applied roofing system by flooding and maintaining 2 inch depth for minimum of 24
hours. Do not test any coated areas sooner than 24 hours following completion of installation. Test
prior to installing of root barrier.
3.
In event fluid-applied roofing system fails, remove substandard fluid-applied roofing system and
apply new at no additional cost to the Contract.
3.5
CLEANING
A.
Clean stains from adjacent surfaces with cleaning materials recommended by the fluid-applied protected
membrane roofing system manufacturer.
B.
Remove foreign matter from finished coating surfaces, masking protection, equipment, material, and debris.
3.6
PROTECTION
A.
B.
Limit traffic over completed roof membrane sections to essential personnel only. Heavily traveled areas
(staging areas, corridors used to transport green roof components) must be protected using expanded or
extruded insulation covered with 1/2 inch thick plywood or other sheathing
END OF SECTION 07 55 56
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of sheet metal flashing and trim work as shown or noted. Only more
important items are shown or noted.
B.
1.2
REFERENCE STANDARDS
A.
B.
ASTM International:
1.
ASTM A240/A240M - Standard Specification for Chromium and Chromium-Nickel Stainless Steel
Plate, Sheet, and Strip for Pressure Vessels and for General Applications.
2.
ASTM B370 - Standard Specification for Copper Sheet and Strip for Building Construction.
C.
1.3
ADMINISTRATIVE REQUIREMENTS
A.
Coordination: Coordinate details with details of adjacent work to assure watertightness, proper attachments,
sealed joints, tight flashings, and clean junctions.
B.
Scheduling: Insure timely delivery of items to be embedded in work of other sections and furnish setting
drawings or templates and setting instructions for exact installation.
1.4
SUBMITTALS
A.
Product Data.
B.
Shop Drawings: Show material profile, jointing pattern, jointing details, fastening methods, flashings,
terminations, and installation details.
C.
1.5
A.
Deliver, store, and handle packaged materials in original containers with seals unbroken and labels intact until
time of use.
B.
C.
Stack material to prevent twisting, bending, and abrasion, and to provide ventilation. Slope metal sheets to
ensure drainage.
D.
PART 2 PRODUCTS
2.1
SHEET METALS
A.
Stainless Steel Sheet: ASTM A240/A240M, Type 302 or 304; minimum 0.015 inch thickness; stainless steel
fastenings.
B.
Copper Sheet: ASTM B370; H00 temper, 20 ounces per square foot; stainless steel, hard copper, brass, or
bronze fastenings as recommended by manufacturer of copper sheet metal.
2.2
ACCESSORIES
A.
Fasteners: Same material and finish as sheet metal unless otherwise noted.
B.
C.
Solder and Flux Items: Remelted or reworked solder will not be permitted. Types as recommended by
manufacturer of sheet metal to be soldered.
D.
Expansion Shields, Packing, and Wedges: Lead or other nonferrous alloys as approved by Architect.
E.
Flashing Compound/Tape:
1.
Description: Polyisobutylene type, nonskinning, nondrying.
2.
Product: Schnee-Morehead, Inc.s SM5229 Tacky Tape Industrial Tape Sealant; or equal.
F.
Wood Nailers: Meet requirements of Section 06 10 00 - Rough Carpentry. Provide as required for lead
counterflashing.
2.3
FABRICATION
A.
Preparation: Verify measurements in field and coordinate with related work as required for proper and
adequate fabrication and installation.
B.
General Requirements:
1.
Items of standard manufacture may be furnished in lieu of specially fabricated items provided such
items meet requirements shown or noted.
2.
As far as practicable, form and fabricate sheet metal items in shop. Where circumstances require onsite fabrication provide quality equal to shop work.
3.
Accurately reproduce profiles and bends as shown or noted. Ensure that intersections are sharp, even,
and true; that plane surfaces are free from buckles and waves; that seams follow direction of water
flow.
4.
Form sections true to shape, accurate in size, square, and free from distortion or defects.
5.
Where work is not otherwise shown or noted, design and fabricate in accordance with SMACNA.
6.
Reinforce properly as required for strength and appearance.
7.
Cut, fit, and drill sheet metal as required to accommodate accessory items and work adjacent or
adjoining.
8.
Exposed Edges of Sheet Metal: Fold, bead, or return; no raw edges will be permitted.
C.
D.
E.
Soldering:
1.
Pre-tin edges 1-1/2 inch both sides prior to soldering.
2.
Use heavy soldering coppers of blunt design.
3.
Immediately after applying flux, solder slowly with well-heated coppers, thoroughly heating seams
and completely sweating solder through full width with at least 1 inch width along seams.
4.
After soldering, immediately neutralize any acid flux and flush with clean water.
F.
Expansion-Contraction of Sheet Metal Runs: Provide loose locking slip joint at maximum 8 feet from external
or internal corners, at every 24 feet of straight runs unless manufacturer recommends more frequent interval,
and one at center of runs less than 20 feet but more than 8 feet long.
G.
Expansion-Contraction of Sheet Metal Runs at Copings: Provide drive cleat expansion joints at maximum 4
feet from external or internal corners, at every 10 feet of straight runs unless manufacturer recommends more
frequent interval, and one at center of runs less than 20 feet but more than 8 feet long.
2.4
FINISHES
A.
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
3.2
PREPARATION
A.
Where flashing and sheet metal work is related to built-up bituminous roofing, install under supervision of
built-up bituminous roofing applicator.
3.3
INSTALLATION
A.
B.
Where installation requires performing work of fabrication, meet requirements of applicable standards of
Fabrication Article of this Section.
C.
Apply flashing compound at slip joints or wherever else metal-to-metal contact occurs and movement may be
anticipated.
D.
Unless otherwise noted or required by manufacturer, fasten sheet metal runs to underlying material by nailing
through slotted holes in flange at 3 inches on center. Provide waterproof washers wherever required fasteners
penetrate flashings. Where sheet metal occurs over roofing materials or other sheet metal, use nails with 1 inch
metal disks.
E.
Insure that items are installed in true and accurate alignment with other items and related work; that joints are
accurately fitted; that exposed surfaces are free from dents; that corners are reinforced; that seams are
watertight.
F.
Secure sheet metal flashing and trim in place using concealed fasteners.
G.
Fit flashings tight in place. Make corners square, surfaces true and straight in planes, and lines accurate to
profiles.
H.
3.4
PROTECTION
A.
Protect sheet metal work as required against construction damage; remove prior to final acceptance.
END OF SECTION 07 62 00
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of joint sealants and related materials where noted.
B.
1.2
REFERENCE STANDARDS
A.
ASTM International:
1.
ASTM C1193 - Standard Guide for Use of Joint Sealants.
2.
ASTM C1330 - Standard Specification for Cylindrical Sealant Backing for Use with Cold Liquid
Applied Sealants.
B.
1.3
SYSTEM DESCRIPTION
A.
Contractor is responsible for the design selection and installation of the sealants, as well as the performance
of the sealant system
B.
Except as otherwise indicated, joint sealants are required to establish and maintain airtight and waterproof
continuous seals on a permanent basis, with recognized limitations of wear and aging as indicated for each
application. Failures of installed sealants to comply with this requirement will be recognized as failures of
materials and workmanship.
1.4
SUBMITTALS
A.
Product Data.
B.
Samples:
1.
Manufacturers bead samples of actual products showing full range of colors available, for each
product exposed to view.
2.
Sealant beads applied to actual materials used in project for testing adhesion.
3.
Other Samples only as requested.
C.
Manufacturer's Installation Instructions: Indicate special procedures, surface preparation, and perimeter
conditions requiring special attention.
1.5
QUALITY ASSURANCE
A.
Joint Sealants
07 92 00 - 1
1.6
A.
Delivery: Deliver sealants and related accessories in factory-sealed, unopened containers bearing
manufacturers name, batch number, product designation, color, expiration period, curing time, and mixing
instructions for multi-component materials..
B.
Storage: Store in original, unopened containers or packages. Follow manufacturers recommendations for
storage temperature and shelf life.
C.
Handling: Follow manufacturers recommendations for handling products containing toxic materials. Keep
flammable material away from heat, sparks, and open flame. Use recommended solvents and cleaning agents
for cleaning tools, equipment, and skin.
1.7
SITE CONDITIONS
A.
Environmental Requirements: Apply materials only when surface and ambient temperatures fall within
manufacturer-recommended ranges. Consult manufacturer when sealant cannot be applied within these
temperature ranges.
PART 2 PRODUCTS
2.1
JOINT SEALANTS
A.
General Requirements:
1.
Sealant systems shall be compatible with contacting membranes, premolded joint filler, and fluid
applied waterproofing systems.
2.
Sealant systems shall not stain adjacent exposed surfaces.
3.
Manufacturers standard color range shall permit matching sealants to color of contacting surfaces.
4.
All sealants shall have VOC content of less than or equal to 100 g/L.
5.
Sealants shall meet or exceed requirements of BAAQMD, Reg. 8, Rule 51 for Volatile Organic
Compound (VOC) emissions.
B.
Sealant Type 1:
1.
Description: One component low modulus silicone sealant.
2.
Product: General Electric Co.s Silpruf SCS2000; Dow Corning Corp.s Dow Corning 795
Building Sealant; or approved equal.
3.
Location: Typical sealant unless otherwise noted.
C.
Sealant Type 2:
1.
Description: Multi-part polyurethane, minimum Shore A hardness of 40.
2.
Product: Tremcos THC/900; Pecora Corp.s Dynatred; or approved equal.
3.
Location: Horizontal joints subject to traffic abrasion.
D.
Sealant Type 3:
1.
Description: One component silicone sealant.
2.
Product: General Electric Co.s SCS1700; Dow Corning Corp.s Dow Corning 786 MildewResistant Silicone Sealant; or approved equal.
3.
Location: Ceramic tile and plumbing fixtures.
2.2
ACCESSORIES
A.
Primers, Sealers, Surface Conditioners, Solvents: As recommended by manufacturer of sealant material for
each substrate. Solvents shall be residue-free.
Joint Sealants
07 92 00 - 2
B.
Typical Back-Up Material, Fillers, and Joint Packing.: Round flexible, polyolefin foam rod made of nonabsorbing outer skin and resilient interior network of both open and closed cells that do not out-gas when
ruptured and meeting requirements of ASTM C1330 Type B. Incompressible materials or acrylic-, asphalt-,
oil-, or solvent-containing materials will not be permitted.
C.
Release Materials: Polyethylene film, masking tape, or similar materials as recommended by sealant
manufacturer.
D.
Cleaning Materials: Nonstaining and not otherwise injurious to exposed surfaces; for metal and glass, use
xylol, tolerol, or methyl ethyl ketone.
2.3
MIXING
A.
Multi-Component Sealants:
1.
Mix at job site with suitable power-operated equipment.
2.
Ensure components are mixed with identical batch control numbers.
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
3.2
PREPARATION
A.
B.
Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants.
1.
Thoroughly clean receiving surfaces, joints, and spaces of foreign material which could interfere with
adhesion of joint sealants, including dirt, paints, mill-scale, rust, oil, grease, waterproofing, water
repellents, water, and surface dirt.
2.
Clean porous surfaces, by brushing, grinding, blast cleaning, mechanical abrading, or acid washing to
produce clean sound substrate.
3.
Remove loose particles remaining from cleaning operation vacuuming or blowing out joints.
4.
Remove laitance and form release agents from concrete.
5.
Use only cleaning materials recommended by sealant manufacturer; do not use soap, detergents, or
water-based cleaners on masonry, metal, or glass.
6.
Do not permit solvents to air dry; wipe surfaces free of solvent using clean, dry white cloth or white
lintless paper.
C.
D.
Protection:
1.
Protect elements surrounding the work of this section from damage or disfigurement.
Joint Sealants
07 92 00 - 3
Use masking tape where required to control lap of materials on adjacent surfaces and remove upon
completion.
Be responsible for damage to adjacent surfaces caused by sealant operations.
E.
F.
Joint Priming:
1.
Make preliminary tests to insure primers will not stain exposed materials or deteriorate back-up
material.
2.
Prime surfaces as recommended by sealant manufacturer immediately prior to sealing.
3.
Confine primers to areas of joint sealant bond, do not allow spillage or migration onto adjoining
surfaces.
G.
3.3
INSTALLATION
A.
Install joint sealants in exact accordance with manufacturers specifications, procedures established during
demonstration, and ASTM C1193.
B.
C.
Bonding Surface Depths: Control depths with back-up material; in placing preformed bead or rope types, do
not twist or bend.
1.
Typical Joints: 1/4 inch.
2.
Concrete Joints Where Movement is Expected: 1/2 to 3/4 inch.
3.
Joints Less than 1/2 Inch Wide: From 1/2 width to full width of joint.
4.
Joints Greater than 1/2 Inch Wide, but No Greater than Two Inches: 1/2 width of joint.
D.
Release Materials:
1.
Use release material between back-up material and sealant where required to confine adhesion of
sealant to surfaces of materials joined.
2.
Conditions requiring release materials include, but are not necessarily limited to, joints subject to
movement where sealant would otherwise contact back of joint or adhere to back-up materials and
over support backing at traffic-bearing joints.
3.
Release material will not be required where back-up material is polyethylene.
E.
Accurately position filler material within joint to establish and control the uniform designated thickness of
sealant. Exercise care in the installation of joint backing to see that the backing is not set too far below surface,
thereby increasing the depth of sealant.
F.
Apply material with sufficient pressure to completely fill the void space and to assure complete wetting of the
contact area to obtain uniform adhesion.
1.
During application keep tip of nozzle at bottom of joint, forcing sealant to fill from the bottom to top.
2.
Move tip along joint to completely fill the joint. Finish joints smooth and flush with adjacent surface
unless detailed otherwise.
G.
Tooling:
1.
Using tooling agent recommended by sealant manufacturer, neatly tool joints to compress material,
improve adhesion to surfaces joined, and achieve slightly concave surface.
2.
Repair air pockets exposed by tooling.
3.
Use masking tape where required to facilitate tooling and remove upon completion.
Joint Sealants
07 92 00 - 4
3.4
PATCHING
A.
3.5
CLEANING
A.
Clean adjacent surfaces soiled in applying sealants in accordance with sealant manufacturers
recommendations.
B.
C.
3.6
PROTECTION
A.
Protect joint sealants during and after curing period from contact with contaminating substances or from
damage.
END OF SECTION 07 92 00
Joint Sealants
07 92 00 - 5
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of steel frames, including but not necessarily limited to the following:
1.
Door frames.
2.
Glazed windows.
B.
1.2
REFERENCE STANDARDS
A.
B.
ASTM International:
1.
ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or ZincIron Alloy-Coated (Galvannealed) by the Hot-Dip Process.
1.3
ADMINISTRATIVE REQUIREMENTS
A.
Coordination:
1.
Coordinate steel frame details with work supporting or adjoining steel frames.
2.
Coordinate steel frame work with frame opening construction with doors and hardware.
1.4
SUBMITTALS
A.
Product Data including preparation of metal for priming and priming material.
B.
Shop Drawings: Show each opening indicating opening criteria, frame types, fire-resistive rating, hardware
locations, and details including anchors and attachment to adjacent structure, dimensions, machining criteria
for hardware.
C.
1.5
A.
B.
C.
D.
Steel Frames
08 12 13 - 1
Provide clean, dry surfaces or platforms as required, and protect from deterioration and foreign
matter.
Do not store on ground.
PART 2 PRODUCTS
2.1
FRAME TYPES
A.
B.
2.2
MATERIALS
A.
Galvanized Sheet Steel: Zinc-iron alloy finish (galvannealed) to meet requirements of ASTM A653/A653M,
coating designation A60.
B.
Factory Applied Primer: Provide primer compatible with paint systems specified in Section 09 91 00 Painting.
C.
2.3
FABRICATION
A.
Fabricate metal frames in accordance with ANSI A250.8 unless otherwise indicated.
B.
Preparation:
1.
Verify partition dimension and door details; obtain reviewed hardware schedule, templates, and other
information.
2.
Verify size and design of each opening.
C.
D.
Gage: 14 gage.
E.
Steel Frames
08 12 13 - 2
F.
G.
2.4
FINISHES
A.
Preparation: Thoroughly clean surfaces of rust, grease, and other impurities. Grind smooth edges, welds, and
rough spots.
B.
Exterior Frames: After fabrication, touch up abraded galvanizing, chemically etch, and apply one baked-on
prime coat.
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
Examine door frames for damage, defects, and suitability for intended use.
C.
D.
Replace with good material any part or item found damaged, defective, or inadequate before installation.
E.
F.
3.2
INSTALLATION
A.
Install frames in accordance with the requirements of the specified frame grade and ANSI A250.11.
B.
Install frames in accordance with final shop drawings and manufacturers data, except where requirements that
are more stringent are specified herein.
C.
D.
Steel Frames
08 12 13 - 4
ERECTION TOLERANCES
A.
Maximum Diagonal Distortion: 1/8 inch measured with straight edges, corner to corner.
3.4
DEFECTIVE WORK
A.
Replace, rework, or otherwise make good as required frames found defective as follows:
1.
Items broken, damaged, disfigured, or defaced.
2.
Incomplete, misaligned, or incorrectly located items.
END OF SECTION 08 12 13
Steel Frames
08 12 13 - 5
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of wood doors of types noted and installation of their hardware.
B.
1.2
ADMINISTRATIVE REQUIREMENTS
A.
Coordination:
1.
Coordinate details with other work supporting or adjoining wood doors.
2.
Coordinate Work with door opening construction, frames, door, and hardware installation.
B.
Scheduling:
1.
Deliver wood doors only after proper facilities are available.
1.3
SUBMITTALS
A.
Product Data.
B.
Shop Drawings: Show each door indicating door elevations, hardware locations, dimensions, door and core
types, swings, undercuts required, and factory machining criteria for hardware.
C.
Samples:
1.
Wood illustrating species and grain, minimum 6 inches square.
2.
Other Samples only as requested.
1.4
A.
Prior to delivery to site, identify each door with individual opening number to permit installation at correct
location.
B.
Pack wood doors individually in heavy polyethylene bags and then corrugated cardboard containers. Provide
additional protection for corners and vertical edges. Break seal on site to permit ventilation.
C.
D.
E.
Wood Doors
08 14 00 - 1
1.5
WARRANTY
A.
Provide manufacturers written one year warranty providing for replacing, including cost of rehanging and
refinishing, at no cost to Owner, wood door exhibiting defects in materials or workmanship.
PART 2 PRODUCTS
2.1
WOOD DOORS
A.
Description:
1.
Wood: Mahogany..
2.
Stiles: 5-5/16 inches.
3.
Top Rail: 5-3/16 inches.
4.
Bottom Rail: 8-15/16 inches.
5.
Panels: Solid lumber, edge glued.
6.
Door Thickness: 1-3/4 inches.
7.
Construction:
a.
Cope and stick joinery with 1/2 inch by 4-1/4 inch dowels.
b.
Type 1 marine grade waterproof glue.
c.
Panels float to allow for expansion and contraction due to humidity changes. Apply caulking
between sticking and panel to prevent water intrusion.
B.
2.2
FABRICATION
A.
Preparation:
1.
Verify frame details; obtain reviewed hardware schedule, templates, and other information.
2.
Verify size, and design of each opening.
B.
C.
Factory fit doors for frame opening dimensions identified on shop drawings.
D.
Factory machine doors for finish hardware in accordance with hardware requirements according to templates.
Do not machine for surface hardware.
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
Examine receiving frames and reviewed hardware schedule to verify proper coordination with doors.
C.
Replace with good material any part or item found damaged, defective, or inadequate before installation.
D.
E.
Do not install doors in frame openings that are not plumb or are out-of-tolerance for size or alignment.
Wood Doors
08 14 00 - 2
3.2
INSTALLATION
A.
Install wood doors in accordance with reviewed shop drawings and manufacturers data, except where more
stringent requirements are specified herein.
B.
Install doors at correct openings; assure smooth swing and proper closure with frame.
C.
D.
Hang doors to obtain free swinging operation without binding, sticking, or sagging. Maintain proper
clearances between door and frame.
E.
Hardware: Install in accordance with Standards for Installation Article of Section 08 71 00 Door
Hardware.
F.
3.3
ADJUSTING
A.
Adjust doors for smooth and balanced door movement and correct swinging, closing, and latching. Lubricate
or wax hardware and moving parts as required.
3.4
DEFECTIVE WORK
A.
Replace, rework, or otherwise make good as required, doors or finish hardware found defective as follows:
1.
Items broken, damaged, disfigured, or defaced.
2.
Incomplete, misaligned, or incorrectly located items.
3.
Doors that will not hang in any position without moving when opened.
4.
Where damages are in excess of repairs, which may be required by touch up process.
END OF SECTION 08 14 00
Wood Doors
08 14 00 - 3
PART 1 GENERAL
1.1
SUMMARY
A.
1.2
REFERENCE STANDARDS
A.
B.
1.3
PERFORMANCE REQUIREMENTS
A.
Design Requirements:
1.
Intent is provision of all required items of door hardware.
2.
Hardware shall be made to template.
B.
All hardware shall meet requirements of CBC Sections 1008.1.8 and 1133B.2.5.1.
C.
D.
1.4
ADMINISTRATIVE REQUIREMENTS
A.
Coordination: Coordinate Work with other directly affected sections involving manufacturer or fabrication of
internal reinforcement for door hardware and recessed items.
1.
Coordinate hardware with doors, frames, and related work to ensure proper size, thickness, hand,
function, and finish of hardware.
2.
Coordinate door hardware work with other directly affected sections involving manufacturer or
fabrication of internal reinforcement for door hardware and recessed items.
3.
Provide necessary copies of templates or actual hardware as required ensuring proper preparation of
doors and frames.
4.
Provide necessary copies of schedules and templates to necessary trade supplying materials to be
prepped for door hardware in ample time to avoid fabrication and construction delays.
5.
Coordinate mounting heights with door and frame manufacturers.
6.
Coordinate reinforcing units provided by door and frame manufacturers with by hardware supplier
and hardware manufacturer.
7.
Coordinate Owners keying requirements during course of Work.
Door Hardware
08 71 00 - 1
1.5
SUBMITTALS
A.
Product Data: For each door hardware item, furnish manufacturers product information including parts list.
B.
C.
D.
Templates: Furnish hardware schedule and templates to Contractor for distribution to necessary trades
supplying materials to be prepped for door hardware.
E.
Manufacturer's Installation Instructions: Submit special procedures, and perimeter conditions requiring
special attention.
1.6
MAINTENANCE PRODUCTS
A.
Provide special wrenches and tools applicable to each different or special hardware component
B.
C.
Deliver materials to Owners designated storage place, unload, and position in place per Owners instructions.
D.
Provide Owner with a signed receipt indicating materials and quantities upon delivery
1.7
A.
B.
Delivery: Hardware supplier shall deliver all hardware to Project site; direct factory shipments are all allowed
unless agreed upon beforehand.
C.
Storage: Provide secure lock-up for hardware delivered to the project, but not yet installed. Control
handling and installation of hardware items which are not immediately replaceable, so that completion of
the work will not be delayed by hardware losses, both before and after installation.
PART 2 PRODUCTS
2.1
GENERAL REQUIREMENTS
A.
Manufacturers' catalog numbers are used herein to establish type, series, operation, and quality desired;
substitutions of equal products will be permitted only where invited.
Door Hardware
08 71 00 - 2
B.
Furnish each type of door hardware with accessories as required for applications indicated and for complete,
finished, operational doors.
C.
Fastenings: Furnish fastenings of sufficient quantity, suitable size and type for heavy use and long life and as
recommended by hardware manufacturer and as required to secure hardware. Following guidelines should be
adhered to for fasteners and anchors:
1.
Finish: Exposed portions of fasteners and anchors shall match hardware item being fastened.
2.
Provide sex bolts, toggle bolts, or other anchors as recommended by hardware manufacturer
according to material to which hardware is applied. Provide sex bolts for door closers attached to
wood doors.
3.
Exposed Screw Heads: Phillips head type, unless otherwise indicated.
4.
Use machine screws for hardware applied to metal.
5.
Install hardware fastened to concrete or masonry with machine screws and Star type double
expansion shields, or for screw sizes less than 1/4 inch, fasten with wood screws and Phillips Red
Head Plastic Anchors, Fastway Extruded Vinyl Anchors, or Star Plastic Anchors , or equal. Do not
use lead shields or tampins.
2.2
A.
Hinges:
1.
Hinges shall display following characteristics:
a.
Entire length of hinge pin shall be circumferenced with a continuous machined surface on
ball bearing hinges.
b.
Swaging of the hinge shall not be in contact with hinge pin on a ball bearing hinge.
c.
All hinges shall have five knuckles.
d.
All ball bearings shall be completely concealed without the use of ferrules or sleeves.
e.
All bearings and raceways shall be stainless steel.
f.
Hinge size shall be in accordance with approved manufacturers published
recommendations. Size shall be sufficient to clear trim projection.
g.
Exterior outswinging doors shall have non-removable pins.
2.
Manufacturers: Hager Companies; Stanley Security Solutions, Inc.; McKinney Products Co.; or
equal.
B.
Locksets:
1.
Mortise Locksets:
a.
Description: All mortise locksets shall display the following characteristics:
1)
Mortise locksets shall meet requirements of ANSI A156.13 Series 1000 Grade 1.
2)
Backset: 2-3/4 inches.
3)
Locksets shall have standard spacing between cylinders, thumb-pieces, and spindle.
4)
Locksets shall have mechanical anti-friction device.
5)
Locksets shall be reversible in the field.
6)
Locksets shall be changeable in the field without changing case.
b.
Product: Schlage Lock Co.'s L Series, 18 Design, N Escutcheon; or equal.
2.
Miscellaneous Locksets: Manufactured by Schlage Lock Co.,; or equal.
3.
Standard Cylinders:
a.
Cylinders to have interchangeable cores.
b.
Use same keyway for all cylinders.
c.
Cylinders shall have six pins.
4.
Strikes:
a.
Provide wrought box strike for all locks, latches, and deadbolts.
b.
Provide lip of strike with proper length for jamb detail and to protect trim from marring by
latch bolt.
c.
Strike to be curved unless otherwise indicated.
d.
Coordinate strike requirements with lockset type and metal frames.
Door Hardware
08 71 00 - 3
C.
Modern Closers:
1.
Description: All modern closers shall display the following characteristics:
a.
Hydraulically controlled full rack and pinion in operation with separate noncritical
adjustable regulation for general closing speed, latching speed, backcheck control and spring
power.
b.
Adhere to manufacturer's recommended schedule of sizes unless otherwise noted.
2.
Manufacturers: LCN Closers; Norton Door Controls; Sargent Manufacturing Co.; or equal.
D.
Threshold:
1.
All thresholds must have a reinforcing center leg. Single length for each opening. Cut ends to match
jamb profile.
2.
Manufacturers: Pemko Manufacturing Co.; Zero International Inc.; Reese Enterprises, Inc.; or equal.
E.
Weatherstripping Manufacturers: Pemko Manufacturing. Co.; Zero International Inc.; Reese Enterprises, Inc.;
or equal.
F.
Mute (Silencer) Manufacturers: Rockwood Mfg. Co.; Triangle Brass Manufacturing Co., Inc. (Trimco); Ives;
or equal.
2.3
FINISHES
A.
All hardware finishes shall conform to ANSI A156.18 product standards, materials, and finishes. Typical
hardware finish shall be satin stainless steel finish.
B.
2.4
KEYING
A.
The hardware supplier shall spend whatever time is required with Owner to obtain his requirements and
properly lay out complete key schedule for approval.
PART 3 EXECUTION
3.1
EXAMINATION
A.
Examine doors, door frames, and hardware for damage, defects, and suitability for intended use.
B.
Verify door and frames are ready to receive door hardware and dimensions are as indicated on shop drawings
and as instructed by manufacturer.
C.
Verify that building is secured and free from weather elements prior to installing interior door hardware.
D.
Replace with good material any part or item found damaged, defective, or inadequate before installation.
3.2
A.
B.
Install door hardware at heights indicated on the Drawings unless otherwise indicated.
1.
Mounting height of latching hardware shall be 30 to 44 inches above finished floor surface per CBC
Section 1133B.2.5.2.
C.
Floor stops shall not be located in path of travel and 4 inches maximum from walls (Policy 99-08).
Door Hardware
08 71 00 - 4
D.
E.
Do not install surface-mounted hardware until finishes have been completed on substrates involved.
F.
Fitting: Accurately and properly fit door hardware. Securely fasten fixed parts for smooth, trouble-free,
nonbinding operation; fit faces of mortised parts snug and flush; operating parts shall move freely and smoothly
without binding, sticking or excessive clearance.
G.
Ensure door hardware displays no evidence of finish paint after final building clean up with exception of
prime-coated door hardware installed for finish painting. Contractor may achieve this by sequencing
installation, removing after fitting and reinstalling after painting is completed, providing protection, cleaning to
original hardware finish or other approved means.
H.
Latch and Bolt: Install latch and bolt to automatically engage in keeper, whether activated by closer or by
manual push; in no case shall additional manual pressure be required to engage latch or bolt in keeper.
I.
Closers:
1.
Adjust closer delay and operating speeds to comply with requirements of CBC Section 1133B.2.5 and
Americans with Disabilities Act Architectural Guidelines, Article 4.13.10.
2.
Adjust sweep period of door closers so that from an open position of 70 degrees, door will take at
least 3 seconds to move to a point 3 inches from that latch, measured to leading edge of door.
3.
Mount closers for 180 degrees swing wherever possible. Supply drop plates at narrow top rail doors.
4.
Carefully adjust closers to operate noiselessly and evenly.
J.
As required during progress of work, remove and reset doors and hardware for installation of work of other
trades.
K.
After work has been otherwise completed, examine hardware in place for complete and proper installation.
3.3
ADJUSTING
A.
Adjust and check each operating item of hardware and each door to ensure proper operation or function of
every unit.
B.
Lubricate bearing surfaces of moving parts and adjust latching and holding devices for proper function; adjust
door control devices for speed and power; test keys for proper conformance with keying system.
C.
Replace units which cannot be adjusted to operate freely and smoothly as intended for the application made.
D.
Final Adjustment: Wherever hardware installation is made more than one month prior to acceptance or
occupancy of a space or area, return to the work during the week prior to acceptance or occupancy, and
make final check and adjustment of all hardware items as necessary. Restore proper function and finish of
hardware and doors. Adjust door control devices to compensate for final operation of heating and
ventilating equipment
3.4
CLEANING
A.
Completely remove protective materials and devices and thoroughly clean exposed surfaces of hardware; check
for surface damage prior to final cleaning for Owner's acceptance of Project.
3.5
A.
Door Hardware
08 71 00 - 5
B.
Protect door hardware from damage or marring of finish during construction; use strippable coatings,
removable tapes or other approved means.
C.
3.6
DEFECTIVE WORK
A.
Replace, rework or otherwise make good any hardware found defective as follows:
1.
Unauthorized substitutes.
2.
Hardware broken, damaged, disfigured, or defaced
3.
Hardware delivered with missing, broken, damaged or defaced parts.
4.
Hardware of incorrect hand or function.
5.
Incomplete, misaligned, or incorrectly located hardware.
3.7
HARDWARE SCHEDULE
GROUP NO. 1 - Each door to have:
3
Hinges
1
Cylinder
1
Deadlock
1
Mortise Privacy Lock with
OCCUPIED indicator
1
Modern Closer, Parallel Arm
with Built-In Stop
3
Mutes
1
Door Bottom (Shoe)
1
Threshold
GROUP NO. 2 - Each door to have:
3
Hinges
1
Cylinder
1
Mortise Storeroom Lockset
1
Modern Closer, Parallel Arm
with Built-In Stop
1
Gasket at Head and Jambs
3
Mutes
1
Automatic Door Bottom
1
Threshold
END OF SECTION 08 71 00
Door Hardware
08 71 00 - 6
SECTION 08 80 00 - GLAZING
PART 1 GENERAL
1.1
SUMMARY
A.
1.2
REFERENCE STANDARDS
A.
B.
ASTM International:
1.
ASTM C1048 - Standard Specification for Heat-Treated Flat Glass-Kind HS, Kind FT Coated and
Uncoated Glass.
2.
ASTM C1172 - Standard Specification for Laminated Architectural Flat Glass.
C.
D.
1.3
SUBMITTALS
A.
Product Data:
1.
Glass: Provide structural, physical, and environmental characteristics, size limitations, and special
handling or installation requirements.
2.
Glazing Sealants, Compounds, and Accessories: Provide chemical, function, and environmental
characteristics, limitations, special application requirements. Identify available colors where exposed.
B.
Samples:
1.
Glass: 12 by 12 inch sample of each glass types specified. Identify all samples with types of glass
and thicknesses/
2.
Other samples as requested.
C.
D.
1.4
QUALITY ASSURANCE
A.
Perform Work in accordance with GANA Glazing Manual, GANA Sealant Manual, and GANA Laminated
Glass Design Guide for glazing installation methods.
1.5
A.
B.
Deliver and store packaged materials in original containers bearing manufacturers name.
Glazing
08 80 00 - 1
C.
Deliver glass affixed with manufacturers labels and do not remove labels prior to installation, inspection, or
final approval.
PART 2 PRODUCTS
2.1
GLASS TYPES
A.
2.2
COMPONENTS
A.
Safety Glass: Conform to ANSI Z97.1, minimum thickness 1/4 inch unless otherwise indicated.
1.
Clear Fully Tempered Glass: ASTM C1048, Kind FT, Condition A uncoated surfaces, Type 1
transparent flat, Class 1 clear, Quality q3 glazing select.
2.
Clear Laminated Glass: ASTM C1172.
a.
Outer Lite: As indicated in Glass Types.
b.
Innerlayer: As indicated in Glass Types
c.
Inner Lite: As indicated in Glass Types.
d.
Overall Thickness: As indicated in Glass Types.
2.3
GLAZING MATERIALS
A.
Sealant: Sealants to have maximum volatile organic compound content in accordance with SCAQMD Rule
#1168.
1.
Typical:
a.
Description: One-part silicone type, neutral cure.
b.
Product: Dow Corning Corp.s 795 Silicone Building Sealant; General Electric Co.s
Silpruf Sealant Series SCS-2000; or equal.
B.
Setting Blocks: ASTM C864, neoprene with 85 to 90 Shore A durometer hardness or silicone with 85 Shore A
durometer hardness.
C.
Spacers, Spacer Shims, Shims, and Wedges: ASTM C864, neoprene, 50-75 Shore A durometer hardness.
D.
Pressure Tape: Preformed butyl compound with integral resilient tube spacing device, 10 to 15 Shore A
durometer hardness; coiled on release paper; black color.
E.
Foam Plastic Tape: Closed cell polyvinyl chloride foam, coiled on release paper over adhesive on two sides,
maximum water absorption by volume of 2 percent, designed for compression of 25 percent to effect an air
barrier and vapor retarder seal.
2.4
FABRICATION
A.
Glazing
08 80 00 - 2
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
3.2
PREPARATION
A.
Ensure receiving surfaces are clean and dry. Prevent formation of condensation.
B.
Remove dust and oil from glass by wiping clean immediately before installation.
3.3
INSTALLATION
A.
General Requirements:
1.
Perform installation in accordance with GANA Glazing Manual and reviewed Shop Drawings.
2.
Cut and set glass to full fit and play consistent with expansion and contraction requirements and for
absolute security under maximum high velocity wind or vacuum stresses.
3.
Maintain edge clearance at least equal to glass thickness from perimeter of glass to inside of rabbet.
4.
Maintain minimum 1/8 inch clearance between faces of glass and adjacent stop or bead.
5.
Provide setting blocks at sill to transmit wind loads from glass to sash. Provide shims at head and
jambs at shop-glazed units.
6.
Accurately size and cut clean for each glazing condition. Do not nip edges.
B.
Laminated Glass:
1.
Protect vinyl at edges against oil, water, or solvent.
2.
Provide setting blocks under glass.
3.
Apply protective tape to glass edges if recommended by glass manufacturer.
4.
Apply protective tape to glass edges if recommended by glass manufacturer.
5.
In all other respects, follow approved manufacturers recommendations.
C.
Sealant Application:
1.
Neatly tool sealant or compound joints to compress material and improve adhesion. Repair air
pockets exposed by tooling.
2.
Meet requirements of Section 07 92 00 - Joint Sealants unless otherwise indicated.
3.
Ensure removal of protective coatings from aluminum surfaces.
3.4
CLEANING
A.
B.
Remove labels, paint spots, and other defacements such that work is clean for Owners final acceptance.
C.
Glazing
08 80 00 - 3
3.5
PROTECTION
A.
After installation, mark pane with an X by using removable plastic tape or paste. Do not mark heat
absorbing or reflective glass units.
B.
Protect installed glass or acrylic plastic sheet against breakage, damage from plaster, sandblasting, welding
spatter, or other sources.
END OF SECTION 08 80 00
Glazing
08 80 00 - 4
PART 1 GENERAL
1.1
SUMMARY
A.
B.
1.2
REFERENCE STANDARDS
A.
ASTM International:
1.
ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or ZincIron Alloy-Coated (Galvannealed) by the Hot-Dip Process.
2.
ASTM C754 - Standard Specification for Installation of Steel Framing Members to Receive
Screw-Attached Gypsum Panel Products.
1.3
SYSTEM DESCRIPTION
A.
B.
Allowable Tolerances:
1.
For flat surfaces, the maximum deviation from true plumb or level plane, 1/8 inch in 10 feet as
measured under straight edge placed at any location on surface.
C.
1.4
ADMINISTRATIVE REQUIREMENTS
A.
Coordination: Coordinate details and requirements of other work that adjoins or fastens to metal studs or
furring and requires backing or special support framing included in this Section.
1.
Coordinate installation of anchors, blocking, electrical work, and mechanical work which is to be
placed by others in or behind partition framing. Allow such items to be installed after framing is
complete.
2.
Items requiring backing or support include, but are not necessarily limited to, casework, wall-mounted
finish hardware, miscellaneous specialties, handrail brackets, and similar items.
3.
Obtain Architects approval of backing method proposed to satisfy requirements that differ from
methods indicated or shown.
1.5
SUBMITTALS
A.
Product Data:
B.
1.6
A.
Deliver and store materials in original packages, containers, or bundles bearing brand name and name of
manufacturer or supplier for whom product is manufactured with seals unbroken and labels intact until time for
use.
B.
C.
D.
E.
F.
Inspect material before installing to determine its suitability for the work.
PART 2 PRODUCTS
2.1
MATERIALS
A.
Metal Studs: : C-shaped sections cold formed with punched webs and 1-5/8 inch plain or perforated flanges to
receive screws; fabricated from 20 gage steel meeting requirements of ASTM A653/A653M with minimum
yield point of 50,000 psi and with G-60 galvanized coating.
B.
Runner Tracks: Formed from 20 gauge steel meeting requirements of ASTM A653/A653M with minimum
yield point of 50,000 psi and with G-60 galvanized coating.
C.
Backing Plates: Gauges, configurations, and sizes as indicated on Drawings. Material to meet requirements of
ASTM A653/A653M and with G-60 galvanized coating.
D.
Fasteners:
1.
Sheet Metal Screws: Self-drilling and self-tapping, flat pan head screws, No. 8 unless otherwise
noted. ITW Buildexs Hi-Lo and S-12 Fasteners; The Rawlplug Co., Inc.s Rawl Self-Drilling
Screws; United States Gypsum Co.s USG Screws, Type S-12 Pan Head; or equal.
2.
Concrete Screws:
a.
Description: Heat-treated screws with unique Hi-Lo thread design that cuts threads in predrilled holes in concrete.
b.
Product: ITW Buildexs Tapcon Anchors; The Rawlplug Co., Inc.s Tapcon Fasteners;
United States Gypsum Co.s HWH Tapcon Anchors; or equal.
3.
Powder Driven Fasteners: Tempered steel pins, minimum 0.145 inch (3.6 mm) diameter, with special
corrosive-resistant plating or coating. Pins shall have guide washers to accurately control penetration,
minimum 1-1/4 inches unless otherwise noted. Fastening shall be accomplished by low-velocity
piston-driven powder-actuated tool. Pins and tool shall be same as manufactured by Hilti Inc.; ITW
Ramset.; or approved equal.
4.
Expansion Anchors Wedge and sleeve type as noted. Hilti, Inc.s Kwik-Bolt 3Concrete Expansion
Anchors and Hilti Drop-In Anchors; ITW Redheads Trubolt Wedge Anchors and Multi-Set II
Anchors; or equal.
E.
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
Immediately notify of any discrepancies in the work, on Drawings or in the specification that will interfere
with the work.
C.
Correct conditions detrimental to the timely and proper completion of the work.
D.
Do not proceed with installation until unsatisfactory conditions have been corrected.
3.2
INSTALLATION - GENERAL
A.
Install in accordance with requirements of the Contract Documents, the manufacturer's instructions and
recommendations, and reviewed Shop Drawings.
B.
Install framing to support the design loads and to accommodate movement of the primary building structure
and clearances of intended openings.
C.
Install framing and accessories plumb, square, true to line, and with connections securely fastened, in
accordance with the Contract Documents and ASTM C754.
D.
Securely fasten framing members together and to walls, floors, and other structural supports.
E.
Fasten framing members by welding or screws. Wire tying of framing members is not permitted.
F.
G.
H.
Do not bridge building expansion joints and control joints with framing members; frame both sides of joints
independently.
I.
Install miscellaneous framing and connections, including supplementary framing, web stiffeners, closure
pieces, clip angles, hold-down angles, stud girts, anchors and fasteners to provide complete and proper
framing system.
J.
Where assembly procedures remove galvanizing, clean area of any foreign matter by wire brushing and/or
metal conditioner recommended by galvanized finish touch-up manufacturer. Apply galvanized touch-up
coating by brush or spray with a minimum coverage of 1.5 mils, dry-film.
Supports for Plaster and Gypsum Board
09 22 00 - 3
K.
Installation Tolerances:
1.
Variation From Plumb, Level, and True to Line: 1/8 inch in 10 feet, maximum.
2.
Variation From Plan Location of Individual Framing Members: Plus/minus 1/8 inch, with
cumulative error not more than minimum fastening requirements of sheathing or other finish
materials.
3.3
A.
B.
Deflection Allowance:
1.
Where partitions abut underside of rigid construction cut studs short and do not rigidly attach to
runner track.
2.
Where partitions abut concrete vertical surfaces, set end stud free of abutting surface and secure ends
of horizontal stiffeners in partition to abutting surface.
C.
Cut Studs: If stud web is cut more than 50 percent or stud flange is cut to any degree, restore stud to original
strength to Architects satisfaction by welding, screwing, or wire-tying on steel reinforcement.
D.
Runner Track:
1.
Accurately align floor and ceiling runner track.
2.
Secure with 1/4 inch diameter expansion bolts, powder driven fasteners at least 1 inch long may be
used, where permitted by code.
3.
Space fasteners maximum 24 inches on center and 4 inches from each end.
4.
Minimum of two fasteners per piece of runner.
E.
Studs:
1.
2.
3.
4.
F.
Install metal backing plate for support of wall mounted items. Install metal backing as indicated on Drawings.
END OF SECTION 09 22 00
SECTION 09 30 00 - TILING
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of tile work including tile materials, cementitious backer units,
setting materials, grouting materials, and miscellaneous materials.
1.2
REFERENCE STANDARDS
A.
B.
C.
1.3
SYSTEM DESCRIPTION
A.
Design Criteria: Tile work shall be clean and durable; no discolored or crumbling joints or cracks should
develop. Correct to Architects satisfaction above conditions which occur within warranty period.
1.4
SUBMITTALS
A.
Product Data.
B.
Verification Samples:
1.
Full size sample for review of each color selected of each tile material specified.
2.
Samples of each tile grout color selected.
3.
Other Samples only as requested.
C.
Shop Drawings: Indicate tile layout, patterns, color arrangement, perimeter conditions, junctions with
dissimilar materials, control and expansion joints, thresholds, ceramic accessories, and setting details.
D.
Tiling
09 30 00 - 1
E.
Maintenance Instructions:
1.
Submit manufacturers recommended maintenance instructions for each type tile installed, including
maintenance procedures, maintenance materials, and suggested schedule for cleaning.
2.
Include precautions to be taken against materials and methods that may be detrimental to resilient
flooring finish.
3.
Submit copy of receipt for maintenance materials.
4.
Maintenance data to be included in the Maintenance Manual specified in Section 01 77 00 Project Closeout.
1.5
MAINTENANCE MATERIALS
A.
Extra Materials: Furnish to Owner two percent of each type and color of tile and trim material installed in this
Project from same lot or production run for compatibility with the installed materials.
B.
Provide in securely wrapped packages, or factory sealed packing, with the manufacturers standard labels and
the material and color designation used in the Contract Documents.
C.
Deliver materials to Owners designated storage place, unload, and position in place per Owners instructions.
D.
Provide Owner with a signed receipt indicating materials and quantities upon delivery.
1.6
QUALITY ASSURANCE
A.
Perform Work in accordance with TCNA Handbook and ANSI A108 Series/ANSI A118 Series.
B.
Material Source: Furnish each type, finish, and color of tile product and accessory materials from one
manufacturer.
C.
Installer: Company with not less than 20 installations of tile work similar in size and complexity to the
work of this project.
1.7
A.
Deliver and store packaged materials in original containers with seals unbroken and labels intact until time of
use.
B.
C.
Protect adhesives and grout from freezing or overheating in accordance with manufacturers printed
instructions.
D.
Do not open containers or remove labels until materials have been inspected and accepted.
1.8
SITE CONDITIONS
A.
Ambient Conditions:
1.
Maintain temperature not less than 50 degrees Fahrenheit during installation.
2.
Do not install adhesives in an unventilated environment.
Tiling
09 30 00 - 2
PART 2 PRODUCTS
2.1
TILE MATERIALS
A.
B.
C.
Trim: Same type, color, thickness, face size, and finish as adjacent tile.
1.
Bullnose tile as indicated on Drawings.
2.2
A.
B.
Screws: ASTM C1002, self-drilling and self-tapping steel screws as recommended by cementitious backer
units manufacturer for steel framing, length to suit application
C.
Joint Tape: Two inch wide, glass-fiber open-weave tape for joints and corners.
D.
2.3
SETTING MATERIALS
A.
Underlayment:
1.
Description: Trowel grade latex mastic underpayment of polymer modified cementitious filler.
2.
Product: Mer-Kote Products, Inc.s Mer-Krete Underlayment-C; or approved equal.
B.
C.
2.4
GROUTING MATERIALS
A.
Tiling
09 30 00 - 3
2.5
MISCELLANEOUS MATERIALS
A.
Expansion Joint Filler: Preformed closed-cell foam polyethylene or butyl rubber; minimum 1/8 inch to
maximum 1/4 inch width.
B.
Expansion Joint Sealant: Multi-part polyurethane or mildew-resistant sealant including back-up and bondbreaker materials necessary; certified by manufacturer as proper for purpose intended.
C.
Acoustical Caulking:
1.
Description: Permanently resilient, nonstaining type.
2.
Product: The Tremco Mfg. Co.s Tremco Acoustical Sealant; Pecora Corp.s AC-20 FTR
Acoustical Sealant; or equal.
D.
Water: Clean and potable, free from impurities detrimental to tile work.
E.
2.6
MIXES
A.
Setting Bed Materials: Mix in accordance with applicable TCNA or ANSI Standards, or, where manufacturer
is cited, its recommendations.
B.
C.
Where latex additive is used in mortar, do not use water; use only compatible latex additive in grout with
proven history of minimizing efflorescence.
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
C.
3.2
PREPARATION
A.
Protection of In-Place Conditions: Protect surrounding work from damage before tile work begins.
B.
Lay-Out:
1.
Lay tile to pattern indicated.
2.
Center fields and patterns on areas so that no tile is less than half size; locate cuts where least
conspicuous.
3.
Unless noted otherwise, make joints in wall tile vertical and horizontal. Precisely locate expansion
joints and accessories before tile is installed.
4.
Coordinate jointing in floor and wall tile whenever possible.
Tiling
09 30 00 - 4
C.
Preparation of Surfaces:
1.
Vacuum clean surfaces and damp clean.
2.
Seal substrate surface cracks with filler/
3.
Otherwise conform to requirements corresponding to tile installation method specified below.
D.
Illuminate the work area during installation, providing the same level and angle of illumination as will be
available for final inspection.
3.3
INSTALLATION - GENERAL
A.
Set tile with uniform joints. Align joints both vertically and horizontally; no staggered joints will be permitted.
Make joints watertight, without voids, cracks, excess mortar, or excess grout.
1.
Set with uniform 1/4 inch wide joint unless otherwise indicated.
B.
Cut and drill tile and trim shapes accurately without damage. Rub exposed cut edges smooth to bring edge of
glaze slightly back from body of tile.
C.
Grind and fit tile carefully at intersections against trim finish and at built-in fixtures and accessories. Fit tile
closely around outlets, pipes, fixtures, and fittings so that plates, escutcheons, and collars overlap cuts.
D.
E.
Floor tile may be set either in full Portland cement mortar or in dry set mortar applied over Portland cement
mortar.
F.
Extend tile work into recesses and under equipment and fixtures, to form a complete covering without
interruptions.
1.
Terminate work neatly at obstructions, edges, and corners without disruption of pattern or joint
alignment.
2.
Terminate tile at centerlines of doors unless otherwise indicated on the Drawings.
G.
H.
3.4
A.
3.5
A.
Tiling
09 30 00 - 5
B.
Finish surface true, even, without waves, cracks, or imperfections. Limit surface tolerance to 5/16 inch in 10
feet with maximum inward and maximum outward allowance not occurring in less than 20 feet.
C.
Do not add lightweight aggregates to dry-set mortar. Follow manufacturers directions exactly. Do not dilute
or extend mix with cement, admixtures, lime, flour, marble dust, or other fillers. Do not use any more water
than manufacturer recommends.
D.
Firmly embed tile into dry-set mortar with finished surfaces brought to true and level planes. Use proper size
notched trowel to obtain nominal 1/8 inch bed thickness.
3.6
A.
B.
Prevent rapid evaporation of moisture from mortar bed. Do not set tile on dry bed
C.
Firmly embed tile into mortar with finished surfaces brought to true level planes or pitches as shown.
3.7
JOINT TREATMENT
A.
B.
Sealant-Filled Joints: Provide expansion, control, and isolation joints as recommended in the TCNA. Sawcut joints are unacceptable.
1.
Expansion joint installation method: TCNA EJ 171.
2.
Keep joints free of adhesive or grout.
3.
Locate joints to coincide with control joints in substrate.
C.
Allow at least 24 hours to elapse before grouting to permit solvents of adhesive material to escape.
D.
Thoroughly brush and wash out joints; saturate with clean water before grouting where required.
E.
F.
Grout square edge tile joints flush with face of tile making neatly finished smooth surface.
G.
Grout joints of other than square edge tiles to full depth; then remove grout to expose modified edges.
H.
I.
At wall outlets, pipes, and fittings, caulk with acoustical caulking. Do not grout.
J.
Use expansion joint sealant at perimeter of tile field, at intersections with columns and posts, at maximum
dimension as indicated TCNA in both directions in large field areas, where noted, and where obstructions
occur; match color of sealant to pointing grout.
K.
3.8
CLEANING
A.
B.
C.
Clean entire tile installation with neutral, non-alkaline chemical cleaner free from lye or caustics.
Tiling
09 30 00 - 6
D.
Thoroughly scrub with water and burlap sacks; remove cement and grout stains in accordance with
manufacturers recommendations.
E.
F.
Apply penetrating sealer on unglazed ceramic floor tile in accordance with the manufacturers printed
directions; prevent damage to adjoining work from this operation.
3.9
A.
B.
C.
D.
Prior to final acceptance, remove protective coverings and clean as specified herein.
END OF SECTION 09 30 00
Tiling
09 30 00 - 7
PART 1 GENERAL
1.1
SUMMARY
A.
1.2
REFERENCE STANDARDS
A.
ASTM International:
1.
ASTM C665 - Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light
Frame Construction and Manufactured Housing.
2.
ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials.
1.3
SUBMITTALS
A.
Product Data.
B.
1.4
A.
Deliver acoustical products only after glazing has been completed, exterior openings closed in, and wet work
completed and dried out.
B.
Deliver and store packaged products in original containers with seals unbroken and labels intact until time of
use.
PART 2 PRODUCTS
2.1
ACOUSTICAL INSULATION
A.
Description:
1.
Nonfaced, stone wool blanket made from basalt rock and slag and meeting requirements of ASTM
C665, Type I.
2.
Thickness: Three inches.
3.
Flame Spread (ASTM E84): Zero.
4.
Smoke Development (ASTM E84): Zero.
B.
2.2
ACCESSORIES
A.
Insulation Support: String wire, staples, Plywood backing strips and nails as required.
PART 3 EXECUTION
3.1
PREPARATION
A.
Examine areas to receive insulation for conditions that will adversely affect installation and performance.
Acoustical Insulation
09 81 00 - 1
B.
3.2
INSTALLATION
A.
B.
Place acoustical insulation full height in partitions, tight within spaces, around cut openings, behind and around
electrical and mechanical items within or behind partitions, and tight in items passing through partitions.
1.
Comply with manufacturer's instructions for particular conditions of installation in each case. If
printed instructions are not available or do not apply to project conditions, consult manufacturer's
technical representative for specific recommendations before proceeding with work.
C.
Install insulation to fit snugly between framing members and around pipes, conduits, and outlet boxes as
necessary to maintain integrity of insulation.
D.
E.
Allow air space between insulation and back of opposite cement board.]
F.
3.3
DEFECTIVE WORK
A.
Remove insulation in areas deemed defective and replace with new material conforming to requirements.
B.
Restore to original condition work of other sections damaged in repair or replacement of defective work.
C.
END OF SECTION 09 81 00
Acoustical Insulation
09 81 00 - 2
SECTION 09 91 00 - PAINTING
PART 1 GENERAL
1.1
SUMMARY
A.
B.
1.2
DEFINITIONS
A.
Paint: Coating systems materials, including primers, emulsions, enamels, stains, sealers, fillers, and other
applied materials whether used as prime, intermediate, or finish coats.
B.
Factory Finish: Factory-applied painting system consisting of primer and finish coats equal in quality to gloss
enamel system specified for ferrous metal under work of this Section.
1.3
REFERENCE STANDARDS
A.
B.
Green Seal:
1.
GC-03 - Anti-Corrosive Paints.
2.
GS-11 - Product Specific Environmental Requirements.
C.
1.4
ADMINISTRATIVE REQUIREMENTS
A.
Scheduling:
1.
Schedule installing products specified in this Section with other construction to minimize possibility
of damage and soiling during remainder of construction period.
1.5
SUBMITTALS
A.
Product Data:
Painting
09 91 00 - 1
Submit copies of a complete list of materials, identified by manufacturers name and product label or
stock number.
Make list in the form of a repetition of painting systems specified, with the addition of the specified
product intended for each coat.
Manufacturers technical information, paint analysis, special surface preparation procedures, substrate
conditions requiring special attention, and application instructions for each proposed material.
Include manufacturers statement that components are appropriate to each painting system.
Include certifications by paint manufacture that products supplied comply with specified regulatory
requirements.
B.
Color Samples: Submit Samples for review of color and sheen only, not texture or finish. Submit in sufficient
time to avoid delaying progress of work.
1.
On 8-1/2 by 11 inch card, provide two Samples of each color and system specified with specified
coats cascaded, with texture to simulate actual conditions.
2.
Final acceptance of colors will be from samples applied on the project site.
C.
Upon Architects request, furnish copies of invoice with quantities of materials purchased for Project.
D.
Maintenance Instructions:
1.
Submit manufacturers recommended maintenance instructions for each type of paint installed,
including maintenance procedures and materials.
2.
Submit copy of receipt for maintenance materials.
3.
Maintenance data to be included in the Maintenance Manual specified in Section 01 77 00 Project Closeout.
1.6
MAINTENANCE MATERIALS
A.
Extra Materials: Furnish to Owner one gallon of each color and type installed in this Project.
B.
Label each container with color, sheen, type, texture, and room locations in addition to the manufacturers
standard label, and the material and color designation used in the Contract Documents.
C.
Deliver materials to Owners designated storage place, unload, and position in place per Owners instructions.
D.
Provide Owner with a signed receipt indicating materials and quantities upon delivery.
1.7
QUALITY ASSURANCE
A.
Employ coats and undercoats for all types of finishes in strict accord with the recommendations of the paint
manufacturer used unless otherwise specified in this Section. In case of conflict, comply with the most
stringent.
B.
Regulatory Requirements: All painting materials shall comply with local, state, and federal Air Quality
mandates, codes, and regulations.
1.8
A.
Deliver products to site in sealed and labeled containers with seals unbroken and labels intact until time of use.
B.
Container Label: Include manufacturers name, type of paint, brand name, lot number, brand code, coverage,
surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and
reducing.
Painting
09 91 00 - 2
C.
Paint Materials: Store paint materials at minimum ambient temperature of 45 degrees Fahrenheit and
maximum of 90 degrees Fahrenheit, in well ventilated areas, unless required otherwise by manufacturers
printed instructions.
D.
E.
Remove all empty containers, waste, and rags from premises daily.
1.9
SITE CONDITIONS
A.
Environmental Requirements:
1.
Do not apply materials when surface and ambient temperatures are outside the temperature ranges
required by the paint product manufacturer.
2.
Do not apply exterior coatings during rain or snow, or when relative humidity is outside the
humidity ranges required by the paint product manufacturer.
3.
Apply paint under dry and dust-free conditions.
4.
Maximize ventilation during application and drying.
B.
C.
D.
PART 2 PRODUCTS
2.1
A.
Paints and Coatings: Ready mixed, except field-catalyzed coatings. Prepare pigments:
1.
To a soft paste consistency, capable of being readily and uniformly dispersed to a homogeneous
coating.
2.
For good flow and brushing properties.
3.
Capable of drying or curing free of streaks or sags.
B.
C.
2.2
PAINT MATERIALS
Painting
09 91 00 - 3
A.
Manufacturers: Provide the below listed products of the following manufacturers, or equal.
1.
Benjamin Moore (BM)
2.
Dunn-Edwards (DE).
3.
Frazee Paint Co., A Comex Group Company (FP).
4.
Kelly Moore (KM)
5.
Sherwin-Williams Co. (S-W).
6.
Restor-It (www.restor-it.com)
B.
Materials:
Type
BM
DE
FP
KM
S-W
96
W901V
124
1250
B42
M04
W715
561
1725
B66W1
W715
561
1725
B66W1
Primers and Subsequent Coats: Provide primers and other undercoat paints produced by the same
manufacturer of finish coats or approved in writing by manufacturer of finish coat. Where primer is shop
applied to metal, subsequent costs may be products of another manufacture provided the coatings are mutually
compatible. Review other sections in which primers are provided to assure compatibility of the total systems
for various substrates.
D.
Colors: Provide colors, and degree of luster as indicated. Color tint primers, sealers, and undercoats to
correspond with finish color. Vary color of successive coats sufficiently to distinguish between coats. Obtain
Architects approval for adjustments of color on job.
1.
Colors: As selected by Architect.
2.3
ASSOCIATED MATERIALS
A.
Thinner: Use only thinners by paint manufacturer, and use only within recommended limits.
B.
Accessory Materials: Linseed oil, shellac, turpentine, and other materials not specifically indicated, but
required to achieve the finishes specified; commercial quality.
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
C.
Report in writing to Architect, with copy to the manufacturer, any deficiencies that could impair work.
Painting
09 91 00 - 4
D.
Application of paint systems materials shall constitute acceptance of the surface, and shall obligate the
Contractor for such repair as necessary any unsatisfactory finish resulting.
3.2
PREPARATION
A.
Follow manufacturers instructions carefully to apply materials only to surfaces that are acceptable.
B.
Surface Appurtenances: Prior to surface preparation and application operations, completely mask, remove,
or otherwise adequately protect hardware, accessories, machined surfaces, plates, lighting fixtures, and
similar items in contact with coated surfaces but not scheduled to receive coating.
C.
Protect the adjacent and adjoining work and materials from damage from this work. If necessary, mask by
suitable covering or other methods, during application of the coating system.
D.
Before applying coating system, thoroughly clean all surfaces involved to remove grease, oil and dirt or other
materials effecting bond. Schedule cleaning so that dust and other contaminants from the cleaning process
do not fall on wet, newly coated surfaces.
E.
Before application is started in any area, broom clean and remove excessive dust.
F.
Clean, dry and adequately protect all surfaces from dampness. Surfaces shall be smooth, even, and true to
place, and free of any foreign material that will adversely affect adhesion or appearance of applied coating
system.
3.3
SURFACE PREPARATION
A.
B.
C.
Marks: Seal with shellac those that may bleed through surface finishes.
3.4
APPLICATION
A.
Apply products in accordance with paint manufacturers printed instructions unless otherwise noted.
B.
Do not reduce any material unless so directed by Architect, or unless recommended by materials manufacturer.
C.
Do not apply finishes to surfaces that are not dry. Allow applied coats to dry before next coat is applied.
D.
Apply each coat to uniform appearance. Apply each coat of paint slightly darker than preceding coat unless
otherwise approved.
E.
Do not paint over code-required labels, equipment identification, performance rating, name, or
nomenclature plates.
Painting
09 91 00 - 5
F.
G.
Vacuum clean surfaces of loose particles. Use tack cloth to remove dust and particles just prior to applying
next coat.
H.
Paint to sharp, true lines and edges; when color change occurs in same plane, paint to chalk lines or tape.
I.
Prime Coats:
1.
Prime substrates the same day they are prepared.
2.
Apply prime coat to material that is required to be painted or finished, and that has not been prime
coated by others.
3.
Recoat primed and sealed substrates where there is evidence of suction spots or unsealed areas in first
coat, to assure a finish coat with no burn-through or other defects due to insufficient sealing.
4.
Shop-Primed Metal Items: Field-applied prime coats may be confined to abraded areas requiring
touch-up.
J.
Miscellaneous Painting: Surfaces to be painted and not specifically described herein shall be painted with a
product specifically manufactured or prepared for the material and surface; prime coat and two finish coats.
K.
Completed Work: Match Architects control samples for color, texture, sheen, and coverage. Remove,
refinish, or repaint work not in compliance with specified requirements.
L.
Minimum Coating Thickness: Apply materials at not less than manufacturers recommended spreading rate, to
establish a total dry film thickness.
M.
N.
Coverage:
1.
Notwithstanding achievement of complete coverage with less than number of coats specified, apply
specified number of coats.
2.
Where application of number of coats specified fails to achieve complete coverage, apply additional
coats as necessary.
O.
Should any coat be deemed unsatisfactory, it shall be sanded and additional coats applied as necessary until
satisfactory finish is achieved.
P.
Reinstall hardware, accessories, machined surfaces, plates, lighting fixtures, and similar items in contact
with coated surfaces that were removed prior to painting.
3.5
CLEANING
A.
Clean Up: During progress of work, remove from site discarded paints materials, rubbish, cans and rags at
end of each workday.
B.
Upon completion of work, remove surplus materials and rubbish, and clean off spilled or splattered paint
resulting from this Work.
C.
3.6
PROTECTION
Painting
09 91 00 - 6
A.
Protect work of others trades, whether to be painted or not, against damage by painting and finishing work.
B.
Protect finished installation from damage until the project is accepted by Owner.
C.
D.
Remove temporary protective wrappings provided by others for protection of their work, after completion
of painting operations.
E.
Clean, repair and recoat damaged surfaces in accordance with manufacturers printed instructions, as
acceptable to Architect, and at no increase in Contract Sum.
3.7
A.
The number of coats specified is the minimum number acceptable. If full coverage is not obtained with the
specified number of coats, apply additional coats as necessary to produce the required finish, at no increase
in Contract Sum.
B.
Painting Systems:
1.
Ferrous Metal, Shop-Primed or Prepainted - Typical, Acrylic Semi-Gloss Trim Enamel:
a.
First Coat:
Ferrous Metal Primer (Acrylic), color to match finish coat.
b.
Second Coat:
100 Percent Acrylic Semi-Gloss Finish.
2.
Galvanized Metal - Typical, Acrylic Semi-Gloss Trim Enamel:
a.
Pretreat Galvanized Metal with Jasco Prep N Prime Metal Pretreatment.
b.
First Coat:
Galvanized Metal Primer (Acrylic).
c.
Second Coat:
100 Percent Acrylic Semi-Gloss Finish.
d.
Third Coat:
Acrylic Semi-Gloss Finish.
3.
Wood Doors:
a.
First Coat:
Epoxy sealer.
b.
Second Coat:
Epoxy sealer.
END OF SECTION 09 91 00
Painting
09 91 00 - 7
PART 1 GENERAL
1.1
SUMMARY
A.
Work Included in this Section: Provision of graffiti-resistant coatings on exterior concrete surfaces.
1.2
ADMINISTRATIVE REQUIREMENTS
A.
Scheduling: Schedule and coordinate this work with other trades and do not proceed until other work and job
conditions are as required to achieve satisfactory results.
1.3
SUBMITTALS
A.
Product Data.
B.
C.
Certificates: Certification of the applicators qualifications including technicians and required equipment.
D.
Upon Architects request, furnish copies of invoice with quantities of materials purchased.
1.4
QUALITY ASSURANCE
A.
Applicator Qualifications:
1.
Applicator of graffiti-resistant coating shall be licensed or otherwise certified by graffiti-resistant
coating manufacturer and shall have been regularly providing installations of the type required for not
less than three years and proving a background of not less than three years of installations of
comparable size to that herein specified.
2.
Applicators technicians to be utilized for the application of graffiti-resistant coating material have
been trained by graffiti-resistant coating manufacturer.
3.
Applicator must have specialized equipment as required by the coating system manufacturer to be
used in the application of graffiti-resistant coating.
B.
Requirements of Regulatory Agencies: All graffiti-resistant coating materials used shall comply with Volatile
Organic Compound (VOC) environmental regulations for location of Project.
C.
Mock-Up:
1.
On site, apply graffiti-resistant coating to approximately 100 square feet to demonstrate method of
application of graffiti-resistant coating, complying with manufacturers printed instructions. Mock-up
preparation to confirm application speed/technique necessary to apply uniform, even coat while
avoiding over application.
2.
Mock-up to ensure suitability and desired result of graffiti resistant coating.
3.
Install graffiti resistant coating where directed by Architect to each type of surface scheduled to
receive coating.
4.
Maintain mock-up as a standard of quality for all installations.
Graffiti-Resistant Coatings
09 96 23 - 1
1.5
A.
Deliver and store packaged materials with seals unbroken and labels intact until time of use. Labels to include
the following:
1.
Name of manufacturer.
2.
Product number.
3.
Batch number.
4.
Date of manufacturer.
5.
Shelf life expiration date.
6.
Color name and number.
7.
Instructions for use.
8.
Safety precautions.
B.
Do not open containers or remove labels until materials have been inspected and accepted.
C.
Store and protect accepted materials in accordance with manufacturers directions and recommendations.
1.6
SITE CONDITIONS
A.
Environmental Requirements
1.
Temperature: Do not apply graffiti-resistant coating when surface temperature is less than 40 degrees
Fahrenheit or more than 90 degrees Fahrenheit.
2.
Do not apply during rain showers.
PART 2 PRODUCTS
2.1
GRAFFITI-RESISTANT COATING
A.
2.2
RELATED MATERIALS
A.
Cleaners:
1.
Product: Monopole Inc.s Citrus Clean; or equal.
2.
Quantity: Provide enough material to remove graffiti from 20 percent of the coated surfaces.
PART 3 EXECUTION
3.1
EXAMINATION
A.
B.
Report in writing to Architect, with copy to the manufacturer, any deficiencies that could impair work.
C.
Application of graffiti-resistant coating materials shall constitute acceptance of the surface, and shall
obligate Contractor for such repair as necessary any unsatisfactory finish resulting.
3.2
PREPARATION
A.
Follow graffiti-resistant coating manufacturer's instructions carefully to apply materials only to surfaces that
are acceptable.
B.
Protect the adjacent and adjoining work and materials from damage from this work. If necessary, mask by
suitable covering or other methods, during application of the coating system.
C.
D.
Thoroughly clean surfaces to remove grease, oil, mortar, plaster stains, and dirt or other material effecting
bond. After cleaning, allow rinse water to dry so surface appears dry and is absorbent. Most surfaces can
be coated 20 minutes to one hour after cleaning.
3.3
MATERIAL PREPARATION
A.
3.4
APPLICATION
A.
Apply graffiti-resistant coating materials in exact accordance with manufacturer's printed instructions as
required to achieve the appearance of the approved samples and specified performance.
B.
Apply the number of coatings as recommended by graffiti-resistant coating manufacturer for the surface being
covered.
C.
D.
Apply using an overlapping horizontal spray pattern. Follow up with vertical stroke for deep vertical recesses.
Avoid flooding surface or creating heavy rundowns.
E.
Concrete Surfaces:
1.
Coverage rate will vary between 200-400 square feet per gallon, depending on surface texture and
porosity. Coverage will increase where additional coats are required.
2.
Allow treatment to penetrate in one to two minutes. Remove buildups using damp bush or roller. Do
not allow material to buildup or collect at reveals in concrete. Do not let coating run or drip on
surfaces below reveals.
3.
Allow previous coat to dry to touch (20 to 30 minutes). Lightly apply subsequent coats. Will dry
thoroughly in one to two hours.
4.
Specified graffiti-resistant coating is formulated for spray application but may be applied with brush
or roller.
3.5
A.
After surface is dry, inspect carefully to assure that sufficient material has been applied to create a continuous
light film across surface. If a continuous surface film cannot be detected, additional coat of material may be
required.
Graffiti-Resistant Coatings
09 96 23 - 3
B.
Arrange for inspections by manufacturer's representatives who shall ensure correct use and application of
graffiti-resistant coating.
3.6
CLEANING
A.
Clean Up: During progress of work, remove from site discarded materials, rubbish, cans and rags at end of
each workday.
B.
Upon completion of application, remove all surplus materials and rubbish, and clean off all spilled or splattered
materials resulting from this Work.
3.7
PROTECTION
A.
Protect finished installation from damage until the project is accepted by Owner.
B.
Protect freshly coated surfaces from rain for two hours following application.
C.
Clean, repair and recoat damaged surfaces in accordance with manufacturer's printed instructions, as
acceptable to Architect, and at no increase in Contract Sum.
END OF SECTION 09 96 23
Graffiti-Resistant Coatings
09 96 23 - 4
SECTION 10 14 00 - SIGNAGE
PART 1 GENERAL
1.1
SUMMARY
A.
1.2
ADMINISTRATIVE REQUIREMENTS
A.
1.3
SUBMITTALS
A.
Product Data.
B.
1.4
QUALITY ASSURANCE
A.
Sign Fabricator Qualifications: Firm experienced in producing signs similar to those indicated for this
Project, with a record of successful in-service performance, and sufficient production capacity to produce
sign units required without causing delay in the Work.
1.5
A.
Deliver, store, and handle packaged materials in original containers with seals unbroken and labels intact until
time of use.
B.
Store delivered products and materials in clean, safe, and dry area.
PART 2 PRODUCTS
2.1
A.
B.
Signage
10 14 00 - 1
PART 3 EXECUTION
3.1
EXAMINATION
A.
3.2
PREPARATION
A.
B.
Remove dirt, dust, grit, grease stains, and foreign matter detrimental to application.
3.3
INSTALLATION
A.
B.
Install signage plumb and level, accurately aligned, and securely mounted
3.4
PROTECTION
A.
Protect exposed signage as required against construction damage until completion of construction.
B.
Remove wrappers, covering, identifying stickers, paper, and other protective from the prior to Owners
acceptance of Project.
C.
Remove and replace any damaged work that cannot be successfully cleaned and repaired to permanently
eliminate evidence of damage to satisfaction of Architect prior to Owners acceptance of Project.
3.5
CLEANING
A.
Prior to final acceptance, clean all signage surfaces in accordance with manufacturer's instructions.
END OF SECTION 10 14 00
Signage
10 14 00 - 2
PART 1 GENERAL
1.1
SUMMARY
A.
B.
1.2
REFERENCE STANDARDS
A.
ASTM International:
1.
ASTM A269 - Standard Specification for Seamless and Welded Austenitic Stainless Steel Tubing
for General Service.
2.
ASTM A666 - Standard Specification for Annealed or Cold-Worked Austenitic Stainless Steel
Sheet, Strip, Plate, and Flat Bar.
1.3
ADMINISTRATIVE REQUIREMENTS
A.
Coordination:
1.
Coordinate the work with the placement of wall backing plates to receive anchor attachments.
1.4
SUBMITTALS
A.
Product Data.
B.
C.
1.5
A.
Deliver materials and products in original containers with seals unbroken and labels intact until time of use.
Label shall identify accessory, catalog number, and finish.
B.
PART 2 PRODUCTS
2.1
MANUFACTURERS
A.
Manufacturers catalog numbers cited below indicate design, quality, capacity, function, and finish desired.
Equivalent products of other manufacturers may be acceptable, if, in the judgement of [Architect,] they meet
the intent of the specifications in terms of design, function, materials, and quality of workmanship.
2.2
COMPONENTS
A.
Accessories - General: Shop assembled, free of dents and scratches and packaged complete with anchors
and fittings, steel anchor plates, adapters, and anchor components for installation.
1.
Grind welded joints smooth.
2.
Fabricate units made of metal sheet of seamless sheets, with flat surfaces.
Toilet Accessories
10 28 13 - 1
B.
Keys: Provide two keys for each accessory. Key all locks alike.
C.
D.
E.
Fasteners, Screws, and Bolts: Hot dip galvanized, tamper-proof, security type.
2.3
ACCESSORY LIST
A.
B.
Grab Bar:
1.
Description: Horizontal gab bars, length as indicated on Drawings. 1-1/4 inch outside diameter, 18
gauge, Type 304 stainless steel tubing, satin finish; 90 degree return ends, swaged and heliarc welded
to concealed mounting flanges. Flange covers to snap over mounting flanges to conceal mounting
screws. Clearance between rail and wall shall be 1-1/2 inches.
2.
Product: Bobrick Washroom Equipment, Inc.s Model B-5806 x 36; or equal.
C.
Hand Dryer:
1.
Description: Surface mounted warm air, rapid drying, energy efficient electric hand dryer; surface
mounted; entire dryer internally grounded
a.
Controls: Completely sealed control assembly and optics for protection against moisture,
lint/dust and vandalism. Automatic, activated by infrared optical sensor. Operates while
hands are under blower. Shut-off within 2 seconds when hands removed or in 35 seconds
if hands not removed.
b.
Cover: Stainless steel with brushed finish.
c.
Air Intake: Small circular Inlet openings on bottom of cover.
a.
Air Outlet: Delivers focused air stream of 18,000 LFM at nozzle and 16,000 LFM at
average hand position of 4 inches below air outlet.
b.
Wall Plate: Injection molded, rib reinforced plate with metal L brackets to attach cover,
with ten 5/16 inch (8 mm) diameter holes for surface mounting to wall and three 7/8 inch
(22 mm) diameter holes for electrical wiring; bottom hole suitable for surface conduit.
a.
Electrical Service: Equip hand dryer for 110/120 volt, 12.5 amp and 60 Hz.
2.
Product: Excel Dryer Inc.s Xlerator Hand Dryer Model XL-SB; or equal.
B.
Mirrors:
1.
Description: Stainless steel construction with mirror surface with #8 architectural bright finish
Mirror has /4 inch thick tempered masonite backing and 1.4 inch return on all for sided. Mirror size
18 by 42 inches.
2.
Product: Bobrick Washroom Equipment, Inc.s Model B-1556; or equal.
C.
Toilet Accessories
10 28 13 - 2
D.
E.
PART 2 EXECUTION
2.1
EXAMINATION
A.
Examine areas and conditions under which work of this Sections will be performed and verify that:
1.
Backing not included in work of this section is correct.
2.
Surfaces are dry, clean, free from foreign matter, and otherwise proper for installation.
3.
Toilet compartments to receive accessories have been properly installed and correctly prepared.
4.
That there are no conditions detrimental to timely and proper completion of the Work.
5.
Conditions are appropriate for installation of toilet accessories.
B.
2.2
PREPARATION
A.
B.
C.
2.3
INSTALLATION
A.
Install toilet accessories in accordance with approved manufacturers printed instructions and reviewed Shop
Drawings.
B.
Mounting Heights and Locations: As required by accessibility regulations and as indicated on Drawings.
C.
Install toilet accessories in their proper location, firmly anchored into position, level and plumb,
D.
Attach accessories securely with concealed fastenings unless otherwise noted; insure true alignment.
E.
F.
Installed grab bars shall withstand a minimum load or stress of 250 pounds point load applied at any point.
END OF SECTION 10 28 13
Toilet Accessories
10 28 13 - 3
PART 1 GENERAL
1.1
SUMMARY
A.
1.2
REFERENCE STANDARDS
A.
ASTM International:
1.
ASTM C136 Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates.
2.
ASTM D2419 - Standard Test Method for Sand Equivalent Value of Soils and Fine Aggregate.
B.
1.3
ADMINISTRATIVE REQUIREMENTS
1.
Coordination: Coordinate work specified in this Section with work specified in other Sections to minimize
cutting of and operation of heavy equipment over newly installed surfacing.
2.
Sequencing: Do not install work specified in this Section prior to acceptance of earth moving.
1.4
SUBMITTALS
A.
Product Data.
B.
Certification that
1.
Installer meets specified requirements.
2.
Material meets specified requirements.
C.
Samples:
1.
2.
1.5
QUALITY ASSURANCE
A.
Installers Qualifications:
1.
Installer to provide evidence to indicate successful experience in providing decomposed granite
surfacing containing specified admixture and / or ability to follow installation instructions.
2.
Installed shall have at least 3 years experience in similar work.
B.
Job Mockup:
1.
Construct mockup of 20 square feet minimum of crushed aggregate blended with admixture
surfacing, including edging, at location approved by Architect. Build mockup seven days prior to
installation.
2.
Intent of the mockup is to demonstrate surface finish, texture, color and standard of workmanship.
3.
Notify Architect seven days in advance of mockup construction.
4.
Allow Architect to view and obtain approval of mock-up before proceeding with rest of crushed
aggregate blended with admixture.
5.
Approved mock-up may remain as first in place construction.
1.6
A.
Deliver and store packaged products in original containers with seals unbroken and labels intact until time of
use.
B.
Protect materials / aggregate from contamination with foreign matter. Store under waterproof
cover and protect from dampness.
1.7
SITE CONDITIONS
A.
Do not install crushed aggregate blended with admixture when sub-base is wet at saturated field capacity.
B.
Do not install materials during rainy conditions or below 40 degrees Fahrenheit and falling.
PART 2 PRODUCTS
2.1
MATERIALS
A.
% (Percent) Passing
100
85-100%
70-80%
50-65%
40-50%
B.
C.
Water: Free from contaminants that would discolor or be deleterious to crushed aggregate blended
with GraniteCrete admixture surfacing.
D.
E.
2.2
MIXING
A.
Mix decomposed granite, admixture, and water in accordance with admixture manufactures printed
instructions.
PART 3 EXECUTION
3.1
EXAMINATION
A.
Examine receiving surfaces and verify that surfaces are in proper condition for receiving decomposed granite
paving.
B.
3.2
PREPARATION
A.
Excavation: Excavate to depth required so edges of crushed aggregate blended with GraniteCrete admixture
surfacing will match adjacent grades and have a maximum cross slope of 1 percent. Remove excavated soil
from site.
B.
C.
Base Course Installation: Comply with Greenbook Section 301-2 Untreated Base.
D.
E.
3.3
INSTALLATION
A.
Install decomposed granite paving in accordance with specified manufacturers printed instruction. Do not
allow decomposed granite paving to dry during installation. Mist as necessary to maintain optimum
moisture content prior to compaction.
B.
Grade and smooth to required elevation. Smooth out any final irregularities prior to substantial compaction.
Smooth by using the straight edge of an asphalt rake or a medium bristle broom over entire paving surface.
C.
Compact: After optimum moisture content is achieved for compaction, thus achieving an 88 to 92 percent
compaction. Hand-tamp around benches, sign posts, corners, boulders, etc. Initially use a vibratory plate or
a 1-3 ton smooth double drum roller in static position. Follow with final compaction using a heavy lawn
roller to obtain the final desired dense, smooth, uniform finish.
D.
E.
F.
Cover finished surface, when practical, to achieve maximum curing period. See Section 3.5.
G.
H.
Surface shall follow overall contours of landscape. Flat areas shall be sloped or crowned for drainage. Slope
2.0 percent minimum to drain away from structures.
I.
Completed, finished surface shall be of consistent quality and free of deleterious materials such as organic
materials, nails, stones, and loose material. Surface shall not have depressions or humps greater than 1/4
inch in ten feet.
3.4
PROTECTION
A.
Do not allow traffic on decomposed granite paving for 5 days after placement or until compacted crushed
aggregate blended with admixture has fully cured. Cover for extended curing period.
B.
C.
Repair damaged areas to match specified requirements in accordance with admixture manufacturers printed
instructions.
END OF SECTION 32 15 16
PART 1 GENERAL
1.1
SUMMARY
A.
B.
1.2
SUBMITTALS
A.
Product Data and Shop Drawings showing sprinkler layout and flow characteristics.
diagrams.
Include wiring
PART 2 PRODUCTS
2.1
IRRIGATION COMPONENTS
Electrical Specifications
Planting Irrigation
32 84 00 - 1
Power back-up not required. Nonvolatile memory permanently saves the current programming and a 10
year life lithium battery maintains the controllers time and date during power outages.
Certifications
UL, cUL, CE, CSA, C-Tick, FCC Part 15b, WEEE, S-Mark, IP24
Dimensions
PART 3 EXECUTION
3.1
INSTALLATION
Planting Irrigation
32 84 00 - 2
3.2
END OF SECTION 32 84 00
Planting Irrigation
32 84 00 - 3
PART 1 - GENERAL
1.01 SUMMARY
A.
Provide a Living Roof Substrate Mix using the four components listed below that will meet
ASTM standards as follows:
1. Organic Components:
a. Well-Aged Organic Compost
15%
b. Forest Humus
15%
c. Mineral Aggregates:
1) Scoria/Lava Rock or Pumice
50%
2) Course Sand
20%
B.
Total saturated load of living roof shall not exceed 40 pounds per square foot.
PART 2 - PRODUCTS
2.01 SUBSTRATE CONSTITUENTS
A.
Living Roof Substrate Mix: 15% well-aged compost, 15% forest humus, 50% lava rock (3/8
scoria), and 20% course sand.
B.
32 91 13 - 1
Vanadium:
Zinc:
32 91 13 - 2
PART 1 GENERAL
1.1
SUMMARY
A.
B.
Common
Yarrow
Armeria maritima
Size
Qty
4pot
17
Sea Thrift
4pot
48
Corethrogyne filaginifolia
Beach Aster
4pot
26
Danthonia californica
Calfornia Oatgrass
2 plug
30
Dudleya caespitos
Sea Lettuce
4pot
40
Dudleya fainosa
Bluff Lettuce
4pot
40
Erigeron glauca
Seaside Daisy
4pot
32
28
Sidalcea maelveflora
Checkerbloom
4pot
23
Blue-eyed Grass
4pot
33
END OF SECTION 32 93 00
Plant List
32 93 00 - 1