Best Practice Guide for Planning
Responsibility for the contents and presentation of findings and recommendations rests with the study team.
The views and opinions expressed in the report do not necessarily correspond with those of Norad.
Prepared by:
Solveig Ulseth and Joakim Arntsen, Norplan AS
NORAD
Guide for Rural Electrification Planning
Page i
EXECUTIVE SUMMARY
The impact and approach of Norwegian development assistance to rural electrification has
had large variations in different countries, indicating a potential for improvement through a
consolidated approach. The challenge is to tailor the rural electrification projects towards
achieving basic development objectives such as combating poverty and climate changes,
while promoting gender equality, economic growth, environment protection and private sector
development.
There is no correct way to plan a rural electrification project as projects can be quite different in terms of context and technology. There are however some recurring critical elements
and sustainability issues to consider, and the following guiding principles for the planning of
rural electrification projects are suggested:
1) Rural electrification projects must be consistent with overall plans and institutional arrangement for the country and/ or region. If a project is part of a national/ regional
master plan it is easier to avoid assistance to projects influenced by ad-hoc factors or
local/ political interests. The development assistance should be coordinated and harmonized with other donors plans for the sector.
2) Electrification through grid expansion should be first priority when feasible. Due to its
high quality services, potential for economic development and the possibilities in a diversified production system, grid extension should always be the preferred solution
when feasible. Feasibility should attach importance to factors like distance to the existing grid (cost) and potential customer base (income). Using cost-effectiveness criteria ensure the financial stability of the service provider, and the feasibility of the
project (investment, operation and maintenance).
3) Off-grid systems should be considered when grid extension is not feasible. Off-grid
solutions based on renewable energy technologies (small hydro, solar PV, wind power, biomass) should be the preferred alternative to reach rural communities when grid
extension is not feasible. The final choice of technology must be based on the recipient countrys overall strategic priorities; however, mature technologies with proven
performance such as hydropower should always be preferred.
4) Rural electrification projects must be institutionally viable. Projects are institutionally
viable when they have adequate organization and funding for operation, maintenance
and follow up. Capabilities and plans to manage operation and maintenance should
be assessed for each project. Appropriate models for local ownership, operation and
maintenance should be selected. If the organization lacks competence, support to
training and other arrangements for institutional strengthening might be required,
such support may be necessary for a considerably longer time than what is necessary for constructing the physical project.
5) Subsidies and other incentives should be considered to optimize economic sustainability. All rural electrification projects should be financially sustainable and economically viable. Expansion of access to electricity will normally require subsidies, but as a
general rule subsidies should not be provided for operation and maintenance costs.
Part of the capital costs for rural electrification is related to the connection of customers. The connection fee is recognized as a main barrier for increasing the number of
connections. A pro-poor approach could be to use subsidies for reduced initial payment.
6) Rural electrification projects should be planned with focus on productive and social
sectors. Lack of knowledge of potential users and lack of financial means to acquire
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page ii
relevant equipment are two of the most important barriers to productive use of electricity in rural areas. Experience shows that lack of cross-sector planning and implementation has resulted in suboptimal effects on economic development and poverty
reduction from electrification. Complementary initiatives to stimulate small-scale business and productive use of electricity should therefore be considered for all rural electrification projects financed by Norway.
7) Social and environmental considerations must be mainstreamed in all project phases.
Both grid extension and isolated grids with central power generation should adhere to
the relevant national regulations on environmental and social management. If these
are lacking or insufficient, international best practice (World Bank) guidelines appropriate to the scale of the project should be used. Gender considerations are best integrated into project design and monitoring if handled already at the onset of planning
and included in preliminary assessments.
8) Training needs at all levels should be assessed and addressed as part of project
planning. This includes both governmental staff, public and private companies, local
communities, providers and consumers. When new organizations are established as
part of the project (energy to new areas, local ownership models, etc.) the need for
technical and managerial capacity building can be substantial. Capacity building and/
or technology transfer must be considered in the planning phase and discussed as
early as possible with the cooperating partner.
Use of result planning and management at an early planning stage is instrumental to increase the probability of achieving wanted effects from rural electrification. Practical examples on use of result management tools for rural electrification projects have been provided in
this report.
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page iii
CDM
DCM
ESAP
ESMAP
F/M
Female/Male
HIV/Aids
IEA
IEG
PfD
PoA
Programme of Activities
PPP
Public-Private Partnership
PV
Photovoltaic
MCDM
MDG
MFA
NGO
Non-Governmental Organisation
Norad
NREL
ODA
O&M
PD
Project Document
PPA
PV
Photo-Voltaic
RE
Rural Electrification
RBM
RETs
SHS
Sida
STD
SWER
UD
WB
World Bank
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page iv
TABLE OF CONTENTS
EXECUTIVE SUMMARY...........................................................................................................................i
LIST OF ABBREVIATION/ ACRONYMS ...............................................................................................iii
TABLE OF CONTENTS ..........................................................................................................................iv
1
1.1
1.2
3.1
3.2
3.3
3.4
3.5
4.1
4.2
4.3
REFERENCES/ BIBLIOGRAPHY
APPENDICES
Appendix 1: List of resources
Appendix 2: Technologies for rural electrification
Appendix 3: Eligibility criteria for selection of system
Appendix 4: Cross-sector planning approaches
Appendix 5: Rural electrification performance indicators
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 1-1
1.1
1
2
IEA, 2006
Norad/UD, 2009
23/10/2009
NORAD
Guide for Rural Electrification Planning
1.2
Page 1-2
The report
This report concludes Norads rural electrification study. It aims at establishing a common platform for Norwegian efforts through a review
of international best practice. The report is intended as a guide for
good project planning of Norwegian supported rural electrification projects.
The focus is on rural electrification and not the broader field of rural
energy. Rural electrification has in this report been defined as grid extensions, isolated grid networks with a centralized power generating
system, and stand-alone electricity systems for individual customers.
Primary target groups for the report are foreseen to be personnel at
Norwegian embassies, Norad and the Ministry of Foreign Affairs
working with energy related development assistance. Other relevant
target groups are energy partners in Norway and Norwegian partner
countries, consultants, NGOs and academia working with Norwegian
energy development assistance.
The report focuses on planning elements that apply to most rural
electrification projects. Inevitably project planning must be adjusted to
the specific context in field as reality differs to the theoretical world.
The report contains four main chapters and appendices.
Chapter 2 presents the essential policy documents and practical manuals guiding Norwegian rural electrification
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 2-1
Local anchoring
3
4
Norad/UD 2007a
Norad/UD, 2009 s 5
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 3-1
3.1
3.1.1
Grid extension
A grid extension is a network expansion from the national power
transmission system to new areas and communities. Due to its flexibility to meet future demand and low maintenance requirements
(compared to isolated grid networks with central power generation)
this should be the preferred solution if feasible. Eligibility of grid extension should mainly be based on consideration of costeffectiveness, and attach importance to factors like distance to the existing grid (cost) and the potential customer base (income). Using
cost-effectiveness criteria will ensure the financial stability of the service provider and the feasibility of the project (operation and maintenance). These criteria will favour grid connections where customers
are many and concentrated, and distance to the existing national grid
network is relatively short.
In many places however, it is a duty and priority for the national utility
to extend electricity to rural areas that do not fulfil the eligibility criteria
of financial operational viability. These cases often imply crosssubsidies between urban and rural areas.
3.1.2
Off-grid systems
If it is found that a grid extension is not feasible, off-grid solutions
should be assessed. Off-grid solutions include both isolated distribution grids (mini-grids) with central power generation and individual
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 3-2
Stand-alone systems Stand-alone systems are power supply systems that only cover the
needs of one single user (household, farm, etc.). Neighbours pooling
resources or paying fee to a generator based on informal agreements
are also considered to be stand-alone systems.
Where the customer base is weak (customers living dispersed, and
little or no productive use of electricity) stand-alone systems should
be considered. Solar PV systems are often considered the most feasible alternative. However, the electricity from PV systems is normally
limited to household lighting and other simple applications, and it is
not sufficient for productive uses requiring high power or much energy. Other technologies such as small-scale wind power or small
fossil fuelled generator sets may be relevant. Where water resources
are available pico-/ micro hydropower systems should be considered
for small communities.
3.1.3
Combined systems
Although grid extension and off-grid systems are discussed separately, they are not mutually exclusive. Grid expansion in rural areas
can never reach all potential customers, and stand-alone systems
can often be an additional component of the project to increase the
coverage and customer base.
Figure 1 illustrates some critical factors and decisions to consider
when selecting technology for a rural electrification project.
Scanteam, 2007
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 3-3
3.2
Institutional models
An efficient and relevant model for ownership, operation and maintenance is a prerequisite to sustain a strong and financially viable utility.
It is important that ownership models are assessed for the individual
projects, as variables are many and no general recommendation on
De Gouvello, 2008
SHS: Solar Home Systems, WHS: Wind Home Systems
8
Norad, 2009
9
IEG, 2008
7
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 3-4
10
Sweco, 2009
However, this also applies to national utilities.
12
Tobich, 2008
11
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 3-5
Capacity building
3.3
13
Note that no there is no experience yet on whether the cooperatives will manage cost of replacing
batteries after approximately 6 years of operation.
14
Norplan 2007b
15
All definitions and information in this chapter are based on Norplan, 2009
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 3-6
Subsidies
Since electricity is seen as a catalyst for economic growth and
development many governments and donors have been willing to
provide subsidies to cover part of the cost of electricity supply. It is
however a question how these subsidies should be granted to
maximize the benefits from the project and at the same time ensure
financial sustainability.
Capital costs
O&M costs
3.3.2
Connection fee
A cost recovery based connection fee usually constitutes a main barrier to customer connections as it is often high compared to income
levels in the local population. It is therefore particularly important to
consider the role of subsidies to reduce the upfront connection fee.
Experience shows that poorer household often have both the ability
16
Note that quality is a concept related to the users needs. The most basic criteria are availability of
power and voltage stability. For more technologically advanced loads frequency stability, harmonic
content and the ability of the source to provide reactive power become relevant. [Sweco, 2009]
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 3-7
and the willingness to pay for electricity consumption, but not for the
connection fee. Subsidies and other alternative mechanisms for financing customer connections could therefore be imperative to obtain
a high connection rate and harvest larger benefits from the investments.
A model can be based on direct subsidies, reduced connection fee
compensated through a higher price per kWh or loan arrangements.
A common subsidy model on connection cost is to have the same initial payment for all customers and a subsidy covering the difference
up to the actual connection cost for each customer. A model for reduced initial payment must make sure that it is encouraging connections, and is easy to understand and implement for the utility. For
more detailed information on alternative subsidy models reference is
made to Norplan (2009).
As an illustration; a success factor in rural electrification programmes
funded by Norway in Northern-Namibia was the provision of free
connections to all public institutions, businesses and households
within 500 metres from distribution transformers (all subsequent
connections 50% subsidised) and introduction of cost-reflective tariffs
to cover operational costs17.
3.3.3
17
Tobich, 2008
23/10/2009
NORAD
Guide for Rural Electrification Planning
3.4
Page 3-8
3.4.1
Productive sectors
Productive use of electricity in rural areas is often related to agriculture production and processing, fish processing and farming, livestock
breeding and other small-scale processing industries as well as tourist activities. Efforts targeting productive use of power may also have
to consider measures to improve access to markets. Economic development is closely linked to productive activities, and strengthening
these will have a direct effect on the sustainability of the rural electrification project. Optimal design should therefore include measures to
both develop existing and initiate new productive activities in the local
area.
18
De Gouvello, 2008
IEG, 2008
20
Tobich, 2008
21
IEG, 2008
19
23/10/2009
NORAD
Guide for Rural Electrification Planning
Social sectors
Page 3-9
Electricity input
Appliances:
Equipment andtools
Bulbs
Electronics
Energyderived output:
Pumping
Altering
Refrigeration
Shaping
Cooking
Lighting
Intermediate output
fromagriculture sector
3.4.2
Cross-sector planning
Methodologies
To optimise productive and social uses of electricity a holistic crosssector planning approach should be adopted. ESMAP has for this
purpose developed two different planning methodologies with opposite approaches for cross-sector rural electrification programmes23.
The systematic approach is used when the rural electrification is
planned without a clear picture of other sector activities are in the
22
23
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 3-10
Financing
3.5
3.5.1
24
25
Norad/UD 2007b.
Ljung, 2007
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 3-11
produce, distribute and use energy. Berthaud (2004) notes that absence of gender considerations in policy and practice is evident in the
energy sector compared to other sectors like health and education.
Energy related issues are often wrongly assumed to be gender neutral26.
Gender in planning
Targeted actions
26
Note that a high percentage of the energy sources in the rural areas in developing countries come
from biomass fuels, which are overwhelmingly the responsibility of women. This report focuses on
electricity provision, and will therefore not consider issues related to biomass fuel or other nonelectric energy.
27
Berthaud, 2004
28
Ljung, 2007
23/10/2009
NORAD
Guide for Rural Electrification Planning
3.5.2
Page 3-12
Anti-corruption efforts
Electricity production, distribution and use generate considerable
cash flows. Experience has shown that corruption in the energy sector takes many forms and appears on many levels, from petty corruption in meter reading and billing to grand corruption29. Rural electrification projects often require large investments in poor areas, creating
new opportunities for personal gain for the people involved. Off-grid
energy systems based on local energy sources provides local people
more control over the supply and reduces the opportunities for corruption. Distribution of electricity in rural areas can involve large numbers of customers each accounting for small shares of final consumption, and corruption in this part of the sector is typically small-scale.30
Generally, possible forms of corruption in rural electrification projects
involve collections and procurement of services and goods, operating
materials and consultants.
The most important activity to curb corruption is ensuring transparency. This includes increased transparency in contracts, transactions
and budgets. Donors should clearly express that no financial irregularities will be tolerated, and stress the need for an appropriate legal
framework, an autonomous regulatory body, and clear guidelines for
accounting practices, auditing systems and financial reporting31. To
prevent possible problems it should be ensured that the planned
funding is sufficient and that the required input is justifiable in terms of
the expected output. The use of monitoring consultants or other independent third parties in contract management can prevent fraudulent
practices.
3.5.3
29
MSI, 2002
MSI, 2002
31
Lovei, L and McKenchie, A, 2000
30
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 3-13
Both grid extension and isolated grids with central power generation
should adhere to the relevant national regulations on environmental
and social management. If these are lacking or insufficient, international best practice (World Bank) guidelines appropriate to the scale
of the project should be used (see Environmental and Social Standards
at
www.ifc.org
and
Safeguard
Policies
at
www.worldbank.org/safeguards)
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 4-1
4.1
Supporting tools
Relevant supporting tools for evaluation and result management are:
Results management in Norwegian Development Cooperation: A
practical guide, Norad, 2008
Development Cooperation Manual, Norad, 200532
Looking Back, Moving Forward, Sida Evaluation Manual 2004
Ten steps to a Result Based Monitoring and Evaluation System,
WB, 2004
Managing for Development Results (www.mfdr.org)
Assessment of Sustainability Element/ Key Risk Factors: Practical guide, Norad 2007
4.2
Project planning
Project proposal
The development partner is responsible for developing a project proposal containing all necessary information on the proposed rural electrification project. Optimally the project proposal should be a result of
a participatory process and dialogue between partner and donor. This
can be achieved through early focus on wanted results through clear
and proactive communication from the Norwegian side.
A project proposal should include:
1) Overall goals and a goal hierarchy, the purpose of the programme
and a result chain
2) Identified sustainability elements, risk factors and mitigating actions
3) Monitoring and evaluation system
4) Relevant feasibility studies and impact assessments
5) Baseline data
Assessment
32
33
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 4-2
whether the rural electrification can contribute to the broader development agenda.
The following questions might be considered when undertaking an
assessment of the sustainability and risk factors of a proposed rural
electrification project:
Technical development
Is the proposed system in line with national priorities and coordinated with other programmes?
Has alternative technological systems for electrification been
considered (grid extension, off-grid or individual systems)?
Has compatibility with future grid services been assessed?
Are there bottlenecks such as capacity shortage in the transmission system, or power or energy shortage in generation? When
will potential or actual bottlenecks be taken care of?
Are locally available energy resources identified and assessed?
Economic development
Have subsidy mechanisms, financing models and other incentives been considered to optimize economic sustainability?
Will the project be financially viable, i.e. generate more income
than the operational costs?
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 4-3
Environmental development
Does the project have potential significant adverse impacts on
the environment (soil, water, air)?
Are there serious land and resettlement issues related to the project?
Result management
Proper result management increase probability of achieving wanted
effects and makes it possible to measure the effects of the rural electrification intervention on people and surroundings. It is important that
due emphasis is given already at the stage of the project proposal.
Result planning
34
35
Norad/ UD 2007b
Norad/UD, 2008b
23/10/2009
NORAD
Guide for Rural Electrification Planning
Page 4-4
Input
(innsatsfaktor)
Activity
(aktiviteter)
Financial assistance
Installation of
generation capacity
Output
(produkter/
tjenester)
Additional generation capacity
Outcome
(brukereffekt)
Impact
(samfunnseffekt)
Enhanced business
environment
Technology
transfer
Competence
Improvements in the
provision of social
services (rural
health sector,
schools etc.)
Higher level of competence. Improved
power system.
Trained personnel,
courses and
reports.
Arrangements
for O&M
Access to
reliable, high
quality energy
services
Enhanced business
environment
Improvements in the
provision of social
services.
(rural health sector,
schools etc.)
Reliable local
power distribution and high
quality energy
services
Enhanced business
environment
Installation of
street lights
New street
lights
Reduced criminality
Connecting new
customers.
Customer connections
23/10/2009
Improvements in the
provision of social
services.
(rural health sector,
schools etc.)
Improved literacy
NORAD
Guide for Rural Electrification Planning
Page 4-5
Table 4-1: Result chain practical examples for use in rural electrification projects
4.3.1
Monitoring of performance
A properly designed monitoring system should provide results information during implementation of the rural electrification project. Progress reports can provide data at output level and measure progress
on key indicators compared with milestones and time schedules. Annual (monitoring) meetings are forums where results are discussed
and possible adjustments can be made. Other possibilities to verify
results are through field visits where stakeholders can be met, or
through reviews assessing progress.
Baseline
Social data (access and use of public services, access to information, communication, etc.)
Economic data (use and consumption of energy, income levels,
employment and economic activities, etc.)
Environmental data (land use, erosion, water quality, etc.)
36
Ihlskog, 2008
23/10/2009
NORAD
Guide for Rural Electrification Planning
REFERENCES
REFERENCES/ BIBLIOGRAPHY
Anderson, R. 2008
Approaches and Financial Models for Scaling up Norwegian Development Assistance to Clean Energy. Norad Report 11/2007
Berthaud, A. 2004
Transfer of Climate-Friendly Technologies. How can NGOs constribute? Report from Norges Naturvernforbund
CMI, 2006
Socio-economic baseline data for rural electrification projects supported by Norway 2005 (Namacurra RE Project). Report prepared for
the Norwegian embassy in Mozambique.
De Gouvello 2008
IEA 2006
Ihlskog, E. 2008
And Then They Lived Sustainably Ever After? Experiences from rural
electrification in Tanzania, Zambia and Kenya. Doctoral Thesis, KTH
Royal Institute of Technology, Stockholm, Sweden.
IEG 2008
The cost of corruption for the poor the energy sector. Viewpoint
207, The World Bank, Finance, Private Sector and Infrastructure
Network, Washington, D.C., 2000
Mostert, W 2008
MSI 2002
Norad 2009
Norad/ UD 2009
Norad/ UD 2008a
Norad/ UD 2008b
23/10/2009
NORAD
Guide for Rural Electrification Planning
REFERENCES
Norad/ UD 2008c
Norad/ UD 2007a
Initiativ for ren energi i utviklingsarbeidet (Clean energy Policy Platform), Norad/UD, 2007
Norad/ UD 2007b
Norad/ UD 2007c
Norad/ UD 2007d
Norad/ UD 2006
Norad/ UD 2005
Norad 2001
Norad/ UD 1999
The Logical Framework Approach (LFA): Handbook for objectivesoriented planning, Norad, 1999
NCG, 1999
Norplan 2009
Norplan 2007
Norplan 2007b
End review of Area Coverage Rural Electrification (ACRE) in Bangladesh. Norad Collected Reviews 15/2007. Norplan in association with
SFA Bangladesh, Oslo, 2007
Scanteam 2007
Sida 2005
Sida 2004
St.meld.nr. 13
Sweco 2009
Sweco 2005
23/10/2009
NORAD
Guide for Rural Electrification Planning
REFERENCES
Winther, Tanja 2006 Social Impact Evaluation Study of the Rural Electrification Project in
Zanzibar, Phase IV (2003-06). SUM, University of Oslo, 2006
World Bank 2009a
Project Appraisal Document for Second Phase of the Energy for Rural Transformation Program, Uganda. World Bank Report No: 47183UG
Ten steps to a result based monitoring system. A handbook for development practitioners. World Bank, Washington, D.C., 2004
kesson, G. 2006.
16.02.09
03.03.09
17.03.09
24.03.09
02.04.09
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDICES
APPENDICES
APPENDIX 1: LIST OF RESOURCES
APPENDIX 2: TECHNOLOGIES FOR RURAL ELECTRIFICATION
APPENDIX 3: ELIGIBILITY CRITERIA FOR SELECTION OF SYSTEM
APPENDIX 4: CROSS-SECTOR PLANNING APPROACHES
APPENDIX 5: RURAL ELECTRIFICATION PERFORMANCE INDICATORS
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDIX 1
Description
Web address
African Development
Bank (AfDB)
www.afdb.org/en/documents/policydocuments
ENERGIA
www.energia.org
ESMAP
On-line database with reports and studies on energy poverty, energy security,
market efficiency and governance, and
renewable energy
www.esmap.org
www.gnesd.org
Renewable Energy
www.renewable.no
www.retscreen.net
www.energyservices.lk
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDIX 2
A high voltage (HV) transmission line with necessary transformers for transport between
existing grid and communities to be connected.
Low voltage (LV) grids distribution grids for distributing the power to consumers. A distribution grid is connected to the transmission line by a step-down transformer.
Advantages:
Additional cost for providing a significant capacity margin is small. Increase in demand is
easy to handle, and all foreseeable power requirements covered.
Limited needs for advanced local organisation, mainly for collecting charges, making
new connections and arranging for maintenance and repair of lines.
Drawbacks:
Substantial investment cost, disfavouring small and dispersed communities (small load)
located far from the grid
High losses in a distribution grid limits the expansion, and power grids are therefore often unsuited for communities living dispersed.
Selection of appropriate service model for connection and metering is of essence to realise
higher connection rates for low-income groups. The technologies most commonly used in
pro-poor service models are pre-payment metering, power limiters and ready boards.
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDIX 2
Pre-payment meter:
Pre-payment meters is a common and well proven solution that allow customers to pay electricity in advance and through this have more control of their own consumption. It may also
improve revenue collection and reduce the losses for the service provider. Traditionally, electricity credits have been purchased from a central office of the service provider. Modern systems (like the future standard pre-payment system of Tanesco in Tanzania - LUKU) open up
for purchase of credits via the mobile network. Prepayment systems are generally more expensive than ordinary meters.
Power limiter:
In small grids where consumption patterns are predictable and transparent, a meter may be
substituted with a power limiter. Power consumption will then be paid as a fixed monthly fee.
This is reducing operational requirements and investment costs. However, a power limiter
will not limit the energy use and the costs may become relatively high.
Ready board:
In an effort to reduce the cost for house wiring and allow electrification of more precarious
dwellings, so called ready-boards have been introduced. A ready-board is a board or
cabinet with the meter, fuses and a few sockets factory-installed. Connection of a house via
ready-board consists of fixing the ready-board at a convenient place in the dwelling and connecting it to the grid. It substantially reduces need for house wiring and allows for simpler
dwellings to be connected to the grid.
Discussion of service models for low-income customers:
The 2005 Tanzania Rural Electrification Study37 discusses service models and subsidy arrangements to achieve higher connection rates for poorer customer segments in rural Tanzania.
1) Service model 1 - standard pre-payment metering: The future standard pre-payment
service model of Tanesco implies relatively high costs for meters and customer attention, and therefore the customers will have to pay a corresponding high connection
fee. In the reference case it is estimated that 5% of the low-income customers will be
connected.
2) Service model 2 ready board with pre-payment metering: In this service model the
ready board should be part of the capital cost and provided to the low-income customers free of charge. The customers should however pay the connection fee. In the
reference case it is estimated that 30% of the low-income customers will be connected.
3) Service model 3 ready board with power limiter: In this service model the ready
board should be provided free of charge. Power limiters are cheaper than meters and
do not imply high connection costs. The customers do not pay a connection fee, but
rather a monthly fee for estimated average electricity use. In the reference case it is
estimated that 45% of the low-income customers will be connected.
37
Sweco 2005
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDIX 2
Isolated grids can normally make better use of energy sources compared to stand-alone
systems (effect of scale)
The system can easily be connected to the national grid if grid extension becomes viable
in the future. Local power plants can export power to grid if costs are competitive.
Main drawbacks:
The available power will be constrained. However, demand in rural areas is normally not
growing quickly.
The investment cost can be adapted to the individual users ability or willingness to pay.
For small loads stand alone systems usually represent the least cost option
Drawbacks:
The available power allows limited household use; lighting, radio/tv and charging of cellphones. It can also be used for some productive uses as light office equipment and
charging of hand tools.
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDIX 2
In the case of battery storage, the system must be carefully sized to the planned load, or
it will malfunction quickly. This requires technical skills, and also regular reinvestments
for replacement of batteries
Battery storage:
The battery storage, when such is needed, is a critical part of the equipment, and it is also
quite costly, representing up to 30% of the total investment for a PV system. It is also sensitive to abuse, and operating the battery outside its design values can drastically reduce its
service life. The battery bank is often the weakest component of the system and the highest
contributor to its life cycle cost. Currently it must be considered that lead-acid battery technology is still the most viable alternative in developing countries. Other technologies, like
NiMH, NiCd, Li-ion etc. are still not so easily available and are more expensive.
TECHNOLOGIES FOR POWER GENERATION
Only the main technologies discussed in the report have been included here. For more new
renewable technology options, reference is made to Sweco (2009).
Pico- and micro hydropower
Pico- (< 10 kW) and micro hydro (< 100 kW) power schemes are normally run-of-the-river
schemes which operate by diverting part or all of the available water flow. Pico-hydro electromechanical equipment is often assembled as one self-contained unit.
Advantages:
It is more cost effective than solar or wind power if there is a good resource available.
Challenges:
Except for the smallest sizes, execution of the civil works requires considerable knowhow.
Small hydropower
Mini-hydro is usually considered to be a hydro power scheme below 10 MW. It is thus already a significant investment, suitable for a large isolated grid or for feeding into a national
grid. In principle, there is no difference between micro- and mini-hydro. However, the size of
the installation means that expert knowledge is required for the design and construction of
the plant.
PV solar technology
The market for photovoltaic technologies has been growing with more than 30% per year for
the last 10 years, and market forecasts are indicating further increased efficiencies and reduced costs. A solar home system consists of a photovoltaic module, a charge regulator, bat-
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDIX 2
tery storage and loads (lights, radio, TV). The smallest systems, only powering one or two
lights, are based on 14W PV modules. About 50 W would do for most uses in a modest rural
home, whereas 300 W would allow a refrigerator. PV systems are also used in isolated grid
systems (at Tangtse in India 100 kW photovoltaic system supplies an average load of about
45 kW).
Advantages:
Size is flexible. The smallest commercial modules are about 14 W, and modules with
power of 150 W and above are commercially available.
Systems can be added to in a modular fashion, thus allowing for capacity increase as
the users wallet permits.
The PV modules are extremely reliable and durable. It is possible to obtain warranties for
25 years.
Challenges:
The cost is relatively high, but may still be least cost for small loads.
High power loads, even for short times, are challenging for battery storages.
Hybrid systems
Diesel engine generators are increasingly being supplemented with renewable energy-based
hybrid power systems. However, also diesel engines in small systems with peaky load profiles can benefit from battery storage, since that allows the engine to run at optimum load for
most of the time. Such a system is often referred to as a hybrid system. Several studies from
Canada indicate that this is highly cost efficient. Wind power or photovoltaics may be added
to such a system for saving fuel. The higher the fuel cost, the more interesting is it to complement the system with a renewable energy sources. Hybrid systems are however complicated and require highly skilled operators.
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDIX 3
N/D > 30 connections/km => Grid extension is likely to be a viable alternative (compared to
off-grid systems)
*
Normally households are the dominating customer group, but usually not all of them will connect. The existence of any high demand, industrial consumers must also be factored in.
38
IEG, 2008
IEG, 2008
40
IEG, 2008
41
Sweco, 2009
39
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDIX 3
P>3xD
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDIX 5
De Gouvello 2008
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDIX 5
Economic development
Key variable
Operation and maintenance
Indicator
Efficiency
Conformance with national standards
43
Technical losses
Compatibility with future grid service
Availability of support infrastructure
Financial perspective
Profitability
Costs for operation and maintenance
Costs for capital and installation
Share of profit set aside for re-investment in electricity service business
Tariff lag
Employment generation
Competition
Improved availability of
social electricity services
Credit facilities
Equal distribution
Global impact
Local impact
Environmental development
43
23/10/2009
NORAD
Guide for Rural Electrification Planning
APPENDIX 5
Capacity strengthening
Client-relation
Stakeholder participation
23/10/2009
Norad
Norwegian Agency for Development Cooperation
Postal address:
P.O. Box 8034 Dep, NO-0030 OSLO
Office address:
Ruselkkveien 26, Oslo, Norway
Tel: +47 22 24 20 30
Fax: +47 22 24 20 31
postmottak@norad.no